TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
.
Anniston
Summary
C. K. Eastman C. A. Rose J, C. Landwehr L. J. Boesch G. W. Hiller W. B. Papageorge W. F. Taffee H. L. Williams
General Offices
,' March, 1969 Cost Improvement Results
Month YTD
42,845 91,460
24,250 64,640
176 141
^ C. Carder /R. Robirds
o'. Danna (5) P. B. Hodges D. B. Hosmer (2) W. A. Kuhn C. F. Luecke N. L. Sample J. E. Smith R. J. Stratmeyer H. S. Trail
OTHER LOCATIONS
D. W. Jackson - WGK
T. M. Patrick -
So. 2nd St.
H, Forsten -
^;
Alvin, Texasj
Organic Division
Estimated manufacturing cost of sodium treating of Santowax R to improve Aroclor 5460 color is $1.04/cwt. New fixed capital is $90,000.
Liquid Aroclor process tentative amendment "B" written pro
posing a reduction in lime usage and increase in biphenyl
yield.
. ' -.
Staley Grade and water-white HC1: Aroclor off-gas catch tank installation 507. complete. -All work halted until Parathion turn-around is completed. Best estimate for start-up now is mid to late April to permit increased recovery. June target still good on coalescer to complete project.
Debottlenecking studies on PNP reactor continued; critical variables on reactor letdown cycles have been identified and are being monitored. Production in March was 1.65 M at . 79% OST; actual_reactor cycle time was 141 min/batch, equi valent to 1.85 M |/mo, at standard 90% OST.
Construction of central Chlorine unloading and Hydrogen Purifi cation facility proceeding per schedule. Target completion is May 1, 1969. Start-up preparations are underway to demonstrate equipment by May 15.
DSW 377666
* "'1/,B68
COMPANY CONFIDENTIAL INFORMATION
"This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant
to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written
approval and the recipient is accountable for its safe keeping, exerpting or otherwise disclosing of its contents and for its proper disposal."
STLCOPCB4099398
Company Confidential 2.
Agricultural Division Plant test of tentative amendment 'X" to Niran process for Acetone Recovery indicates 27% increase in Acetone Recovery at no increase in batch cycle time. Sulfur Recovery has been delayed in CED due to higher priorities. Anniston TSD proceeding to develop scope to help off-set delay.
Design and Drafting Emergency radio communications installation- 50% complete with mid-April target. HC1 Carbon Conveyor - replacing unsafe elevator - started up successfully. Information developed for preparation of Retirement Authority covering Anniston Chlorine Plant and forwarded to CED
Utilities Engineering Project to change Trane Compressor (Niran) from city water to recovered water successfully started up - $1500 per year savings potential.
Process and Quality Analysis The Plant Quality Score was 94.0, down 0.9 from February, with a YTD score of 92.6 against a target of 95.0 minimum. Conspicuous improvement in quality of P2S5 has resulted from efforts by Production supervision to improve raw material phosphorus as received.
rj\. C. Landwehr jw
DSW 377667
STLCOPCB4099399
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUA L JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Sol.Aro.
TAR
2250 2250 2250 2250 2250 2250 2250 2250 2250
Li-Still SpG. EST
AFE 3015 Sp.Solid Aro.
ACT TAR
2600 ?600 p600 2600 2600
fcr\00
2600 2600 2600 -
--
Lower 5060
EST. ACT
1500 5490 4890 1500 5490
Sol.Aro.-Still TAR Coolout temp. EST.
160 170 160 170 160 170 160 170 160
AFE 3015
ACT
Sol .Aro. -Chlortcz TAR
Batch End
EST:
390 390 390 390 390 390 390 390 390
AFE ^015
ACT
SW/R Composition TAR
2750 2750 2750 2750 2750 2750 2750 2750
UST.
AFE 3016
ACT
Solid Aro.
TAR
Montar 5 Flake EST
1080 1030 1080 1080 1080 1080 1080 1080
AFE 2949
ACT
Sol.Aro.
TAR 2.500 2500 2500 2500 2500 500 500 2500 2500 2500 2500 2500
Blend 4465
EST- 1690 1920 16SO ACT 1690 1920
Sol.Aro.-Verti- TAR
cal Still Cond. EST'
AFE 2324
ACT
70 80 70 80 70 70 90 90 70 90
S0l.Aro.Cl2 T/C Dock
TAR EST:
940 940 950 0
AFE 2342
ACT
Cl2 Pit.Down No TAR
Unload
EST-
150 940 950 940 950 940 250
CED 1831
ACT
Solid Aro.-Flake TAR
& Drum
EST.
