Document n94nEnJmyRzy354qkGdeKy3Xa

Region 6 Compliance Assurance and Enforcement Division INSPECTION REPORT Inspection Date(s): Media: Regulatory Program(s) Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Contact: FRS Number: Identification/Permit Number: Media Number: NAICS: SIC: Facility Representatives: October 1, 2016 Water CWA 308[A][B] Guadalupe-Blanco River Authority Johnson Ranch Wastewater Treatment Facility 30679 Horseshoe Way Path Bulverde, Texas 78163 30679 Horseshoe Way Path Bulverde, Texas 78163 Co mal Cecil Holliday cholliday@gbra.org 110067179047 TX0133815 NA 221320 4952 Cecil Holliday Distribution Operator -- 830.885.2639 EPA Inspectors: State lnspector(s): Other lnspector(s): Title: .".,' -"o' Author: .., "(I') Subject: :2! Keywords: EPA Lead Inspector Signature/Date Supervisor Signature/Date David Long 6EN-WM 214.665.7323 -- Johnson Valley Ranch WWTP Compliance Evaluation Inspection, Bulverde, Coma! County Texas US EPA Region 6 Compliance Assurance and Enforcement Division Dallas TX GBRA Johnson Valley Ranch I WWTP Compliance Evaluation Inspection Report (CEI) Scheme neutral targeted inspection under ACS requirements ~J~ {Inspector name} d (!h. fl-_v:.____ z-4-_;, p {Supervisor name} o413)2ot? -- Date 3 113/;7 Date Johnson Valley Ranch Wastewater Treatment Facility 10/01/2016 Section I - INTRODUCTION PURPOSE OF THE INSPECTION A U.S. Environmental Protection Agency (USEPA) compliance evaluation inspection was performed at the Guadalupe-Blanco River Authority (GBRA)/Johnson Valley Ranch Wastewater Treatment Plant located at 30679 Horseshoe Way Path, in Bulverde, Texas on October 1, 2016. The inspection was conducted under the guidelines established by the USEPA under the National Pollutant Discharge Elimination System (NPDES) for wastewater treatment systems. This scheme neutral targeted site visit was performed as a part of the USEPA Region 6's annual ACS inspection commitment and its' purpose was to inspect and review current operations as compared to their NPDES permit requirements. An entry briefing was conducted by EPA-Region 6 inspector David Long at 11:30 a.m. and the inspector met with Distribution Operator Cecil Holliday who was present for the site tour, data review and exit interview. During the entry briefing, the EPA inspector provided credentials and explained the purpose of the inspection. FACILITY DESCRIPTION The Johnson Valley Ranch WWTP is a minor discharger built to service the Johnson Valley Ranch residential development and has a design flow of 37,500 gallons/day and average daily flow of 22,100 gallons/day. The facility operates under NPDES permit TX0133818 which will expire on March 1, 2018. The discharge from the WWTP is to an unnamed tributary and eventually to Segment Number 1908 of Upper Cibolo Creek in the San Antonio River Basin. The Johnson Valley Ranch residential development collection system currently has two lift stations which feed wastewater to the facility's lift station and, thence, to the facility's headworks and manual barscreens. The head works then feed to the clarifier and aeration basin for primary treatment followed by phosphorus removal and disinfection via gaseous chlorine (Two 150 cylinders are kept on site in a chlorine storage shed). No de-chlorination is required at this facility. The treated effluent is discharged through a 22.5 inch V-notch weir for immediate flow measurement and continuous flow measurement is via an electronic flow meter. Solids are treated on'site and sent via waste haulers to the GBRA Wilbarger Creek WWTP for additional treatment and disposal. The annual sludge Discharge Monitoring Report is submitted by the Wilbarger Creek facility. Section II- OBSERVATIONS The Johnson Valley Ranch WWTP began discharging in October 2015 and is in operation 24 hours each day and seven days per week. However, due to the small size of the facility, operators are not on site on a regular schedule. A Supervisory Control and Data Acquisition (SCADA) system is tied to the facility's lift stations to monitor inflow, and all treatment units are connected to Mr. Holliday's cell phone via an automated callout system which activates when any issues occur within the treatment plant. Additionally, the facility has a backup generator that is designed to power the entire facility in the event of a power failure. All meters had been calibrated on July 29, 2016. 2