Document mqvVBdbdZb1O1DkLN4gaDLzKO
STLCOPCB4057215
Monsanto
FROM (NAME ft. LOCATION-
p
R. Kucera, W. G. Krummrich Plant
DATE
.
SUBJECT
:
REFERENCE
:
TO :
January 10, 1978
R. A. Pohl B2SB
CC: L Burks
D. Cissell
W. Engman
S . Finkelstein - B3SE
A. Koenig
- B2SK
A. Le isy
A. Lewis
W. Smith
- B3SE
Attached is the status of Aroclor shutdown costs through December and an update to estimated costs for January, prepared by Bill Engman and myself.
/ tm attachment
Paul Kucera
IN 10 REV. 1'72
DSW 442681
STLCOPCB4057216
A R0 C L0 R
SHUT
DOWN
COST
PROJECTION
ACCOUNT
DESCRIPTION
PLANT COST ESTIMATE 4/77
AUGUST SEPT. OCT. NOV. DEC.
DEC.
ACTUAL ACTUAL ACTUAL ACTUAL ACTUAL Y.T.D.
JAN. 1970
702-81467
Retirement Loss Dept. Equip. Capitalized Spares
Total........................................... ....
392M Depreciation 30M
20M 20M 19M 20M 20M 99M 19M
--
1M
--
-- 25M
26M
--
Dismantling Expense Dept. Equip. Shipping & Landfill Tankcars--Remove liners
Total.....................................................
500M 350M 215M
Miscellaneous Total
2M
--
22H
1M
--
22M
2M
--
2LM
3M 15M
--
23M
-- 60M
23M
-- 148M
75M SOM --
144M
721-81451
Decontamination Cleaning Storages & 1016 Col. Incineration of Solvents Tankcar - Replace Valves
Total.....................................................
175M Mlsc. Directs 51M 32M <3)32M 16M 6M 137M --
13M
--
--
10M -- --
10M
--
135M
-- -- -- -- -- -- 15M
Total
51M 32M 42M 16M 6M 147M 15M
745-81468
DecomisslonlnR Expense GIP Inventory Incineration--GIP Inv.
Total...........................................................................
100M 52M
. . 152M
Total
45M
--
45M
32M
--
32M
3M 56M 59M
2M
--
2H
4M
--
4M
86M 56M 142M
Project Related Grand Total
1962M
118M
86M 122M 41M 70M 437M
758-81469
Incineration of 1016 Bottoms on Hand after July shutdown
In--plant incin. -
Mlsc. Directs
Rollins Inc.
Total
*
28M'\ 13M > 37M ' 78M
17M ^ 13M I>
48M ' 78M
1M* 92M 5 3M
26M* 2M
56M 32M
--
18M 18M 36M
19*M 45M 251M 277M
TOTAL
COST........................................
164M
175M
73M 106M
714M
(1) Includes 29M write-off of 141,360 lbs. FG inventory booked at G.O. to General Ledger Account 45-03-46915.
-- --
0
159M
-- -- -- --
159M
(2) Includes 90M credit from accrual for customer returns.
(3) Includes 14M dismantling expense Incurred in Aug., Sept., Oct.
COMMENTS:
Retire when department is dismantled.
nCosts to continue into 1978
t ti
n
m
1st Quarter 1978
Cost to continue into 1978.
DSVV 442682
STLCOPCB4057217
Monsanto ' ' '*
-
,HOM 'NAMI ,WOC`T'ON' p. r. Kucera, W. G. Krummrich Plant
DATt September 22, 1977
SUBJECT WfTEHFNCl
A$oc.ton. - Stot ooo/aj
^'
fT ^
TO Art Leisy
L. Burks W. Engman A. Koenig - B2SK R. Pohl - B2SB
Attached is the cost projection on Aroclor shutdown for 1977, prepared by Bill Engraan and Larry Burks per your request.
/ tm att.
Paul Kucera
IN 10 REV 1 17
qS\N 442683
STLCOPCB4057218
AR0C L0 R
SHUT
DOWN
COST PROJ E C T I 0 N
ACCOUNT 702-81467
_
DESCRIPTION
PLANT COST ESTIMATE 4/77
Retirement Loss Dept. Equip. Capitalized Spares
Total .........................................................
392M 30M
Depreciation
AUGUST ACTUAL
SEPT. EST.
20M 20M --
721-81451
Dismantling Expense Dept. Equip. Shipping & Landfill Tankcars - Remove Liners
Total .........................................................
Decontamination Cleaning Storages & 1016 Col.. Incineration of Solvents Tankcar - Replace Valves
Total..................................................... ....
500M 350H 215M
175M 13M
135M
Miscellaneous Total Misc. Directs Total -
2M -- -- 22M
51M -- -- 5LM
___ --
20M
70M
___ ___
70M
745-81468
Decommissioning Expense GIP Inventory Incineration - GIP Inv.
Total.....................................................
100H 52M
total -
Project Related Grand Total ........................ . 1962M
758-81469
Incineration of 1016 Bottoms on hand after July shutdown.
In plant incin. Misc. Directs Rollins Incin.
45M -- 45M
30M 30M 60M
118M
- 28M > - 13M > - 37M '
150M 90M
Total
78M
'
TOTAL COST.............................................................................. 196K
240M
(1) Includes 29M write-off of 4 141,360 lbs. FG inventory
booked at G.O. to General Ledger Acct. 45-03-46915
(2) Accrual for customer returns.
OCT. EST.
2 0M
25M
-- --
45M
30M 13M
___
43M
10M 30M 40M 128M
90M
218M
NOV. EST.
DEC. EST.
19M 19M30H
40M
--
20M 79M
150M 75M 40M
314M
24M
--
10M 34M
_____
--
20M 20M
,,
-- --
113M
_
-- --
334M
^5> 40M
153M 219M
TOTAL
98M 30M
217M 75M 60M
480M
175M 13M 30M
218M
85M 60H 14 5M 84 3M
183M
1026M
COMMENTS Retire when dept, is dismantled.
Costs to continue into 1978
11 it
"
Hti it
"
Costs to continue into 1978
DSW 442684
STLCOPCB4057219
Monsanto
TROM IN4MC A LOC
K. E. Boucher - W. G. Krummrich Plant
or. 0
SUBJECT RET ERENCt
TO
March 7, 1977 PCB RETIREMENT ^
J. P. Snow B3NC
A. E. Leisy
A. J. Koenig - B2SC
D. Wood
~ ,^B2SD
R. A. PohLl # 132SB
P. Kucera
*
w. C. Engmaa
L. W. Sprandel
Estimates for the retirement and other related cost , of terminating Aroclor operations at WGK are summarized below. These estimates follow the Expense Summary for Accrual Request prepared last fall (copy attached).
Equipment
$M
Asset Value to be Retired Less Accrued Depreciation (as of 8/77) Retirement Loss
(Detail sheets attached)
$3,081 2,715
$ 366
Retained equipment to be transferred to idle equipment will be 12-20M gallon aluminum product storage tanks, 7 other tanks that were not in PCB service and the Aroclor 1016 distillation column.
Present policy is for any Business Group vacating a multi-product equipment center to share in obsolescence losses of the center incurred in the following two-year period. Assuming the plant Aroclor incinerator would discontinue to operate on December 31, 1978, the obsolescence losses for Aroclor would be based on past usage, roughly 70%.
Net Book Value (12/31/78)
-
Charge to Obsolescence $294M x . 70 =
$294M $205M
emz Att.
Kenneth E. Boucher dS\N 442685
STLCOPCB4057220
DOMESTIC FACILITIES AT W. G. KRUMMRICH
Equipment Obsolescence Aroclor Facilities (as of 8/77) Aroclor Incinerator (70% as of 1/79) Net Equipment Obsolescence
Dismantling Expense (1) Equipment - Reduce to Size Tank Cars - (car liner)
M$ $366
205
$500 215
Decontamination Expense (1) Equipment Prepare, Ship and Landfill Tank Cars - ReplaceValves,
etc.
$175 350 135
Decommissioning Expense (1) Captive Spares and Supplies Incinerator Residues
$ 30 240
M$ $571 $715
$660
$270
Total Domestic Expense
$2, 216
(1) Estimated to be within + 15% of expected cost.
OS'N
STLCOPCB4057221
MONSANTO INDUSTRIAL CHEMICALS COMPANY
TERMINATION OF AROCLOR OPERATIONS Expense Summary For Accrual Request
Domestic Facilities @ W. G. Krummrich
Equipment -
Net Book Value @ 8/77
$ 559
. Less Accelerated Depr. Accrual @ 9/76 155
Net equipment obsolescence
Dismantling Equipment Tank Cars
Expense (1) - Reduce to size
- (car liner)
. *
$ 500 215
Decontamination Expense (1)
Equipment
'
Prepare, ship and landfill
Tank cars - Replace valves,
' etc.
~ $ 150
''
300
135
Decommissioning Expense (1) Captive spares & supplies
Incineration Residues
.
.'
.
. $ 30
..
240
.
M$ $404 $715
$585 $270
Total Domestic Expense
. . $1,974
Estimated to be within + 155 of expected cost. DSVJ 442687
STLCOPCB4057222
controller's
OFFICE
.
POLICY AND PROCEDURE
;-------------------------------------------:--------------------------------\
SUBJECT: OBSOLESCENCE EXPENSE
5. Other Accounting Matters
A. It is intended that obsolescence expense will be charged to Business Groups in an equitable manner. In some cases this will require the judgment of the Accounting Department as to the fair and equitable distribution of such expense. The following is intended to illustrate guidelines which will be used, but does not preclude rulings by the MIC Controller under special circumstances.
1. Dismantling and retirement losses will be shared by the Business Groups (Division and Companies) based on a reasonable determination of their usage of assets for:
Common Utilities and services
Multi-product equipment centers
2. The reasonable determination of usage of a facility will be made by refer ence to sales and use quantities produced or consumed as appropriate. Other indicators of usage in the case of service departments may be used as required.
3. Obsolescence expense for products sold to other operating units at a transfer price will remain with the owning Business Group.
4. The usage factors considered in the determination of an equitable distri bution of obsolescence expense will usually be those for the current year of occupancy for the facility. An exception would be made in a year where unusual occupancy would distort the distribution basis, in which
. case the basis will be determined by consultation with the MIC Controller.
5. A Business Group vacating a multi-product equipment center will share
in obsolescence losses of the center incurred in the following two year
period, unless a written agreement to the contrary is made between all
parties.
.
B. The cost of providing supports, etc., for utility lines which may have been attached to a facility to be dismantled will not become part of obsolescence expense. Such costs are normally part of the capital costs of a plant utility distribution system.
DSW 442688
Page 8 of 12 VI-C-1
V
Monsanto
Revised October 1976
STLCOPCB4057223
SUBJECT
:
REFERENCE
:
TO :
May 19, 1977 PCB
M. F. Mee
. Messrs: J. E. Hast injrS A. J. Koenig R. A. Pohl L. B. Rub in J. P. Snow
B2NL B2SK B2SBv^ B2NL B3NF
The PCB retirement and related expense have been up-dated for presentation of a combined Krummrich and Newport re tirement request to the Board.
Based on information provided by the Krummrich and Newport plants, the original obsolescence accrual of $2,767 (Dorn. $1,974M + $793M Int'l) plus accelerated depreciation of $155M or a total accrual of $2,922M is sufficient to cover the expected PCB expenses of retirement, decontamination and dismantling.
Following is a breakdown of of expense:
Current Est. (May 1977)
the
latest USA
estimates bycategory
EX USA
(M's $) TOTAL
Retirement Loss
576
160
736
Dismantling
1,065
126
1,191
Decontamination
323
180
503
Decommissioning Expenses
152
236
388
Contingencies
98 98
Total Estimate
2,116
800
2,916
Accrued Reserves
2,129
793
2,922
The domestic accrual includes $1,859M in obsolescence accounts
for retirement loss, dismantling, and decontamination plus $270M
other accrual for decommissioning expense. The investment tax
credit recapture is only a $14M charge.
v
In addition to the above there is an on-going incineration operation for disposing of PCB's from several sources including customers. There is approximately 1.9Mlbs. on hand to be incinerated and another 2Mlbs. will be generated by the time we shut-down. Part of this will continue to_be incinerated by the plant (1.4Mlbs.) and the balance (2.5Mlbs.) is planned to be incinerated by outside facilities pending liability clearance by legal. This incineration is part of normal operations charged to plant product cost and covered in the plant budget. A rough estimate of this cost is $450M of which approximately $136M will have been accumulated as deferred income from billings to customers for incineration.
DSW 442689
STLCOPCB4057224
May 19, 1977 PCB M. F. Mee
Page -2-
It does not appear that this item should be accrued unless a significant quantity is on hand at shut-down.
Also, in addition to the above, there is a question concerning a possible retirement-in-place of the incinerator facility at the Krummrich plant. If a decision is made by MCI to retire this plant and if it is included with the PCB package it would add approximately $330M (MIC share) to the write-off for retirement loss and decontamination. The gross value of the incinerator is $710M with a net book value of $375M at 9/30/77 with dismantling of $240M. MIC's total share at 75% would be $510M which has not been included in previous economics. I understand the decision on the incinerator is to be made this week.
Please let me know if you wish to discuss this further.
WAS:js
W. A. Smith
os'fl a42690
STLCOPCB4057225
Monsanto
dcc :
f.s. A. E. A. J,C.
D.B.
fark - E2NE Leisy Gallion Weber- B2SK
Hosmer-EISF
MONSANTO INDUSTRIAL CHEMICALS CO. Sauget, Illinois 62201 Phone: (618) 271-5835
May 19, 1976
Mr. Dale S. Bryson, Acting Director
Enforcement Division U.S. EPA, Region V 230 South Dearborn Street Chicago, Illinois 60604
Dear Mr. Bryson:
Your May 7 letter reached me on May 12 with the report on the January 27, 1976 visit attached. Our Mr. Heisler was in contact by phone with your Mr. Zar on Friday, May 14.
Your suggestion for a meeting is appropriate and we would like to schedule one as soon as we have had an opportunity to review your report, along with the Versar report in detail. I'm sure after reading the 250+ page Versar report you realize the complexity of this problem and the recom mendations listed. We will need some time to evaluate these recommendations.
We will be in contact with your office to confirm a meeting as soon as we have completed our evaluation of the recom mendations. I expect this to occur within a few weeks.
Also attached for your information is a copy of statement delivered to Mr. Russell Train on May 13 regarding our position in the PCB business.
Very truly yours
RWF./ap Attachment
R. W. Flint Plant Manager
a unit of Monsanto Company
DSW 442691
STLCOPCB4057226
Remarks - J. C. Weber Meeting with Russell Train, ' Administrator of the EPA - Washington, D.C. May 13, 1976
Good afternoon, my name is Cole Weber. I am manager
of product acceptability for specialty chemicals, including
polychlorinated biphenyl (PCB) dielectric fluids, manufactured
by Monsanto Industrial Chemicals Company, a unit of Monsanto
Company.
When Jack Fitzgerald, a Monsanto vice president and
managing director of this operating unit, met with you in January,
he assured you that Monsanto had no desire to remain inithe PCB
business any longer than necessary. He also stated that as soon
as Monsanto was satisfied that the electrical power supply
industry's needs for usable, acceptable alternate dielectric
fluids had been met by whomever, Monsanto would voluntarily
shut down its PCB manufacturing unit.
I am here today representing Monsanto to reaffirm this
position and to give you a brief update on the status of develop
ment work on possible replacement products. I'll also comment
on the phaseout timetable.
Based on customer feedback, the transformer industry
is apparently leaning towards silicones, which are readily
available, as the leading askarel (PCB) replacement candidate.
We do, however, still sense some reservations on the part of our
transformer customers.with regard to the fire resistance of all
current replacement candidates and are awaiting further clarifi
cation of their evaluation programs.
.
-more-
DSW 442692
STLCOPCB4057227
In the meantime, we have shelved all development work
on our transformer fluid alternates because they simply did not
appear to be able to compete on a cost/performance basis with other
viable alternates.
In the capacitor segment, the trend is currently
.
"towards commodity type solutions which are widely available
in large quantities such as phthalate esters. If this approach
proves satisfactory, it will obviously preclude further consideration
of specialty solutions such as Monsanto's MCS 1238-type technology
which is a proprietary blend specially designed as a capacitor
dielectric. Consequently we are very close to terminating
our development efforts in this area as well.
If the capacitor industry determines that commodity
fluids are indeed the most expedient way to satisfy their cost/
performance criteria, we believe that Monsanto may have viable
candidates to assist them in this approach.
Regarding the phaseout timetable, we are already
involved in the transformer fluid phaseout. Since we
announced our intentions to exit the business, demand for
.PCB-filled transformers has declined substantially. Our trans
former fluid sales in 1976 will be less then half the total
recorded in 1975.
..
When'the capacitor makers complete their evaluation
work and tell us they are satisfied that they have viable alter
nates in hand, we will cooperate fully in an industry-wide
changeover and proceed with the orderly termination of all PCB
production, including Aroclor 1016, the current capacitor industry
standard.
.
DSW 442693
-more-
STLCOPCB4057228
Monsanto is often asked, and indeed pressed, to
establish a firm exit date. We are as anxious as anyone to settle
on a firm timetable so we can complete our exit plan and begin
applying these considerable resources to ongoing programs.
However, to unilaterally set an exit date would be inconsistent
with our long-standing pledge to work with the electrical
industry to replace PCBs in an orderly manner. So, to reiterate,
Monsanto is fully prepared and indeed most anxious to exit this
business at the earliest practical date. We will establish and
begin executing a firm phaseout timetable as soon as we Ni receive a consensus judgement that viable alternates arte in
hand.
'
Thank you.
0O0-
/
STLCOPCB4057229
Monsanto
FROM (NAME & LOCATION
A. E. Leisy - W. G. Krummrich Plant
DATE SUBJECT
May 26, 1976 PCB DISCUSSION - 5/25/76
CC: R. W. Flint C. Paton
REFERENCE
TO
R. A. Pohl B2SB
2 7 197B
B2SK
The discussion held with you, Cumming Paton, and David Wood pointed to certain decisions the W. G. K. Plant felt were needed in the near future. These were:
1. The desirability (need) to set a "cease manu facturing" date.
2. The need to relate this date to cut-off of customer scrap PCB's for incineration at WGK.
3. The need to set a date past which we would stop inventorying PCB's and make "on order" for the customer.
Attachment: Background data reviewed in 5/25/76 discussion.
emz
IN - 10 REV. 1/72
STLCOPCB4057230
DISCUSSION WITH R. A. POHL - 5/25/76
A. Possibility of supplying total Aroclor requirements from England and closing W. G. K. (Do not make 1016 there.)
B. E. P. A. request for meeting and limits they propose:
1. 1 ppb is probably not feasible. Can measure at 10 ppb in sewers but not much less with current procedure.
2. Cost to attempt capital in excess of $1.6 M.
3. Timing probably 1 - 1-1/2 years after request approval.
4. Research work will be needed on carbon treatment before design starts.
5. Losses to air, however minimal, must be resolved. Added money to $1.6 M listed.
6. Decision on what is minimum production to trigger shutdown.
7. System needed to insure we don't get stuck with inventory (produce on order?, etc.).
C. Incinerator
1. Must make decision on when to stop taking scrap pcb.
2. Must raise price to make profit until "1".
3. Plan to burn all PCB now in stock by August, 1976 if we can get
fix on 246 and returns.
This will allow better use of incinerator
for plant and further economies.
D. Reasons why I would rather give E.P.A. shutdown date:
1. Keep them out of plant and have early end possible to reporting. ' We do not report at all now.
2. Reduce possibilities of long term work and expenditures due to back ground levels if we once start reporting.
3. Costs for treating 4500-5000 gallons per minute from plant by carbon separations would be staggering. Both capital and operating.
Generally, other sewers are <10 ppb which is our detection limit with current method. New method will be needed to check lower limit.
DSW 442696
A. E. L.
STLCOPCB4057231
Monsstfto .
FROM (NAME & LOCATI DATE SUBJECT REFERENCE
TO
A. E. Leisy - W. G. Krummrich Plant
May 26, 1976 PCB DISCUSSION - 5/25/76
R. W. Flint C. Paton
MAY 2 7 mb
- B2SK
R. A. Pohl B2SB
The discussion held with you, Cumming Paton, and David Wood pointed to certain decisions the W.G. K. Plant felt were needed in the near future. These were:
1. The desirability (need) to set a "cease manu facturing" date.
2. The need to relate this date to cut-off of customer scrap PCB's for incineration at WGK.
3. The need to set a date past which we would stop inventorying PCB's and make "on order" for the customer.
A. E. Leisy
Attachment: Background data reviewed in 5/25/76 discussion.
emz
DSW 442697
STLCOPCB4057232
-DISCUSSION WITH R.-A.-POHL-----5/25/76 -
A. Possibility o`f~supplying total Aroclor requirements from England and closing W. G. K. (Do not make 1016 there.)
B. E. P. A. request for meeting and limits they propose;
1. 1 ppb is probably not feasible. Can measure at 10 ppb in sewers
but not much less with current procedure. .
--
2. Cost to attempt capital in excess of $1.6 M. " '
3. Timing probably 1 - 1-1/2 years after request approval.
4. Research work will be needed on carbon treatment before design
starts.
_
___ _
5. Losses to air, however minimal, must be resolved. Added money to $1.6 M listed.
6. Decision on what is minimum production to trigger shutdown.
7. System needed to insure we don't get stuck with inventory (produce on order?, etc.).
C. Incinerator
1. Must make decision on when to stop taking scrap pcb.
2. Must raise price to make profit until "1".
3. Plan to burn all PCB now in stock by August, 1976 if we can get
fix on 246 and returns.
This will allow better use of incinerator
for plant and further economies.
D. Reasons why I would rather give E. P. A. shutdown date;
1. Keep them out of plant and have early end possible to reporting. ' We do not report at all now.
2. Reduce possibilities of long term work and expenditures due to back ground levels if we once start reporting.
3. Costs for treating 4500-5000 gallons per minute from plant by carbon separations would be staggering. Both capital and operating.
Generally, other sewers are <10 ppb which is our detection limit with current 'method. New method will be needed to check lower limit.
' DSW 442698
A. E. L.
STLCOPCB4057233
2 0 X 2 0 TO THE IN C H 4 6 1 2 4 0
xu
u a. z a.
4
2s-o tA
/6.r^
/o/6
STLCOPCB4057234
Monsanto
FROM iNAMC & LOCAT
DATE
______________________J. J. Zeman - B2SK
February 10, 1976
.
SUBJECT
PCB Emergency Plan
FEB 17
REFERENCE
TO
D. R. Bishop R. W. Flint M. E. Gibbs W. C. Hammann A. Leisy W. B. Papageorge C. Paton
-ijLk'-'A'i, "Petal' E. M. Potter R. G. Potter G. Roush D. L. Sliney J. C. Weber W. W. Withers/T. H. Bottini D. Wood
CONFIDENTIAL
Attached is your copy of the approved PCB Emergency Plan. This is the official plan to be used in case of a precipitous ban on PCBs. Please contact Ruth Dickey if you need additional copies.
/rd Attachment
DSW 442700
STLCOPCB4057235
Hi-a k
f e E"f g f. 5
PCB EMERGENCY PLAN
J.J. Zeman et al January 9* 1976
DSW 442701
STLCOPCB4057236
PCB EMERGENCY PIAN 1. Scenario 2. Preliminary Actions 3. Emergency Plan A. Immediate B. CAC Decisions C. Follow-up 4. Telephone List
DSW 442702
STLCOPCB4057237
DSW 442703
SCENARIO
STLCOPCB4057238
1. Scenario The plan assumes an immediate ban on production, sale or use of PCB before volume production of MCS 1238 is ready. It is recognized that the actual circumstances may vary from this scenario, so provision has been made to review the plan to assure that it fits before com mitting publicly to the indicated policies. Responsibility for verification of existence of a ban, initiation of this plan and verification of acceptance of responsibilities: R.G. Potter
DSW 442704
STLCOPCB4057239
PRELIMINARY ACTIONS
DSW 442705
STLCOPCB4057240
2. Preliminary Actions
a. Persuade customers to accelerate MCS 1238 approval programs.
Responsibility:
D. Wood (contact by 2/15/76)
b. Confirm no continuing contractual obligations to supply.
Responsibility:
D. Wood (12/31/75) (Done)
c. Prepare survey of Askarel equipment used by Monsanto.
Responsibility:
G.L. Bratsch (request to GLB by 12/22/75) (Done)
d. List corporate sales to all dielectric customers.
Responsibility:
R.E. Hatton (MICC 1/31/76, Corp. 3/31/76)
e. Prepare Tentative P.R. statement.
Responsibility:
D.R. Bishop (1/1/76) (Done)
f. List names of contacts to call at all customers.
Responsibility:
D. Wood (1/31/76)
g. Define detailed decontamination procedure for use at Krummrich and possible adaptation for customers.
Responsibility:
J.R. Savage (1/22/76)
h. Prepare recommendation on advice to customers re decontami nation.