CED 1430
ACT
3000 3000 5000 5000 5000 5000 5000 5000 5000 5000 5000 5000 0 0 1000 00
Liq.Aro.
TAR 3000 3000
48-53 H #/yr. AFE 2545
EST ACT
0 550C 0 550C
Liq.Aro."No.2
TAR
3000 3000
Still Entrain Sep. EST.
AFE 3093
ACT
Liq.Aro.-Montar TAR
1080 1080 1080 1080 1080 1080 1080 1080 1080 1080
Disposal
EST.
0
AFE 295?
ACT
Warehouse *
CFA 1452
TAR _ - EST;
ACT
2000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
2000 2000 200C 2000 200C
Liq.Aro.New
TAR
Burners $3 Still EST
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 0
ACT
Biphenyl Relocate TAR
500 500 500 500 500 500 500 500 500 500 500 500
No. 1 Preheat CEA 1892
EST ACT
1500 150C
0 1560 0
HB-40 2 A/C's AFE 3102
TAR
EST ACT
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
2230 2580 0
.
3490 2420
'' "-
___ _
DSW 377668
STLCOPCB4099400
ORGANIC division 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR KAY JUN JUL AUG . SEP OCT NOV DEC
Bi0 Improve
TAR
450 450 450 450 450 450 450 450
Tower Treat.
EST
AFE 3155 Improve Pit. Power Factor
-ACT.... TAR
EST
900 900 900 900 900 900 900 900
ACT
Central Air System
TAR EST
1000 1000 1000 1000
ACT
Optimize Rx Time PNP
TAR EST ACT
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500
0 3420 0
Reduce Mole Ratio NaOH/PNCB
TAR EST
4000 4000 4C00- 4000 4000 4000 4000 4000 4000 .. '
PNP ACT
New Wash Water Pump - PNP AFE 2998
TAR EST ACT
25 50 25
50 50 50 50 50 50 50 50
Automatic pH Control
TAR EST
500 500 500
PNP ACT
HC1 Filter Pump
TAR EST ACT
330 330 340
330 33O 340 330 330
New Blow Tank HC1.
TAR EST ACT
200 200 200 200 200 200
200 200 200 200 200
150,000 Gal.-HCl TAR
Storage Tank
EST
1760 1760 1780 1760 1760 1780 1760 1760 1780
AFE 2468
ACT
Produce Staley Grade Acid
TAR EST
Z80. .180 _L90 780 780 790
AFE 3076
ACT
ClgPlt, Shutdown TAR
8880 8880 S880 8880 8880 3880 8880
EST
CEA mi
ACT
Hg Recover from Residue
TAR 250 250 250 250
EST 3910 0
0
ACT 3910 0
Hg Wash Tank AFE 2802
TAR EST ACT
>50 250 250 250
o0 00
0
Biphenyl Productivity
TAR EST
ACT
o' 9u0u l5,0& 5150 10,800
Total Organic By Month M $
Total Organic YTD M $
TAR
EST ACT TAR
EST
17.7 21.2 2A.7 31.9 a.6.7 45.5 46.0 46.0 46.0 47.1 47.9 45,0
27.1 30.2 19.S 28.7 17.7 38.9 o2T 94.6 131.3 176.8 222.9 2S3J9 316.0 16470 412 .C 457.0
46.9 78.8
ACT 19.8 48.5
oSVM 377669
STLCOPCB4099401
AG DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Cooling Tower
TAR
420 420 410 410 420 420 410 420 420
Repiping
EST
AFE 2598 Optimize N2 &
-ACT TAR
6600 6700 6700 6600 67 00 67 00
Clg Levels
EST
ACT
Increase Waste
TAR
400 300 300 400 300 3OO 400 300 300
Acid Sales
ESI
ACT
Chlorinator R.I.
TAR EST
250 250 250 250 250 250 *
AFE 2244
ACT .
EVOP Condensation TAR 750 750 500
500 750 750
Rx.
