Document n9r29MddJ43Yjap93D6VxyoL8

/ PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING MAY 17, 1978 Present: G. W. Bostick P. E. Brubaker J. E. Clark G. A. Danner J. Townsend (for Daues) W. C. Fuller J A Glass H. Nelson (for Lane) P. Payne (for Martini) G E. S ma11 C. M. McCullough D. W. Metten G. T. Ryan H. Lacy (for Trafton) W. H. Triplett 1. REVIEW OF STATISTICS TEXAS CITY SAFETY PERFORMANCE 'SUMMARY APRIL 1978 TOTAL INJURY CASES 1977 1978 MTD YTD MTD YTD 29 184 19 100 RECORDABLE CASES 1977 MTD YTD 1978 MTD YTD (a) INJURIES WITHOUT LOST WORK DAYS (medical treatment only) (b) LOST WORKDAYS CASES RESTRICTED ACTIVITY 0 0 0 3 2 1 28 03 02 **b2 DAYS AWAY FROM WORK CASES 01 01 (C) FATALITIES 000 0 *TOTAL RECORDABLE CASES 0 5 2 11 * A+B+C = TOTAL RECORDABLE INJURIES ** Bt + B2 - (B) TOTAL LOST WORKDAY CASES INJURY RATES PER 200,000 MANHOURS 1977 1978 MTD YTD MTD YTD TIR - TOTAL INJURY RATE 20.93 RIR - RECORDABLE INJURY RATE TLWR - TOTAL LOST WORKDAY CASE RATE DAWR-DAYS AWAY FROM WORK CASE RATE 0 0 '0 TLWR TARGET: 1.45 14.82 13.62 .88 1.43 .35 0 .18 0 (1/2 CHEM . IND. 17.52 1.93 .53 .18 AVG.) April YTD 1978 MCIC - 2.35 .96 .43 SC 002680 STG 2402000 LAM003887 PMSB Minutes - 5/17/78 Page 2 2. PLANT MANAGER'S COMMENTS Phil Brubaker stated that he had received a memo from Earl Brasfield expressing his concern about the increasing number of incidents at our plants which are resulting in injuries, time lost from work, and other near misses. Phil said that Earl was sending Bob Flint to the major MCI plants for a one-to-two day in-depth discussion of safety performance problems, action plans and corrective actions. Bob's visit will be announced as soon as arrangements have been completed. 3. OLD BUSINESS a. Guards for Smooth Rotating Shafts -- Ryan The Safety Advisory Committee recommended and the Plant Manager's Safety Board approved the safety practice which states that guards should be installed over smooth rotat ing shafts exposed between pump bearing brackets and stuffing boxes. Pump stuffing box splash guards used on hazardous and corrosive chemicals are satisfactory under the policy as guards for smooth rotating shafts. b. Railroad Lighting -- McCullough Work is in progress for defining the project to provide improved lighting at railroad crossings to reduce traffic and pedestrian exposure through improved visibility of railroad switching operations. c. Basic Safety Training for Foremen -- Glass The initial basic safety training session has been held and follow-up additional sessions are scheduled to be resumed in June. d. Job Safety Audits/Job Hazard Analysis -- Glass Several training sessions of unit safety promotion teams have been trained on the job hazard analysis technique. The teams have been trained to provide training and follow up on job safety analysis in their own operating areas. This training will be continuing through the summer and will be utilized in the operating areas as appropriate thereafter. e. Critical Reviews -- Glass LAM003888 A listing of critical reviews has been prepared by Materials and Mechanical Technology. Some additional manpower has been assigned to the project for defining and scheduling the critical reviews to be made. The Plant Manager requested that each member of the Board submit a memo stating the status of their inspections of tanks and rotating equipment checks. SC 002681 STG 2402001 From the desk of J, A GLA5S i f STG 2402002 SC 002682 LAM003889 PMSB Minutes - 5/17/78 Page 3 f. Property Loss Incident Notification and Reporting -- Metten A review of the status of this item showed that the P-Bulletin had been issued and information and training sessions were being developed between Safety and Accounting, scheduling of these meetings pending clarification of the minimum loss value to be reported. Target date for these sessions will be sometime this summer. g. Superhazardous Fluid P-Bulletin -- Trafton The proposed P-Bulletin has been circulated and a number of comments have been received. These are being reviewed and are expected to be resolved prior to the next meeting of the Plant Manager's Safety Board. 4. REPORT OF SAFETY ADVISORY COMMITTEE (SAC) -- G. T. Ryan Application of Ground Fault' Circuit Interrupters The SAC Committee reviewed the recommendations of the committee assigned to study the need for use of Ground Fault Circuit Interrupters (GFCI) in various areas throughout the plant. Mike McCullough reviewed the principles and applications and recommended approval of recommendations submitted by the committee. The PMSB approved the recommendation. A copy of "GFCI Recommen dations" is attached. (Appendix A) In addition Plant Engineering: 1) will review specific applications with each manufacturing area responsibility 2) will work in conjunction with CED in oEf-site and construc tion requirements 3) will develop outline of total program and review or circu late to PMSB 4) will commence orderly installations after all of the above 5) will develop "P" bulletin after program tests are underway. 