Responsibility:
D. Wood (2/15/76)
i. Develop list of publications for potential ad campaign.
Responsibility:
D.R. Bishop (12/19/75)
DSW 442706
STLCOPCB4057241
IMMEDIATE ACTIONS
DSW 442707
STLCOPCB4057242
3. Emergency Plan
A. Immediate Actions
Timing Day 1
Action
1) Suspend chlorination operations. Suspend shipments from Krummrich Plant and warehouses (Santa Clara, Elizabeth, Los Angeles). Do not recall shipments enroute. Finish any distillation batches under way.
Responsibility:
R.A. Pohl
Contacts:
Krummrich Plant A.E. Leisy R.W. Flint
Warehouses E.M. Potter C.B. Sigler
Day 1
2) Communicate to customers regarding suspension of shipments. Emphasize that this is a preliminary response pending clarification of government and corporate positions.
Responsibility:
D. Wood
Day 1
3) Make preliminary press release (pre pared in advance) stating that opera tions have been suspended and supplying background information on our PCB con trol efforts, status of replacements.
Responsibility:
D.R. Bishop
NOTE: First confirm that action (1) above is in force.
DSW 442708
STLCOPCB4057243
Timing Day 1
Day 2 Day 3
Action
4) Communicate situation to other affected Monsanto operations.
-Krummrich production planning - D.T. Mayer
-Process Chemicals Marketing
(CS Acid, Muriatic)
- J.F. Winkler
-Anniston Plant (Biphenyl)
- W.E. Voss
-Purchasing (TCB, Drums)
- B. Byrne
Responsibility:
E.M. Potter
5) Determine precise details of ban:
Marketing (D. Wood), Product Acceptability (J.C. Weber), Washington Office (W. Easley), Legal (W. Withers/T. Bottini), and report to Business Director.
Coordinating Responsibility: D. Wood
6) Review this plan to determine whether it fits the circumstances and make recommendations to the CAC on policy and implementation.
Responsibility:
R.G. Potter
A**09
STLCOPCB4057244
DSW 442710
STLCOPCB4057245
CAC POLICY DECISIONS
B. CAC Policy Decisions
After the precise nature of the ban has been determined, recommendations will be made on the following points (revised as indicated by the nature of the ban).
Domestic
1. Date of final production.
2. Shipment of inventory.
3. Customer commitment to orders on books but unshipped.
4. Incinerator returns (maximum rate 300,000 pounds per month).
a. All returns invoiced a price to fully cover incineration cost.
b. All customers given equal opportunity to use service.
c. COP to be set up to handle. d. Alert other incinerator services of our policy.
5. No change in policy on refusal to ship transformer makeup requirements to transformer users. They should still obtain product from transformer manufacturer.
6. What assistance we will give on customer plant decontamination.
a. Capacitor/Transformer manufacturers. b. End users <-- will refer to equipment manufacturers
(let our customers know we will do this).
7. Position on replacement fluid from Monsanto.
U.S. Export
1. Recommend cease shipments two months after we cease domestic shipments.
a. Documentation/L of Credit/Import licenses involve longer lead time and possibility of legal liability if we shut off immediately.
b. Additional flexibility in inventory run down.
Ex-U.S.A.
a. Maintain U.K. production and take separate decision within one month of a U.S. ban.
b. MESA should avoid commitment to long term supplycontracts.
DSW 442711
STLCOPCB4057246
FOLLOW-UP ACTIONS
DSW 442712
STLCOPCB4057247
C. Follow-up Actions After CAC Approval of Detailed Policy
Timing
Action
Day 4
l) Appoint Administrative Coordinator for 3-5 month period.
Responsibility:
R.G. Potter
Day 4
2) Briefing meeting to define policy and announce appointment of coordinator to:
a) Business Group b) COP cl Sales Force dl Research e] P.R. f) Washington Office
Responsibility:
R.G. Potter
Day 4 Day 5
3) Notify Customers by:
a) Telephone to most senior management contact -- Marketing
3) b) Certified express letter to:
-- Office of the President -- Purchasing Manager of use locations -- Confirmation to telephone contact
(NOTE: Direct all immediate customer responses to Marketing Group.)
Responsibility:
D. Wood
Day 5
4) Notify Manufacturing, Company-wide, to minimize impact on operation of Askarel units.
Responsibility:
R.A. Pohl to G.L. Bratsch
DSW 442713
STLCOPCB4057248
TimingAction
Day 5
5) Resume production and shipments as permitted by the approved policy, if any.
Responsibility:
R.A. Pohl E.M. Potter
Day 5
6) Brief corporate marketing directors with other sales to dielectric customers on policy.
Responsibility:
D. Sliney
Day 6-8
7) Notify Federal/State agencies of policies.
Responsibility:
Washington OfficeW. Easley
Day 5
8) a. P.R. release on policy.
Day 6
8) b. P.R. prepare Q&A sheet on policy.
Day 10-15
8) c. Arrange series of paid advertisements
Responsibility:
D.R. Bishop
Day 6-7
9) Prepare form letters
a. Transformers users b. Capacitor users
Responsibility:
D. Wood
Day 8
10) Brief U.S. Export Managers on export policy.
Responsibility:
C. Paton/D. Wood
0S\N 442714
STLCOPCB4057249
Timing Week 2-3
Action
11) Management/Marketing meetings with customers
Responsibility:
D. Wood
Week 2
12) Notify U.S. Export Customers of policy.
Responsibility:
Area Managers
Month 2
13) Upon completion of final customer ship ments, move all Monsanto PCB inventories to Krummrich incinerator.
Responsibility:
E.M. Potter
Month 2
14) Initiate decontamination of Krummrich PCB facilities (see detailed decontami
nation plan).
Responsibility:
R.A. Pohl
DS\N 442715
STLCOPCB4057250
TELEPHONE LIST
OS\N 442716
STLCOPCB4057251
4. PCB Emergency Plan - Telephone List
R.G. Potter
Office 4-2142
Home 469-1835
Manufa cturing
R.A. Pohl A.E. Leisy R.W. Flint D.T. Mayer W.E. Voss
4-2243
812-2019 812-2043
812-310
823-205-293
991-5455 966-5608
849-0758 618-286-3^83 205-237-5834
Marketing
C. Paton D. Wood
4-2529 4-2623
227-7581 536-2161
Medical/Prdto Acceptability
J.C. Weber Dr. G. Roush W.B. Papageorge
4-2027
4-2191 4-2086
961-7693 997-2234
878-3513
Legal
W.W. Withers T. Bottini
4-2851 4-2872
227-8345 725-0677
Distribution
E.M. Potter C.B. Sigler R.A. Sipes
'
4-2443
567-6043
4-2428
618-234-9945
4-2431
821-0938
Washington Office W.K. Easley
Public Relations D.R. Bishop
821-4548
301-299-9587
4-2891
469-1377
qS\J\J 442717
STLCOPCB4057252
Monsanto
DATE.
.
SUBJECT
:
RE'ERENCt
:
TO :
IO__ ______ Kucera, W.__ G_,__Krummrich Plant
December 9, 1977
R. A. Pohl B2SB
.cc L Burks
D. Cissell
W. Engman
S . Finkels tein - B3SE
A. Koenig
- B2SK
A. Le isy
A. Lewis
W. Smith
- B3SE
__________f t l ir Attached is the status of ^roclor shutdown) costs through November and an update to estimated costs for December and January, prepared by Bill Engman and myself.
/ tm at t.
Paul Kucera
i N REV. 1 72
DSW 442718
STLCOPCB4057253
ACCOUNT DESCRIPTION
702-81467 Retirement Loss Dept. Equip. Capitalized Spares
Total.................................................
PLANT COST ESTIMATE 4/77
n J l i, u ft 2 P. U i - u u
COST PR 0 J E C T I 0 N
AUGUST SEPT. OCT.
NOV.
NOV.
ACTUAL ACTUAL ACTUAL actual YTD
DEC. EST.
TOTAL YTD JAN . ,, -
u~;
EST. 1978 " COMMENTS
392M
Depreciation
20M
20M
19M 20M 79M 19M 98M 19M Retire when department is
30M
--
1M --
--
1M 30M
31M --
dismantled.
Dismantling Expense Dept. Equip. Shipping & Landfill Tankcars--Remove liners
Total.....................................................
500M 350M 215M
Miscellaneous Total -
2M -- -- 22M
1M --
-- 22M
2M --
-- 21M
3M -- --' 23M
8M -- -- 88M
75M --
--
124M
83M --
--
212M
75M 100M
-- 175M
Costs to continue.into 1978
M"
"
'* "
1st Quarter 1978
721-81451 Decontamination Cleaning Storages & 1016 Col. Incineration of Solvents Tankcar - Replace Valves
Total.....................................................
175M 13M
135M
Misc. Directs Total -
51M
--
--
5LM
32M <3>32M -- 10M
32M 42M
16M 131M
--
131M --
--
10M
--
10M --
15M Cost to continue into 1978.
16M 141M -0- TTR 15M
745-8146$ Decommissioning Expense GIP Inventory Incineration---GIP Inv.
Total. . .
100M 5?M
. 152M
Total -
v ' 45M -- 45M
32M -- 32M
3M
56M 59M
2M
--
_2M
82M SAM 138M
2M
.-- .__ 2M
84M --
56M -- 140M __ 0_
Project Related Grand Total . . . .
.1962M
118H
86M 122M
41M 367M
126M 493H 209M
758-81469 Incineration of 1016 Bottoms on hand after July shutdown.
In-plant incin. Misc. Directs Rollins Incin.1
Total
-
-
28M ^
13H > 37M)
78M
17M 'i 13M } 48M )
78M
1M* 92M 53M
26M* 2H
56M 32M
19M* 27M 233M 241M
__ 19M* -- ` 14M AIM -- 12M 245M -- 26M 267M
TOTAL CO S T - - . .
. . 196M
164M
175M
73M 608M
152M 760M 209M
'1) Includes 29M write-off of 141,360 lbs. FG inventory booked at G.O. to General Ledger Account 45-03-46915.
(2) Includes 90M credit from accrual for customer returns. (3) Includes 14M dismantling expense incurred in Aug., Sept
4^19
STLCOPCB4057254
Monsanto
TROM (NAME- LOCATION--PHONE J
W. A. Smith - General Offices - B3SE.
DATE
: May 16, 1978
Messrs:
REFERENCE
: PCB --Obsolescence/Decommissioning
Accruals
"
____
R. E. Beal
-B2SB
L. L. Dearing -1740
M. E. Gibbs
-T3B
J. E. Hastings
A T Yjsss* a ~
r> nav
: M. F. Mee
Based on the latest Krummrich Plant estimates the actual PCB
expenses will underrun the accruals by approximately $600M.
Please refer to the attached schedule which breaks down the
expenses by category and compares the original accruals
established in 1976 to plant/division estimates at the end
of 1977 and the most recent estimates in May 1978. The major
underrun has occurred in dismantling $450M and decommissioning
$128M.
:
I recommend that the accrued obsolescence be reduced in May 1978 business by a credit to obsolescence expense of $500M leaving approximately $130M in the reserve for contingencies until we are assured that all expenses are recorded. The division agrees with retaining at least $100M in the accrual and included a credit to cost of $400M in their May estimates based on an earlier plant estimate. The PCB asset retirement paper work will be processed in May by the plant. Retirement of several scrapped tank cars remains to be processed but the associated los.s is included in the estimates.
Europe has been requested to forward a status report on the ex U.S.A. portion of PCB's. Please let me know if you approve of the adjustment to the domestic accrual in May and the retention of a portion for contingency until the project is completed.
WAS:j s
W. A. Smtih
DS\N 442720
77
STLCOPCB4057255
MONSANTO INDUSTRIAL CHEMICALS CO. KRUMMRICH PLANT
DOMESTIC P.C.B. ACCRUED OBSOLESCENCE MAY 15, 1978
December,- 1976 Original Accrued Reserve
Estimated Cost
November,1977
May,1978
OBSOLESCENCE EXPENSE
Retirement Loss on Equip. $559M
$577M
$502M
Dismantling Expense:
Equipment
50 OM
Shipping & Landfill
300M
Tank Cars
215M
Sub total dismantling $1,015M
500M 350M 215M . $1,065M
328M ' 19 2M
45M 56 5M
Decontamination
285M
27 7M
290M
TOTAL OBSOLESCENCE
$1,859M
$1,919M
$1,357M
Latest Est.5/15/78 Over/Under*
Original Reserve
$ 57M*
172* 108* 170* 450*
5M
$502M*
DECOMMISSIONING EXPENSE Inventory W/0 & Incineration
TOTAL EXPENSE
270M $2,129M
138M $2,057M
14 2M $1,499M
128M*(2) $630M*
(1) Tank Car Retirement losses of $35M to be handled by Distribution was added to plant extimate.
(2) Excess in decommissioning reserve was put into obsolescence reserve December, 1977. DSW 442721
STLCOPCB4057256
TO
. W. A. Smith - General Offices - B3SE January 13, 1978 PCB Obsolescence/Decommissioning Accruals
Mr. M. F. Mee
Messrs.
J. E. Hastings
R. E. Beal
B2SB
D. J. Curran B3SE
P. R. Kucera 1740
R. A. Pohl
B2SB
6*
In October, 1976, MIC received approval and established an accrual of $2.8M Worldwide for the estimated expenses to discontinue the PCB business Worldwide. The domestic portion of this estimated accrual was $2.0M further broken down into an obsolescence accrual of $1,859M (A/C 362.04) and decommissioning accrual of $270M (A/C 469.15) both of which were established by a charge to Cost of Goods in 1976.
The decommissioning expense of $270M was estimated to cover write off and incineration of G.I.P. inventory. This portion of the PCB shutdown was completed in December, 1977, at a total cost of $142M leaving a balance in this accrual account of $128M. At this point in time, the plant or division cannot accurately estimate the remain ing total of retirement loss, dismantling, and decontamination that will be charged against the obsolescence accrual.
It is recommended that the unused balance of $128M decommissioning accrual (A/C 469.15) be moved and added to the obsolescence accrual (A/C 362.04) which results in no effect on income for 1977. This allows utilization of the 1976 accrual funds for remaining PCB obsolescence expense even though the original split of the total $2.0M accrual between decommissioning and obsolescence was not accurate.
The alternative is to reverse the $128M over accrual of decommissioning expense and increase 1977 income, then in 1978 require a charge to income for excess obsolescence over the accrual.
The last estimate by the division, in November, indicated that the obsolescence portion of the total PCB accrual would be overrun by approximately $60M, while the decommissioning portion would be underrun by $132M, or a net underrun of the total accrual of $72M. However, until the dismantling, decontamination, and disposal is further along, an accurate enough estimate is not possible to justify returning $128M to income at this time. Please approve the recommendation not to make an adjustment in December, 1977, and to adjust the accounts as ex plained above.
Michael F. Mee
qS\N *4272?'
STLCOPCB4057257
Monsanto
DATE SUBJGCT REF ERENCE
TO
J. Coleman Weber - B2SK
January 26, 1978
cc W. C. Engman E. T. Mollica
1740 B3SA
to David Wood or me.
We are trying to disengage ourselves from the PCB arena. Your people no longer need to be involved.
Thanks for your help.
/rd
IN - 10 REV. 1 72
0S* 4123
STLCOPCB4057258
/)] US&btTO
hgcrx^.
U-T^ C?&'f477f<rE'
3~A-AJ0+&y / 3, tf7<> r~bi$/nAK>Tmu(r T>efi7 2 <46 . 5>T/476)5
To A ' * C orsy
f\ S F TH
>4D
TatF , /4^c 'PtfitJb /-/a 6 jee/V COt Do/aO //Z 7AO
/
/heOA/ TAo/a 0OOA1 y 0&/AuT 'fa&f A/ai> /ft*X TO/at: sfO'OA
C PLy A- 7~OU /.4/scS rfoTi'tA/// To CZcTiz 'Deoj// a/7 JOT /j/<5Or/-/
> PC O F Tb-T QgajTcL 7?oo-m, lUdfZA St(1(TOQ 1~&>Ay //Z
'fH<f /foz> " &/fe/f / Or/etdTO LtzVe/L.
jf (
0JV ^
T. (P OA'/S ne e<^
Z
jw
futAZ
jZTTJaJzz//tj T?tA
7/
TlAZT OThLA-A
.
6~r) OaCJL , fl /u^oZLy^ aAtTMU* TA-
Im* EsuJaJ yCw
Z//ZZ tb
'ilucL, Zo iLt^lMd .vm/aZj Zbo
''
STLCOPCB4057259
MINUTES - AROCLOR DECONTAMINATION/DISMANTLING Meeting 7/15/76
Attendees:
D. L. Eby B. W. Eley A. E. Leisy M. A. Pierle R- A. Pohl C. B. Sigler J. C. Weber
The following guidelines were defined for decontamination and dismantling of PCB contaminated systems in phasing out the Aroclor business.
1. Tank-----C--ar" Fle---e---t-
-'
^,
There are 45 cars in this fleet. Five (J>| are leased, .40 are owned by Monsanto. Monsanto will buy the leased cars.
a. All cars will be cleaned to a 400-500 ppb PCB Content in the final wash water.
. b. Cars will be stripped of valves, fittings, rupture discs, etc. These will be decontaminated and scrapped. Con taminated insulation on the cars will be buried in an approved landfill. The cars will be re-equipped and used to move fuel oil. After moving fuel oil a recheck for PCB will be made to insure there is no detectable amount. Cars will then be released for industrial chemicals use.
2. Major Storage Tanks and 1016 Column
a. Storage tanks will be cleaned to a 1 ppm level in the final water wash. These tanks will then be held for internal Monsanto use. Guidelines for their future use will be prepared. The 1016 column which is a 30 tray stainless steel item will be handled as the storage tanks are.
DSW 442725
STLCOPCB4057260
2- -
3. Process Equipment, General
a. Reactors, stills, small vessels will be cleaned to state of dryness, when completed, closed for shipment and burial at an approved landfill.
b. Piping will be cleaned to as near to 1 ppm level in the wash water as practical and dismantled for shipment to an approved landfill. Gaskets, fittings will not be removed prior to shipment.
c. Structural steel and platforms will be cleaned to dryness and shipped to an approved landfill.
d. Miscellaneous equipment such as pumps will be flushed and steamed thoroughly for shipping to an approved landfill.
4. Site Preparation
a. The department site will be cleared of all equipment and
floors/concrete to plant specification. The area will be
checked for PCB contamination after dismantling is com-,
plete.
.
Equipment shipped to landfills will be monitored enroute by a
member of Monsanto supervision as will burial at the landfill
site for proper handling.
-
'
Dismantling will take place in such manner that PCB sewer losses will be minimized. The target will be a 1 lb. per day average during the dismantling.
A. E. Leisy
OS'N
eb
STLCOPCB4057261
R. A. Pohl ~ B2SB
December 6, 1977
W.G. KRUMMRICH AROCLORS SHUTDOWN COSTS ANALYSIS REPORT
F. J. Holzapfel A. J. Koenig A. E. Leisy - 1740 E. T. Mollica - B3SA
W. C. Engman 1740
This is to confirm our discussion relative to the need and timing for issuing a semi-monthly Aroclor shutdown costs analysis report instead of the current practice of publshing only one report monthly. The current reporting format should be continued with the mid-month report expanded to include current month-to-date with the current month forecast. When there are significant deviations from forecasts and/or budgets, please detail in the comments causes for the deviations.
The following schedule is the timing for the reports to ! with a copy to Art Koenig:
December 9, 22, 1977
January 5, 19, 1978
February 9, 23, 1978
March
9, 23, 1978
April
6, 20, 1978
May
4, 18, 1978
tO
to
>
June 8, 1978
July
6, 20, 1978
August 10, 24, 1978
Sept.
7, 21, 1978
It will be to our mutual benefit to complete the dismantling and burial of the PCB facilities as quickly as possible together with the completion of the tank cars decontamination and refitting program.
RAP/cp
R. A. Pohl
DS^
STLCOPCB4057262
Monsanto
r HOM < NAM* A '
L. Burks/W. G. Krummrich
DA T E October 3 , 1977
SUB If CT 'NCE
D1 s p osrtirofl--e-f--ILq_s a 1 e able (Aroclor 1016
TO Steve M. Finkelstein B-3-SE General Offices
D. L. Cissell W. C. Engman P. R. Kucera A. E. Leisy A. J. Koenig (B2SK) - G.O,
OCT 5REC0
B)(c^> ft <=
As a result of the Aroclor phase-out, we had an excess of. 39M lbs. of Aroclor 1016 (Bulk) in the department that was shipped to the incinerator. The value of this inventory is $9M.
This material, in addition to materials aforementioned in my memo to you of September 23, 1977, will be written off during the September closing.
With the exception of tank car wt. adjustments, this should conclude our Finished Goods Write-Off.
/ nm
L. Burks
W. C. Engman, Operating Superintendent
DSW 442728
STLCOPCB4057263
Monsanto
OM 'NiM
TO
P. R. Kucera. W. G. Krummrich Plant
June 27, 1977 COST COLLECTION ACCOUNTS FOR TERMINATION OF PCB OPERATIONS
Art Leisy
T. Carrico W. Crabtree J. Segrave D. Wuebbels W. Engman V. Brawley L. Burks D. Hughes D. Cissell F. Basile 0. Hotto
L. Sprandel B. Faries J. Peduzzl A. Lewis K. Boucher T. Morrow S. Finklestein W. A. Smith A. J. Koenig R. A. Pohl
B3SE B3SE B2SK B2SB
Four special manufacturing job numbers are being established to collect cost associated with the termination of PCB operations at W. G. Krummrich. They are as follows:
DISMANTLING EXPENSE
1. 702 81467
Close to 45-03-36204
Department Equipment Dismantling Shipping and Landfill Tankcars - remove liners
DECONTAMINATION
2. 721 81451
Close to 45-03-36204
Cleaning storages and 1016 column Incineration of solvents Tankcars - replace valves
DECOMMISSIONING EXPENSE
3. 745 81468 Close to 45-03-46915
GIP inventory
.
Incineration of GIP inventory
4. 758 81469 Close to 45-03-70601
To collect cost associated with incineration of Aroclor 1016 Bottoms, Customer Returns, and Montar inventory on hand after July shutdown.
The WGK A.R. number is 2535.
P. R. Kucera
/tm
09*
STLCOPCB4057264
lflom,anto
FROM INAME: a LOC*' ION .
J. W. Boehm / WGK
OATE
May 16, 1977
SUBJECT
Incinerator Meeting - 5/11/77
REFERENCE
TO
Messrs. Present
J. J. Kaiman W. E. Scruggs
J. A. Alley - B2SD F. J. Basile E.R. Billen J.W. Boehm W.C. Engman R.W. Flint C.R. Ganote/R.E. Bunge
W. A. A.E. J.C. W.L. M. A. R.A. B.R.
Kuhn - EISA Leisy Peduzzi Smull Pierle - EISA Pohl - B2SB Williams
The above met on 5/11 to discuss the shutdown plan for the WGK Incinerator. Attached is a copy of the presentation summarizing the plan and timing.
Agreement was reached to proceed with the plan as proposed. Critical to successful implementation of this plan is achieve ment of acceptable clearance to permit shipment of PCB waste to Rollins for incineration.
Manufacturing (Bob Pohl and others as required) will work with Environmental and Legal Personnel to resolve clearance details by 6/1/77.