EST'
0 0 12,615
ACT
00
CI2 Unloading
TAR
5000 5000 5000 2000 2000 2000
ESI
CEA 18^51
ACT
Recycle Wash
TAR
1
290 290 290 g90 290 290
Water
EST'
AFE 2960
ACT
Parathion Recovery TAR
5800 5800 5800
EST
AFE 2655
ACT
Reduce Acetone Losses
TAR EST
4300^4300 4300 '
ACT :
Formulations
TAR
1600 1600 1600 1600 1600 1600
EST
AFE 2897
ACT
Change Cooling
TAR
125 125 125 125 125 125 125 125 125
Item 737
EST
AFE 3067 Well HgO to Jets
ACT TAR
500 500 500
EST
ACT
Ag. Division by Month
TAR 750 750 50C 9145 9145 91 h5 14(475 14(4.P,5 -! Af85 14575 1 AAP, *jmbsEST I2p5
ACT 0 0
Ag. Division YTD
TAR
EST ACT
750 1500 poor 1113 P0P90 P94P5 44 1 O'; 53785 7447 c 3 8 045 10P54I 117015
12,615 00
TAR
EST ACT .
TAR EST
ACT
OS\N 377^70
STLCOPCB4099402
AROCLOR
Company Confidential 3.
E. E. Bowles, C. R. Mcllwain, (V. R. Haupt)
Evaluate QuaterphenylPolyphenyl Effects on Solid Aroclor Yields '
1969 Savings $63,200 NFC $14,000
TSD Objective B-8 (a)
Work started on running conduit and installing control room instruments. Field work scheduled for April. Awaiting receipt of radioactive materials license before radioactive source for level alarm can be shipped.
Low Color Aroclor 5460
New Sales
TSD Objective
________ ________________$90.000 NFC_________________________ B-8 (e)
Completed manufacturing cost estimate for producing low color Aroclor 5460 by sodium treatment of Santowax. Estimated cost is 1.0 cents per pound with $90,000 NFC required, excluding engineering costs.
Therrainol System
Evaluation
TSD Objective
_________________________________________
_____________ :B-8 00
** *
CED and TSD are combining efforts to overcome Therminol distribution pro
blem with insufficient flow to important points and too low flow for ex
pected additions to the system.
CED Project 2080 will cotfer the cost of the new surge tank, the six inch circulating line to the furnace, the main circulating pump, and the Solid Aroclor Expansion Therminol system. TSD Project 3216 will cover the cost of the -ex-iatiag--system circulating pump and the necessary piping changes in the existing system. The TSD Project will also provide for the dis mantling and retirement of the existing Therminol surge tank and pump.
Debottleneck Liquid
Capacity
TSD Objective
Aroclor Stills.Increase;___________________________________________________ B-8 (i)
Anniston PR&D Report 446-506-l discussed the laboratory demonstration of lime requirements of the Liquid Aroclor stills, pointing out the excessive amount of lime presently being added.
Aroclor Standard Manufacturing Process'Tentative Amendment "B" proposes a reduction in lime usage and an increase in the biphenyl yield due to in creasing number of batches between boildown for Montar removal.
OS**161'
STLCOPCB4099403
AROCLOR-SANTOWAX
Company Confidential 4.
W. G. Niemeyer, J. W. McGee, D. A. Self (V. R. Haupt)
Debottleneck Bijihenyl
Capacity
TSD Objective
StillB to 87.6M lbs/yr.Increase________________________
B-7 (a)
CED's work in this area is mechanically complete. However the Santowax C surge tank and new still feed pump have not been put into service as yet. A valve was required in the vent line between the column and surge tank to isolate the two during startup and shutdown of the column.
No. 1 Furnace Upgrade Liaison (CEA-1892);Increase
Capacity
' TSD Objective
___________________________________,B-7 (c)
This project is essentially complete. Remaining work includes: piping insulation, finish grading at benzene storage tank, and minor punch list items.
Improve Santowax R Quality with New Distillation Column
Quality
TSD Objective B-7 (dj
Installation of instrumentation on this project has been delayed by late delivery of instruments and P&S manpower drain for the Niran turnaround. This project should be installed by late April.
