FOREWORD
IOR many years builders have been looking for a quick-setcing cement which would speed up the installation of floors and roofs. Thev have demanded that this material be fireproof,
I light in weight, an excellent insulator and withal, it should be economical.
Some years ago Structolite (structural gypsum) was developed and after exhaustive tests both in the laboratory and actual construction, was found to meet, in an ideal way, the strictest requirements of modern building practice.
We strongly recommend Structolite to the architect, the contractor and the owner for use in light occupancy buildings, such as offices, apartments, garages, hotels, hospitals, school buildings and residences.
\
l08007 2ZZ
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
US
6
Modern Building Requires Structolitc
The last decade has brought about manv astounding improvements in the broad held of materials for building purposes. None has been more timely than that shown by manufacturers of steel products available for floor and roof construction. The standard rolled section has been sup plemented by junior beams, pressed and 'welded sections, bar joists and others of a more or less similar character.
In many classes of buildings there has been a limited use of fireproof floor and roof construction, due to the relatively high cost of fireproof systems as compared with combustible construction. The econ omy of Structolite concrete poured on ex panded metal reinforcement in the joist system has overcome this objection, for, with the available light weight steel mem bers, manv variations can be developed. Their use means economy.
Apartments, office buildings, garages, hotels, hospitals, school buildings and residences will use this economical design, and at the same time secure fireproof, in sulating, sound deadening, durable and speedily installed floors and roofs.
Small crew making a record for speedy erection on large theater roof
Structolite Meets These Requirements
Structolite is a quick sec insulating gypsum cement and when properly mixed with aggregate produces Structolite Con crete. Structolite Concrete develops 60 per cent of its ultimate strength within one hour after being poured. This permits work ro continue on cop of the slab, favor ing more rapid erection and eliminating costly protection of the slab over a longer period of time. The plasticity and quick set reduces to a minimum the leakage through the mesh, consequently the loss from this source is practically eliminated.
Light Weight
Light weight materials contribute to a
decided saving in present-davconstruction.
When needlesslv heavv roofs, lloors and
walls are used the owner is penalized not
onlv in the freight,
h a u I, h o i s t a nd
- ~ -.
handling charges,
but most of all in
BB007 122
QutcJc-strt Striictoiuc insures minimum of dripping--Not? clean appearance
--U6S
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
Walking on Structolite deck within an hour after pouring, work speeds materially
the additional dead load, requiring heavier framing, foundations and footings. Weigh ing only 90 pounds per cubic foot, Structolite Concrete is more than one-third lighter than Portland cement concrete.
Fireproof
One of the most important advantages in
Structolite Concrete is its fireproof quality.
Fire applied to a Structolite surface cannot
raise the temperature of the slab higher
than 212 degrees Fahrenheit until com
plete calcination has taken place and the
water of crystallization entirely vaporized.
The application of fire results in a thick
steamy area of uncalcined gypsum which
is a most effective barrier to fire. The fire
test curve in the following diagram shows
the remarkable results of a fire test con
ducted by the Building Department of the
City of New York, co-operating with the
Civil Engineering Department of Columbia
University at the university testing labora
tories in Decem-
-;
ber, 1923- Walls
3 inches thick
and 9 feet high
Ready for the wearing surface. Nailing screeds if nec essary, are set before pouring
by 14 feet long were subjected to a maxi mum temperature of 1,810 degrees Fahren heit. An average temperature of 1,707 degrees Fahrenheit was maintained within this structure for one hour. Immediately
following, a stream of water from a l}/g-
inch nozzle at a distance of approximately 8 feet and a nozzle pressure of 50 pounds was directed against the superheated wall
1
ifri
S1
i 1AM
Mi O
z
J 3
s
sIT}
f
A\
Y
/
1
V
g r 5
if
rutrEMOtQATUBES OP
MAO.
__1 nd 1
EXTE810B 4UBFACE51 OF DABTmOHO
I? WE TtiTi HADE DE{,19,ISU,
1 1 1 on l II
TWO MONO1LITHIC!. JTOUIC'T-OlLITt CIN1 DEB P1 ABTl T10N4
ATuei { |
"UCftACt TEMPI
ntnetBATuot oun Slot 3U0FACE WEST PA ititic N
J-VIUkL OH1 S.JL
JL. tA
K1
1
1 1
: i
rw
Ta____
~ ~T
I 8: A-LXlBUH
4
This curve shows the average temperature on the interior walls, which
was maintained at 1707 Fahr. for the required period. The maximum war IS 10 Fahr. Notice that the outsides of these walls, only
three inches thick, did not exceed 2100 Fahr.