Plant personnel are proceeding to firm up details and begin, implementation of the plan immediately.
cw Attachment
.W. Boehm
&
0S\N 442730
STLCOPCB4057265
SHUTDOWN OF AROCLOR INCINERATOR
NO AROCLOR PRODUCTION NO MATERIAL REQUIRING HIGH TEMP INCINERATION CHEAPER TO SEND NON-PCB'S OUTSIDE NEW AREAWIDE INCINERATOR WILL BURN ALL WASTES IN PLANT NEW PCB REGULATIONS
^
-1
OS\N 442731
STLCOPCB4057266
PCB REGULATIONS ANTICIPATED FOR 1/78
CONTINUOUS MONITORING
02 g* CO
C02 TEMPERATURE WEEKLY MONITORING N0X TOTAL HYDROCARBONS ' CHLORINATED ORGANICS
2 CO
C02
HC1
SHUTDOWN ON MONITOR FAILURE
MAINTAIN RECORDS OF DATE RECEIVED, PAST
USER, PAST USE
.*
MOVABLE EQUIPMENT (FORKLIFT) MUST BE DECONTAMINATED BEFORE REMOVAL ALL CONTAINERS (DRUMS) LABELED AND DATED AND STORED BY DATE
DECONTAMINATION TRIPLE RINSING WITH SOLVENT
SEWAGE TREATMENT SLUDGE OF0.05^ PCB
MUST BE INCINERATED
'
SPECIAL LABEL ALL DRUMS
RECORDS, RECORDS, RECORDS, AND KEEP FOR 20 YEARS
-2
STLCOPCB4057267
SHUTDOWN PLAN
STOP NON-PCB WASTE RECEIPTS ASAP
STOP AROCLOR CUSTOMER RETURNS- 8/31/77
BEGIN TO SEND 500,000///M0. PCB WASTE OUTSIDE. MUST START NO LATER THAN 6/1/77
OPERATE UNTIL ALL WASTE INVENTORY IS EITHER BURNED OR SHIPPED OUTSIDE 10/1/77
DECONTAMINATE 10/77 TO 1/78
DISMANTLE
.
ot
- 3-
qS'N
STLCOPCB4057268
STOP NON-PCB WASTES
ONA RESIDUE (25M#/foO.) TO BE DRUMMED AND SENT' OUT. COULD START WITHIN 2 WEEKS
SANTOPHEN I RESIDUE (35M///MO.) SEND OUTSIDE. START WITHIN 2 WEEKS
CHLORO-PHENOL/SANTOPHEN I ACID RESIDUE (100M#/M0.) A) MUST BE NEUTRALIZED STARTING 8/31 B) TEMPORARY LIME FACILITIES AT
INCINERATOR 8/31 C) PERMANENT FACILITIES AT DEPT. 236 BY 6/78
MCB PILOT PLANT (lOM#/foO.) - STORE IN DRUMS UNTIL OUTSIDE BURNING PERMIT IS OBTAINED
- 4-
DSW 442734
STLCOPCB4057269
NEUTRALIZATION FACILITIES
TEMPORARY
A) DESIGN THRU STARTUP BY ZONE D
B) OPERATED BY ZONE B WHILE INCINERATOR
IS IN OPERATION AND/OR DECONTAMINATION
C) REQUIRE ARTICLE 10 FOR INCINERATOR
D) COSTS - INSTALLATION $30,000
OPERATION
$ 2,000/MO .
PERMANENT
A) ALL WORK TO BE DONE BY ZONE D
B) COSTS - CAPITAL
$169,000
EXPENSE
$ 5,000
$174,000
3- -
DSW 442735
STLCOPCB4057270
STOP PCB WASTES
CUSTOMER RETURNS STOP 8/31 MARKETING TO HANDLE RECEIVE 246 WASTES UNTIL INCINERATOR SHUTDOWN 10/1/77 AFTER 10/1/77 DECONTAMINATION WASTES TO GO OUTSIDE
SENDING PCB'S OUTSIDE FOR 10/1/77 SHUTDOWN 1) CONTRACT FOR INCINERATION 2) THREE 10,000 GALLON CARS FOR '
WASTE HAULING 3) MUST START BY 6/1/77
-7-
QSV\J 442737
STLCOPCB4057272
ECONOMICS
OPERATE UNTIL l/l/80
$1,744,000
BURN ALL PCB WASTE INVENTORY $1,525,000 IN HOUSE 3/1/78 SHUTDOWN
SEND PCB WASTES OUT SHUTDOWN 10/1/77
$1,549,000
SEND PCB WASTES OUT FOR 1/1/78 SHUTDOWN
$1,544,000
CURRENT OPERATIONS WILL BE TO MINIMIZE UNIT COST OF WASTE BURNING CONSISTENT WITH AVAILABLE RESOURCES
COSTS TO BURN IN HOUSE COSTS FOR OUTSIDE INCINERATION
9-5^/LB. 11.7^/LB.
3*
-8
DSW 442738
STLCOPCB4057273
DECONTAMINATION/DISMANTLING
COSTS
A) CHARGE TO OBSOLESCENCE
$294,000
B) DECONTAMINATION
$ 62,000
C) DISMANTLING
$240,000
PERSONNEL FOR DECONTAMINATION
A) OPERATING - WILL REQUIRE 4 ADDITIONAL
PEOPLE FROM UTILITY
B) SUPERVISION - AROCLOR DEPT. TO HANDLE
TIMING
A) DECONTAMINATION BY 1/78
B) DISMANTLING
" 9-
DSW 442739
STLCOPCB4057274
LOOSE ENDS PHENOL HANDLING, DISTRIBUTION, 236, 248, 212, ? FUEL OIL TANK, USED BY 239 AND 245 ? 212 ? TEMPORARY LIME FACILITIES WILL BE OPERATED BY 236 AFTER DECONTAMINATION IS COMPLETED
- 10 -
STLCOPCB4057275
'om oesK o:
STLCOPCB4057277
fit**
~AT'd+J ^ ovu
7c ^ ^ Ci n tf&-\Jt<r*
SHUTDOWN OF AROCLOR INCINERATOR
1) NO AROCLOR PRODUCTION 2) NO MATERIAL REQUIRING HIGH TEMP INCINERATION 3) CHEAPER TO SEND NON-PCB'S OUTSIDE 4) NEW AREAWIDE INCINERATOR WILL BURN ALL WASTES
IN PLANT 5) NEW PCB REGULATIONS
-1
DSW 442743
STLCOPCB4057278
PCB REGULATIONS ANTICIPATED FOR 1/78
CONTINUOUS MONITORING
02 CO
C02 TEMPERATURE WEEKLY MONITORING NOx TOTAL HYDROCARBONS CHLORINATED ORGANICS
.
2
CO
CO2
'
HC1
SHUTDOWN ON MONITOR FAILURE
MAINTAIN RECORDS OF DATE RECEIVED, PAST
USER, PAST USE
.
MOVABLE EQUIPMENT (FORKLIFT) MUST BE
DECONTAMINATED BEFORE REMOVAL
ALL CONTAINERS (DRUMS) LABELED AND DATED
AND STORED BY DATE
DECONTAMINATION TRIPLE RINSING WITH SOLVENT
SEWAGE TREATMENT SLUDGE OF 0.05$ PCB
MUST BE INCINERATED
'
SPECIAL LABEL ALL DRUMS
RECORDS, RECORDS, RECORDS, AND KEEP FOR 20 YEARS
- 2-
DsW 442744
STLCOPCB4057279
SHUTDOWN PLAN
1) STOP NON-PCB WASTE RECEIPTS ASAP
2) STOP AROCLOR CUSTOMER RETURNS- 8/31/77
3) BEGIN TO SEND 500,000#/M0. PCB WASTE OUTSIDE. MUST START NO LATER THAN 6/1/77
4) OPERATE UNTIL ALL WASTE INVENTORY IS EITHER BURNED OR SHIPPED OUTSIDE 10/1/77
5) DECONTAMINATE 10/77 TO 1/78
6) DISMANTLE
.
- 3-
DSW 442745
STLCOPCB4057280
STOP NON-PCB WASTES
ONA RESIDUE (25M#/MO.) TO BE DRUMMED AND SENT OUT. COULD START WITHIN 2 WEEKS
SANTOPHEN I RESIDUE (35M#/fo0.j SEND OUTSIDE. START WITHIN 2 WEEKS
CHLORO-PHENOL/SANTOPHEN I ACID RESIDUE (lOOM#/MO.) A) MUST BE NEUTRALIZED STARTING 8/31 B) TEMPORARY LIME FACILITIES AT
INCINERATOR 8/31 C) PERMANENT FACILITIES AT DEPT. 236 BY 6/78
MCB PILOT PLANT (lOM#/hO.) - STORE IN DRUMS UNTIL OUTSIDE BURNING PERMIT IS OBTAINED
-4-
DSW 442746
STLCOPCB4057281
NEUTRALIZATION FACILITIES
TEMPORARY
A) DESIGN THRU STARTUP BY ZONE D
B) OPERATED BY ZONE B WHILE INCINERATOR
IS IN OPERATION AND/OR DECONTAMINATION
C) REQUIRE ARTICLE 10 FOR INCINERATOR
D) COSTS - INSTALLATION $30,000
OPERATION
$ 2,000/MO.
PERMANENT
A) ALL WORK TO BE DONE BY ZONE D
B) COSTS - CAPITAL
$169,000
EXPENSE
$ 5,000
$17^,000
- 5-
STLCOPCB4057282
STOP PCB WASTES CUSTOMER RETURNS STOP 8/31 MARKETING TO HANDLE RECEIVE 246 WASTES UNTIL INCINERATOR SHUTDOWN 10/1/77 AFTER 10/1/77 DECONTAMINATION WASTES TO GO OUTSIDE
DSW 442748
STLCOPCB4057283
SENDING PCB'S OUTSIDE FOR 10/1/77 SHUTDOWN 1) CONTRACT FOR INCINERATION 2) THREE 10,000 GALLON CARS FOR
WASTE HAULING 3) MUST START BY 6/1/77
-7-
DSW 442749
STLCOPCB4057284
ECONOMICS
OPERATE UNTIL 1/1/80
$1,744,000
BURN ALL PCB WASTE INVENTORY $1,525,000 IN HOUSE 3/1/78 SHUTDOWN
SEND PCB WASTES OUT SHUTDOWN 10/1/77
$1,549,000
SEND PCB WASTES OUT FOR 1/1/78 SHUTDOWN
$1,544,000
CURRENT OPERATIONS WILL BE TO MINIMIZE UNIT COST OF WASTE BURNING CONSISTENT WITH AVAILABLE RESOURCES
COSTS TO BURN IN HOUSE COSTS FOR OUTSIDE INCINERATION
9.5^/LB. 11.7^/LB.
-8-
DSW 442750
STLCOPCB4057285
DECONTAMINATION/DISMANTLING
COSTS
A) CHARGE TO OBSOLESCENCE
$294,000
B) DECONTAMINATION
$ 62,000
C) DISMANTLING
$240,000
PERSONNEL FOR DECONTAMINATION
A) OPERATING - WILL REQUIRE 4 ADDITIONAL
PEOPLE FROM UTILITY
B) SUPERVISION - AROCLOR DEPT. TO HANDLE
TIMING
A) DECONTAMINATION BY 1/78
B) DISMANTLING
- 9-
DSVV 442751
STLCOPCB4057286
LOOSE ENDS
PHENOL HANDLING, DISTRIBUTION, 236, 248, 212, ? FUEL OIL TANK, USED BY 239 AND 245 ? 212 ? TEMPORARY LIME FACILITIES WILL BE OPERATED BY 236 AFTER DECONTAMINATION IS COMPLETED
- 10 -
DSW 442752
STLCOPCB4057287
RCflRENCt
JO :
J. Newton - Brussels
In our meeting of May 4 the following questions arose pertinent to the MESA PCB retirement request:
1. We would like to have some more definition of the $105,000 of unscheduled capacity charges and the rationale to support charging this cost to ob solescence expense. Is this the cost associated with the shutdown of the ongoing operations directly resulting from the dismantlement of the PCB facilities?
2. On page 1 "Reason for Retirement", the request speaks of expense monies necessary to refurbish and maintain viability of the on-going product range. Would you please furnish additional details and rationale regarding this $50,000 of expense monies?
3. Lastly, additional capital requirements are men
tioned. How much capital is involved and for what
purpose and its relationship to this retirement
request?
.
4. On the U.S. portion of the Retirement Request we will show some monies reflecting repayment of invest ment tax credit to the federal government. Are there any similar tax liabilities due the U.K. government as a result of this retirement?
As we discussed on May 5, I will transmit the final ver sion of the combined retirement request directly to you to obtain MESA approval prior to transmittal to the President.
STLCOPCB4057288
F.MACDONALDI'HOM (f.'AMi: & location)
Brussels
April 27, 1977
P.C.B. Obsolescence Newport Operations FM/JH
cc; J.MASON A.C.W.PEMBERTON
J.B.WELLINGER
TO
R.C.LEBRETT
Brussels
Brussels Brussels Brussels
Roger Beal's letter April 11th 1977 requested information in order to combine Newport and Krumrich obsolescence requests for submission to the Board.
Attached is a copy of Newport Retirement Request n 432207005Cessation of Aroclors Manufacture at Newport.
This request has been approved by all necessary MESA signatures. It still requires the approval of F.J.Fitzgerald. This request includes all the information requested by Roger Beal in his memo of April 11th concerning financial details.
Also appended is a brief outline of the Newport proposals for the methods of dismantling and disposal &r equipment, building, structures and waste arisings.
In addition monitoring of plant effluent will continue until all dismantling and disposal operations have been concluded.
We have scheduled to cease manufacturing operations Sept. 30th 1977. Phase out action programme will start October 1st 1977 and is scheduled for completion by June 30th 1978.
DSW 442754
STLCOPCB4057289
TO:
MONSANTO LIMITED' - NEWPORT UK RETIREMENT' ' REQUEST
DATE:
3RD MARCH, 1977.
RETIREMENT REQUEST NO. 432207005
. . COST CENTRE: VARIOUS
' TITLE:
CESSATION OF AROCLOR MANUFACTURE, NEWPORT UK
SUMMARY' OF PROPERTY' BEING' RETIRED
Gross Asset Value Being Retired: Accrued Depreciation (Sept. 77) Retirement Loss Retirement Expenses
Total Withdrawal Costs:
$000 768 608 160
. 6.40
. . .8.00
000
295 230
65 . 37 6
4 41
All data in US Dollars has boon converted from Sterling at the rates applying at the time of the transactions. Dismantling and other costs are converted at the. current rate $1.7 to 1 Sterling.
DATE:
DATE: If
77-
date : Ll" D_(r?
APPROVED :
-;;APPROVED:
F.J. Fitzgerald
Managing Director.
- J. Hanley President
DSW 442755
STLCOPCB4057290
-1
REASON FOR RETIREMENT
The background to the PCB situation and the Company decision to phase out of production both in the UK and the USA is wellknown and is not discussed in this document.
This Retirement Request is now presented for the retirement of the Aroclors/Pyroclors manufacturing plant and equipment and includes capitalised spares, specific supplies stores spares, specialised laboratory equipment and all bulk transport vehicles specifically associated with this range of products. The request also includes those specific and itemised sums of expense which will be required to meet the Business Group Plans as outlined in the European PCB Withdrawal Plan as at October 8th, 1976.
The bulk of the equipment associated with PCB's is housed in Building 35 at Newport, which also accommodates part of the equipment associated with the on-going products, principally Biphenyl, Terphenyl and HB40. This request also contains sums of expense money necessary to re-furbish and maintain viability of the on-going product range. The expenditure of capital will also be necessary to meet these objectives and is the subject of a separate request.
SAFETY- AND' ENVIRONMENT
.
The environmental problems associated with this range of chemicals is the reason for the presentation of this request.
ALTERNATE' COURSES
The Business Group has already decided not to consider any alternative actions.
DSW4^6
STLCOPCB4057291
2
RETIREMENT SUMMARY.
1. SUMMARY OF' TOTAL PCP AND ASSOCIATED FIXED ASSETS TO BE
RETIRED
~
Gross Asset Value
Retirement Loss
$
$
Aroclors M & E 82220
193,034
499,453 30,201
72,29 5
Pyroclors M & E 82240 . . 21,519.............. . 5.7,342
3,548
8,231
. 214,55 3. .
556,795 33,749
80,509
Polyphenyl M & E 82231
Lab .Apparatus
94010
Dis tribution Dept. 90310
14,152
39,272
3,124
7,497
11., 5.9 3.............. . 27,085
0 0 5,029
. 2.8,8.69........... . .73,854 . 5,029
0 0 11,955
11,955
Retirement 70% Building 35
51,140
137,398 25,822
67,47C
TOTAL:
. 2.9 4., 562........... .7.6.8,0.47 64,600
159,938
ASSOCIATED' COSTS
A. Gross Decontamination
B.. Dismantling Cost
C. Miscellaneous Returns
D. Limited Customer Liaison
E. Still Bottom Incineration.
F. Laboratory Expense.
G. Bulk Vehicle Clean Up.
H. Surplus FP, RM and Package Disposal.
I. Unusable Spares.
'
J. Unscheduled Capacity Charges
K. Refurbishing Expense.
L. Design Charges
-
M. Contingencies.
DSW 442757
' 85 ,400 74 , 100
5 ,900 2 ,900 5 ,900 . 8 ,800 14 ,700 20 ,600 3 ,500 61 ,700 29 , 400 5 ,900 57 , 600
$ 145,200 126,000
10,000 5,000
10,000 15,000 25,000 35,000
6,000 105,000
50,000 10,000 97,862
STLCOPCB4057292
3 3. SUMMARY OF COSTS
RETIREMENT LOSS ASSOCIATED RETIREMENT EXPENSE NET CHARGE TO PROVISION
64,600 .37 6,500
441,100
$ 159,938 640,062
800,000.
NOTE
A provision of $800000 was set up in ML books during 1976 (approved by European Controller) and all above costs will be charged against this Account.
The unscheduled capacity charge of $105,000 is an estimate
of the Zero bracket charges to be incurred during the shut
down of this on-going product range (HB.40 - Polyphenyls) in
the first quarter of 1978.
'
qSMM 442758
STLCOPCB4057293
PROJECT AUTHORITY FOR EXPENDITURE AND/OR RETIREMENT
Pago
of
(THIS FORM TO BE USED FOR AUTHORITIES REQUIRING GENERAL MANAGER AND LOWER LEVEL OF APPROVAL!
PLANT
BUDGET ITEM NO.
DEPT. NO.
DATE
ENG. JOB NO.
AUTHORITY NO.
NEWPORT
-
Various
8.3.77.
-
432207005
DESCRIPTION REASON AND JUSTIFICATION FOR WORK:
Cessation of Aroclor Manufacture, Newport.
PREPARED BY
TSD Supv.
REVIEWED Acctg. Supt.
Mice. Supt.
TSD Supt.
Date
APPROVALS Manuf. Supt.
Date
Plant Man.
Date
DESCRIPTION
EQUIPMENT
Contr. Mat. & Stores Direct
Work
Supp. O'head Labour
Shop O'head TOTAL
OC
^Oo vs
uo-
INFORMATION FOR RETIREMENT
Summary of Items to be Retired
1. Installed Cost
$000 7 6fi
2. Value Not Retired
_
3. Value to be Retired (1-2)
4. Accrued Depreciation on Voluo to bo retired
6. Depteciatcd Veluo (3-4)
6. Amt. Fxpectcd from Solo, Trade In etc.
7. Retirement Loss (6 01
768 608 160
-
160
INFORMATION FOR EXPENDITURES
Classification of Amount Authorised
Projoct Summary
8. Capital Expenditure
$000
14. Project Total (Orig. or Rev.)
9. Repair or Other Expenses `
10. Leasehold Improvements
11. Transferred Equipment 12. Dismantling Expense 13. Totol Amt, Authorized 8 + 9+ 10+11 + 12 - 13 A 19 8 * l.evol for Capital Approval
-
-
640 640
15. Less Previously Auth. 16. Project Total -- This Rev.
(14-15) 17. Less Transferred Equip.
18. Net Cash Required (15-17)
19. Amount Authorized (1G)
DSW 442759
640
-
6 40 640
STLCOPCB4057294
PROGRAMME FOR THE DECONTAMINATION AND DISPOSAL OF THE AROCLOR . DEPARTMENT AT NEWPORT
1. P2ess_Eguigment_and_Piping
a. Drain all equipment, intermediate storages, interceptors, etc. and process lines to drums for incineration.
b. Hot water and steam sparge as above. All liquids to be collected and tankered to the incineration disposal sys tem at Rechem - Pontypool.
c. Monitor PCB level to meet penquired standard for disposal of equipment to approved toxic land fill or alternatively for local steel mill furnace scrap feed-stock.
2 Dismantle_all_eguipment_and_process_lines
a. Incinerate all joints, valve packing, lagging, etc.
b. Final clean up of equipment and process lines. Cut down to required.
c. Disposal at approved toxic land fill or steel mill furnace scrap feed-stock.
2 2ii^iD2:!l_52d_structural_steel-work.
Dismantle all buildings and structural steel-work.
Decontaminate as necessary.
Reduce to size for disposal as a. Approved toxic land fill.
'
b. Steel mill scrap feed-stock.
OS* `160
STLCOPCB4057295
4. Storages
a. Medium size intermediate tanks or day storages - deconta minate and reduce to appropriate disposal size. For toxic land fill or steel mill feed-stock.
b. Major storages
Decontaminate and replace all' joints, valves, instruments, etc. Monitor for required reduction to acceptable PCB level.
5. Road and rail tank cars
Decontaminate by the approved method. Replace all joints, valves, etc.
Alternative measure will be to sell this equipment to Bayer, Progil or a major customer who is scheduled to continue to use PCB's after the Monsanto cessation date. ACEC has expressed interest in Pyroclor tankers. Monsanto system is demountable tanks. In this case all chassis will be suitably decontaminated for reuse.
6. Site clearance
a. Dismantle any brick structures.
b. Break up and remove all equipment concrete plinths.
c. Remove and reroute all utilities pipe runs in the Aroclors areas which are essential supplies to adjacent other manu facturing units. Especially for continued operations of polyphenyls and hydrogenated polyphenyls.
d. Reroute cooling water supply and return mains now running
south to north through the entire Aroclor area. These mains
are at present above ground level.
e. Completely clear the entire area formerly occupied by Aroclors operation.
f. Locate and concrete block all drain lines leaving the batte ry limits.
A
DSW 442761
STLCOPCB4057296
g. Completely clean up and decontaminate the two interceptor pit systems in the Aroclor area and retain for surface area draining and seepage. Monitor these pits on a regular frequency until tests show discontinuance conditions.
h. Remove all surface areas to a depth of one foot - toxic land fill or incinerate as necessary, if specific areas show gross contamination.
i. Granit chip fill in.all areas to retain original site level.
7. John H.Williams, Production Supervisor Aroclors and Related Operations.to be seconded full time for the responsibility for the successful execution and conclusion of the cessation and phase out operations.
8. John H.Williams to be made available at the same time as the Newport Plant engineer able to advise all West European account: on plant dismantling, decontamination and disposal. This ser vice to be on request through Marketing.
9. Arpino, Vodden and Macdonald to discuss all related proposals for clearance and comment by the Legal Department.
10.
Arpino, Vodden and Macdonald to inform the British Government Department of the Environment Officials of the phase out and disposal action programme prepared by Monsanto. This will be a useful position to have in the event that any long term pro blem arises from the disposal programme.
F.MACDONALD rjx6A.ii
svv 442762
STLCOPCB4057297
Monsanto
R.E.FROM (NAME ft LOCATION! Bunge / WGK
DATE
< May 4, 1977
SUBJECT
t.
REFERENCE
i
Shutdown Plan for WGK Incinerator
TO : R.A. Pohl - B2SB M.A. Pierle - EISA W.A. Kuhn - EISA
CC; W. Smull E. Billen W. Scruggs A. Leisy J. Boehm
J. Kaiman F. Basile J. Peduzzi B. Williams R. Flint
A shutdown plan for the WGK Incinerator has been prepared and will be reviewed at 2:00 p.m. on May 11 in the WGK's North Conference Room.
Our current plans are to cease all PCB operations at WGK by 1/1/78 prior to the advent of the proposed EPA PCB incineration regulations. To accomplish this,certain actions must be initiated on or about June 1 of this year.
Please feel free to invite other personnel as you deem necessary (Marketing, Legal, etc.). Your approval of the plan will be requested so that we can begin implementation.
Please contact John Boehm (Sta. 304) or myself (Sta. 409) if you have questions prior to the review.
cw
* >
DSW 442763
STLCOPCB4057298
COMPANY CONFIDENTIAL i
W. 6. KRUMMRICH PLANT MANUFACTURING IMPROVEMENT PLAN
FOR PLANT INCINERATOR
DEPARTMENT 790
PREPARED BY: BARBARA CARLISLE
APPROVED: 7T PEDUZZI, PROD. SUPERVISOR
ISSUE DATE:
ifjn
Y / A.
--------------y/>"/7?
W. A. KUHN, MANAGER OF PLANT SERVICES AND CAPITAL PLANNING
DSW 442764
STLCOPCB4057299
-TABLE OF CONTENTS
OVERVIEW. CAPACITY. COSTS . . SAFETY. . ENERGY. .
Page 1 2 2 4 4
DSVV 442765
STLCOPCB4057300
DISTRIBUTION
D. P. Alt P. J. Basile E. R. Billen J. w. Boehm K. E. Boucher P. Brewer R. E. Bunge B. K. Carlisle W. C. Engman R. W. Flint R. L. Harness H. J. Horner W. A. Kuhn A. E. Leisy
B3NH
D. K. Lynch
D. Metherd
R. H. Munch - TIB
P. S. Neuhoff
C. P. Orr
- G2WD
C. Paton - B2SK
J. Peduzzi
R. A. Pohl
- B2SB
E. M. Potter - B2NK
J. Schriner
W. L. Smull
L. W. Sprandel
R. Sterghos
B. R. Williams
QSW 442766
STLCOPCB4057301
MANUFACTURING IMPROVEMENT PLAN PLANT INCINERATOR DEPARTMENT 790______________________
Page 1 March 1977 WGK
OVERVIEW
The specific purpose of the plant incinerator, since its origin, has been to destroy Aroclors. Other plant wastes, such as ONA, PNA, Chlorophenols and Santophen I have also been incin erated to utilize excess capacity. MCB pilot plant wastes are scheduled to be incinerated in 1977 as well. Since a permanent shutdown of the Aroclor Department (Dept. 246) will occur late in 1977, eliminating internally generated Aroclor wastes, shutdown of the plant incinerator must be considered as a strong possibility.