Improve Biphenyl Process Knowledge;
Process Study
TSD Objective B-7 (e)
A designed experiment on No. 1 biphenyl furnace was started on March 10 to determine the effects of various process variables. The test was based on three blocks of data, each run at a fixed process outlet temperature. The variables studied were: 1) average radiant coil pressure, 2) promoter concentration, and 3) per cent biphenyl recycled to the furnace. TSD per sonnel monitored the test on a 24 hour basis which was planned for 5-1/2 to 6 days. After 2-1/2 days the test was stopped due to color problems in HB-40, but will be re-run when the Santowax R inventory level is back to normal.
HB-40
V. R. Haupt
Plan for Meeting Product Demands in 1970-1975;
Capacity
TSD Objective B-12 (c)
Sufficient clean hydrogen from the biphenyl tubular units is available to meet 1973's product forecast.
Present autoclaves cannot handle the demand without increasing their size or going to continuous hydrogenation.
DSW 377672 STLCOPCB4099404
CHLORINE
. D. W. Dudley (A. G. McCarty)
Company Confidential 5.
Central Chlorine Unloading _Savings $55.500
TSD Backup of Manufacturing Rep.
TSD Objective B-6 (a)
Construction of central chlorine unloading facility proceeding according to scheduled completion date of May 1, 1969. Don Dudley is assisting in start-up preparations which are underway to meet May 15 demonstration. Rough draft of tentative operating instructions are being revised and training, simulation, and demonstration plans in progress.
HC1 0. J. Norris, G. L. Moore (A. G. McCarty)
Production of Staley Grade
New Earnings $28.8 M
TSD Objective
Acid - Project 5076 .Potential Savings $71 MB-10 (c)
Target date for catch tank installation missed. An work will now be delayed until completion of the Parathion turnaround. Presently this installation is 507. complete. Startup may get under way by late April.
Muriatic Acid StorageSavings $21.200 TSD Job No. 497
Rubber lining complete, pointing 957,, complete. in mid April.
Piping work scheduled to begin
PNP 0. J. Norris, G. L. Moore (A. G. McCarty)
Debottleneck
Capacity
to 1.8 M #/mo.________________ Savings $27,500B-9 (a)
TSD Objective
Reactor operated at 2785 lb/hr rate for 590 hrs.(79% OST) versus standard_of 2700 lb/hr. Adjusted to standard OST of 907. this is equivalent to 1.8J M lbs. per JO day month which exceeds objective B-9 (a) by 3O M lbs. Cycle time on reactor averaged 141 min/batch versus February 151 min/batch. Key process variables on letdowns have been identified and are the major reason for cycle time improve ment. Further optimization of reactor cycle time is still possible with equip ment modifications. Capacity studies on filter and dryer will be necessary as reactor improvement continues.
Revise PNP MIP
Changes being made to rough draft to incorporate comments from TPM review. EDC for revised draft is week of April 7.
DSW 377673 STLCOPCB4099405
Company Confidential 6.
NIRAN
K. G. Hale, D. W. Dudley (A. G. McCarty)
Demonstrate Farathion
Savings $17,500
TSD Objective
Recovery
10-15% Reduced
B-5 (a)
_____ _______________ COD Load________ ;_________________ _____________
Laboratory tests of sequestering agent for chelating iron from waste water to allow filtration were largely inconclusive. No consistent data were obtained on filter life. Program being prepared to pilot test sequestering agent, pre coat filter, and fiberglass coalescing media this summer.
Parathion " Formulations
Savings $10,000
TSD Objective B-5 (f)
Design package for expanding formulation capacity from 65,000 to 77,000 gallons per month was completed and circulated for approvals. Following approval, the package will be filed until future needs require its installation.
Acetone Recovery40-50% COD Reduction
Savings $12,900
TSD Objective
________________________________________ B-5 (i)
Plant test of tentative amendment "A" to Niran process for Acetone Recovery in dicates 27% increase in Acetone Recovery at no increase in batch cycle time on No. 3 reactor. Test on Niran was completed March 28. Tentative amendment "K" to the Methyl Parathion Standard Manufacturing Process is being circulated for approvals. Demonstration of Recovery on Methyl will require approximately one week.
Recycle Wash
Savings $3,500
TSD Objective
Water____________________ ________________ __________
-_______ ________ B-5 (g)
Plant test of revised wash and prewash systems will be delayed until June. Con struction of piping revisions will be completed during March turn-around, and existing system will be used until a controlled plant test shows benefit of new washing arrangement.