5. REPORT OF SAFETY ADVISORY COMMITTEE (SHAC) -- Triplett a. Emergency Procedure Plan Test Emergency procedure proposed date - J. A. Martin The SHAC Committee proposed that a test of the Emergency Procedure Plan be conducted during the month of June and an outline of the procedures to be used was submitted for PMSB review. The Board approved the plan (Appendix B) with the following suggested changes. SC 002683 STG 2402003 LAM003890 '- PMSB Minutes - 5/17//8 r Page 4 1) The date of the drill has been set for June 20, 1978. 2) A notice about the drill should be placed in the local newspapers. 3) The Texas City Fire and Police Departments and local press should be notified in advance of our plans to avoid any alarm to the community. b. 1978 Annual Housekeeping Inspection Listed below are the committees, their duties and chairmen for the 1978 annual housekeeping inspection. SHAC will be contacting members of the PMSB for people to serve on these various committees. Subcommittee Duties Chairman Pre-inspections 1. Area Inspections 2. Personnel Involvement 3. 1977 Inspection Followup D. R. Wise Annual Inspection 1. Route 2. Timing 3. Tour Guides 4. Team Structure 5. Personal Needs 6. Transportation during Inspection 7. Inspection Format J. Townsend Inspection Brochure 1. Inspection Publicity 2. Brochures Design, Format, Content 3. Distribution 4. Inspection Booklet J. A. Jones Inspector Arrangements 1. Hotel Accommodations J. A. Martin 2. Travel Arrangements 3. Gifts 4. Inspector Information for Paper 5. Information Packets Theme 1. Plant Involvement & Promotion 2. Displays and Presentations 3. Data Research J. A. Glass Entertainment 1. Evening Arrangements 2. Guest List 3. Special Recognition 4. Lunch Arrangements W. H. Triplett SC 002684 STG 2402004 LAM003891 o PMSB Minutes - 5/17/78 Page 5 The Plant Manager requested the preparation of a report on their accomplishments and/or status of recommendations made by last year's inspection team. This report should be prepared in advance so it can be received by the inspection team members prior to their visit to the plant. c. Hourly Safety Committee Meeting A question was raised concerning the operation of the newly revised Hourly Safety Committee and the minutes distributed by that group. Joe Clark will meet with the management group that meets representatives to resolve the concerns of the Plant Manager's Safety Board. d. OSHA Inspection for Contractor Asbestos Handling We have had two visits to J. A. Jones Construction from OSHA regarding proper handling of asbestos. The members of PMSB were urged to become particularly alert to the asbestos handling requirements so that we can maintain compliance with the OSHA standard for work being done in the plant. Copies of the asbestos handling procedures developed by Plant Engineering will be distributed by LP&S to members of the PMSB. A contract employee has been terminated for failure to follow instructions necessary to comply with proper asbestos handling procedures. We are monitoring asbestos work closely with our field inspectors as an added measure to insure compliance. 6. REVIEW OF INCIDENTS a. 4/2/78 b. 4/14/78 c. 4/19/78 d. 5/4/78 Benzene Leaking into North Ditch -- Fuller Alkylation Spill -- Fuller Incident - Pipefitter Twisted Right Ankle -McCullough Condensate Contamination Incident -- Ryan 7. PROPOSED P-BULLETIN P-0139 INSPECTION OF STEAM CONDENSATE TANKS (JAG memo May 2, 1978 to PMSB with Second Draft Attached) -- Glass Many comments and questions were raised and these will be resolved as appropriate within the framework fo the OSHA agreement. Target date for completion is prior to next PMSB meeting. 8. EMERGENCY HEADCOUNT ACCOUNTING PROCEDURE -- Bostick A proposal for emergency headcount accounting was described by George Bostick. The PMSB took no action pending further demonstration of justification for the development of such a computerized procedure. A test of the emergency procedure plant personnel accounting may provide some indication of need for this in the future. SC 002685 STG 2402005 LAM003892 PMSB Minutes - 5/17/78 Page 6 9. CIVIL DEFENSE "HURRICANE HELEN" EXERCISE -- Daues Greg Daues reviewed the results of the Gulf Coast Area Civil Defense "Hurricane Helen" preparedness test held on Friday, May 12. This was primarily a communications network test using hurricane conditions. The local IMA network was used for communications, "problem situations" were developed in the EPP Room and submitted to the City for actions they would take if these conditions truly existed. Shutdown actions and release of people were simulated and records of actions were recorded. A summary report of the test was issued to members of PMSB. An additional test may be conducted in July. vf 6/1/68 Attachments J. A. Glass 7 002686 STG 2402006 LAM003893