The current waste inventory of 2 M pounds (a four-month supply) and the 3 M pounds of wastes to be generated during 1977 by Dept. 246 would allow the incinerator to operate near capacity through 1977.
An area-wide incinerator is scheduled for start-up in early 1980. It is to be capable of disposing of all known and projected incineratable Monsanto wastes in the St. Louis area. Presently, all WGK wastes, with the possible exception of Aroclors, could be incinerated outside the plant for less cost than at the plant.unit. Operation and retention of this facility after 1977 appears to be economically undesirable, unless a viable specific need for high temperature incineration is identified. The position of the business group toward disposal of customer Aroclor wastes needs to be reconfirmed; the previous position has been that all customers will be referred to contract incinerators on the basis of lower cost to the customer and no liability to Monsanto. It might, however, be* desirable to retain the incinerator as a test unit for obtaining design data for the area-wide incinerator.
During 1977, a formal economic evaluation will be completed to determine the best course of action for incineration between now and when the new area-wide incinerator is brought on-stream. Until this decision is made, technical effort in the unit will be kept to an absolute minimum.
os'W a*2161
STLCOPCB4057302
MANUFACTURING IMPROVEMENT PLAN PLANT INCINERATOR DEPARTMENT 790
Page 2 March 1977 WGK
A. CAPACITY
The incinerator is budgeted to dispose of 6Mft of residue in 1977. While the incinerator standard capacity is 500.000 lbs/month, waste receipts are expected to total 550.000 lbs/month until 9/77 when they will drop to under 200.000 lbs/month, for a total of 5.1fl pounds for the year.
The table that follows shows the amounts of the various wastes expected to be incinerated in 1977.
Dept.______ProductProjected Waste Incineration, M lbs.
219/222 ONA/PNA
.30
226/237 Chlorophenols
.72
00
239 Santophen I
MCB Pilot Plant
.11
Aroclors Customer Returns
.47
246 Aroclors & Montars
2.64
5.08
B. COSTS Budgeted incineration cost for 1977 is $.133/pound based on burning 6M pounds. The 1976 cost was $.106/pound.
qSV'J 4427 6S
STLCOPCB4057303
MANUFACTURING IMPROVEMENT PLAN PLANT INCINERATOR DEPARTMENT 790
Page 3 March 1977 WGK
COSTS (cont'd)
Th following table shows estimated 1976 and 1977 costs for contract incineration of plant wastes that could alternatively be incinerated in the plant.
Department1976 Cost'1977 Cost
Contract Incineration Cost
$/lb.
(includes freight)
237 248
221 247
238 229
Chlorophenols Santophen I ONA/PNA MCB Pilot Plant Metafractions MIBK Lab solvents S-160 Benzyl Chloride
.070 .071
--
--
.091 .173 .067
--
--
.07-.10 .07-.10 .07-.10 .07-.10 .121 .106 .082 .071 .068
Of the possibilities for Aroclor waste replacement that have been considered thus far. Metafractions and MIBK are the most logical, although they still do not economically justify continued operation of the incinerator. The very low cost of contract incineration of Benzyl Chloride/S-160 makes it a less desirable alternative. ;
Rough estimates show that, omitting the costs of a NOx control system which would be necessary, costs of plant incineration would be as follows, based on 1977 costs and 5 Ft pounds incineration capacity: (416,000 lbs/mo.)
Total
Out of Pocket Cost
Out of Pocket Cost
Dept.
(including depreciation cost) (excluding depreciation co:
Coat____________________________________________________________________________.
$63,600/mo. 15.3/lb.
$46,200/mo. ll.ie/lb.
$40,900/mo. 9.8<=/lb.
Total outside incineration cost for the 5 R pounds considered
os^
STLCOPCB4057304
MANUFACTURING IMPROVEMENT PLAN PLANT INCINERATOR DEPARTMENT 790
Page 4 March 1977 WGK
COST (cont'd)
in the previous situation would be $46,600/mo. or 11.3/lb.
lbs/mo.
Chloropheno1s
60,000
Santophen I
70,000
ONA
25,000
MCB Pilot Plant
10,000
Metafractions/MlBK 251,000
Total
416,000
Outside incineration, estimated
$/lb.
/mo.
.10 6,000 .10 7,000 .10 2,500 .10 1,000 .12 30,100
46,600
It should be noted that the above numbers are preliminary and only indicate the need for a formal economic evaluation to determine the future of the existing incinerator.
C. SAFETY
The departmental Safety audit was begun late in the year, and is expected to be completed during the second quarter of this year.
D. ENERGY
Due to the anticipated shutdown of the WGK incinerator anywhere betwee: early 1978 and early 1980, the energy audit scheduled in 1976 was deferred indefinitely.
The incinerator is a relatively low energy consumer as indicated by the following table:
DSW 442770
ITEM
INCINERATOR USAGE
TOTAL WGK USAGE
% OF TOTAL WGK USAGE
Steam (MMBTU) Gas (MMBTU) Electric (CKWH) Plant Water (M Gal) Purchased Water (M Gal)
970 568 833
4083 848
300030 21700 72300
790300 167094
.32 2.6 1.1
.5
.5
STLCOPCB4057305
Monsanto
incinerator by December 31, 1977. To shutdown the incinerator on October 1st, all customer returns would have to be stopped no later than August 31st.
Manufacturing expects to prepare a recommendation for shipment of PCB " waste, which cannot be incinerated at W.G. Krummrich due to the volume involved, to an outside incinerator.
There are two impending EPA regulations which tend to make shutdown of the incinerator in October and decontamination by year-end desirable. The Versar draft regulation established some fairly rigid standards for incinerator operators which would cost Monsanto an estimated $100M if the incinerator was kept on-line beyond January 1, 1978 (the expected effective date). Secondly, the EPA regulation 307B (expected to be issued before July 1977) would force corrective steps_by Monsanto to comply with the regulation with costs estimated at $2M if the incinerator continued to operate.
Another point is that as stringent regulations pertaining to PCB incinerators are placed into effect, some of the outside incineration facilities may elect or be forced to shut down. The result could be inadequate PCB incinerator capacity in the U.S. This might place Monsanto in the position of continuing to operate the W.G. Krummrich PCB incinerator either for social responsibility reasons or possibly because the EPA requests that our incinerator remain in operation. While the W.G. Krummrich incinerator would be decontaminated by December 31, 1977, current planning calls for it to remain intact until 1981. Also, the new Monsanto area-wide incinerator is scheduled for start-up in early 1980. Therefore, should a contingency arise after October 1, 1977 requiring that Monsanto bring the old incinerator back on-stream, such action would seem feasible after necessary startup preparations to ensure compliance at that time.
DSW 442771
IN - 10 REV
STLCOPCB4057306
D. Wood
-2- May 13, 1977
Monsanto's incinerator has been used to dispose of our PCB production unit's wastes, W.G. Krummrich non-PCB wastes, and PCB "customer" returned wastes. Planning is underway to dispose of our PCB production unit's wastes (beyond what can be incinerated by October 1 at WGK) and the non-PCB wastes. Therefore, the flow back to WGK of customer PCB wastes should be stopped.
It should be noted that so-called "customer returns" may not be from a direct Monsanto customer. For example, the material may be returned from a Monsanto customer or from a firm which owns an askarel transformer.
Analysis of PCB waste return reflects that 907M pounds were returned over the past twelve months for an average of 76M pounds per month. Of this total, 357M pounds (39%) were from current PCB dielectrics customers. During this period most of the current Monsanto customer returns were from G. E. and Westinghouse transformer service shop locations. G.E. Rome was the only transformer manufacturing location to use the incinerator. There were no returns from our capacitor customers.
It is projected that the return rate until shut down of the incinerator
would be 50M pounds per month or lower as we are continuing the practice
of informing customers of outside incinerators and that the cost may be
less at these facilities.
2. Recommendation
It is recommended that all "customer" users of the Monsanto PCB incinerator be informed immediately in writing that we will cease accepting PCB returns effective August 31, 1977. Monsanto should also point out that due to the significant volume of PCB waste now on hand at WGK's incinerator we are not in a position to accept substantial volumes between now and August 31st, Therefore, the "customer" should be advised of other incinerator facilities which may be able to dispose of his PCB wastes. The attached letter is recommended for written communication with customers. Cliff Field, in Marketing ServicesJwould also use the contents of the letter in response to phone inquiries.
Monsanto should advise the EPA about our decision.
It is suggested that Monsanto not make a press release about shutting down the incinerator because this would leave us open to criticism and a barrage of inquiries questioning our action.
osnn
STLCOPCB4057307
D. Wood -3- May 13, 1977 3. Alternatives considered and reasons for rejection.
a) Monsanto could continue to accept customer returns and operate the PCB incinerator. While this might have some social responsibility advantages, the costs to Monsanto to comply with regulations (estimated at up to $2.1M) and cost of incinerator operation (estimated at $815M per year) would make this an undesirable option. This alternative would also tend to perpetuate Monsanto's direct handling and involvement with PCB's. Rejected.
b) Monsanto might operate the PCB incinerator until March 1, 1978, and cease accepting customer returns on December 31, 1977. This would be costly to Monsanto in terms of incinerator operation ($67,847/month) and compliance with regulations (at least $100M to comply with proposed regulations for incinerators). Rejected.
4. Action requested. Management approval of recommendation.
tmc
0S^ 4AZ*73
STLCOPCB4057308
LETTER TO OUTSIDE USERS OF MONSANTO PCB INCINERATOR (Will also be used by Cliff Field for telephone inquiries.)
Monsanto will stop accepting PCB waste returns effective August 31, 1977. We now have substantial volumes of PCB waste on hand which must be incinerated along with our production unit's residue before the incinerator is decontaminated and shutdown later this year. For this reason we,are not able to accept any significant volumes between now and August 31st.
The American National Standards Institute's publication ANSI C107.1 - 1974 lists
the following firms as having incineration facilities capable of handling PCB's.
Chem-Trol Pollution Services, Inc. P.0. Box 200 1550 Balmer Road Model City, New York 14107 Phone: 716-754-8231
.
Rollins Environmental Services, Inc. P.0. Box 2349 Wilmington, Delaware 19899 " Phone: 302-658-8541
'
It is your responsibility to determine the adequacy of the facility and its
compliance with, regulations,
1
STLCOPCB4057309
l DOMESTIC
OVERSEAS
MonsantoINDICATE k FULL RATE FULL RATE
OUTGOING MESS AGE ....... ' . Tele-Communications System
DESIRED Pn OVERNIGHT LETTER
DATE
1-7-77
TIME
12 s 15
fSERVICE
TWX/TELEX TELEX
SENDER'S ACCOUNT NO.
45-000-735.46
TWX/TELEX NO. i
ALL MESSAGES MUST BE TYPED OR PRINTED IN BLOCK LETTERS
F. MacDonald - Brussels
Regret the delay in providing you WGK plant ?4_PCBs withdrawal plan. Art Leisy, our most qualified man to provide the details tha~~have been generated relative to decommissioning and dismantling the plant has been off work since Hov. 24 due to major surgery. Art is now on the job again and will be putting the requested information together. It will be available for mailing from here January 12. Please indicate if you would like to have a copy sent directly to Newport also to minimize the time in getting the plan to Newport. If so, who should receive it?
Regards, Bob Pohl
DSW 442775
IN--IR REV. 1/74
BETTERor service -- Forward to transmitting operator IMMEDIATELY after preparation.
STLCOPCB4057310
Monsanto
FROM .NAME ft LOCATION)
P. R. Kucera, W. G. Krummrich Plant
date
subject
; May 10, 1977 , PCB RETIREMENT
REFERENCE
TO : J. P. Snow B3NF
CC: R.E. Beal
B2SB
D. Cissell
- W.C. Engman
D.T. Hughes
A.J. Koenig B2SJ
A.E. Leisy
R.A. Pohl v B2SB |
D. Wood/J. Alley - B2SD
Attached are the detail schedules you requested for the PCB Retirement Request. Included are the following:
1. Detail of "Authority for Retirement" for Aroclor and Pyranol Departments.
2. Schedule of Investment Tax Credit Repayment for Aroclor and Pyranol Depts.
Summary of Attached Data:
Dept. No.
Original Asset Value
Assets Not Retired
Assets To Be Retired
Accrued Depreciation
Salvage Value
Estimated Retirement Loss
Repayment of Investment Tax Credit
81090 $ 168,227 $ 2,500 $ 165,727 $ 135,664
0
$ 30,063
$ 784
81100
3,062,983
146,210 2,916,773 2,400,537
0
516,236
13,420
TOTALS $3,231,210 $148,710 $3,082,500 $2,536,201
0
$546,299
$14,204
The above calculations do not include the accelerated Depreciation accrual
of $155,088.
.
P. R. Kucera /tm
i m . t r\ o c v 1 /7?
DSW 442776
STLCOPCB4057311
Monsanto
/ROM (NAME ft LOCATION)
1
OATC SUBJECT REFERENCE
March 2, 1977
FINDETT SERVICE COMPANY CONVERSION AGREEMENT
TO Eo L. Moore
H. No Brandstetter - B2SA
CC * w. Ho Duffey - E2NB R. A. Pohl - B23fl^-
* R. A. Stohr - B2SA * J. C. Weber - B2SK
I have attached, for your review, a redraft of a proposed conversion agreement with Findett covering their performance of conversion services for us beginning as of January 1, 1977. The attached redraft incorporates a number of the changes which you and I have discussed over the past several weeks.
One of the major changes involves a restructuring of the agreement to make it more of a typical conversion agreement rather than a purchase and sale agreement. You will also note that I have deleted all references to the bid procedure previously used in our prior agreement with Findett. The contract now covers the specific Special Chemicals which are listed on Exhibit A. Should we wish to add any other chemicals to the agreement, we could do so by mutual agreement with Findett.
Among the other major changes included in the attached redraft are the following:
In Section 2, which lists the various manufacturing services to be performed by Findett for us, I have added a new Section 2.03 which obligates Findett to maintain certain records relating to the Special Chemicals produced by them.
Section 2.06 now spells out Findett1s obligations with respect to maintaining certain storage facilities for storage of Special Chemicals and raw materials.
Section 2.07, covering title to the raw materials and Special Chemicals, represents a change from the prior agreement, which had provided that Findett would have title to the raw materials and Special Chemical's until they were shipped to Monsanto or to our customer. The revised section, which gives Monsanto title to such materials, is more in keeping with the typical conversion arrangement.
Before leaving Section 2, I direct your attention once again to Section 2.04 which was added as per your request in the first draft of this 1977 agreement. Are you and Cole Weber both comfortable with the 1 ppm maximum level of polychlorinated biphenyl contamination? Also, this
*copy of attachment
' dS\j\| 44277? .
IN - 10L REV. 10/71
STLCOPCB4057312
-2-
March 2, 1977
maximum permissible level should be included in the speci fications for each of these Special Chemicals. How great is our concern in this area, in light of Findett's past and/or present practices? Is there anything else we should provide for in this agreement to place us in a better position? Your comments will be appreciated.
In Section 3, I have deleted the provisions in our prior contract which covered Monsanto's sale of raw materials and intermediate chemicals to Findett. Since we have structured the attached agreement on a conversion basis, Monsanto will simply provide whatever raw materials are needed under the agreement for Findett's production of Special Chemicals. Also, in response to your request, I have added conversion ratios into this section. The specific ratio for each Special Chemical is set forth in Exhibit C.
Section 4 now provides for our payment of a conversion fee rather than a purchase price for the Special Chemicals, which is also consistent with the restructuring of the agree ment along the lines of a conversion agreement. Please note that Section 4.02 limits the quantity of Special Chemicals which Monsanto is obligated to accept and pay for at the expiration or termination of the agreement. Is there any reason for limiting this quantity? This provision could be read as being inconsistent with Section 2.07, which obligates Findett to return to Monsanto all raw materials and Special Chemicals remaining in their inventory at the expiration or termination of the agreement. Which provision do we want to include in the agreement?
Section 5 deals with forecasts and quantities. As this section and Section 2.01 are worded, the determination of quantities is left to the mutual agreement of the parties. Is this sufficient protection for Monsanto? Can we be more specific on quantities? If for any reason we need a commit ment from Findett as to their willingness to convert a specified quantity of any of the Special Chemicals for us, we should make some modifications in these two sections.
There are various other relative and minor changes included in this redraft of the agreement. For example, I have made some modifications in Section 10, Termination, which gives Monsanto the right to terminate the agreement if Findett fails to comply with applicable laws, regulations, etc., which is a change from the previous wording of this section giving us the right to terminate if Findett "should persistently disregard laws, ordinances" etc. Also on the subject of termination, do we want to provide Findett with a right to terminate the agreement?
qSVn) 442778
STLCOPCB4057313
-3-
March 2, 1977
Please look over the agreement and let me have any comments or suggestions you have to offer on it. I have included attach ments (Exhibits A-D) and suggest that you look over these also to make sure that they conform to what you have in mind. Exhibit B, of course, will have to be re-typed to clearly indicate the specifications for each of the Special Chemicals.
I will look forward to hearing from you on this redraft at your earliest convenience.
HNB:pk attachment*
Holly N. Brandstetter
DSW 442779
STLCOPCB4057314
Monsanto
DATE SUBJECT REFERENCE
TO
G. F. Fort - E1SF General Offices
September 3, 1976 .
Thermal Destruction of PCB 1 s in Cement Kilns
cc; R. S. Nelson M. A. Pierle
A. Pohl
SEP 7 1976
^ lo
Larry MacDonald, who is
Cement Company of Canada
ministry of Ontario, who
Environment Canada Group to get approval to import
PCB1s into Canada. To accelerate this approval, please
forward to me an approximate typical analysis of a tank
car lot of PCB material that we might send for thermal
destruction. Please include these parameters:
37(J
% by WT. PCB's % by WT. Chlorine Organically Bound
S'-#" Content / lb. Approximate Viscosity @ 70 F'
Flash Point (open cup)-Range (if > 150 F, so indicate)
Any other significant contaminant?
Please contact me if you have any question.
/sa
/ ?
G. F. Fort
IN - 10 REV. 1/72
DSW 442780
STLCOPCB4057315
DSW 442781
STLCOPCB4057316
TENTATIVE PROGRAM FOR DECONTAMINATION AND DISPOSAL OF THE AROCLOR DEPARTMENT
1/13/77
tt A. 3 ^ AW*
1. Open and drain process equipment and piping to drums for incineration (or landfilling). After draining is complete, piping can be removed for disposal. The process equipment will be used to help dispose of piping (Item 4).
2. Wash storage tanks, process and finished goods. Hot water and steam sparging in H20. Two-three washes should get tanks down to ppm Aroclors in final wash. May have to remove solids - clay, FeGl - from some tanks before washing.
3. All wash water is to be drained through some type drum/filter with sand or other absorbent to trap Aroclor. This will be sent to an approved landfill. Measure Aroclor water leaving the area to control losses to (in WGK case) less than 1 lb./day.
4. Process piping disposal either:
a. Cut small enough to fit into process tanks.
b. Cut small enough to fit onto flat car or truck for disposal at an approved landfill. If shipped, this piping must have open ends suitably plugged to prevent loss of Aroclor in shipping. Wood plugs driven in will suffice at WGK.
c. WGK plans are not to remove insulation except as necessary to dismantle and/or to ship safely without loss of Aroclor enroute to burial. Insulation that must be removed due to contamination or dis mantling will be placed in secure drums and land filled at an approved landfill.
5. Reactors, rundown tanks, blow tanks, intermediate storage (5000 gals, or less) and other small process tanks will be handled as described in (1) and closed tightly after suitable internal loading for burial at an approved landfill.
DSW 442782
STLCOPCB4057317
2
6. All structural steel will be dismantled. Two choices for disposal appear feasible. This steel along with non-process steel piping and equipment may be sized properly and sent to a local steel mill for remelting. If this cannot be done, due to no takers or excessive cost, then all this steel will also be sent to an approved landfill.
7. It is now planned to explore further use of the large aluminum finished goods storage tanks, along with assorted alloy pumps.
. If we can find no use for these items, then they will also be landfilled.
8. The fleet of tank cars will be cleaned thoroughly with hot water, stripped of fitting, then refitted for further use. Insulation removal may be required if contaminated. One or more shipments of a fuel oil or organic type chemical will be necessary to insure Aroclor cannot be detected in future shipments. These cars will then be controlled by some Monsanto group to insure they are never put into sensitive service. The other alternate is to cut up and landfill these cars after they are decontaminated.
9. The department site will be cleared to one foot below grade level with the rubble landfilled where contaminated with Aroclor.
It is obvious that this scheme will not reduce Aroclor contamination in the equipment to the 1 ppm range. If this becomes necessary then the problem becomes very complicated because plans for each piece of equipment must be worked out. It will also require use of solvents in cleaning and incineration of these solvents.
A. E. Leisy General Manufacturing Supt. W. G. Krummrich Plant .
DSW 442783
STLCOPCB4057318
Monsanto
" M. A. Pierle - E1SF General Offices November 19, 1976
PURCHASE PCB TANK CARS APPROPRIATION REQUEST
R. S. Nelson
TO C. B. Sigler - B1NC
The following comments are submitted for inclusion as Section VH-Pollution and Toxicity, in the subject appropri ation request.
"This project will avoid potential secondary liability associated with contaminating transported materials ' with PCB by placing all PCB tank cars under direct Monsanto control. Further use in Monsanto service will be conducted under strict Product Acceptability Procedures. Initial use will be restricted to non-food grade materials, primarily fuel oils.
At present there are no regulatory requirements on the disposition of PCB contaminated equipment. "
/ ms
M. A. Pierle
. '.2 3EV. t 72
DSVV 442784
STLCOPCB4057319
'/feriR 197(> . 11 1 '',,,,w'f""
""CuirQtttfi
an
IV. V.......... '
TKb&ocr -- .... .....r.,r
" 0?2~.'.~
fcwt? --a?-- -7vm
/jtsvwc
460
( 4f3o
6c>a .
/830 ...
_Sj
__ 5* `
^
// M 40
J30C &1'
(jUuvtnaJ 7&' Mf
<24! 014 366
nt
'
C2/3 276 70
-
36 Jf
/%o tfo ':/) 1 /to
268
980
/80
?o?
180 o>)
W
' -.
270
??Z
M c7
JliU- Ouwa (r 0 1
Ua*d . rfnjllltfry
l62o S(?7 '
96 IZO m 9o
/6oy ST!
-
% 366
90
/ Loo SSo
I fiS
/So 270
I 61
/ 6 60 . \ M6Q
&27 313$-
' ' '90
270 360
720 mi
ftfi
. ^ .
'
^_ .
Ja^wo^ -0-------------------
/m4M
<?7<?
?o
je/
3b
.
'
/*<?
.
f0
2lo ^7^
I
1
7Z9 Qo *70 <2^ .
/^?
0
<Jo 2.6
_27o__
7/6/
/OV
DSW 442785
-/
o%5
4776
`
".
j 4^2.
.
1/612-
Lr . *
STLCOPCB4057320
STLCOPCB4057321
CVS TQtl&Z
at
'Ptfc&ucT V " -"----- .,.. r
C?2 .
O'*
Z61&, -T" --
U/(f--------- ~ronu
(fajCW*
'
UtwtJOu V To/?-
ti (3fct-*VtU fie- fr d. Q Z/u&ch f$U
/Tnailc*-) /?ft.
S/Tr<%uK/yvte--
-
'
3& .lo .
teo
/to
JlO 7G0
&60 7o
ni /to ft ' ' -
Ho
fJO
* -
/&o zo
/30 /to 1 ft
1^ -276
1 -1--
6 ;rrf 1
0 I^ ,370 1-- I--
4$
M * --
; ^
K M0?$ - .:-
1 1 1 1
-
1
1 -'
I . .
*
-
I-
t* 0 o J6 '
73 0 o JC
-
S2 1 1 1
1o | e2^
I 1 DSW 442/0/
700 30
Sd*/ So
& qqo / 2oo
-- fa
o 6'oH
o o J/9 G a h*/.
J/SZO
*-' I
c?tty
1 &>?
- ' A^C,
-
STLCOPCB4057322
VeflR ____/?/
"Cvi Tories
"0?/"-
,T\ ffc&ucr
Cp2----------------<#3---------
7o/3o. c?y------- TOTftL'
/kfdi*
0 _ _ l._
0
3 (0
2u&u
So __ So_______ _..*8$_______ ____ 0_____ 32L
Cfltnn
0
0
0 .. . 0
0
Hdtm
/
0
0 O Jl/
fit/! SO- 0
0 0 S2
(7
Va
38 m
?7
M /&0
0
3Z 0 /oo /OO
0a
fki, G$&bSJ.