Sulfur Recovery
$500,000/yr. Savings
From Residue 40% Reduction in SOpB-5 (d)
TSD Objective
CED has delayed work on the Sulfur Recovery Project due to higher priorities. Anniston TSD will continue work on scope and equipment process design in an attempt to off-set the present delay in CED.
Anniston PR&D is continuing work on corrosion tests and necessary modifications.
DSW 377674 STLCOPCB4099406
Company Confidential 7.
NIRAN (Cont'd)
Submerged Pump for Refractive Index Control of Chlorination'
Savings $1500 (Potential Automation)
TSD Objective B-5 (c)
The Refractometer pump was started and circulated for four days before seal pro blems developed. The pump has been removed and inspected. Some indications of corrosion or mechanical failure are present. Potential modifications to pump and/or seals will be investigated with Taber (Pump Manufactory).
DSW 377674.01 STLCOPCB4099407
Company Confidential 8.
ENGINEERING DESIGN AND SERVICES
Mechanical/Electrical/lnstrument Design and DraftingJ. C. Price. J. A. Veazey. R. L. Brewer, J. K. Rennie, (W. F. Taffee)________________
Installation of emergency communications radio system (AFE 2951 - $14M) is approximately 507* complete. Completion now targeted for mid-April.
Projects forwarded for approval: (AFE 3212 - $3.6 M) Provide Offices for New TSD Personnel. (AFE 3250 - $1.4 M) Purchase Office Equipment for TSD. (AFE 3181 - $.9 M) PgSj Vent Temperature Indicator.
Review drawings were completed for (AFE 3124 - $7 M) Niran Tank Farm Area Lighting, (AFE 3205 - $.7 M) Biphenyl Tank Farm Lighting, (AFE 2934 - $11.3 M) Niran Intermediate Loading Dock, (AFE 3216 - $11 M) Alter Therminol System in Solid Aroclor, (AFE 2949 $12 M) Montar Flaking Pump.
Construction drawings were completed for (AFE 2754 - $22 M) Niran Formulation.
Information for authority for retirement (3214) was prepared and forwarded to CED covering Dismantling and Removal of Chlorine Manufacturing Facilities at Anniston.
Assistance rendered in start-up of HC1 Carbon Conveyer. Provided design services for ten other jobs during the month.
UTILITIES ENGINEERING
J. C. Price, L. 0. Chambers, (W. F. Taffee)
Assisted in start-up of Project 3067 - Cooling Water on Trane Compressors (savings $1500/yr.). Completed preliminary study of possible utilities savings in Biphenyl Department arid forwarded results.for inclusion in Biphenyl MIP. Project 3155 Improve Biphenyl Cooling Tower Treatment was approved, design for this project is completed and ready for drafting. Arranged for emergency treatment to Biphenyl tower because of fouling of heat exchangers by Algae. Manual addition of treating chemicals will be done until equipment for automatic feeding can be received and installed.
PLANT IMPROVEMENT
G. C. Goodwin (W. F. Taffee)
AFE forwarded for Niran loading dock drain pad, Aroclor, Biphenyl and Niran safety shelters. Project premise forwarded for repaving of 7th Street, HCl area drainage. Anniston Plant organization charts were up-dated and published. Contract was signed for preparation of plant maps by photogrammetric methods and necessary ground control provided for photo flights. Design package forwarded to Maintenance for renovating 3*4 floor of Building 28 for operator traning room.
)
DSW 377675
STLCOPCB4099408
POLLUTION CONTROL
E. G. Wright (W. F. Taffee)
Company Confidential 9.
Contact With
Community and Govt.
TSD Objective
Regulatory AgenciesRelationsF-2
Visited city treatment plant one time during March. They have not complained about solids this month.
Waste Audits
Pollution Abatement
. ;___________________________________ ___________________ Li.
TSD Objective
Waste audit plans have been published and distributed. All necessary equipment has been ordered. Will begin audits in April.
Wildlife Study
Pollution Abatement
TSD Objective F-4
Final report was received on the January study. The report has been distributed.
Spills and Emission
Pollution Abatement
Reporting________________________________________ .
TSD Objective _______ F-4
Three reports were received during March. Two were for SO2 fumes and one for Cl2 fumes.
Solids Removal Equipment at Waste Treatment
Pollution Abatement
TSD Objective F-4
Project revision was approved during*March. Project is in Maintenance for planning and scheduling.
