Document mrpBRXLgDmL8eQxmJ1QpnK8Z
Monsanto
'
'
r^oN ,naME. locat.oh, E> e. Stewart, Krummrich Plant
May 10, 1972
CC: Art Leisy
SUBJECT
:
ftCFCWENCC
r
PCB - LOSS CONTROL OFF-GAS SCRUBBING
:
TO :
.
i .. .
Messrs. Ken Boucher
Bill Engman Linus Horcher
Dan Lynch Ed Stewart
Neil Thompson
,
The addressees met 5/5 to review the laboratory data
related to off-gas scrubbing experiments currently being
run in the laboratory. The objective of the laboratory
runs is to provide data that can be used to design an
.
off-gas scrubber that can be installed in the plant to
remove PCB*s from the HC1 off-gas from the Aroclor depart- .
ment. PCB*s will be defined for this memo as all chlori
nated biphenyls including the mono chlorinated biphenyls.
I. We will use the following PCB levels as a guideline . to evaluate various scrubbing media.
Daily PCB loss in the off-gas
2.5 #/day ^ 1.0 #/day ^ 0.5 #/day ^ 0.05 #/day(2)
Maximum PCB permitted in the off-gas
Maximum Production Average Production
Rate ( )
Rate
21 ppm 8'
47 ppm 18
-4 0.4
9 0.9
^ ) Would assume an additional 0.5 #/day from rest of Aroclor department, the Incinerator and the Rip Track area..
Assume 0.05 #/day from rest of Aroclor Department, the Incinerator and the Rip Track area.
IN - 10 REV. 1/72
DSW 329980
STLCOPCB4076623
PCB - LOSS CONTROL OFF-GAS SCRUBBING
Page 2 5/10/72 WGK
II. Approximately 40 laboratory off-gas scrubbing experiments were run by passing HC1 through various PCB mixtures, scrubbing the resultant HC1-PCB mixture with different
. scrubbing media in Oldershaw columns and then analyzing the scrubbed HC1 gas to determine residual PCB content.
Resultant PCB's in the HC1 gas scrubbed by various media from some of the data are tabulated below. Results were corrected to 40C by assuming there is a two-fold change . per 10C change in temperature. Each grouping refers to a particular scrubbing liquid.
0XYALC0H0L
OFF GAS CONDENSATE
24 ppm 6 25C
HB 40
6 ppm @ 25C 2 ppm @ 25C 6 ppm @ 25C 9 ppm @ 25 C
(18
66
(118 (27
17ave.)
22 ppm @ 25 *C 8 ppm
17 ppm 10 ppm 20 ppm 40C 25 ppm 40C
(17 ave.)
HB 40 and CARBON 0.7 ppm @ 25C 1242
24 ave.)
1016 DISTILLED BOTTOMS
38
18
6
28 22
8
4 5
(16 ave.)
1242/1254
1109
4 ppm @ 25 C
(17)
2 ppm*
1242 and CARBON
CARBON
1 ppm @ 25C 0.4 ppm @ 25C
3 ppm @ 25 C
8 ppm
DSW 329981
STLCOPCB4076624
PCB - LOSS CONTROL OFF-GAS SCRUBBING
Page 3 5/10/72 WGK
Amounts of PCB present obtained from calculation based on PCB content as measured by control lab using method for PCB analysis in sewer streams. This method does not detect the mono chloro biphenyls present. To all of the above numbers the amount of mono present would have to be added. This is especially true for the off-gas scrubbed with off-gas con densate, 1242 and 1109
Additional data was presented that indicated PCB's scrubbed with C/S could reduce PCB content to 1-5 ppm range. More testing to be done.
III. Possible scrubbing systems to meet various levels are:
Daily PCB loss in the off-gas
Scrubbing Liquid
2.5 #/day
1016 Distilled Bottoms HB 40
1.0 #/day '
Possibly 10l6 Distilled Bottoms HB 40
0.5#/day
Carbon 1016 or HB 40 plus Carbon
0.05 #/day v
Carbon Possibly c/S 1016 or HB 40 plus carbon or C/S
IV. Additional information required
-
A. Lab runs using 5, 10 and 15 plate Oldershaw column using C/S acid needed to design plant C/S scrubber.
B. Analyze off-gas taken from Dept. 217 where a C/S packed tower and demister are present in off-gas line to C/S reactor. Make three runs.
*
C. Analyze off-gas from Dept. 246 using combined analysis of control section for higher PCB's and Linus Horcher's method to determine mono.
DSW 329982
STLCOPCB4076625
PCB - LOSS CONTROL OFF-GAS SCRUBBING
Page 4 5/10/72 WGK
17. Additional information required
D. Incorporate present thinking and off-gas scrubbing possibilities into thinking related to future adiabatic absorber. May want to loc ate adiabatic absorber at Dept. 217.
Next review meeting to be held 5/11/72 @ 3:00 P.M. in Lab Conference Room.
E. E. Stewart Technical Services Department
/tm
OSVM 329983 STLCOPCB4076626