0 0O
StOMd, lOCLT/ll 77
, /So
/oo
/So
Haul Httff&d. So
0 00
(Jatw&L
0
So
0
0
Fv
laMJh^L___
6
O 00
(jOtot* S&Qt*L- ft
So bo
l&o
/Ottof* Ska***
40, Sfitd/bu
40. 9kto4x,
0
____ 0....... ....
0
____ 3jL____
____0_________
0
.... _ 0________ JbO
0a 00
/oo
400
27
0 Ml So So O m ?s ^<fO
0
.... ....... --------------- ------ ------------- ------- -------------------
OS^
S21.
P7
SW
m
............. ---
c/4 & /.
STLCOPCB4057323
y<sna
m
'CuirotieR
air
fje/tbOL /fel/i &u2lf /\ uhlftA&H /V/^t2^A //A" fetfc*
]fctA* JlctH _
SkaStLj Jj>ofe*i
fyoe.n/*.
o o o o
o
/oo
6 _/o_
O
[0O
TRt&ocT /^raSN 7/3o
0?2
ape/.
-romL.
o o o o
e> too
/* o o /$o 0 o 0
o_ o o o a a sTo
O & lOO o a /CMi? O
o
o
o . o o _ o___ _o jao
o
o 5^0 O o
<9So
9S &0
o
oSVM 442739
Jfoo
t>o
tfo
f$ys
STLCOPCB4057324
YfrflR
/97*
'Cusrort&Z
cur
ax*. S0,g&rv*'z4.>
o
So
J60
So
Ttfc&ucr /Ntrert&fij 7SI30.
C? 2
/OO o
So
So
o?0*>
2&o
STLCOPCB4057325
Vfflfi
!fh________________ ?R6Doct N
'CvlToti&R. " " cat
" CP 2
A). Jkrr*'u~
/0O
_
1
*
7p3o
.......--
727^
/G&
/oo.
j-
DSW 442791
/&o.
STLCOPCB4057326
c
STLCOPCB4057327
STLCOPCB4057328
STLCOPCB4057329
STLCOPCB4057330
'/gag.
/m
Tf?t>5ocr f'yx'/iA'tiL /hs&/.
NT
Q?2
--cp 3 ~
Opt*
-n>mL.
0 o o .o
ZZ
7Z
*Z.
/OK
DSW 442796
21 <Z?
t
*?
<*?
/OS'
STLCOPCB4057331
VgflR
fox'_____________________________ TflofrocT
\ 1 1 ----------- ----------f--
'CumrtfR
CP 2. ~~ ------cp 3-------
a?cf. -
- ~r07ftL.
fa*-
--
---------------
<??
*?
--
-- --------
1
--
-------------------- -
--
------r---------- --------------------- --- --
--
--
-
--
.
--
-- -----------
DS\N 442797
.. *7
1 *7
A7 /off.
STLCOPCB4057332
'/eaR >/9% "____________ \
'Curort#? " ~ai
... CQ 2
-pRcauer /^f****'t'M*-*&
*
.... <#3---------
..- - ~romL,
0
. J?.........
0o ll....... ....I ................
0____ o____
Qf
tit
101/ ,io
/CD
f3S
ofif 0 0 0 0 o.....
---------------- ---
--------------
--------------- ------
' ------------------
----------- -
---------------- :-----
no
1. I OS'N 442798
-------------- ---- ------ .
m 1 /(*> ' / /OO
IIS
STLCOPCB4057333
Vgflft /9V_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Tftc&ucT
--
'Cviroti^R
A/ 4*6 K***'
---- -----------------------------
($6 ServK*.
an
3*C
do
"0? 2
"
o2o/ >r
#3......
1 ^oy
Af36S&-3 .
<3>*....-
TV?#/,.
Soy
&S
6? So
** w/H &,U /fa&U CA
1
--
----
--
#0 (a
I
j--------------------------------------------------------------
--
DSW 442799
- --
.??
|
/SS
ft 6 If
STLCOPCB4057334
'/car
im
m
fit &
fig fiesvi'cj}.
%
'Ptfo'DooT
CP 2 90 9o
a?** 62i
-ro7ftL. 94.
^ (? -4vti/ A $
qSW 442800
9o
fo
<Q6>.
<?? 9.
STLCOPCB4057335
DIELECTRICS-PHASE-OUT PLAN
June 15 - 30 We Asked For Customer Assistance
*To Provide Us Estimated Usage To Their Phase-Out
'With Critical Underlying Assumptions 'And Input On Their Storage Capacity. So That We Could 'Prepare The Most Efficient Production Plan
To Meet Their Needs
'At Lowest Cost
'To Provide Responsible Stable Pricing To Phase-Out
'Desirably Permitting Us To Cease Production In 1977.
OS\N 442801
STLCOPCB4057336
CUSTOMER CONCLUSIONS .1
ARQCLOR 1016. FORECAST
1976 - 21 ffl Lbs. (Export 2 FI ) 1977 - 18 FI Lbs. (Export 1 FI ) 1978 - 5.5 FI Lbs. (Export 0 ) (U. S. Export - Monsanto Forecast)
* POWER CAPACITORS WILL PHASE-OUT FIRST. -LARGELY COMPLETE IN 1977.
* SMALL INDUSTRIAL CAPACITORS WILL PHASE-OUT IN 1978.
DSW 442802
STLCOPCB4057337
CUSTOMER CONCLUSIONS .2 .
TRANSFORMER FLUID DEMAND 1976 - 8,5 FI Lbs. (Export 2,2 M ) 1977 - 3.8 Ff Lbs. (Export 1.0 M ) 1978 - 1.3 Ff Lbs. (Export .2 Ff ) 1979 - ,1 FT Lbs. (Export 0 )
3
NEW TRANSFORMER PRODUCTION WILL CEASE EARLY 1977.
.EXCEPT FOR 2 SMALL PRODUCERS FILLING A TEMPORARY MARKET VOID.
TRANSFORMER MAKE-UP DEMAND TO PHASE-OUT APPROXIMATELY 1.0 M LBS. (JAN. 1, 1977 TO PHASE-OUT).
DSW 442803
STLCOPCB4057338
CUSTOMER CONCLUSIONS ,3
CUSTOMER/MONSANTO INVENTORY CAPABILITY
CAPACITORS 2.4 FI LBS. (1.0 FI 77 PHASE-OUT)
TRANSFORMERS 1.2 M LBS. .(1,0 FI 77 PHASE-OUT)
MONSANTO
5.5 FI LBS. U4.0 M 1/0
CAPACITOR STORAGE EXCLUDES G.E. MONSANTO STORAGE INCLUDES TRANSFORMER FLUID STORAGE.
STLCOPCB4057339
5
PRELIMINARY MONSANTO CONCLUSIONS .1
'1977/78 AROCLOR 1016 DEMAND CAN BE PRODUCED IN 1977 BY OCT/NOV.
'4TH Q. 1977 + 1978 AROCLOR 1016 DEMAND OF 9.4 FI LBS. STRETCHES INVENTORY CAPABILITY.
TRANSFORMER FLUID DEMAND JAN. 1, 77 TO PHASE-OUT EQUIVALENT TO 3.5 FI LBS. AROCLOR 1254.
1977/78 AROCLOR 1016 DEMAND EQUIVALENT TO 7.0 FI LBS. AROCLOR 1254.
INCINERATION LOAD WILL BE APPROXIMATELY 3.5 FI LBS. + 1.0 FI LBS. IN 1976 = 4.5 FI LBS.
APPROXIMATE COST WILL BE $1.5 FI.
'
SPREAD OVER 1977/78 DOMESTIC SALES = 67LB.
DSW 442805
STLCOPCB4057340
6 PRELIMINARY mNSANTO CONCLUSIONS .2 1976 (2ND HALF)/1977/1978 TRANSFORMER FLUID DEMAND = 2.0 M LBS. TCB. ' HOOKER INVENTORY 800 M - 1100 M LBS. TCB SHORTFALL POSSIBILITY.
DSW 442806
STLCOPCB4057341
PROPOSED ACTION STEPS
m
7
1) Assumptions Listed
DW
2) #s Tabulated By Grade
3) #s/Assumptions------- PMP/RAP
DW DW
.? . '
A) Production Plan: Aug--------> Phase-Out
A) A-1016
B) A-1242 Replaces A-1016 (10% Accuracy Vol.)
EMP/MFG.
5) Biphenyl Needs For Diel. in 1977 (10% Vol.)
EMP
6) HB-40/Biphenyl/WCM Needs For 1977 (Marketing Input)
7) Biphenyl/Terphenyl #s------- Production CP
ENP/RAP
8) COGS Biphenyl/Terphenyl for 1977 (10% Vol.)
9) COGS Diel. (10% Vol.)
MFG 7lyi^/rc y MFG Ifal7<-
10) Decision On 1242 Case
OPERATING COMMITTEE
11) Price Plan To Phase-Out
DW
12) establish In-House Date To Cease Production.
OPERATING COMMITTEE
DSW 442807
STLCOPCB4057342
o PCB PHASE-OUT WRITEJDEF.-r. m Q..76
DOMESTIC
Capital Write Off
Plant Tank Cars
$ 500 N 250
Decontamination & Dismantling 1,250
Total Domestic
$2,000 M
o EX-USA
Capital Write Off
$
Decontamination & Dismantling
130 M 670'
Total Ex-USA
$ 800 M
WORLDWIDE TOTAL
$ 2,800
8
o DSW 442808 STLCOPCB4057343
1977 MAT FROM 3RD QUARTER FORECAST
MKT ADMIN. PRODUCT GP. FLD. SALES ADVERTISING
GENERAL ADMIN. MFG. MANAGEMENT
RESEARCH PRODUCT ACCEPTANCE ENGINEERING COMMERCIAL DEVELOPMENT
U. S. EXPORT MAT
25 110 10
A
68 AO
120 60 AO 50 507
12 513.
9
DSW 442809
STLCOPCB4057344
POTENT IAL ..EXTRAORD.I NARY ..COSTS
T/C $.250 M REPAIR
9 9 9
10
dsVNI 442810
STLCOPCB4057345
P, I, OBJECTIVES
11
1. 3RD QUARTER FORECAST FOR 1976 1977 TARGET
$ A.7 FI 2.5 FI
$ 7,2 FT
2. 1976 WITH $2.0 FI WRITE OFF 4TH QUARTER
1977 TARGET
$ 2.7 FI
4.5 FI $ 7.2 FI
Dsw^8n STLCOPCB4057346
PRICE-PLAN
1. Alii FOR INCREASE DECEMBER 1.
2. LAST INCREASE TO PHASE-OUT.
3. WITH QUALIFICATION OF A) RM B) VOLUME OFF FORECAST BY 10%.
12
0S\N A***12 STLCOPCB4057347
TRANSFORMER GRADE RATIONALIZATION
1. WESTINGHOUSE SERVICE SHOPS TO 70/30. 2. G. E. TO 70/30. 3. SUPPLY IN DRUMS AT DATE TO BE ESTABLISHED.
13
4*^ OS'N
STLCOPCB4057348
POTENTIAL 1977 P. I. (PRELIM.)
SALES M LBS. UNIT PRICE $ SALES $M COGS $FI GP $M MAT 20% CAPACITOR CONTINGENCY P.I.
22.0 0.65
14,3 7.3 7.0 0.5 1.0
5.5
22.0
0.60
13.2
'"
7.3
f~7 \
5.9
0.5
1.0
4.4 /o4
DSW 442814
STLCOPCB4057349
ACTION. REQUESTED
J//"
1. SUPPORT OF MANUFACTURING TO GENERATE PRODUCTION PLAN/ COSTS.
2. SUPPORT OF DEPT. HEADS TO DEFINE 77 MAT. -j
3. IDENTIFICATION OF EXTRAORDINARY COSTS.
A. AGREEMENT TO P.T. OBJECTIVES.
DSW 442815
STLCOPCB4057350
muiioaiiiu
r*OM N>Mf ..Locnw, David Wood-St. Louis-B2SD
REF ERCNCfc
July 12, 1976 PCB PHASE-OUT
TO
:
R. A. Pohl-B2SB E. M. Potter-B2NK
cc A. E. Leisy-1740 A. Koenig C. Paton
I attach a chart summarizing domestic customer input on volumes of dielectrics required to phase-out.
Our customers were not as helpful as we had hoped in detailing critical assumptions supporting their forecast. I have listed those comments which we did receive and separately, I have listed certain deductions which we have made which we will be checking with our customers.
We, also, attach details of customer storage capacities.
U. S. Export volumes reflect input from MOCAN and Latin America, our 2 major U. S. export markets.
We should consider 2 cases. A) Sale of existing product line. B) Replacement of Aroclor 1016 by Aroclor 1242 from Jan.
1, 1977, to phase-out.
Can you please develop for us an optimum production program based on this forecast for cases A and B.
Additionally, please advise sensitivity to a swing of - 10% on the volume forecast.
Cumming Paton will provide input on other polyphenyl needs during this period to put alongside the biphenyl need for dielectrics, to enable calculation of biphenyl COGS to flow to dielectrics.
In summary, we suggest the following action sequence.
IN - 10 RE V. 1 '72
DSW 442816
STLCOPCB4057351
-2-
Dielectric Price & Phase-Out Plan
1) Assumptions listed
2) #s tabulated by grade
3) #s/Assumptions--------^EMP/RAP
4) Production Plan: Aug--phase-out
A) A-1016 B) A-1242 replaces A-1016
4-
(-10% Accuracy Vol.)
5) Biphenyl Needs for Diel. in 1977 (10% Vol.)
Who DW DW DW
EMP/Mfg.
EMP
6) HB-40/Biphenyl/WCM needs for 1977 (Marketing Input)
CP
7) Biphenyl/Terphenyl #s---------^ production CP
EMP/RAP
8) COGS Biphenyl/Terphenyl for 1977
^10% Volume)
-
Mfg.
9) COGS Diel. (10% Volume)
Mfg.
OSMM 4428A7
STLCOPCB4057352
-3-
Customer Assumptions Capacitors Aerovox - 'Success with esters by inid-1978.
G. E.
- '7-8 M lbs. 1016 in 1977. 'Power converting to non-PCB starting in 1977. 'Some usage of Aroclor 1016 in 1978. Not prepared to give a number at this time.
Jard
- 'Convert to non-PCB in 4th quarter, 1977. 'Capacitor business strong in 1977.
Universal-
'Aroclor will be available until capacitor in dustry phases-out.
'Governmental restrictions on Aroclor will allow continued use without intolerable cost premiums.
'Aroclor capacitors will continue to be acceptable to end users.
'Unimpregnated metallized film capacitors will be
proved economically and technically feasible in low voltage fluorescent ballast applications and increasing portions of Totowa production will be switched over by end of first quarter, 1978.
Sprague - 'phase-out late 1977.
Cornell Dubilier -
'
'Forecast based on CDE using Aroclor 1016. Any engineering change of materials would alter the above estimate.
High, Energy
e - 'Will continue to use Aroclor 1016 as long as it
is available.
York
No replacement plans formulated. long as Aroclor is available.
Will use as
OS'N
STLCOPCB4057353
-4-
Westinghouse Bloomington -
*Phase-out of 1016 by 12/31/77.
'HV capacitors will be first area to phase-out
in face of customer pressure.
.
'Convert 2 ovens at a time as demand requires,
(forecast 2 each quarter '77, total of 8 ovens)
McGraw Edison
`Power capacitors will be mainly non-PCB
after Jan. 1, 1977. `Domestic power business for PCBs almost gone
now.
''11 need for exports to Europe.
`Expect to be finally converted by end-1977. *1/3 converted by end-1976.
Mallory
`Use '76 offtake as base.
''11 approximately same business activity as
`Non-PCB phase-in well underway by mid-'78.
'76.
EUC
`Reflects overall economy and effect of non-PCB fluids on Aroclor consumption.
Sangamo
`Monsanto desire to be out of production by end-
'11 if this accomodates industry needs.
`Market attitude turning against PCB power
capacitors.
Transformers G. E. Rome
*No Bl requirement second half, 1976. `Askarel transformer volume drops to very
low level 1977/78. *No B3 volume required 2nd half, 1977. *1977/78 requirement for Union Carbide and
Goodyear Atomic makeup. `Rome normal use 26 M per quarter 77/78.
DSW 442819
STLCOPCB4057354
-5-
Westinghouse,
S. Boston
- *1977/78 are not predictable.
1976 accurate to ten percent based on
bookings and bookings forecast.
'There will be some clearing of booked orders
in 1977.
Kuhlman
- 'Forecast 1 further T/T on basis of known requirements.
<ft
Helena-Van Tran-
Hevi-Duty
_ 'No further usage.
Westinghouse,
Sharon
- 'Small volume in '77 and then cease.
Buell
- 'One large production run fall, 1976. 'No orders for '77. 'One large delivery for single '78 order 350 M lbs.
Niagara Standard
- 'Will try to fill void in market in 1977.
- 'Will seek to supply through 'll.
Research Cottrell
- 'No further usage
Uptegraf
- *No further usage
G. E., Pittsfield '2 cars in second half, 1976 'No further usage
G. E. Service Shops -
*250 M lbs. of Pyranol A13B3-B3 in 'll. 'Could not give forecast beyond 'll.
Westinghouse Service Shops -
'Average of last 4 years x 1.75 should cover total need to phase-out 1977-79.
DSW 442820
STLCOPCB4057355
6- -
Assumptions Deduced From Forecast Data
Capacitors
1. No EPA ban on PCB before late, 1978.
2. PCB regulations will permit continued operation of capacitor plants using PCB.
3. Phthalate esters will work in lighting/small industrial capacitors.
4. Utilities will lead move to non-PCB power capacitors during 1977.
5. Fire safety problems will be solved in time to permit 1978 transition to non-PCB units.
6. Total demand for small industrial/lighting capacitors in 1977 will be approximately 110% of 1976 demand.
7. Monsanto will be able to produce Aroclor thorugh 1977, and sell Aroclor in 1978.
8. Prodelec/Bayer will increase market share in export markets during 1977 as we become cost uncompetitive.
9. Canadian timetable will be closely tied to U. S. time table by parent companies.
Transformers
1. Total service shop demand between June '76 and phase out will be approximately 1.4 M lbs.
2. There will be only 5 producers of askarel transformers after January 1, 1977, and this will drop to 3 by mid-1977.
3. All manufacture of new askarel units will cease by mid1978.
4. There will be sufficient TCB to suppor obligations.
our phase-out
/deb
Dav
Wood
os* 442821
STLCOPCB4057356
STORAGE CAPACITIES
Capacitor
Transformer
U. S. Gals.
U. S. GaIs.
Universal, Bridgeport
25,000
Westinghouse, S. Boston
20,000
Totowa
25,000
G. E., Rome
20,000
Aerovox
18,000
Kuhlman
3,200
Cornell Dubilier
20,000
Westinghouse, Sharon
28,000
Jard
22,000
Buell
8,000
Sprague
15,000
Niagara
6,000
High Energy
4,000
Standard, Warren
10,000
Westinghouse
30,000
Total
95,200
McGraw Mallory
15,000 4,000
1.2 M lb
EUC
25,000
Sangamo
11,200
G. E.
To be Advised
Total excl. G. E.
214,200
-- 2.4 M lbs
DSW 442822
STLCOPCB4057357
STLCOPCB4057358
Frf 'nj tfae desk of GUMMING PATON
^~.S fir/
/fc&je -Oqt n- &*/
s &?c**sc*jz*ry
F
a
DSW 442824
STLCOPCB4057359
/<?77 /oe-Y&5&01Mc^'T'S
()___Axcu^ha ouv^j cLUitcl-fi'c* &rtii
__ i)-CL
/ 9 *7 7 0^>(L plcL*Jr S
o <?5 n -/Co > a-'si S
/Hg- uniA____
6UV/~4-
STLCOPCB4057360
STLCOPCB4057361
STLCOPCB4057362
p c <5 7 "^ S /fr r<y*rc<z
Pc & -jy.
I. Business Plan
TABLE OF CONTENTS
Page No.
A. Strategic Summary B. Results and Goals C. General Summary of Action Steps D. Business Position Identification/Analysis
U.S. and ROW E. Critical Assumptions F. Technical G. Capital Program H. Manufacturing Capacity I. Business Position Identi./Anal. - Europe J. Financial
II. Capacitor Action Plan
1-1 1-1-2 1-3
1-5 1-9 1-10 1-14 1-16 1-17 1-20
A. U. S.
- 1. 2. 3.
TacticalApproach Alternatives Events Chart
II-l II-2 II-4
B. Europe - 1. Tactical Approach 2. Alternatives 3. Events Chart
11-14 11-15 11-16
III. Transformer Action Plan
A. Tactical Approach B. Trichlorobenzene Issue C. Europe D. Events Chart (Worldwide)
III-l III-l III-l III-2
IV. Impact on Related Business
A. Economic Dependence
1. U. S. Manufacture 2. Polyphenyl Tree 3. Europe
IV-1 IV-3 IV-4
V. Appendix
1. 2. 3. 4. 5. 6. 7.
8.
9. 10. 11. 12. 13.
Potential Problem Analysis - Capacitors Capacitor Dielectric Fluid Potential (Chart 1) Monsanto Capacitor Sales Forecast (Chart 2) Transformer Fluid Market (Chart 3) Capacitor Fluid Sales (U. S. Produced)(Chart 4a) Capacitor Fluid Sales (U. K. Produced)(Chart 4b) Transformer Fluid Sales (U. S. Produced) (Chart 5a) Transformer Fluid Sales (U. K. Produced) (Chart 5b) Toxicological Program Retrofit Opportunity Patent Position G. E. Timetable and Regulatory Situation Price Plan
V-l V-12 V-13 V-14 V-15 V-16
V-17
V-18 V-19 V-47 V-51 V-53 V-56
DSW 442828
STLCOPCB4057363
I. Business Plan
A. Strategic Summary
1. Withdraw from supply of chlorinated biphenyl dielectrics (PCB) in u.S.A./Canada when a suitable replacement is available, from whatever source. Date to be established by 8/1/76.
2. Establish MCS 1238 as the major replacement for PCB in capacitors in U.S.A. and Canada.
3. On the basis of (2), establish MCS 1238 as a major re placement for PCB in capacitors in Europe, japan, and other major markets as they move away from PCBs. Diccontinue production of PCB in Europe. Date to be established by 8/1/77.
4. Achieve worldwide performance income for total dielec trics of $4.4M in 1976 and $4.5M in 1979, which maintains the performance income through the transition period.
5. Continue transformer PCB replacement evaluation until late in 1976 and, if at that time no strong candidate can be supported, phase out PCB transformer fluids without a Monsanto replacement, at the same time as PCB capacitor fluids.
6. Resolve by mid-1976 the need for a second supplier for MCS 1238 in Europe, e.g. Prodelec or Bayer.
7. investigate growth opportunities in dielectric fluids through developmental programs, such as cable dielectric/ coolants and transformer oil modifiers.
B. Results and Goals
1. Results
a. Phase out of PCB production when a suitable replace ment is available, from whatever source.
b. Replace our present PCB capacitor fluid with a nonPCB fluid (MCS 1238), and:
1) Achieve in 1979 a _P.I. of $4.5M worldwd.de total dielectrics ($4.05M US-produced, $0.45M Europe). Position the business for future growth beyond 1979.
2) Achieve sales volume in 1979 of 19.5M pounds worldwide.
1-1
DSW 442829
STLCOPCB4057364
c. If we have a viable product, replace present PCB transformer fluids with a non-PCB fluid generating a minimum of 32% PI on sales, and with a sales volume of 6-10M pounds per year by 1979 in U.S.A. and Canada.
d. Maintain Monsanto image as a responsible company during transition from PCBs and in the clean-up phase following discontinuation of PCB production; while recovering the costs for this involvement, e.g. perform incineration of waste fluids on a break-even basis.
e. Be in a position to supply MCS 1238 in Europe in 1980 from a local blending facility, earning 40% gross profit minimum.
(Note:
Volume was estimated at 3M pounds per year, but Monsanto^ Europe requested a change to 5M to 6M pounds, which would adjust long range forecast in years 1979-85.)
Goals
a. Achieve a worldwi.de performance income in 1976 of $4.4M. ($4.0M US-produced, $0.4M European produced).
b. MCS 1238 blending ^facility in U.S.A. demonstrated at design rate (11M pound^ear) six months after G.E.'s commitment.
c. Obtain customer commitment to MCS 1238 early enough to support AR submission for project 3023 (non-PCB Dielectrics) by 12/1/77.
d. Reach a decision by late in 1976 on whether to continue a transformer fluid replacement program.
e. Obtain European customer commitment to support approval of an AR for European blending by January 1, 1978.
0SVJ 4`2830
1-2 STLCOPCB4057365
C. General Summary of Action Steps
1. Capacitors MCS 1238
a. Complete environmental study on MCS 1238 (excl. 2-year feeding study) by July 1976.
b. Obtain G.E. commitment to MCS 1238 sufficient to:
1) Support an interim blending facility (in production six months after commitment).