Waste Treatment
All wastes were effectively treated during March. Solids have been sewered to the city at a steady rate rather than in "slugs" and they haven't complained. Average daily values for Monsanto's effluent are as follows:
Average Daily
Specifications
PNP 1.2 ppm
5 ppm
COD 58 ppm ^ 200 ppm
Parathion
.08 ppm
1.0 ppm
BOD
6.5 ppm
^ 200 ppm
DSW 377676
STLCOPCB4099409
PROCESS AND QUALITY ANALYSIS
W. B. Dunlap
Company Confidential 10.
Quality
The Plant Quality Score was 94.0, down 0.9 from February, with a YTD score of 92.6 against a target of 95.0 minimum. Conspicuous improvement in quality of PjsS^ has resulted from efforts by Production supervision to improve raw material phosphorus as received.
PNP - Monitor Critical Variables
Potential Savings $60,000
TSD Objective C-3
Job 879
The process controls which are critical in stabilizing the depressurization cycle ("letdown") were identified and tentatively quantified. Operation has been main tained for extended period at rates which eliminate the reactor as the bottleneck in PNP. Immediate future plans include a written description of control relation ships and a full month demonstration run to confirm the improvement.
Manpower
Lamar Murphree was selected as Process Analysis Technician, effective upon his replacement as Laboratory Analyst.
STLCOPCB4099410
PLANT LABORATORIES G. W. Miller PROCESS RESEARCH AND DEVELOPMENT
J. T. Bell
Company Confidential 11.
During the month, 51 mandays out of a scheduled 84 mandays were directed
toward projects outlined in the 1969 PR&D Program. The Blend Scavenger
Refinement (Aroclor) project is 3-4 weeks behind the published work
plan primarily due to the unscheduled effort directed toward improved
HB-40 color improvement. Analytical studies were made to demonstrate
the effectiveness of plant investigations to lower acetone losses in
the Parathion condensation process.
.
p-Nitrophenol;Reduce Cycle Times
W. H. Howard
Construction of the laboratory apparatus to simulate plant PNP production has been completed. The presence of the ortho isomer of nitrophenol has been detected in mix-tank and 216 recycle water apparently at very low concentrations. The study to determine the effects of high solids level and ONP on reactor cool-down rates is being initiated.
Sulfur Recovery;for Reuse
Sulfur Refinement ________________ I. Ransaw______
A method to determine the amount of I^S generated in the first wash step of the Sulfur purification process by trapping the off-gases in a liquid N cold trap has been unsuccessful to date. High levels of ^S are indicated. Corrosion testing has indicated that after 4 days of immersion in water from the third wash step, Hastelloy and 316 stainless were not affected. A work plan for studies involving corrosion and neutralization of wash water has been prepared and is being issued.
Blend Scavenger
Improved Aroclor
Refinement (Aroclor)Electrical Properties
J. L. Brown
The investigation to determine stress voltage vs. resistivity relation ships for Aroclor 1242 and phenyl glycidyl ether has begun after a delay to investigate HB-40 color. Results are inconclusive at this time.
Quaterphenyl Conversion
Possible Montar 9 Utilization
_____________ J. L. Brown
Completion of project awaits instrument repair and special analytical work. No effort expended during report period.
Montar UtilizationRecover Aroclor ValueG. L. Arnett
It was determined that 20 batches of Aroclor 1142 may be distilled over a single lime charge with no abnormal changes in color, free chloride, or hydrolysis stability. Pretreatment of Aroclor 1142 by passing through a column packed with various neutralizing agents was unsuc cessful. The project has been concluded and a report issued.
oSVJ 311618
STLCOPCB4099411
PROCESS RESEARCH AND DEVELOPMENT (Continued)
Company Confidential 12.
HB-40Color Improvement _______________J. L. Brown
Laboratory studies have demonstrated that HB-40 color may be reduced by approximately 40 APHA (Hellige Aqua Tester) by reducing hydrogenation temperature from 250 to 220C. A color dependency of HB-40 on thermal stress of the Santowax R was also demonstrated. The active effort in this area has been terminated.
Parathion Isomer ReductionImprove Yields
__________________ G. L, Arnett
A vork plan has been prepared and is being issued. The laboratory study
has been initiated.