4
8B007 1224
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
Screening to /mtsh for concrete topping
for 2J/0 minutes. The official report on this test states: "The exterior surface of these partitions as they appeared on the day following the test showed no visible sign that they had gone through a one hour fire and water test." Some of the form marks were still visible indicating that calcina tion from this intense heat and the washing action of the hose stream had not pro gressed to a depth sufficient to damage materially the structural strength of the wall.
Insulation
Gypsum has long been recognized as the only structural building material pos sessing insulation to an efficient degree. Structolite is gypsum treated mechani cally and chemically to increase density and compressive strength. Naturally, Structolite possesses all the insulating qualities of calcined gypsum. The princi pal advantage of Structolite lies in this combination--structural strength and high
Nailing strips clipped diagonally to joists preparatory to pouring Structolite
insulation in the one material, tending to simplify construction and thereby reduce costs.
Conductivity in B, T. U.
loss per hour, per sq. ft.
per degree difference in
Wall Construction
Temperature
Siding, sheathing, studs, lath and plaster on inside................ 37
Siding, paper, sheathing, studs, lath and plaster on inside .30
8r Cement block, stucco, plaster on inside............................... 35
8* Brick wall plastered on inside...............................................36
8* Brick wall Furred and plastered on inside............................ 28
6' Clay tile stucco, plaster on inside......................................... 46
8" Clay tile stucco, plaster on inside......................................... 32
6r Clay tile stucco, furred and plastered on inside................... 40
8* Clay tile stucco, furred and plastered on inside...................30
6* Clay tile, brick veneer and plaster on inside........................27
S* Clay tile, brick veneer and plaster on inside........................23
6* Clay tile, brick veneer, furred and plastered on inside...... 22
8* Clay tile, brick veneer, furred and plastered on inside......20
6" Structolite, stucco, 14* plaster on inside........................16
8'Structolite, stucco, y? plaster on inside........................127
6" Structolite, stucco, furred and plastered on inside...... 143
8'Structolite, stucco, furred and plastered on inside......115
6" Structolite, furred stucco, lA* plaster on inside............ 129
8' Structolite, furred stucco, A9 plaster on inside............ 106
6" Structolite, 4* brick, plaster on inside........................... 12
8* Structolite, 4* brick, An plaster on inside........................... 0995
6* Structolite, 4* stone, A" plaster on inside........................... 152
8* Structolite, 4* stone, A0 plaster on inside........................... 121
6'Structolite, 4* stone, furred and plastered on inside..........136
8WStructolite, 4* stone, furred and plastered on inside..........Ill
The impressive table is for the purpose
of calculating the heat loss in B. T. U.'s
(British thermal
units) per hour, per
square foot, per de-
...------------- x
gree difference in
/
i
/
Structolite floor systems present clean underside for piping and conduits
5
BB007 1225
-U,S -6
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
A rush job successfully done with Structoltce
temperature for different materials. The values given here are compiled from the results of tests at Pittsburgh Testing Lab oratory, University of Illinois, published data by the American Society of Heating and Ventilating Engineers, and tests con ducted by Dr. Severinghaus, of Columbia University on Structolite.
With a floor or roof of Structolite Con crete it is not necessary to add expensive insulators to secure warmth in winter and cool comfort in summer.
Soundproof
Sound-proof construction is highly essen tial in many types of buildings. In apart ments, hospitals, schools, hotels and resi dences the added advantage of sound-proof floors cannot be over emphasized. In apart ment construction it will at once be appre ciated and the tenant frequently is willing
to pav a premium for this feature i ' which can be ogiven , . him at no extra cost
Standard equipment handled this large apartment with Structolite floors throughout
by the use of Structolite Concrete. The minute cells in Structolite rapidly absorb sound, reducing reverberation and prevent ing conduction through the wall to ad joining space.