2) Justify a major plant (CEA 3023).
c. Cooperate as needed with capacitor industry/ insurance groups to obtain approval for MCS 1238 capacitors - in terms of fire safety.
d. Establish raw material supply sufficient for forecast volumes of MCS 1238 in interim blending facility; MCS 1238 supply to commence six months after G.E. Commitment.
e. Complete construction of interim MCS 1238 blending facility and start up six months after G.E. com mitment.
f. Obtain AR approval for CEW 3023 project (MIPB/ TXS/blending) by December 31, 1977.
2. Transformers MCS 1866*
a. Cooperate with G.E./Westinghouse to complete test transformer evaluation of MCS 1866 by June 1, 1976.
b. Cooperate with G.E. and Westinghouse/insurance groups to establish fire resistance rating for MCS 1866.
c. Establish by March 1, 1976 an environmental test ing program which will completely evaluate MCS 1839 and MCS 1866 by March 1, 1977, (excl. 2-year feed ing study).
d. Make decision by late in 1976 whether to continue a transformer replacement fluid program.
* A blend of 60% MCS 1839 (alkylated biphenyl) and trichlorobenzene (TCB).
DSiy 442831
1-3
STLCOPCB4057366
C. General Summary of Action Steps (continued)
3. International Involvement
a. Establish Canadian/Latin American MCS 1238 capacitor evaluation programs to support a request for their commitment in 1977 - June 1976.
b. Establish agreement with 7-8 Key European capacitor producers to schedule MCS 1238 trials sufficient to make a commitment by October 1977 - May 1, 1976.
c. Complete training of European technical personnel and provide technical documentation on MCS 1238 to support key customer and government activities in Europe - March 15, 1976.
d. Set up a program for transformers only when we have a viable product.
4. Pricing
a. Increase dielectric fluid domestic pricing March 1, 1976, and later in the year to cover the expenses of commitment and changeover from PCB.
b. Increase U.S. export price by at least 10% March 1, 1976 to achieve 1976 P.I. of $0.70M.
5. Growth Programs
a. Determine if there is opportunity for growth in new dielectric programs such as cable oils and transformer oil modifiers.
1-4
DSW 442832
STLCOPCB4057367
D. Business Position Identification/Analysis - U.S. & RCM
1. Our current rarige of products serve two major markets:
a. Dielectric liquids in capacitors (devices for storing electrical energy).
b. Dielectric/coolant in special* fire resistant power transformers, e.g. those in the 500-10,000 KVA range commonly used in factory and residential installations.
* Special - e.g., U.S.A. annual usage of^ PCB transformer fluids is approximately 1M gallons compared to usage of mineral oil transformer coolants of 90M gallons.
2. Capacitor Market
a. The worldwide potential expressed as M pounds of Aroclor is:
1974 1975 1976 1977 1978 1979 1980 1985
50 37
43 46 47 49
50 56
b. A geographic breakdown is given in Chart 1 in the Appendix V-12 (Capacitor Dielectric Fluid Potential)
c. In 1975 Monsanto held 58% of worldwide market.
d. Our major competitors outside of U.S.A. are:
Prodelec (France) - Monsanto Relative Share
Bayer (Germany)
- Monsanto Relative Share
3.2 6.4
e. U.S. market (40% of world market) is under pressure to convert to non-PCB dielectric.
f. Other world markets are forecast to follow later because they are not under the same environmental pressure.
g-
MCS 1238 Aroclor
We plan to progressively replace Aroclor worldwide with MCS 1238 (M pounds).
1974 1975 1976 1977 1978 1979 1980 1985
32.5
21.5
1.3 23.3
11.0 12.2
16.5 4.0
19. 0
20.
0
23.5 0
Chart 2 in the Appendix V-13 shows details of Monsanto Capacitor Fluids Sales Forecast.
1-5
DSW 442833
STLCOPCB4057368
D. Business Position Identification/Analysis (continued)
h. In converting to non-PCB replacement capacitor fluids, major competition will not be with other producers of identical products to MCS 1238, but with alternative technologies.
E.g.,
Dow Fluid XFS 4169L
Phthalate Ester
Metallized Plastic Film
Chloralkylene 12) Bichlorobiphenyl)
E
p
3. Transformer Market
a. The worldwide potential expressed as M pounds of Aroclor-Trichlorobenzene blends is:
1974 1975 1976 1977 1978 1979 1980 1985
51 53 50
47 56
59
62 76
(Note:
Aroclor on average represents 60% by weight of the blend.)
b. A geographic breakdown is given in Chart 3 in the Appendix v-14 (Transformer Fluid Market).
c. In 1975 Monsanto held 42% of the worldwide market.
d. Our major competitors outside of U.S.A. are:
Prodelec (France) Bayer (Germany)
- Monsanto Relative Share 1.8 - Monsanto Relative Share 4.9
(Note:
Both of these are basic in chlorinated benzene, while Monsanto purchases.)
e. The U.S. market (30% of world consumption) is under pressure to convert to non-PCB replacements. The French market (30%) and other European markets (22%) are not under the same pressure.
f. We presently seek to replace PCBs with an alternative fluid in U.S.A. and Canada only.
M Pounds
PCB trans former fluid
Non-PCB trans former fluid
1974 1975 1976 1977 1978 1979 1980 1985
21.5 20.7 17.2 10.2
2.2
0
0
0
4.2
6.0
7.5 10.0
1-6
DS\N 442834
STLCOPCB4057369
D. Business Position Identification/Analysis (continued)
g. in the transition from PCB competition will be:
- Silicones
- High flash point oil distillates
- Air-cooled designs
- Redesigned fire protected oil systems
4. Based on our market in chemical base dielectric fluids, we can seek growth opportunities for non-PCB fluids in new dielectric market segments, which we expect to arise from a world shortage of naphthenic-based oils, e.g. cable dielectrics/coolants and transformer oil modifiers.
5. Price Trend
a. Capacitor Fluids
1) Prices domestically have tended to follow costs to yield a gross profit in the range 40-45% (see Chart 4a in the Appendix V-15 - Capacitor Fluid Sales, U.S. Produced).
2) Prices in export markets have in recent years been relatively lower reflecting specifically French attempts to move volume. (See Chart 4a)
3) The cost of Aroclor represents 4-5% of the total capacitor cost so that capacitor cost is compara tively insensitive to fluid price.
4) We plan to price MCS 1238 to yield a 25% minimum performance income return on replacement capital (45% G.P. minimum).
1-7
DSW 442835
STLCOPCB4057370
D. Business Position Identification/Analysis (continued) b. Transformer Fluids 1) Prices domestically have tended to follow costs to yield a gross profit in the range 35-40% (see Chart 5a in the Appendix V-17 - Transformer Fluid Sales, U.S. Produced). 2) Prices in export markets have, while following costs, yielded relatively lower gross profits reflecting both the competitive edge of our competitors' basic position in chlorinated benzenes and the French intention to move volume. (See Chart 5a) 3) The cost of transformer PCB represents 20-25% of the cost of the transformer so that this market is much more sensitive to price change. Additionally, there is an ultimate ceiling on fluid price related to the cost of competing transformer installation designs. 4) To achieve the desired volume, our cost for any non-PCB replacement material must permit pricing no higher than 1.5 times 1975 PCB-blend price per gallon. At this level, we must be able to satisfy performance income criteria. 5) After product changeover to non-PCB fluids, there will not be the present relationship between capacitor and transformer prices because replacements are not from a common base stock.
DSW 442836
STLCOPCB4057371
Critical Assumptions
1. The capacitor industry will design around the reduced fire resistance of MCS 1238.
2. There will not he any government ban on PCBs in U.S.A. for capacitor/transformer use through 1977.
3. Some level of fire resistance below that of PCBs is acceptable for replacement transformer fluids and MCS 1866 meets such standards.
4. There will be no ban on electrical use of PCBs in Europe through 1978, but that European governments will move to support non-PCB requirements.
5. There will be no major growth in capacitor fluid volume usage 1976-1980.
6. MCS 1238 priced for 32% margin on sales performance income minimum maintains a cost/performance advantage over Dow XFS 4169L.
7. Phthalates will not be accepted as functionally suit able dielectrics for wide scale use in capacitors.
8. No major capacitor design changes which would rule out use of fluids are within two years of commerciali zation.
9. The transition timetables given us by our customers are reliable.
1-9
DSW 442837
STLCOPCB4057372
F. Technical
1. Capacitor Fluids
a. Function. A capacitor is a device to store elec trical energy. It consists of two electrodes separated by a dielectric medium. The functions of the medium are to store electrical energy between the two charged electrodes and to insulate one electrode from another. The ability to store energy is deter mined by dielectric constant (DK) and dielectric strength. The ability to insulate against complete electrical breakdown is measured by dielectric strength, against temporary breakdown by corona inception voltage, and against current leakage by dissipation factor (Df). Dielectric constant varies over a range of 1 to 100 with molecular structure while dielectric strength and corona voltage are less sensitive to structure. Low frequency dissipation factor measures ionic impurities, present initially in the fluid or resulting from breakdown in use, which conduct current across the medium.
Fluid impregnated paper or plastics have been the dielectric medium of choice because of their much higher dielectric strength as opposed to gases and their much greater ability to completely fill the void between charged surfaces as opposed to solids.
Capacitor designers seek fluids optimizing high di electric constant, high dielectric strength, high corona inception voltage and low dissipation factor with safety and low cost.
b. Industry Standard. Monsanto Aroclor 1016 with a high DK, high dielectric strength, low dissipation factor, historical low cost, and excellent fire resistance is the industry standard. It will eventually be re placed because of hazard to the environment.
c. Monsanto Replacement Fluid. MCS 1238 has the same high dielectric constant and strength as Aroclor and gives equivalent electrical performance in capacitors. Fire resistance is the only significant deficiency. Lack of fire resistance in MCS 1238 will be circum vented by capacitor manufacturers' use of fused designs. MCS 1238 biodegrades rapidly, does not bioaccumulate and has a low order of mammalian and aquatic acute toxicity, thus rectifying the environ mental objections to PCBs. Chronic toxicity studies are underway. Accelerated life tests in our labora tories demonstrate substantially equivalent life to
OS\N 442838
1-10
STLCOPCB4057373
Aroclor based capacitors. These results have been duplicated at General Electric and Electrical indus tries. Successful operation and performance has also been demonstrated in commercial processing equipment at GE, Cornell Dubilier and Electrical Utilities.
MCS 1238 is a blend of TXS (toylyl xylyl sulfone) and MIPB (monoisopropyl biphenyl). TXS is a very high dielectric constant material developed by us in sufficient purity to be usable in conjunction with stable low dielectric constant materials to give desired capacitor performance. We have use patent coverage which claims capacitors containing TXS with hydrocarbons. The biphenyl base of the IPB hydro carbon is significant to our family tree viability which also involves heat transfer and encapsulent fluid products. Processes for the MCS 1238 blend and raw material have been demonstrated. Final definition for full scale design is nearing completion.
Competitive Fluids and Technology
1) DOP and DINP esters (dioctyl phthalate and diisononyl phthalate) have been actively promoted as PCB replacements and are low cost products, but have the following deficiencies which are prevent ing their acceptance: low dielectric constant (75% of MCS 1238 and Aroclor) tendency to hydrolyze with use increasing dissipation factor, low corona inception and extinction voltages, inability to be used at all in power capacitors (30% of total market).
2) Dow XFS 4169L, a chlorinated aromatic, is the only other replacement candidate being significantly promoted. Although it does have good corona in ception and extinction voltages, its dielectric constant is also low (85% of MCS 1238) ,* it has a 7% density penalty to the customer and does not biodegrade as readily as MCS 1238.
3) Technologies which could impact use of MCS 1238 include tight wound metallized polypropylene film construction requiring no fluid impregnant (for low voltage capacitors) and all film construction where fluid impregnation does not increase capaci tance as much as for paper (for power capacitors). Both methodologies involve significant technical problems not resolved to date.
1-11
STLCOPCB4057374
2. Transformer Fluids
a. Function. A transformer is a device for converting power at one voltage to equivalent power at a different voltage. The functions of a transformer medium are to insulate the electrical components from each other and to remove thermal energy from power losses. Fluids have been widely used in power transformers because of their good dielectric strength and their superior ity over gases and solids in transferring heat by convection. Dielectric strength and heat transfer properties, in particular viscosity at low ambient temperatures, are the most important functional prop erties. Other properties important in practice are resistance to oxidative or hydrolytic deterioration in use, fire resistance in case of a catastrophic failure and safety in the environment.
b. Industry Standards
1) Mineral oils are the most widely used transformer oils because of their good electrical and heat transfer properties, stability and low cost. They are not used in fire-risk areas because they are combustible.
2) Askarels (mixtures of Aroclors and tri- and tetrachlorobenzenes added to reduce low temperature viscosity) are used in fire-critical areas because they do not support combustion, in addition to having good electrical and heat transfer properties, excellent stability and reasonable costs.
c. Monsanto Replacement Fluids for Askarels. MCS 1866, a mixture of alkyl biphenyl and TCB (trichlorobenzene) which has dielectric strength and heat transfer char acteristics similar to current Aroclor based products. Fire resistance is less than Aroclor/TCB, but slightly better than mineral oils. While biodegradation rate is slow, the acute toxicity is very low. Bioaccumula tion and fish toxicity studies are underway.
General Electric has rated the fluids as promising based on laboratory tests, and we have supplied them with fluid for the next phase of testing.
We have a process for production of development samples and are progressing toward a process of engineering design.
d. Competitive Fluids and Technology
1) Mineral oil is used in the majority of applications where fire hazard is low and can replace askarels
1-12
DSW 442840
STLCOPCB4057375
3. Technical Programs (1976 Budget $960 M)
a. Capacitors 1) Provide development quantities of MCS-1238 at a rate of at least 40,000 pounds/month ($200 M).
2) Complete process for engineering design of MIPB, TXS and MCS-1238 ($100 M).
3) Obtain toxicity and environmental data required for approval of MCS-1238 by industry and govern ment agencies ($100 M)-
4) Support commercial development of MCS-1238 ($200 M).
b. Transformers 1) Complete process and property optimization of MCS-1866 ($100 M). 2) Provide development quantities and develop process for engineering design for MCS-1866 ($110 M). 3) Evaluate alternates for TCB in blends with alkyl biphenyl ($50 M).
c. Long Range 1) Provide fundamental information leading to modified fluids of improved dielectric performance to solve future dielectric system problems ($75 M) .
4. Risk Because of Voids
Lack of accepted fire resistance standards for transformer fluids may lead to lack of acceptance of MCS-1866.
1-13
DSW 442841
STLCOPCB4057376
G. Capital Program (1976-1980)
1976 1) Over $2m 2) 500M - $2M 3) 0 - 500
List Projects
Total NFC Only
Location
Priority
AR Date
NFC $m
650*
1977 1) Over $2m 2) 500M- $2M
3) 0-500
CEA 3023
Europe MCS 1238 blending Total NFC
Only
Undecided
2
12/77
10,500
12/77
600
155
1978 1) Over $2M 2) 500M- $2m 3) 0-500
WGK Historical Replacement
165
1979 1) Over $5M (Only)
1980 1) Over $5M (Only)
* Europe NFC incl.
1-14
dsnn a2842
STLCOPCB4057377
G. Capital Program (continued)
1976 1) 0-500
Project
WGK Blending Plant
WGK Blending Ex pansion
Newport Effluent/ Waste Handling
WGK Misc. Aroclor Projects
AR No.
AR Date NFC ($M)
Req. 8683
-
*
**
450
100
- 76 25
- 76 75 $650M
* After receiving commitment from G.E. ** 6 months after the initial blending project
1-15
DSW 442843
STLCOPCB4057378
H. Manufacturing Capacity (Product Mix Basis)
Location 1 Aroclor WGK
M Lbs. Capacity M Lbs. Sales
% Occupancy
1975
1976
1977
1978
59,800 30,700
51.3
59.800 29.800
49.8
50,200
12,100
24.0
50,200 0
Location 2 Aroclor Newport
M Lbs. Capacity M Lbs. Sales % Occupancy
13,200 7,500 56.8
13,200 7,400 56.8
13,200 7,500 56.8
13,200 5,500 41.7
Location 3 MCS 1238 Interim WGK
M Lbs. Capacity M Lbs. Sales
% Occupancy
2,360 1,300
55
13,500 11,000
81
20,000*
16,500 82
* After completion of the $100M Expansion Project.
1-16
DSW 442844
STLCOPCB4057379
I. Business Position Identification/Analysis - Europe
1. Our current range of products serves two major markets, namely dielectric liquids in capacitors and special dielectric coolants in transformers.
2. Capacitor Market
a. The European potential for dielectric liquids in capacitors expressed as M pounds Aroclor is:
1974 21
1975 1976 17 20
1977 20
1978 21
1979 21
1980 21
1985 21
The growth is negligible because improvements in capacitor design which reduce the amount of liquid used are absorbing the normal growth of 5-10% p.a.
b. The split between Western and Eastern Europe is given in Chart 1 in the Appendix V-12 (Capacitor Dielectric Fluid Potential).
c. In 1975 Monsanto held approximately 25% of the European market.
d. Our major competitors in Europe are Prodelec, France (Monsanto relative share: 0.64); Bayer, Germany (Monsanto relative share: 1.25); with minor competitors, Caffaro, Italy and coquisa/ Flix, Spain.
e. Use of our product in Western Europe (70% of the total European market) is limited by OECD recom mendations, but there is no immediate pressure to convert to a non-PCB dielectric. Events in the U.S.A. however, together with pressure that can be brought into the OECD by the U.S. government, is likely to create the need for conversion.
In Eastern Europe, there is concern over worker safety and an increasing use of Western technology; to the extent that Western capacitor technology will in the future be based on non-PCB dielectric fluids, the same demand should be present in Eastern Europe.
1-17
STLCOPCB4057380
I. Business Position Identification/Analysis - Europe (cont'd)
f. We plan to progressively replace Aroclor with MCS 1238 (M pounds):
MCS 1238* Aroclor
1974 6.8
1975 5.5
1976 5.9
CN
o
1977 6.0
1978 1.0 4.0
1979 5.7
_
1980 6.0
_
1985 6.5
_
g. In converting to replacement fluids for capacitors, major competition will not come from products iden tical to MCS 1238, but from alternate technologies.
E.G., Prodelec's Chloroalkylene 12 (Alkylated Dichlorodephenyl, which might be ruled out because of its similarity to a PCB).
Dow Fluid XFS-4169L (Butylated Monochloro Diphenyl Oxide and Esters.
3. Transformer Market
a. The European potential expressed as M pounds of Pyroclor (Aroclor + Trichlorobenzenes) is:
1974 28
1975 1976 27.5 25
1977 23
1978 25
1979 26
1980 28
1985 30
b. Our market is in Western Europe, as the Eastern bloc is self-sufficient with locally manufactured askarel.
c. in 1975 Monsanto held approximately 10% of the European market.
d. Our major competitors in Europe are:
Prodelec, France - Monsanto relative share 0.19
Bayer, Germany
-
"
" " 0.27
Caffaro, Italy
-
"
" " 0.44
Coquisa/Flix, Spain- "
" " 0.47
e. The European market is not under the same pressure as the U.S. market to convert the non-PCB replace ments. However, events in the U.S.A. will affect Europe, both via the media and the OECD.
* Volumes do not agree with business group results. See note on page 1-2.
1-18
DSl/V 442846
STLCOPCB4057381
I. Business Position Identification/Analysis - Europe (cont`d)
f. We will decide whether to seek to replace our current PCB business with an alternative only when replacements acceptable to the U.S. market are defined.
There are already higher cost alternative safety transformer systems, e.g., dry type transformers, cast resin transformers, specially protected mineral oil filled transformers, etc. Any new replacement fluid must be able to compete on a cost/performance basis with the existing systems.
4. Profit Trends
a. Traditionally this business yielded 25-30% gross profit (see Chart 5b), but in the last two years, price controls and competitive activity have kept market prices low.
b. The cost of Aroclor represents 5-10% of the cost of most capacitors. The impact of fluid cost is minor. However, in the case of transformers, the fluid cost is 25-35% of the cost of the transformer and there is a limit on fluid price since alterna tive safety transformer systems already exist.
c. Non-PCB Capacitor Fluids
MCS 1238 to yield 30% G.P. and P.I. minimum 20% on replacement capital.*
d. Non-PCB Transformer Fluids Position to be defined.
* These targets, as supplied by Monsanto Europe, must reconcile with Corporate goals. These are under discussion with Europe and will be resolved before the final European plan is published.
1-19
DSW 442847 STLCOPCB4057382
J. Financial (To be provided)
1-20
DSW 442848
STLCOPCB4057383
II. Capacitor Action Plan - U.S. A.l - Tactical Approach
The detailed events on the following pages are premised upon the "main line" course of action. At certain points in the program there are alternative routes that may prove better and, if they are taken, then some of the detailed action plans must be modified.
The "main line" can be summarized as follows:
1. Our choice of product for replacing PCBs in capacitors is MCS 1238, a blend of monoisopropyl biphenyl (MIPB) and tolyl xylyl sulfone (TXS).
2. We will move rapidly to establish an interim blending and treating operation at Krummrich Plant within 6 months of a customer commitment. This project could readily be debottlenecked to permanently serve our needs, but may prove to be a temporary installation if another site is chosen for self-manufacture of MIPB and TXS.
3. We will complete and sign contracts for toll manufac ture for MIPB and TXS blend components in time to begin shipments within time parameters defined by major customers.
4. The Monsanto pricing plan will be completed by March 1, 1976 detailing interim and long-term pricing for MCS 1238, as well as an escalation schedule for PCBs as phase-out approaches.
5. We will determine the target date to cease manufacture of PCBs by August 1, 1976.
6. Documents and activities leading to self-manufacture of TXS and MIPB will be timed to postpone major capital commitments until results of 2-year medical studies can be foreseen with greater evidence.
Tentaive Dates: PIR 6/77; AR 12/77.
Alternative considering U.S."
courses and circumstances which might lead to adopting them are discussed under "Alternatives
-
II-l
0SVM
'
STLCOPCB4057384
II. Capacitor Action Plan - U.S.
A.2 - Alternatives
1. Products
From a technical standpoint, there probably a number of hydrocarbon base stocks that could serve the role of MIPB, which was selected because it will be low in cost and supports the polyphenyl investment. The role of TXS as an enhancer of dielectric constant is more unique. There may be slightly different sulfones that would work, but all should be covered by our patent. Another area of chemistry which has not been fully explored is in aromatic ketones, but they would be much more expensive.
From the standpoint of meeting our timetable for com mercialization, we must remain with MCS 1238, if some unforeseen weakness is found in the product, at least one year will be lost in changing to something else. Therefore, if MCS 1238 fails, we would question the viability of a continuing effort in capacitor fluids.
2. Plant Sites
Most of the site evaluation work has concerned adapta tion of Aroclor equipment at Krummrich Plant and phosphate ester/Santosol 100 equipment at Delaware River Plant, which was rejected because of lack of capacity in existing equipment. Capital requirements and available time favor Krummrich -- but at Krummrich we are faced with a potential problem of PCB contamination of at least the first few batches. The "main line" plan has assumed that the contamination can be held to a level that is low, temporary, and acceptable, and a blending project using PCB equipment is underway using pre-approved authority funds.
A third alternate, using potentially idle Silica and plasticizer equipment at Everett, is under evaluation. MIPB manufacture and MCS 1238 blending could be done in this equipment. This could be the lowest capital route to in-house manufacture of MIPB and without any question of PCB contamination. Based on preliminary capital estimates, it has been decided to have both raw materials, TXS and MIPB, made by converters. However, Everett remains a potential site for blending. A decision is expected by mid-March.
II-2
442850 OSV'1
STLCOPCB4057385
3. Timing of Major Investments
The main line plan calls for deferral of commitments to major investment until interim results of two year feeding studies are known, specifically the Master List calls for approval of a $10.5M project in December 1977. However, if evaluation shows that capital for the Queeny site for TXS is low (<$1M), then earlier implementation should be considered. To get adequate quantities of TXS at acceptable cost through toll manufacture, we must commit to a lump sum of $600M to set up facilities. If the capital for internal manufacture is not much more, it seems more desirable to spend the money to build our own unit rather than someone else1s, provided payback time on the increment is short. A recommendation on this point is scheduled for February on the Events Chart.
A similar situation may exist in an Everett project for MIPB. If both these possibilities materialize, no Master List project would be needed.
The European capacitor action plan starts on 11-14.
II-3
SW 442851
STLCOPCB4057386
II. A. 3 - Capacitor Action Plan (Events Chart - U.S.)
TIMING_____________________________________ACTIONS_________________________________ Jan. 1976
DEC IS IONS/APPROVALS
1/31 Research geared to 4QM pounds/month production
Feb. 1976
2/11 Presentation completed on medical/ environmental package
2/17 Visit to G.E. to quote price for research volumes of MCS 1238
2/28 Detailed storage trials underway
a
CO
-U
croo Ol ro
STLCOPCB4057387
TIMING
_______________________ ACTIONS___________________________
March 1976 '
3/1
Complete pricing study for both short and long term, based on replacement capital
DECISIONS/APPROVALS
3/8 Visit to G.E. to quote interim and long term pricing
3/22 Potential visit to Westinghouse on transformer blend grade change to facilitate interim blending (if WGK is selected)
3/15 Decision on location for interim MIPB and TXS
3/15 Decision on site for interim blending
April 1976
4/1 Present test data and protocol to
federal agencies
.