,
Muriatic Acid _______
Lower Organic ContaminantsI. Ransaw
A work plan has been published but laboratory studies will be delayed indefinitely due to expanded work on Sulfur Recovery.
ANALYTICAL AND QUALITY CONTROL
S. 0. Kemp
Complaint Report Quality
None YTD Quality Complaints/100 Shipments 0.11
Service None YTD Qaulity Complaints/100 Shipments 0.0
Target 0.20 Target 0.25
DSW 377679
STLCOPCB4099412
Company Confidential 13.
COMMUNITY RELATIONS. PERSONNEL. RECRUITING. AND DEVELOPMENT
Personnel
1. T. W. Lawrence, Process Engineer, reported to work March 31. He will be working under A. G. McCarty.
2. March 28 Lamar Murphree was promoted to Process Analysis Technician responsible to W. B. Dunlap.
3. K. G. Hale, W. G. Niemeyer and J. T. Bell were judges in the Northeast Alabama Regional Science Fair held Friday, March 28.
4. All members of TSD attended "State of the Division" talk by Mr. Minckler
on March 4.
^
Community Relations
1. On March 26, J. C. Landwehr and H. L. Williams attended "Close Circuit Telecast with Key Members of Nixon Adminstration" sponsored by Anniston Chamber of Commerce in Birmingham.
Development
1. 0. J. Norris attended Process Control Seminar week of March 10 and week of March 24 in St. Louis.
2. J. T. Bell, K. G. Hale, S. 0. Kemp, W. G. Niemeyer and J. A. Veazey attended Management Process Course at Holiday Inn taught by C. K. Eastman, March 2-7, 1969.
Visitors
1. Plant Innovation Exchange was March 20 & 21 and included visitors, Carl Tillstrom of El Dorado Refinery, Don Minges of Avon and Dick Korff of Bridgeview.
2. Bob Yates CED visited concerning Solid Aroclor Expansion March 25 & 26.
3. J. R. Ryland CED Project Manager and Bill Kennedy (E) Estimator for CED 1831 (chlorine unloading) and CED 8008 (dismantle chlorine depart ment) visited the plant March 5 & 6.
DSW 377680 STLCOPCB4099413
' * ' DISTRIBUTION OF TIME BY TECHNICAL SERVICE * - Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec.
PROCESS IMPROVEMENT
NEW PRODUCTS
PLANT
.
IMPROVEMENT
ci ASSIST OPERATIONS
SPECIAL ENGINEERING SERVICES
TECHNICAL MANPOWER
20
10
0 20 3 Ho 10 O
0
u wo 30
t(dA 20
10
0 20
10
0
MISCELLANEOUS ACTIVITIES
AND ABSENCES
--"--- j. j"~" j.- - - - - J j - "
1 ...1 1 -----~ ___j--j.--j--j--j--
iI ii l li I 39 3> i -i--....i j
i I ! L.
Jan. Feb. March Apr. May June July Aug. Sept. Oct. Nov. Dec.
DSW 377681
STLCOPCB4099414
STLCOPCB4099415
LABORATORY ADMINISTRATION *
L
ANALYTICAL SAMPLES
1968
M
r--
56 i
i
52 *
i
48 i
44 40 CisKJfKtifarg
JV 1 1|W/ 1V
M
SO N D
2400
2300
2200
ANALYTICAL MANPOWER
2100 2000
1-------------------- --------------1 1 1 1 1 1 1
1900
1 1 1 <aal.A
1800 ............
1
\
\\
( 11 11700 ____________ _____________ .
________ ]>
--
0.6 Manpower/sample 0.4
0.2
(-------i*
i !1 i
1 i
__j_.
l_____ !_____ 1_____
1 1 1 1
l1 iP 1 "
i_____L,,
i i i
i-- i ii
$/Manhours
11.00 ii
10.00 i i 1
9.00 I I
8.00 1 1 1\
7. Oci _______1_______!____ _
-------- r-------1 i 1 I
1 i
1i ii
ii ---
i i
i. L i____-1____
% Total Plant Operating Cost
2.0 1.5 1.0
0.5
11
------ \-----ZZL
rz 1 ____ L
Overtime %
~T
1
l1
11
1 e32"---- ^r31
11
1967 1963 J
1
FM
i i
A i-i
l 1
DSWf 377683
____
J JA S
i1
1____ 1__
d i
t;i i i
ci !
STLCOPCB4099416