Adaptability
Any wearing surface may be applied to a Structolite Concrete floor or roof slab. The roof surface is particularly recom-
Even the wood floor could burn u'ichout damaging the Structolite
BB007 1226
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
An Meal roof deck surface for a built-up roofing applied by mopping specification
mended for built-up roof covering applied by mopping specifications. No additional equipment or unusual care is required to install Structolite Concrete. Any ceiling construction may be applied under this type of work. For instance, plaster board may be clipped to the underside of the floor joists and plaster applied in the usual man ner, leaving adequate space within for piping and conduit work. The use of an attached ceiling of this character will in crease the fireproof insulation and sounddeadening qualities of the lloor system.
Where an attractive under-surface is de sired Sheetrock can be substituted for ex panded reinforcement and the joists painted a light battleship gray to harmonize with the Sheetrock, making a very attractive under-surface, having more the appearance
Any type of ceiling may ke attached to this undersurface
of a finished ceiling than a floor construc tion. In the use of Sheetrock it is applied so that joints are hidden by the joists. Welded steel fabric is laid on the fireproof wallboard, and then a Structolite mixture is poured to the desired thickness.
Carpet, linoleum, or rubber tile may be applied successfully, as outlined in specifi cations on page 14. The remarkable strength of this type of slab makes it adaptable to any light occupancy building, thus permitting of its use througnout the construction field.
Weighs only 90 pounds per cu. ft. when dry--even in wet condition it is easily handled and "worked" into place
Apartments such as these should always have Structolite floors
Economy
The economy of Structolite is the result of all these splendid characteristics. Quick set permits rapid erection, low labor costs and earlier occupancy. Light weight means a saving in floor steel, columns and footings. Good insulation saves fuel and heating plant costs. This system is more economical than a flat arch of Portland
( Continued on page 11
1 0088
MADONNA HIGH SC
W. J. Van de:
These Buildings are Built with St
DR. HANSEN CLINIC BLDG., Cleveland, Ohio
Geo. Ebeling, Arch. Jas. L. Hunting Const. Co., Cont.
ST. AGNES SCHOOL, Milwaukee, Wis.
M. A. Pfaller, Arch. Edw. Steigerwald & Sons, Cont.
STORE, OFFICE and APT. BLDG., Cleveland, Ohio
Max Weis, Arch. Ben Zuckerman, Cont.
SARANAC LAKE HOTEL, Saranac Lake, N.Y.
Scopes & Feustmann, Arch. Branch & Callanan, Cont.
BEDFORD SEMINARY, Bedford, Mass.
Walter Fontaine, Arch. Louis C. Cyr, IncM Cont.
8
RIVIERA THEATRE, F
Wood & Drescel, Arch. M
MADONNA HIGH SC
W. J. Van der Meer, Arch. V
SURDAM RESIDENCE
Bley & Lyman, Arch. Al.
KARP THEATRE, Syrac
Thos. L. Tomlins, Arch, P
JOHNSON-BEATRICE
Sidney Cain, Cont.
58007
tolite Concrete Floors or Roofs
ter, N.Y.
& Maggio Co., Inc., Ccmt.
'L, Aurora, 111.
\n Eng.6# Const. Co.,Cont.
alo, N.Y.
escher & Sons, Cont.
4. Y.
irp, Cont.
5., Rockford, 111.
SCANDROLI-ARNOLD APTS., Rockford, 111.
Scandroli Const. Co., Ccmt.
WAUKEGAN HIGH SCHOOL, Waukegan, 111.
Ben Zide, Cont.
ANNUNCIATION B. V. M. PARISH, Aurora, 111.
W.J.Van derMeer, Arch. Wisconsin Eng. 6? Const. Co.,Cont.
STORE BUILDING, Rockford, 111.
Bradley & Bradley, Arch. Tolmie Brothers, Cont.
ST. PHILLIPS SCHOOL, Indianapolis, Ind.
Michaelis Bros., Cont.