4/1
Recommendation to Management on potential in-house interim manufac ture of TXS and MIPB (assumes low capital)
4/15 Complete contract signing for toll manufacture (MIPB and TXS)
%Otn
4/15 Complete 'business/economic review for go/no-go recommendation to CAC
rcoo 4/15 issue report on various acute ccno toxicity tests
4/1 Decision from G.E. Need favor able response
4/15 AR approval of WGK or Everett
project
'
4/15 Decision on sites for in-house manufacture of MIPB and TXS and companion blending facility
4/22 Favorable CAC decision
STLCOPCB4057388
--TIMING
ACTIONS
May 1976
5/1 Final shipments of 100-42 to Westinghouse (if WGK chosen)
DECIS IONS /APPROVAL
June 1976
6/1 Approved PED's for TXS and MIPB to CED
O
&&
to CO
CP t*
6/15 Decontamination of used equipment for MCS 1238 blending complete (if WGK chosen)
STLCOPCB4057389
TIMING
July 1976
ACTIONS
7/1 Results of various feeding studies
7/15 Determine need to debottleneck blending
DECISIONS/APPROVALS
Aug. 1976 i
8/15 Complete AR to debottleneck blend ing to 20M lb/yr (if needed)
8/15 Establish patent licensing policy
DSW 442355
*
STLCOPCB4057390
TIMING
Sept. 1976
ACTIONS
9/1 Start up toll manufacture of TXS and flashed MIPB
9/1 90 day feeding test results on MIPB and TXS
decisions Approvals
9/1 AR approval for debottlenecking of blending system (if needed)
9/15 Release tank cars as needed from Aroclor 1016 service for decontamin ation and conversion to MCS 1238 service
Oct. 1976
10/1 Start up WGK blending
10/15 Demonstration of rate and quality at WGK
O 10/15 Begin shipments from WGK C/5 g -fPOi
CO
U1 05
*r
STLCOPCB4057391
TIMING 1st Qtr '77
ACTIONS
DECISIONS/APPROVALS
3/1 Demonstrate debottlenecked blending rate at WGK.
h 2nd Qtr '77 HO
5/77 Customer long-term commitment to 1238.
6/77 PIR approval on project for in-house manufacture of MIPB and TXS.
6/77 90-day results from chronic feeding study.
DSW 442857
STLCOPCB4057392
TIMING 3rd Qtr *77
ACTIONS
DECISIONS/APPROVALS
8/77 ARDT from CED to Roger Beal. '
AR grade sales forecast to Roger Beal.
4th Qtr '77
11/77 Final draft AR complete.
12/77 12/77
CED begin Project Definition Report.
Final shipments of Aroclor 1016.
Begin final decontamination of equipment and tank cars.
12/77 AR approval for in-house manufacture of MIPB and TXS.
DSW 442858
STLCOPCB4057393
TIMING 1st Qtr '78
ACTIONS
3/78 Decontamination work complete.
DECISIONS/APPROVALS 1/78 6-month inhalation study results.
2nd Qtr '78 3rd Qtr '78 4th Qtr '78
4/78 Results of 2 year chronic studies on MIPB & TXS.
STLCOPCB4057394
11-13
TIMING______ _______________________ACTIONS__________________________
1st Qtr '79
1/79
Begin field construction of MIPB and TXS facility
DECISIONS APPROVALS
2nd Qtr '79
3rd Qtr '79
*
h 4th Qtr '79 H I Vu->*
12/79 Start up in-house manufacture of .MIPB and TXS
1st Qtr '80
2/80 Demonstrate rate and quality
o
t* to CO CD O
STLCOPCB4057395
II. 3.3 - Capacitor Action Plan - (Events Chart - Europe^
TE-: ____________________________ACTIONS Jan t 76
DECISIONS/APPROVALS
I
Feb. :j6
2/20 Recommendation on European approach to oECDEa-rch 15 meeting.
2/lp Complete Europe product evaluation plan.
D
CO
2/28 Approval of European product evaluation plan.
CC5O
11-16
STLCOPCB4057396
TIMING
1st Qtr. '78
1/1
ACTIONS
European Inventory (3 mo. sales) in place.
DECISIONS/APPROVALS
1/1 AR approval for European blending plant
2nd Qtr. 78
o CO 4N^J
CO
o> hO
82-11
STLCOPCB4057397
III. Transformer Action Plan
A. Tactical Approach
1 The actions on the following pages are necessarily less detailed than those related to capacitors, since we are not certain that we have a viable product. We do have a candidate in a blend of MCS 1839, a highly alkylated biphenyl, with trichlorobenzene. The actions described are intended to bring us to go/no-go decisions at various steps toward commercialization; if the product survives them, it will be necessary to re-examine the plan and detail the further steps involved in justify ing dedicated facilities.
2. One step in the plan is firm -- U.S. production of the present PCB-based transformer blends will cease essen tially concurrently with PCBs for capacitors, whether a replacement has been qualified or not.
B. Trichlorobenzene Issue
1. The most serious obstacle to success of 1839 is that it has only exhibited the needed low-temperature viscosity when blended with trichlorobenzene (TCB). TCB has been used for the same purpose in blends with PCB for many years and also is widely used as an intermediate and a solvent. While TCB has not yet acquired any environ mental notoriety, there is a good probability that it will do so in future years -- being a chlorinated aromatic, it may well exhibit biomagnification, persis tence or other unfavorable characteristics.
2. The only U.S. source of electrical grade TCB is Hooker, who make it as a by-product of Lindane. They may not be ready to spend the effort and money needed to assess and defend its environmental acceptability.
3. We conclude that the current program should continue for the time being on the basis of blends with TCB, but before significant investment is made, a full resolution of the TCB issue is mandatory -- preferably by finding a non-chlorinated diluent.
C. Europe
No separate European Events Chart has been prepared. For now, the only appropriate plan is for periodic communication as to status, with more detailed plans firmed up when we conclude that we do have a viable product. Final shutdown of Newport askarel production will be determined by 8/1/77.
III-l
DSW 442863
STLCOPCB4057398
III. D. Transformer Action Plan (Events Chart - Worldwide)
TIMING
ACTIONS
1st Qtr '76 2/76 Solicit customer information on materials compatibility
2/76 Obtain GE/Westinghouse agreement to model testing program
3/76 Identify site and rough economics of interim manufacture
3/76 Define fire test program
DECISIONS/APPROVALS
2nd Qtr '76 Ki )
4/76 5/76
Analyze research program for find ing a replacement for TCB as a diluent
Conclusion on patentability
6/76 Begin 90 day feeding studies
4/76
Management decision to accept TCB or alternate diluent program or drop
O Ch
Ji-
to
00
<D
Ill
STLCOPCB4057399
III. D. Transformer Action Plan (Events Chart - Worldwide)
TIMING 3rd Qtr '76
7/76 7/76
ACTIONS____________________________________ DECISIONS/APPROVAI^S
AR grade estimate prepared for interim manufacture.
Obtain GE/Westinghouse results on transformer model test pro gram.
rp 4th Qtr '76 30
O w a>.
K3 CO
03 UI
9/76
9/76 9/76 9/76
Check 1839 blends against
emergent fire safety stan dard.
9/76 Interim approval of EC 202 including
resolution of TCB issue.
Results for 90-day feeding studies.
9/76 Customer commitment to interim
manufacture.
AR grade forecast to R.E. Beal 9/76 Decide GO/NO GO on transformer pro
Complete MCS 1866 Review Report
gram.
10/76 AR for interim manufacture
in existing facilities.
10/76 Begin 2-year feeding studies.
10/76 Initiate European planning
process.
10/76 AR approval for interim
manufacture.
12/76 Alternate diluent found or
search abandoned.
III-3
STLCOPCB4057400
Ill
III-D Transformer Action Plan (Events Chart - Worldwide)
TIMING 1st Qtr
___________________________ACTIONS________________________________
'77 1/77 Complete site study for economic evaluation for long-term manufacture
DECISIONS APPROVALS 1/77 Site selected
2nd Qtr 'll
3rd Qtr 'll
4th Qtr 'll 10/77 Begin interim manufacture
*
11/77 1-year results of 2-year feeding studies
12/77 PIR submission for permanent ' facilities
1st Qtr '78 2nd Qtr '78
AR submission for permanent facility
DSW 442866
STLCOPCB4057401
1976 BUDGET
LYPHENYL IV--3
TREE
STLCOPCB4057402
IV. Impact on Related Business A.2 Economic Dependence - Europe
PCB's represent only 26%> of our European polypheny^
output, but
of sales revenue. Immediate loss
of PCB's would put the complex at a negative perfor
mance income, but there are more options available
to correct the problem than in the U.S. In addition
to the therapeutic effect of a successful MCS 1238
program, the following actions can be taken:
1. Increase merchant biphenyl volume.
Increase capacity for hydrogenation of terphenyl
for Santosol 3^0 and/or Santotherm 66, either by
debottlenecking from 1500 to 2000 tons/year or
'
by a major expansion to 5000 tons/year, depending
on the degree of customer commitment to the prod
ucts. While these actions would have a negative
effect on U.S. economics (by replacing U.S. exports)
the worldwide effect would be positive because of
the more favorable flowsheet balance in Europe,
and reductions of freight and tariff.
3. Europe can also follow any U.S. lead on new poly phenyl derivatives.
Impact of MCS 1238 on our European business is illus trated in Table II (using a 2000 ton/year volume of hydrogenated terphenyl in 1978 as an example).
Except for the "1976 Budget" column, these figures are very rough and are only intended to indicate direc tion. More detailed analysis is to be completed during 1977. This study must answer the question of interdependence of the MCS 1238 program and a major HB-40 expansion.
VJ
DSW 442868
IV-4
STLCOPCB4057403
oo
!
t
i
Sales Revenue $M
Gross Profit $M %
l
Performance Income . # on Gross Inv.
TABLE II
1976 Budget with PCBs
$ 5920
1510 25
916 18*
. 1976
1978
Without Dielectrics Without Dielectrics
2705
4320
459 17*
1070 25#
!9U>
519 ' 1556
1973 with 2600T MCS 1238
8740
2557 297
156^ 293
H
? in
acn
rooo <t7o>
STLCOPCB4057404
Potential Problem;
Viable competition emerges to reduce our market share to an unacceptable level.
1. Dow fluid succeeds in power capacitors, perhaps with a sulfone boost.
2. Small capacitors switch to phthalates and/or "dry" technology.
Preventive Actions:
1. Consider further patent activities to block use of sulfones by others.
2. Tout the absence of halogen in 1238, look for weak nesses in competitive fluids.
3. Meet competitive prices on a cost/performance basis.
4. Begin aggressive promotion of 1238 as the PCB replace ment during 2nd Quarter 1976 to preempt emergence of other competitors after 9/1/76 issuance of testing protocol.
5. Seek contractual commitments from major customers.
Contingency Actions:
1. If market share is clearly lost and competition has no serious weakness, re-assess continuing in the dielectrics business.
V-2
DSW 442870
STLCOPCB4057405
V.4 - Appendix
CHART 3
WORLD AREA
U.S.A. West Europe Canada Miscellaneous
TOTAL
TRANSFORMER FLUID MARKET (M LBS. EXPRESSED AS AROCLOR/TCB BLEND)
M/I %
'74
'75
'76
' 77
' 78
* 79
100 7-10
100 25
14 14.5
10
5 12 14
30 31.5 33 35 37 38
33
3 333
44
4444
42
51 53
50 47 56 59
'80
15 40
3 4
62
'85
18 51
3 4
76
iDn
b. ho oo -I
STLCOPCB4057406
V.51 Appendix
CAPACITOR FLUID SALES (U.S. Produced)
CHART 4a
1970 1971 1972 1973 1974
1975
DOMESTIC
SALES
M Lbs
$M
GROSS Profit t-
27583
3872
1725 44
17369
2748
978 35
22654
4271
2108 49
37742
7756
2259 29
22098
6731
2753 40
13468
5092
1957 38
EXPORT
SALES
M Lbs
$M
GROSS Profit fL
4717 3288
699 485
255 36 118 24
3069 4333 2483
517 139 27 837 276 33 720 264 37
2270
968 332 34
TOTAL D & E
SALES M Lbs $M
GROSS Profit
32300 4571
1980
20657 3233 25723 4788
1096 2247
42075 8593 24581 7451
2535 3017
15738 6060
2289
O C/)
c fo
00
NO
*r
STLCOPCB4057407
V.61 - Appendix
TRANSFORMER FLUID SALES (U.S. PRODUCED)
CHART 5a
1970 1971 1972 1973 1974 1975
DOMESTIC
SALES
GROSS
M Lbs
$M
PROFIT
%
M Lbs
EXPORT
SALES
GROSS
$M PROFIT
%
TOTAL D & E
SALES
GROSS
M Lbs
$M
PROFIT
15902
2494
956 38 5454
853
259 30
21356
3347
1215
14007
2571
879 34 5383
926
262 28
19390
3497
1141
11384
23 78
825 34 3673
686
172 25
15057
3064
997
13415
2751
864 31 4014
802
202 25
17429
3553
1066
13870
4522
1516 34 4093
1290
333 26
17963
5812
1849
14202
5884
2326 40 4454
1791
532 30
18656
7675
2858
O </>
N>
CO
CO
STLCOPCB4057408
HEALTH & ENVIRONMENTAL ASSESSMENT MCS1238
Available data on Isopropyl Biphenyl Tolyl Xylyl Sulfone MCS 1238
Outline of the test underway Bioaccumulation data Metabolism data Biodegradation data
STLCOPCB4057409
RAT ACUTE ORAL TOXICITY
Signal LDS0
MCS
Word g/kg Category IPB TXS 1238
Danger <.05
Highly
--
--
--
<
i
Toxic
to
Warning .05-.5 Moderately
Toxic
Caution .5-5
Slightly Toxic
5.0
3.8
>5 Practically Non-Toxic
7.6 _
DSW 442875
STLCOPCB4057410
RABBIT ACUTE DERMAL TOXICITY
Signal Word Danger
*
Warning
Caution
--
LD,o mg/kg
<.2
.2-1
1-5
>5
Category
Highly Toxic
Moderately Toxic
Slightly Toxic
Practically Non-Toxic
IPB
--
>10.2
TXS
--
>7.9
MCS 1238
--
>5.0
STLCOPCB4057411
I
SUBACUTE MAMMALIAN TOXICITY 90-DAY RAT FEEDING STUDIES
IPB
Dietary
Concentrations: 0, 100, 300 and 1000 ppm
<
i
Parameters Evaluated:
to u>
Behavioral activity Clinical chemistry
Food consumption Organ weights
Body weight
Gross pathology
Hematology
Histopathology
No Adverse Effect Level: 1000 ppm
DSW 442877
STLCOPCB4057412
SUBACUTE MAMMALIAN TOXICITY 90-DAY RAT FEEDING STUDIES
TXS Dietary Concentrations: 0,1000, 3000 and 10,000 ppm
Completion 7/76
MCS 1238 Dietary Concentrations: 0,100, 300 and 1000 ppm
Completion 7/76
STLCOPCB4057413
MCS 1238 ACUTE MAMMALIAN TOXICITY
<
Acute Oral LDSo
3.8 g/kg
l NJ
Rats
Slightly toxic
<J1
Acute Dermal LDSo ' >5.0 g/kg
Rabbits
Practically non-toxic
Skin Irritation Rabbits
3.6/8.0 Moderate irritant
Eye Irritation Rabbits
12/110 Slight irritant
DSW 442879
STLCOPCB4057414
SKIN SENSITIZATION
Human Skin Patch Test, Repeated Application
Number
IPB TXS
Of Subjects................................................ 50 50
< > With Irritation............................................. 0 0
^ With Skin Fatigue..................................... 0 0
1 Sensitized
Completion 3/76
DSW 442880
STLCOPCB4057415
DSW 442881
I
SUBACUTE MAMMALIAN TOXICITY 4-WEEK INHALATION STUDIES Vapor Concentration 6 hours/day-5 days/week (mg/cubic meter)
IPB..........................................................................0,10 and 100 TXS.........................................................................0,10 and 100
Parameters Evaluated Behavioral activity Respiratory response Gross pathology Histopathoiogy
Completion 4/76
STLCOPCB4057416
DSW 442882
CHRONIC MAMMALIAN TOXICITY TWO-YEAR RAT FEEDING STUDIES
Dietary Concentrations (PPM) IPB......................................................... 0, 500 and 1000 TXS...................................................... 0, 1000 and 3000 MCS 1238...................................0, 100, 300 and 1000 Parameters Evaluated: Chronic Toxicology Oncology
Completion 7/78
STLCOPCB4057417
ACUTE AVIAN TOXICITY 8-day LCSo PPM
1PB
Bobwhite Quail.. >10,000 Mallard Ducks... >10,000
TXS MCS 1238
>10,000 >10,000 > 10,000 > 10,000
Practically Non-Toxic = > 5000 ppm Slightly Toxic = 500 to 5000 ppm
STLCOPCB4057418
1
ACUTE FISH TOXICITY 96-Hour LCso PPM
1PB TXS MCS 1238
Bluegills................................ 5
8
11
Rainbow Trout..................... 10-100 8
8
Slightly Toxic - 10 to 100 ppm Moderately Toxic = 1 to 10 ppm Highly Toxic -- <1 ppm
o
\
to
CO CO
STLCOPCB4057419
BIOACCUMULATION IN MAMMALS (RATS)
-25 PPM DIELECTRIC FLUID IN DIET - 30 DAY EXPOSURE, 75 DAY RECOVERY - FAT SAMPLES COMPOSITED PERIODICALLY - EXTRACTED, ISOLATED AND ANALYZED
V-32
442885 ds\n
STLCOPCB4057420
FAT TISSUE RESIDUE LEVEL VS. TIME
25 PPM FEED LEVEL FOR RATS
TIME (DAYS)
V-3 3
OSVN/ 442886
STLCOPCB4057421
DIELECTRIC FLUID ACCUMULATION FACTORS
FLUID MCS 1238 AROCLOR 1016 AROCLOR 1242
ACCUMULATION FACTOR* 0.04 0.9 1.4
ACCUMULATION FACTOR = {TISSUE CONCENTRATION/ FEED CONCENTRATION) AFTER 30 DAYS
V-34
DSW 442887
STLCOPCB4057422
BIOCONCENTRATION POTENTIAL
EQUILIBRATE FLUID BETWEEN WATER AND 1-OCTANOL DETERMINE CONCENTRATION IN EACH PHASE CALCULATE PARTITION COEFFICIENT (Co/Cw) ESTIMATE BIOCONCENTRATION FACTOR
V-35
DSW 442888
I [
I
STLCOPCB4057423
PARTITION COEFFICIENTS (LOGARITHMS)
PRODUCT BIPHENYL
LITERATURE 4.1
DIPHENYL SULFONE
2.4
ISOPROPYL BIPHENYL
TOLYLXYLYL SULFONE
MCS 1238
CALCULATED
5.6 4.1 4.7
EXPERIMENTAL 4.1 . 2.5 5.5 3.9 4.5
V-36
DSW 442889
STLCOPCB4057424
BIOCONCENTRATION FACTORS (BF) LOG (BF) = 0.54 LOG (P) + 0.12
PRODUCT BIPHENYL ISOPROPYL BIPHENYL TOLYLXYLYL SULFONE MCS 1238 TRICHLOROBIPHENYL TETRACHLOROBIPHENYL
CALCULATED
LOG P 4.1 5.5 3.9 4.5 6.2* 6.9*
BF 200 1200 160 400 3200 6300
V-37
DS\I\J 442890
STLCOPCB4057425
FUTURE BIOACCUMULATION STUDIES
- C14 METABOLISM IN RATS - C14 BIOCONCENTRATION IN FISH
V-38
DSW 442891
STLCOPCB4057426
BIODEGRADATION
MICROBIAL ORGANISMS - NATURALLY OCCURRING ULTIMATE - C02,H20, INORGANIC SALTS PRIMARY - DISAPPEARANCE OF TEST MATERIAL
V-39
DSW 442892
STLCOPCB4057427
ULTIMATE BIODEGRADATION
V-40
4A2&93 pSMM
STLCOPCB4057428
ULTIMATE BIODEGRADABILITY C02 EVOLVED IN 35 DAYS
PRODUCT MCS 1238
PER CENT OF THEORY 52
AROCLOR 1016
11
DEXTROSE
80-90
C12 LINEAR ALKYLBENZENE 60-80
SULFONATE
V-41
DSW 442894
STLCOPCB4057429
PPJr.lARY BSODEGRADATEOPJ OF [\T.CG 1238
08
Time (Minutes)
V-42
DSW 442895
STLCOPCB4057430
PRIMARY BIODEGRADABILITY
PER CENT BIODEGRADATION
MCS 1238
1-DAY 62
7-DAY 87
ISOPROPYL BIPHENYL
78
95
TOLYLXYLYL SULFONE
32
69
V-43
DSW 442896
STLCOPCB4057431
FUTURE BIODEGRADATION STUDIES
C14 BIODEGRADATION IN SOIL C14 BIODEGRADATION IN RIVER WATER
V-44
OSVM 442897 STLCOPCB4057432
MCS1839 HEALTH AND ENVIRONMENTAL PROGRAM
8-day LCso Bobwhite Quail
6-month Inhalation study
8-day LCso Mallard Ducks
90-day Rat feeding
Microbial mutagenic plate assay 2-year Rat feeding (screen)
Mouse lymphoma mutagenicity Chronic fish toxicity/reproduction
Rat teratogenicity
Tissue residue accumulation
Human skin patch test
14c Metabolism--Rats
4-week Inhalation study
14q Fish residue
STLCOPCB4057433
MCS 1839 ACUTE MAMMALIAN TOXICITY
Acute Oral LD 50
>15.8 g/kg
<
Rats
Practically Non-toxic
i
Acute Dermal LDSo
> 7.9 g/kg
G">
Rabbits
Practically Non-toxic
Skin Irritation Rabbits
0/8 Non-Irritating
Eye Irritation Rabbits
0/110 Non-Irritating
DSW 442899
STLCOPCB4057434
J. J. Zemail - B2SK
January 22, 1976
V--10. Retrofit Opportunity
R. G. Potter'
As part of the PCB Task Force planning exercise, we considered the possible opportunity of undertaking a program to retrofit askarel containing transformers. This was a natural item to consider as part of our planning. After due consideration, the Task Force has decided and will recommend that Monsanto not enter into such a program.
The reasons for this are that such a program would greatly increase Monsanto's liability and exposure to PCB contamina' tion in the environment. Also, part of the transformer retro fit would be the re-rating of the transformer and the issuing of a new warranty. This obviously has to be the responsibility of the transformer manufacturer.
The only area we have decided Monsanto should enter would be to supply the fluids used for retrofitting. We also have decided and recommended that we not be involved in the incineration of askarel fluids. This was decided because it would require large quantities of PCB containing materials being handled within a Monsanto site, which would make it difficult for Monsanto to meet any forthcoming PCB discharge standards.
Obviously this does not preclude some other technology for de struction of PCB's, only that technology that we now possess for incineration. Also, in the case of incineration it may require building a unit much larger than the one we now have at Krummrich and on the surface this does not look like a business Monsanto should be involved in.
In the area of developing fluids for transformer retrofitting, we should be very careful not to dilute our R&D manpower and detract from our replacement programs or our own internal de contamination requirements. Such a development effort should evolve from our own program for internal decontamination.
Unless you advise otherwise, we are proceeding with our planning accordingly. Attached for your information is a document we used for analyzing the retrofitting matter.
/rd Attachment
V-47
DSW 442900
STLCOPCB4057435
V-10. Retrofit Opportunity'
PCD PLANNING TASK FORCE
TRANSFORMER FLUID RETROFIT OPPORTUNITY
There are some one hundred thousand askarel transformers in place in the United States containing a total of about three hundred million pounds of PCB base fluid. These transformers are valued at an estimated one billion dollars. Seventy percent of them are less than ten years old. Top up for these transformers represents about one million pounds per year of fluid. Replacement over ten years would represent a demand of thirty million pounds per year of dielectric fluid plus whatever flushing medium is needed.
If there is some broad national program to drain the PCB base fluids out of these transformers, and if Monsanto has a PCB replacement fluid program for new transformers, what should Monsanto's role be regarding the retrofit opportunity?
1. No participation; 2. Sell fluid to transformer manufacturers; 3. Sell fluid to transformer users; . 4. Dispose of the PCB's if they are drained; 5. Involve in a service of retrofit?
These and other postures are possible. The following out lines the issues to be resolved to answer this question.
