Document mz847DbJBKp0Znk4aBgp4n3d
DATE:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
77 WEST JACKSON BOULEVARD CHICAGO, IL 60604
APR O4 2019
SUBJECT: FROM:
CLEAN AIR ACT INSPECTION REPORT InSolution, LLC, Indianapolis, Indiana
Charles Hall, Environmental Engineer ('... ~
AECAB (MN/OH)
THRU:
Brian Dickens, Section Chief AECAB (MN/OH)
TO:
File, InSolution, LLC, Indianapolis, Indiana
BASIC INFORMATION
Facility Name: InSolution, LLC
Facility Location: 5157 East 64th Street, Suite A, Indianapolis, Indiana
Date of Inspection: 25 March 2019
EPA Inspector(s): 1. Charles Hall, Environmental Engineer 2. Marie St. Peter, Environmental Engineer
Other Attendees: 1. Aaron Emmert, Systems Analyst, Enviro-Max, Inc. 2. David Williams, Vice President, Enviro-Max, Inc.
Purpose of Inspection: chloroflurocarbon reclaim Facility Type: chloroflurocarbon reclaimer Regulations Central to Inspection: 40 C.F.R. Part 82, Subpart F
Arrival Time: 2:20 p.m. EDT Departure Time: 3:45 p.m. EDT
Inspection Type: lZl Unannounced Inspection Announced Inspection
1 of2
OPENING CONFERENCE
IZl Credentials Presented ~ CBI warning to facility provided
The following ini:ormmion was obtained verbally from ATTENDEEtS), unless otherwise noted. Process Description: InSolution, LLC (INS) receives R-22 in reusable 30 or SO-pound cylinders. INS weighs the cylinder and tests the contents of the cylinder for refrigerant purity to be assured that no other refrigerants are mixed with R-22. INS then records the weight and purity. If the contents of the cylinder are found to be 100% R-22, INS then uses a Van Steenburgh JV-90 refrigerant reclaimer to remove contaminants including oil and moisture. INS then stores the reclaimed refrigerant in a labeled "Pure" 1000-pound process storage tank. If the contents of the cylinder are less than 100% R-22, INS empties the cylinder into a labeled "Mixed" 1000-pound product storage tank. INS is not equipped to separate refrigerants, and sends the "Mixed" tank to a qualified third party when the "Mixed" tank is full. When the "Pure" tank is full, INS collects and sends a sample to an outside testing laboratory. The site representatives provided a copy of a sample analysis report. It is attached. Ifthe sample passes all of the parameters including moisture content, acidity, chloride content, and purity, INS fills 30-pouud cylinders from the 1000-pound product storage tank for sale.
TOUR INFORMATION
EPA toured the facility: Yes
Data Collected and Observations: were not taken during this inspection. Photos and/or Videos: were not taken during this inspection. Field Measurements: were not taken during this inspection.
SIGNATURES
Lead Inspector:
Section Chief:
2 of2