9
9B007 1227
6US STRUCTOL1TE CONCRETE FOR FLOORS AND ROOFS
Different Joists, Ceilings and Floor Finishes in Combination with Structolite Slabs
"Pressed and Welded" joist with nailing: strips attached by clips. Ceiling may be Rockiath and plaster
"Junior. Beam" joists, finished floor of wood laid parallel to Joists. Rocklath and plaster ceiling may be used
**Expanded Bar" joist with diagonal nailing scrips and wood floor
"Pressed and Welded" section with Rocklath and plaster for added insulation and protection. Concrete tcearing surface
"Expanded Bar" with concrete wearing surface. Carpetlinoleum or rubber tile can be applied readily to this type
10
BB007 1230
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
6U>S-
Quantities of material per cubic yard of
mixed concrete:
Structolite
600 pounds
Sand
.28 yards
Coarse Aggregate .84 yards
The above sketch shows the use of a suspended ceiling in connection utth our Structohte Concrete Floor Construction.
Note that this type of construction provides excellent opportunities to take care of piping conduits, heat and vent ducts. thus allowing a minimum thickness of floor above.
STRUCTOLITE CONCRETE WITH HY-RI8 REINFORCING
TABLE OF SAFE SUPERIMPOSE!) LOADS IN POUNDS PER SO. FT UNIfORMILY DISTRIBUTED NOTE:- THE LOADS ARE THE SAFE LOADS FOR THE SLAB ONLY.
THE TABULATED LOA0S ARE BASED ON A STRUCTOLITE CONCRETE MIXTURE OF Ht PARTS STRUCTOLITE. Ill PART SAND. ANO <31 PARTS AGGREGATE AND THE FOLLOWING MAXIMUM STRESESS.
FCs2SO SQ. IN. Lst 250.000 FS 16.000* PER SO. IN.
3LA5 DC PTH INCH ZjlNCH 3 INCH
3jCH 4> INCH 4;lNCH
12 INCH 8 25
JOIST SPACING
16 INCH 19 INCH Zl INCH *4 INCH Z6 INCH 30 INCH 32 INCH
457
340 5/2
ns 416 s?z
zzi 3 32 460
153 339 332
136 206 28 6
W7 ITS ZSO
548
396 341
297
458
395 343
445
391
( Continued from page 7 )
cement concrece or the tile and joist sys tem, because there is no form work re quired for Structolite Concrete.
STRUCTOLITE p CONCRETE
FLOOR FINISH _ NOT LESS THAN
IF OF PORTIANO
CEMENT
*___ METAL LUMBER OR STEEL BAR JOISTS
1
wj,|......................................... ..........................................................1
PLASTER
1-- ROCKLATH
SEE TABLE PAGE 11 FOR LOAD CARRYING CAPACITY BASED ON SPAN LENGTH
SCHEME I
Cement Floor Finish
This construction used when a cement wearing surface or a Granolithic or Terrazzp floor finish is desired. Conduits and other piping can be run under the floor or in the slab.
The depth of the Structolite floor slab will be as required by the load'and distance between joists.
The ceiling may be attached directly to the bottom of the metal lumber joists or may be full suspended.
If Granolithic or Terraco finish is to be used then the finish above the slab proper shall be as required by standard practice. When the floor finish is cement, tile, Terrazyo or Granolithic, it is best to lay all piping before lath is placed.
Procedure
The Structolite Concrete slab thickness and joist spacing are determined by the load to be carried and on this page is a cable from which can be figured the most eco nomical construction to meet every con dition.
The joists are placed in the usual manner, firmly held in the masonry with a pin anchor, and either clipped or bolted to intermediate supports. The expanded lath is clipped on top of the joists so that the stiffening rib in the lath is at right angles to the joists and is thus held to prevent displacement while the Structolite Con crete is being poured. The Structolite Concrete is brought to its required thick ness by means of screed strips which mav be removed or left embedded in the slab for nailing ;urposes.
SCHEME II V\ odd Floor Finish Over Fill This construction used when a wood floor finish is desired. Conduits may be embedded in the floor fill, floor slab, or may be run under the floor as shown. Where a minimum depth of floor slab is required, conduits and other piping should be run in space between the floor slab and ceiling.
Test Data
The remarkable strength of this con struction was actually demonstrated by tests conducted at Fort Dodge, Iowa, dur ing the period of March 1 to 20, 1926. The slabs tested at this time consisted of three
11
CD CD
oO
-V
N)
I l I
6US STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
Wood Floor Finish
This construction used when a wood floor finish is desired and conduits or piping are to be concealed in the floor. Conduits and other piping may be run in space between floor slab and ceiling if desired.
