CONTINENT AI OIL COMPANY CONOCO CHEMICALS Aberdeen, Mississippi
MANUFACTURING PROCEDURE
Department
oar fnrt
Procedure Section Title:.,-Chpm
Issue Number: _1____________
Process Title; T.jirge Reactor Operations Rinsc--M
Issue Dfltr*- 4/11/75
Reason For Issue:
Originated By:..-Gilbert:
*
After the reactor has been rinsed following the dump cycle, it is
*
*
ready to be chem-washed. The chem-wash cycle is necessary to remove
*
any polymer build-up from the reactor condensor, walls, baffles and
4 agitator. This build-up must be removed after every reactor charge.
p
If allowed to remain in the reactor, they continue to grow with each m
successive charge. Build-ups will contribute to high gel, low quality
a
resin and will make reactor dumping very difficult if they get large
,,*
A
4 enough to start breaking off by plugging dump valves and lines.
9
Operators must exercise caution during the chem-wash due to the
fl
caustic in the solution. Be watchful for any line or seal leaks and
+
#
A
*
report any leaks that are found. If a drop of solution should get on an operator, flush immediately with water. Caustic feels slick to the
*
touch and will start burning the skin just a few seconds after contact.
i
m
If the solution should spray over the body, immediately get under a
.
safety shower and remove your clothing. If any should get in an eye, flush
*
*
APPROVALS:
:
*
Department Operations Supervisor:
department Operations Superintendent:
f
PJant Superintendent:
CAM/lpb
1/27/75
CHIEF PROCESS ENGINEER;
- mm w mm m
!*>!
........................ ....
*'
** A
I
m 4 i * *
Date
'
*I
t **
W
7-
7-^0 -7g~
r
XIXMOTTl) VIb:0001027537
i 4
** TpT
i
tf i
I
4
i it
*
**
*#
* *- ft
*i
H.
ye, for at least 15 minutes but until all burning stops and report to
your Supervisor
*i
PROCEDURE
*
*
After giving the Lead Operator notice that the reactor is ready
*
*
for chem-wash, the Reactor Operator: .
*
p
!- Hakes sure the reactor sewer valve is closed.
2. make
This will help determine
during the wash
The Lead Operator Will: 1.
main
CLEANING
3* Open the reactor chem-wash return valve.
5
4*
4. Put
5. from
6* Open the chem-wash pump discharge valve.
*
*
7. Open the condenser chem wash valve.
*
81 Start the chem wash pump.
*
NOTE Have
inform the thru
reactor. When all the solution is in the system, the Lead Operator
make If the operator notes any resin in the bottom of the tank, he will
^e
open the chem-wash tank waive -and wash out to the sewer. This should be done once per shift.
4
\
9 After washing the condenser for ten minutes, close the condcnsor
chem-wash valve.
-2-
VAB.OG01027538
' Ai
%*
*
<
: r-r-
.
* *
* .*
\ *
10. Open the shell (Jacket) chem-wash valve and wash the walls for
ten minutes.
*I
11
4*
make
up tank return valve. When the chem-wash pump loses prime (check
*
all the chem-wash solution has returned.
make
_.
NOTE
At any time a part or full batch of solution is lost or dumped ^ m*
l____ iv t-ft t-h* sewer, notify the Utilities Supervisor. This
must
t the lagoons.
12. Shut off the chem-wash pump.
13*
t
14.
Close reactor chem-wash valves.
a
Open reactor condensor valve.
15* Cut on hot H?0 pumps A & 8 and flush thru
ten minutes.
16. Close condensor valve, open jacket valve. Flush reactor to sewer
for ten minutes.
m
m
* *
*
17, Have the Reactor Operator close the sewer valve.
4
NOTE:
accumulation
mu
Xhis is necessary about two times per week. Follow
*
outlined under lfUscd Chco**Wflch Solution Disposer
*#
;t
t
44
r
*
*
4
m*
-t
-3-
*
f
*
VAB.0001027539
i {)
*4
*
CONTINENTAL OIL COMPANY CONOCO CHEMICALS
Abcrdeon, Mississippi
MANUFACTURING PROCEDURE
Department: Large Reactors
ProcessTitle: Large Reactor Operations
Procedure Section Title.: Full & Partial Swirl Of Reactor
Issue Number: _JLI
Issue Date: A/ll/75
Reason For Issue:...Original Originated By: Gilbert A..Jttoxsan
To assist in the production of quality resin, particularly *low-gel,
*
It has been found that by filling the reactor with water and agitating,
*
the gel count is markedly lower.
FULL SWIRL:
In this swirl, the reactor is almost completely filled with water
The Operator:
1. Has Reactor Operator open man-head
.2 Open main dump valve.
3. Open water charge valve.
4
4. Start both A & B hot water charge pumps.
*
5. Add 1,800 counts of water to reactor (18,000 gallons)
6 Cut off pumps and close valves.
7* Agitate for ten minutes.
%
8#. Open swirl or sewer valve and dump.
*
PARTIAL SWIRL:
APPROVALS:
Department Operations Supervisor:
Department Operations Superintendent:
%
Plant Superintendent:
GAM/Ji>t>
1/27/75
CHIEF PROCESS ENGINEER:
VAD10001027540 ALLMONO 211
4
* **
4
This swirl
same
amount of water used. Charge 44Q counts
same procedure as the full, swirl*
I 4
I
*4 4
follow
`4
T *
*
I
P
**
\
*
4
>
*
4
+
*
**
*
4
I 4
t 4-
A
# 4
*
*
*
4
*
*
4
*
* 4-
*
*
I
a
9
4
4
4
P
*
*
4
4
1
4
* 4
i
4
4
-p
4 1
* *
* *
a
4
*
%
*
VAB.0001027541
t
9
1