Document myeRZvrnvMdq0q6Y5MLjyn9B

. i fVt :M INTFRNAL CORRESPONDENCE BE/.JCALS AND PLASTICS P. O BOX 836), SOUTH CPAroOON, WEST VIP.GiNIA 25303 - i; rir Mr. D. L. Johnson 511 -5518 Institute Plant py lO Mr. G. F. Hurley Mr . L. R. Noble Mr. II. L. Robinson Mr . E. C. Shipley Mr. E. J. Tawney dj-c April 9, 1980 r rS d.;,; Technica Center IIJ/EP f c: Asbestos Monitoring at Institut #1 Powerhouse PROJECT Monitor employee exposure to airborne asbestos fibers during removal of insulation from the #2 boiler in the #1 Powerhouse at Institute. DATE OF SURVEY April 3, 1980 DISCUSSION Four Construction employees, three insulators and one laborer, removed insulation from boiler #2 on the third level in the Institute #1 Powerhouse. All employees wore disposable coveralls, gloves and respirators. The insulation was wetted before and during removal and the area was barricaded. An insulator, Mr. B. M. Beckett, and a laborer, Mr. R. D. Ward, wore personal samplers during the removal and bagging operations. The air concentrations of the four samples taken ranged from 0.17 to 0.41 fibers per cubic centimeter of air (f/cc). Since there was no other exposure to asbestos the rest of the day, the eight-hour time-weighted average (TWA) exposures were 0.06 and 0.07 f/cc. The OSHA permissible exposure limit for an eight-hour TWA is 2 f/cc. DATA (Continued on next page) UCC 024524 2 4/9/80 DATE 3/3/80 3/3/80 3/3/80 3/3/80 SAMPLE B.M. Beckett B.M. Beckett R.D. Ward R.D. Ward SAMPLING TIME 0825-0945 1010-1053 0825-0945 1010-1110 AIR CONC. (f/cc) 0.23 0.41 0.17 0.26 TWA (f/cc) - 0.07 - 0.06 REPORT PREPARED BY W. F. Blythe, Jr. WFBJr/sc UCC 024525