View of slab C at bottom of slab showing that reinforcing steel had failed in tension
adjacent spans continuous over two inter mediate supports and were constructed to a total thickness of 2 inches. These slabs are designated as A, B, C, and D, and differ in weight of reinforcement used and sup port spacings only. Slab A had supports spaced 12 inches on centers and was rein forced withTruscon j^j-inch Hy-rib 3 pounds per square yard. Slab B was constructed in exactly the same manner except the dis tance from center to center of supports was 16 inches. Slab C was constructed sim ilarly, but the distance from center to center of supports was 19 inches and the weight of the %-in. Hy-rib was 3K pounds per square yard. Slab D was constructed similarly, except the distance from center to center on supports was 24 inches and t'ie weight of the Hy-rib was four pounds per square yard. These slabs were allowed to dry normally in room temperature from ten to twelve days each after which the load tests were applied. The loads were applied to the slabs by placing l,k2-inch by l>2-inch wood strips exactly in the center of the span and parallel to the supports. On these strips was placed a platform of 1x6 lumber and this supported the test load composed of bags of cement weighing 95 pounds each. In loading slabs A and B, it was found impossible to load to destruc tion due to the fact that the height of the cement was such as to become dangerous to workmen in the immediate vicinity.
The following table gives the results in the ultimate load per square foot uni formly distributed on the slabs:
Panel Ult. Load
Slab
Mesh
Area
Load per sq. ft.
per Panel Conc't'd Uniformly
in Center Disc.
A 3 lb. Hy-rib 4 sq. fc. 3,493 lbs. 1,747 lbs. B --3 lb. Hy-rib 5.33 sq. ft. 3,363 lbs. 2,012 lbs. C aV--3 XA lb. Hy-rib 6.J3 sq. fc. 5,470 lbs. 1,728 lbs. D i s"--^ !b. Hy-rib S sq. fc. 4,025 lbs. 1,006 lbs.
In slabs A and B ultimate load not reached. Test slab was unbroken.
The views of this test are shown in the attached cuts and will be of interest, as they give some idea of the enormous load this slab successfully supported. It was a slab typical of the one we are installing and its construction represents standard practice.
Part ceiling detail shouting Rocklach clipped to metal joists
12
98007 1232
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
U6S--
TYPICAL DETAILS AT WALLS
by the breaking of the reinforcement. Failure occurred in the 4-inch slab at 10,860 pounds (969 pounds per square foot) by the reinforcement mat breaking in ex actly the same manner.
It will be seen readily that this con struction is ideal for light occupancy buildings.
Manufacturing Service
Structolite is produced entirely within our own mills. We control the quality from the time it is mined as gypsum until it is installed as a floor or roof deck in your building. Our thorough inspection of all materials and supervision of manu facturing processes assure you of quality, uniformity and satisfaction. Our many plants, strategically located, can give you prompt and continuous service.
Detail and method of attaching RocUath to metal lumber toith clips
Saturated Slab Tests
A very interesting test was conducted during April and June of 1925 to determine the load-carrying capacity of Structolite Concrete poured on permanent Sheetrock forms and reinforced with galvanized elec trically welded steel fabric. The Structo lite Concrete was mixed in the proportions of 1)'2 parts Structolite, 1 part sand, and 3 parts Anthracite coal cinders. Two thicknesses of slab were tested; 2>2 inches and 4 inches on a 32-inch span.
The slabs were allowed to dry in normal room temperatures for 41 days and then were saturated with water for 48 hours. Immediately after which the test loads were applied. The test loads consisted of gypsum plaster in 100-pound bags concen trated at the Li point by means of a wood loading platform. Failure occurred in the 23'2-inch slab under a maximum load of 5,234 pounds (476 pounds per square foot)
"View of slab with total load of 16,090 pounds, equivalent to 2,012 pounds per square foot uniformly loaded
13
zooee
i
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
Method of installing slab--Sheerrock reinforcement and Structolite
Specifications
Scope of Work--All Hour and root slabs over metal lath shall be the United States Gypsum Company's Structolite construc tion. All slabs shall be of the thickness shown on the plans, and shall be laid level and true, and left in the proper condition required tor the type of floor finish to be used.
Proportions--All Structol ite Concrete used structural!}' in this work shall be of the following proportions, which shall be volumetric:
For the equivalent to a 1: 2: 4 Portland cement concrete:
Shoii'ing method of loading 4" slab. 10,860 founds uere applied before failure
Showing failure of saturated slab after application of 5,234 pounds total load
11'2 parts of Structolite. 1 part of sand. 3 parts of coarse aggregate.
Structolite Cement--The Structolite Ce ment used shall be as manufactured bv the Uniced States Gvpsum Company and shall be delivered to the job in the original packages.
Storage --The Structolite Cement shall be stored in a drv place and shall be well pro tected from the elemencs.
Sand--The sand shall be clean, sharp and well graded. It shall be free from loam or other organic material.
Coarse Aggregate--Coarse aggregate shall be cinders, crushed stone, gravel or slag. Cinders shall be a good grade of power house cinders, containing no large un broken lumps, and shall be reasonably free from unburned coal, powdery ash or other soft material. The proportion of line and coarse material shall be such as to give a reasonably well-graded aggregate.
Crushed stone shall be limestone, craprock or granite, and shall be crushed to such a size as will pass through a ^4-inch ring and be retained on a j4-inch sieve.
14
"
o is>
oj
3 11
STRUCTOLITE CONCRETE FOR FLOORS AND ROOFS
6US
Gravel shall be clean and well graded from T+ to ^4 inches in diameter.
Gravel and slag shall be free from clay or other soft material.
Slag--shall be air-cooled, clean and prop
erly graded from }4 to K inches. Water--The water used for mixing shall
be clean and free from organic substances. Mixing and Placing--The mixing of
Structolite Concrete shall be done in the ordinary concrete mixer, preferably of the tilting drum type. Care must be exercised in dumping all of each batch and keeping the mixer clean generally, so that particles of set Structolite do not remain to acceler ate the next batch. The speed of the drum shall not exceed 20 R.P.M. The predeter mined amount of water shall be introduced into the drum first, and the drum allowed to revolve until the paddles and sides are cleaned from any material left from the previous mix. The feeding hopper should be charged, so that the coarse aggregate is delivered into the drum first to help scour it out. For the same reason if no hopper is used, the coarse aggregate should be placed in the drum first, after the water, and the Structolite last. Just enough water shall be used to insure a thorough mixing of the mass into a workable consistency. (The amount of water required will vary with the dampness of the aggregate.) As soon as the mass has become thoroughly mixed, it shall be removed immediately and placed in the slab. W ith a drum speed of 20 R. P. M., the entire mixing time shall not exceed two minutes after the Structolite and aggregate have been introduced into the drum. Dump at once, do not allow the drum to idle with all or part of the
mix therein and further agitate the mass once the mixing is complete.
Cement or Terrazzp Finish--Where a ce ment or Terrazzo finish is indicated on the plans the top surface of the slab shall be left in a rough condition to insure proper bond between the Structolite and the fin ish. The Structolite slab shall be thor oughly wet down before the finish is applied. Cement finish shall not be less than 3-4 inch in thickness. Terrazzo finish shall be applied according co standard prac tice and this contractor's specifications.
Composition Finish--Where composition finish is indicated on plans, it shall be ap plied as per manufacturer's directions.
Carpet, Linoleum or Rubber Tile Finish-- Where carpet, linoleum or rubber tile fin ish is indicated on the plans, the Structo lite slabs shall be troweled smooth and level, and the top wearing surface applied according to the directions of its manu facturer. A long-handled, double-acting trowel may be used to smooth the top of the Structolite slabs. The slabs shall not be troweled for more than one minute; two or three times over with a steel trowel is usually sufficient.
Roof Slabs--The Structolite roof slabs shall be troweled smooth and level. Where drainage fill is indicated the slab shall be left rough so that the drainage fill will bond satisfactorilv with the slab proper. Before placing drainage fill thoroughly, wet down that portion of the slab on which the fill is to be placed.
Roof Covering--The roof covering shall be applied as quickly as possible after the completion of the Structolite Concrete slab, within twenty days preferably.
United States Gypsum Company
205 WEST MONROE STREET
CHICAGO
15