Product
1. Do we have a proved, environmentally qualified transformer fluid? Accepted as fire resistant by FM?
2. Is it compatible with askarel transformer (design insulation, sealants, etc.)? Some or all transformer models?
3. Is it suitable for top up in askarel transformers?
4. If not, is it suitable after a reasonable drain and flush procedure?
5. What would the flush fluid be?
6. How does our fluid compare to potential competition?
V-48
dS\N 442901
STLCOPCB4057436
V-10. Retrofit Opportunity
-
Market Volume and Timing
..
1. Where are these (domestic) transformers? Type, size,
user, location, age, fluid fill.
.
2. What is the total quantity of askarel in them?
3. What volume of fluid would be needed for top up or flush
and replace? When?
.
4. VThat pressures or legislation are state and federal agencies likely to impose?
Procedure
1. Will transformer users have to dispose of their askarel because of a law or because of unavailability of a com patible top up fluid?
2. Will replacement fluids allow top up; or drain, flush and fill?
3. If top up, who supplies the fluid and instructions for retrofit to the transformer user:
- transformer manufacturers (including Allis Chalmers and others who once made them),
. - fluid manufacturer or
- service companies.
4. If drain, flush and replace, who performs the service?
5. What roles do the transformer manufacturers want to play?
Incineration
1. What incineration load will result? Volume, timing, storage.
2. What incineration capacity is needed in what locations? What is available (Monsanto, G.E., others)? How will capacity be increased sufficiently?
Manufacturing
1. How will we manufacture/purchase the needed volumes of flushing and replacement fluids?
V-49
OS^1
STLCOPCB4057437
V-10. Retrofit Opportunity
Law
1. Who is responsible for performance of each transformer retrofitted?
2. Who will be responsible for PCB entering the ecology during draining, flushing, transportation, storage and incineration of askarels?
Public Relations 1. What would be the risks to Monsanto's image if we were to
handle and transport PCB's and concentrate volumes at incineration sites?
Economics 1. Sales of fluids for retrofit programs?
Profit opportunity. New capital required.
V-50
DSW 442903
STLCOPCB4057438
Monsanto
V-- 1 i .
*OM . S t m( * LOt*fiOfe
patent position PATENT DEPARTMENT - GENERAL OFFICES
E2NB
______ JCCT
me* ecunci
TO
:
November 20, 1975
PATENT POSITION ON PCD REPLACEMENTS V.10 Appendix
M. E. Gibbs - NlA
CL R. Davis
- B2SF
W. C. Ilammann - B3SA
R. H. Munch
- TIB
C. Paton
- B2SC
H. B. Roberts - E2NB
J. R. Savage
- B2SL
Q. E. Thompson - T3E
D. Wood
- B2SD
J. J. Zeman
- B2SK
1*i / in m.v
With reference to Jim Savage's memo of November 18, 1975, the current Monsanto patent position on candidate PCD re placements for electrical apparatus is as follows:
I. Hydrocarbon + Sulfone Candidates (e.g., MCS-1238, 1488, 15 8 8)
(a)
U.S.P. 3,796,934 issued 3/12/74 claims capacitors containing these fluids.
(b)
Pending U.S. Application Serial No. 424,491 (a divisional application of the capacitor case in (a) above) claims the composition of these candi date fluids. Composition claims in this divi sional application were allowed on 10/21/75 and Business Group's approval has been received to issue the patent. By coincidence, this applica tion was selected for optional participation in a trial Voluntary Protest Program undertaken by the Patent Office. This experimental program is similar to opposition proceedings employed for years in Germany, Japan, etc. Because of the importance.of the composition claims to the Busi ness Group, I have recommended that the U.S. patent be allowed to issue and that Monsanto decline to participate in the trial program.
(c)
Foreign counterparts of (a) and (b) were filed as a single application in:
Argentina Australia Belgium Brazil Canada Franco Great Britain West Germany
Holland Italy Japan Mexico Sweden Spain Switzerland USSR
Foreign patents have already issued in Argentina, Belgium, Great Britain, Itaiy and Spain.
V-51
DSVJ 442904
STLCOPCB4057439
V-ll. Patent Position M. E. Gibbs
2
11/20/75
11. Ester + Sul Tone Candidates (e.g., MCS-1475)
(a)
U.S.P. 3,811,077 issued 5/14/74 claims capacitors impregnated with composition such as MCS-1475.
(b)
Pending U.S. Application Serial Mo. 424,037 (a divisional case originating from capacitor case 11(a) above) claims the composition of ester + sulfone candidates. The composition claims were allowed on 10/21/75 and were included in the trial Voluntary Protest Program referred to in Section I above. The Business Group has again approved is suance of this patent and cur recommendation is to forego the experimental protest program.
(c)
Foreign counterparts were filed in the following countries:
Argentina Australia Belgium Brazil Canada Finland France Great Britain; West Germany
Holland India Italy Japan Mexico Sweden Spain Switzerland USSR
Only the Belgian counterpart has yet issued as a patent.
III. Chlorinated Diphenylmethanes (e.g., MCS-1558)
(a)
Pending U.S. Application Serial No. 582,486 filed 5/30/75 claims electrical devices (a broad term defined as including capacitors, transformers, etc.) employing a dielectric fluid comprising at least one halogenated diphenylmethane compound wherein one of the phenyl rings is unsubstituted. These compounds were found to have good electrical and fire resistant properties coupled with excellent primary biodegrada tion as measured in the SCAS test procedure. Mo action has been received from the Patent Examiner and the foreign filing decision is yet to be reached.
(b)
Claims cannot be made to the chemicals per se because they are all old compounds.
Please advise if you need further information regarding the current patent position on PCB replacements for electrical apparatus.
v-52
WUD:rk
DSW 442905
William H. Duffey
STLCOPCB4057440
'w
V-12. G- E. Timetable and Regulatory Situation
D. R. Bishop -- HIND Jan. 30, 1976
Mr. W. B. Papageorge - B3ND
Dr. Mr. Mr. Mr. Mr.
C. Paton - B2SK R. G. Potter - B2SB D. L. Slj.ney - B2SB David Wood - B2SD J. C. Weber - B2SK
F.Y.I., the attached appeared in this morning's New York Times.
The heat's off G.E. in New York...and that probably doesn't help us much with MCS 1238.
/mks attachment*
D. R. Bishop
*The Task Force feels that the reduced pressure helps us and the industry attain an orderly timetable.
10 HI' v 1 ' J
V-53
DSW 442906 STLCOPCB4057441
Timetable and Regulatory Situation
V-12. G. E
Tills tww YORK T1MW, FniDAY, JANUARY 90,
'
Overrules' field and Gives
G.ji 1977 ic Meet/
" -iFedral Standard
s .,t
.*
v i' .
- *.
. fey UNTjA GREWOfOUSE
Governor Carry,' <>v*rnilin
hi#-Committ loner of Environ-
menial CodjmybUoh, ' hw de>
died not to fort* the Ctnfft!
Electric C-ompwiy fo Mb;- com- .
pleW.v.Uedlsoh/'jt* ol th* tox
ic `ohemlwds cCied ,K3i`* Into
Urn Hcd*nn Rive,-.'
' " Inrlcad, Mr, .Carry hi- decid
ed o require'th* company to
adhere only, to the foctenl
ilandanl fw--pCR"d!i(h#r*ee, '
Which calls for no mw* than
- S.b ounce* a <t#y by June), )Y77.
Th* company now discharge#
rt>eut two pound# of the chernl.
c*l* very d#y fpim two Hud
. *wi River plaitf* compared with
SO pound#`*.;dy .from! 671
101674.; ......... ' ' . .
, Th# tmrtttmnontM Outainli-
slontf,' OjderT -R.' Reid/ h#i
*#k*d General Electric to flop
ihe PKvtarjte* ocmpletelv by nwt fiopt. SO, ahd ft# Is con.
aucUng hwwvis#. i whether Urn company hi# viotit*! alai* wMor-^ualfiy tandai\ij.
Mr. Reid'* polity hat been opposed by the fiiVs Com-
mer<* Oocrimlj.'joner, jnbn $.
Dyton,- on th# f/eund that a Mandate) lht wa* Mrltfcr In
New York than In oiht.r Mate* ' would weaken H#w Ynrb'j
eompstlilve poilllon and dflv*
wt*Jn. duii,ry. .. w, *
...
. .OwnpacyVS'M'ltlM ' j
' (i-'i-tu i Bloot/jo ht s raid that!
wWr): oouid ntvi tr,*Flcr?.!
*tr.;:di.rd for 3.S ounces r. ii-'f,
s xcro dirtWge *- nut'***-
fiblc and mljlit hzi to d#ei-
Mon to close the plan Is. . '
'
Governor Csre.v'r- ecccpltnc*
of Mr.-' Dyson's arturr.ent ft lliei liist concrete jtijn pf the
, polity Iht Governor Annc.-untod
tlili monih In hit Slat* ef the
Stale
At tint time, Sir.
Cf;fty t*id that ho would welch
economic ecpsider*Uoni In lie'
fonmuliUon.'io}; tjivlromnenUI
policy, <
- ;
Mr. Held 'wi# InformoiJ yti ttrdey iftemooh by Robert i. Morfjtdo.V Director 'of EUle
1 Oper#tion#,-bf the Governor'*
, ciwision.frte Corntnitrlcmer
wAj /iot' fuehlite'- (or,, corn-
menl.
v. ' *n
For ih *l*t# lo require tecs
ditch# rp.e of PCB'f, on# cd. Iht upytmor1* lop'ld#r *eid ye#-
, lerday, would "pul ut on the j unit old ariMtttfurt couret"
of onMtjnp *n unfavortMe cti-
njileforlnduilryhtr*. \.' +
*' ' lu#'c*JW Thony* 1
.Purthermote, thli' el'dn stlrf, "efur #11 tboWyetr*. of <J|toh#rgint-50 pound* a d#y, no an# 4Ui <tll tn thtit'* - one
Ml' of dif/eren.^etw#t?v.lw'
and 3J ojmow.'.V;*.
.. ;
"U1* a totilly pho/jy, ^mibo'-
, lit he added. t ' '
1 Mr. Reid and Mr. Py wn haul
*leo -pjathw) publicly -on th# Implmantaiioh of ,a new Hw :
requlrint dtvelopor# to file an- , vlronmuiUl-Impatt-tUlarnAnU. t
PC'* --' pofytWoHnatod bl-t phenyieMnvt cauaod liver can- .
. r,,.reproductive failure and rkln'.lnfacthvn# ini'laboratory
antmali., Wudapfl River Inn1
Utied ' by tU( 'and federal > re*e#.her# havo' tbewn PCB t
level* far in txe*#* of th*' *1;
lowabla limit of fiv^ part* per
million nt by lb* food*and
. Druji Admlnlttratlon.;' " ; J
fcf^|rt,,tlhJ, work`lb# Mon . *anlo Company, (h only.maker ' of llih rhrmtcai. Mid It'Would
phate oul'produltb.*r aa aoun
<u aceepiabt# alternate# wer*
* available. POP'# arv ued pH- ; m*rily ln\ Wi* produeUw ot t etpuUtOTjiand aifttfle pener*,'
' mre
I\r ,V- ,
V-54
0<o 0^-
V --1 2 . G . E . T im e ta b le and R e g u la to r y S it u a t io n
V-S5
C
if
m; REFINING ,iAT
c Stitt c:;;r. V? If ?ilst Refining Facility
'
e Carplet* S.eirrtr.rarir.t a Clean Op. Introduce Liquids,
0 Start Refining Trials
1 Ctr.iltta Initial Rtiirir.g
o Circuit Treat :tr river. Refine Return,
a Initiate Pilcc Treats
1 lark r. 1 Trei t/'.'tek 1 Tir.V. y. 2 iriitf 2 Tanks :: 2 Tretta/Deek
2200 Units/Week (75 Gal/Vk) 1400 Units/Week (150 Cal/Wk) -S&OG Units/V.'eek (JOG Gal/Kk)
protuc::::;
rci full conversion
o Ditorr.ite F.iiiring Requirements And Define Process
Spilt:;.- Refining 1 Ksr.tlir.s Equipment, Obtain Quotes, Prepare Layout. Prepare
i-.i 5ubr.it
(Cat. $100,COO Investcent - Refining & Related Equipment)
e A.R vxttrcvtl
.
a Fcuiprer: Delivery (5-S Months)
Installation. Cctpleted
o Start l'p
RC Nartill/RC Padouicr -1/16/76-
FW 2 - Jan. rW 3 - Jan. TV 4 - Jar,. FV 5 - Jar.. FW 6 - Fen.
4 FW 7 - Fa's. FU 10 - Xar. FW It - Apr.
FW 13 - Kar. Fa' 17 - Apr.
FW 19 - Kay October December January 1977
t. I1) il
DSW 442906.02
STLCOPCB4057443
-- ""TiTu'rtTVTT?-----
4429^*3 STLCOPCB4057444
2/75 Printing
----*iVI3
BASIC ACTIVITIES CHECKLIST
ELEMENTS OF HUMAN ACTIVITIES WHICH GENERATE CAUSES AND EFFECTS.
PEOPLE motivation attitudes skills abilities performance reliability productivity development growth health safety goals Interests philosophy family needs rewards benefits seniority availability civil rights social values
FACILITIES, EQUIPMENT space location flexibility reliability productivity safety efficiency complexity capacity availability
MONEY fixed capital working capital Income costs overhead profit return time supply demand trends
ORGANIZATION communications responsibilities delegation coordination structure relationships voids conflicts overlaps power position design staffing information handling
IDEAS. PROCESSES, PROCEDURES standards efficiency flexibility * complexity new developments life cycle by-products pollution security proprietary position objectives information handling new uses competition technology
OUTPUT quality quantity capacity packaging transport waste pollution by-products new uses product
EXTERNAL INFLUENCES economics competition image legal market customers regulatory political ecology demonstrators social crusades criminal activities products legislation government
MATERIALS sources availability dependability quality transport handling storage measurements control safety pollution hazards
442906 .04
C 3-3
STLCOPCB4057445
ft f 9
'/
J * K
"i7#
I. Business Plan
A. Strategic Summary B. Results and Goals C. General Summary of Action Steps D. Business Position Identification/Analysis -
U.S. and ROW E. Business Position Identification/Analysis -
Europe
II. Capacitor Action Plan
A. Events Chart - U.S. B. Events Chart - Europe C. Alternatives - U.S. D. Alternatives - Europe
III. Transformer Action Plan
A. Events Chart - Worldwide B. Retrofit Opportunity
IV. Impact on Related Business
A. Economic Dependence 1. U.S. Manufacture 2. Europe
B. Areas for Further Study
V. Appendix
1. Potential Problem Analysis 2. Forecast Sales by World Area 3. Forecast Sales by Origin 4. Forecast Sales by World Area 5. Historical Revenue & Gross
Profit 6. Historical Revenue & Gross
Profit
- Capacitors - Capacitors - Transformers
- Capacitors
- Transformers
OSVJ
STLCOPCB4057446
CAPACITOR ACTION PIAN - U.S. The detailed events on the following pages are premised upon a "main line" course of action. At certain points in the program there are alternative routes that may prove better and, if they are taken, then some of the detailed action plans must be modified. The "main line" can be summarized as follows: 1. Our choice of product for replacing PCB's in capacitors
is MCS 1238, a blend of monoisopropyl biphenyl (MIPB) and tolyl xylyl sulfone (TXS). 2. We will move rapidly to establish a full scale blend ing and treating operation at Krummrich Plant. This project can readily be debottlenecked to permanently serve our needs, but may prove to be an interim installa tion if another site is chosen for self-manufacture of MIPB and TXS. 3. We will complete contracts for toll manufacture of MIPB and TXS blend components as soon as possible -- and sign them soon enough to begin shipments within time param eters defined by major customers. 4. We will cease manufacture of PCB's by 1/1/78. 5. Documents and activities leading to self-manufacture of TXS and MIPB will be timed to postpone major capital commitments until results of 2-year medical studies are known. Alternative courses and circumstances which might lead to con sidering adopting them are discussed under "Alternatives - U.S.".
DSW 442908
STLCOPCB4057447
II. C - Alternatives - U.S.
1. Products
From a technical standpoint, there probably are a number of hydrocarbon base stocks that could serve the role of MIPB, which was selected because it will be low in cost and supports the polyphenyl flow sheet. The role of TXS as an enhancer of dielectric constant is more unique. There may be slightly different sulfones that would work, but all should be covered by our patent. Another area of chemistry which has not been fully explored is in aromatic ketones, but they would be much more expensive.
From the standpoint of meeting our timetable for commercialization, we must remain with MCS 1238; if some unforeseen weakness is found in the product, at least one year will be lost in changing to something else. Therefore, if MCS 1238 fails, we would question the viability of a continuing effort in capacitor fluids.
2. Plant Sites
Most of the site evaluation work has concerned adapta tion of Aroclor equipment at Krummrich Plant and phosphate ester/Santosol 100 equipment at Delaware River Plant. Capital requirements and available time favor Krummrich -- but at Krummrich we are faced with a potential problem of PCB contamination of at least the first few batches. The "main line" plan has assumed that the contamination can be held to a level that is low, temporary, and acceptable, and a blending project using PCB equipment is underway using pre-approved authority funds.
A third alternate, using potentially idle Santocel and plasticizer equipment at Everett Plant, has recently been added to the evaluation for both MIPB and blending (in this case TXS would be kept at Queeny by expanding the interim 00 Building facility) and may well prove to be lowest in cost and without the question of PCB contamin ation. Results of the evaluation will be available in February 1976.
If Everett is the preferred alternate, then a decision must be made as to continuing the Krummrich blending project. If an Everett blending project can be completed in time to satisfy customer needs above the amount Research can make (40 M lb/mo.), then the Krummrich project should be aborted, with write-off of ca $90 M design cost. This will depend on the time required for an Everett blending project to be completed, timing of customer needs as now foreseen, and the risk of an earlier need due to some unforeseen crisis.
DSW 442909
STLCOPCB4057448
II. D - Alternatives - Europe
1. Products
Monsanto will totally follow the U.S. technical route in Europe.
2. Market Approach
While our basic thrust will be to improve market share by being first with a good non-PCB product, full con version of the industry to hydrocarbon/sulfone technology would be speeded by existence of a second source. We thus would entertain a licensing proposal, but will let "them" make the first move from a bargaining strategy viewpoint. Prodelac would be the preferred licensee, since they are so committed to the dielectrics business that they are unlikely to drop out -- this is not true of Bayer. If Bayer drops out of dielectrics, we should offer them biphenyl for their DPO/biphenyl heat transfer fluid and shut down their obsolescent biphenyl furnaces.
3. Sites/Sources
Since biphenyl is made at Newport, it seems logical to consider installing dedicated facilities there for MIPB. We should first determine justification vs possible toll conversion. TXS volume is relatively small and probably should be supplied from the U.S. Blending in existing PCB equipment at Newport is probably feasible, but raises the same potential contamination problem as at Krummrich and should be similarly resolved. One alternate blending site would be an idle Pydraul blending unit at Antwerp.
4. Timing
European competitors are unlikely to abandon PCB's unless there is a governmental regulation to force the issue. European customers have done little testing of non-PCB fluid and G.E. has not released 1238 data to their licensees. For these reasons, we do not believe that Europe could be accelerated to the U.S. timetable by unilateral Monsanto action on PCB withdrawal without total loss of our European dielectric business. There fore our timing considerations should be premised entirely on the rate of progress toward regulation by OECD.
DSW 442910
STLCOPCB4057449
Transformer Action Plan
The actions on the following pages are necessarily less detailed than those related to capacitors, since we are not certain that we have a viable product. We do have a candidate in a blend of MCS 1839, a highly alkylated biphenyl, with trichlorobenzene. The actions described are intended to bring us to go/no-go decisions at various steps toward commercialization; if the product survives them, it will be necessary to re-examine the plan and detail the further steps involved in justifying dedicated facilities.
One step in the plan is firm -- U.S. production of present PCB-based transformer blends will cease by whether a replacement has been qualified or not.
the 1/1/78,
The most serious obstacle to success of 1839 is that it has only exhibited the needed low-temperature viscosity when blended with trichlorobenzene (TCB). TCB has been used for the same purpose in blends with PCB for many years and also is widely used as an intermediate and a solvent. While TCB has not yet acquired any environmental notoriety, there is a good probability that it will do so in future years -- being a chlorinated aromatic, it may well exhibit biomagnification, persistence or other unfavorable characteristics.
The only U.S. source of electrical grade TCB is Hooker, who make it as a by-product of Lindane. They do not appear ready to spend the effort and money needed to assess and defend its environmental acceptability.
We conclude that the current program should continue for the time being on the basis of blends with TCB, but before significant investment is made, a full resolution of the TCB issue is mandatory --preferably by finding a nonchlorinated diluent.
No separate European Events Chart has been prepared. For now, the only appropriate plan is for periodic communication as to status, with more detailed plans firmed up when we conclude that we do have a viable product. Final shutdown of Newport askarel production is set for 1/1/79, one year later than in the U.S., for the reasons described in the capacitor section.
os'N a*2911
STLCOPCB4057450
3. Timing of Major investments The main line plan calls for deferral of commitments to major investment until results of 2-yr. feeding studies are known, specifically the Capital investment Program calls for approval of a $10.5M project in December 1977. However, if evaluation shows that, capital for. the Queeny site for TXS is low (< $1M) , then earlier implementation should be considered. To get adequate quantities of TXS at acceptable cost through toll manufacture, we must commit to a lump sum of $600M to set up facilities. If the capital for internal manufacture is not much more, it seems more desirable to spend the money to build our own unit rather than someone else's, provided payback time on the increment is short. A recommendation on this point is scheduled for February on the Events Chart.
DSW 442912
STLCOPCB4057451
TIMING Jan '76
ACTIONS
DECISIONS/APPROVALS
? cb
2/12
3 commandat ion on European approval to CCED March 15 meeting.
2/15
Complete Europ product evaluation plan.
2/28
Approval of European product evaluation plan.
DSW 442913
STLCOPCB4057452
TIMING ACTIONS_____________________________________________________
Mar 7o
DECISIONS/APPROVALS
3/7
Completed action for OCED meeting.
3/15
-Complete technical training of European personnel.
-Support technical documentation. -Including 3 sets of slides.
t
Apr *76
jo
jtt*oo t*
STLCOPCB4057453
TIMING May '76
ACTIONS;________________________________________
DECISIONS/APPROVALS
5/1 Evaluation program agreed with 7 (?) customers.
p/12 Development forecast for Europe for balance '76.
June 176
O
%
V6Z*V
STLCOPCB4057454
TIMING
July '76
ACTIONS
7/1 Recommendation on USSR approach and required resources (and Rumania).
DECISIONS/APPROVALS
7/30 environmental data presented to European Agencies.
'76
Ou>
t<oo cn
r
STLCOPCB4057455
TIMING Sept '76
ACTIONS
9/1 Key customers have capacitors on test.
DECISIONS/APPROVALS
c^-c. '75
DSW 442917
STLCOPCB4057456
Nov. '76
ACTION'S
DECISIONS/APPROVA LS
Esc. '76
12/15 Eve.iua.te government attitudes tovaras PCB replacements.
O
8V6W V
STLCOPCB4057457
<a
d s.n '77
ACTIONS
Report completed results and confirm schedule (customer).
DECISIONS/APPROVALS
1 Feb. '77
DSW 442919
STLCOPCB4057458
STLCOPCB4057459
TIDING May '77
ACTIONS
DECISIONS/APPROVALS
June '77
to
&fCO*
CO
to
STLCOPCB4057460
July '77
7/1
ACTIONS
Source evaluation complete for KIP3/TXS
DECISIONS/APPROVALS
aug. : 77
o co
.
to tO to to
*r
STLCOPCB4057461
TIMING Sept. '77
ACTIONS
DECISIONS/APPROVALS
Oct. *77
10/1 Key Customer Commitment.
10/7 Volume forecast for Ex-U.S.A. sales.
0 1
>to to N>
-
>
STLCOPCB4057462
TIMING Nov. *77
ACTIONS
DECISIONS/APPROVALS
Dec. '77
O
to
t\3
CD
M -k.
*
STLCOPCB4057463
TIMING
let Qtr. '73
ACTIONS
1/1 European inventory (3 mo. sales) in place.
1A AR approval for European blending plant.
DECISIONS/APPROVALS
2nd Qtr. '78
DSW 442925
STLCOPCB4057464
TIMING
3rd Qtr.
78
ACTIONS
7/1
Issue shutdown and decontamination plan for Newport PCB.
DECISIONS/APPROVALS
8/1 Approval of shutdown and decontamination plan.
4th Qtr. 78
O
Hk
12/31 Newport UK Aroclor production ceased.
<SVSW t
*r
STLCOPCB4057465
TIMING
1st Qtr. '79
ACTIONS
DECISIONS/APPROVALS
2nd Qtr. *79
QSW 442927
tf
STLCOPCB4057466
TIMING
3rd Qtr. '79
ACTIONS
DECISIONS/APPROVALS
/th Qtr. . : 79
10/1
Demonstrate blending plant at rated capacity.
co
10 to to
CO
STLCOPCB4057467
king
1st Qtr. '30
ACTIONS
1/1 Assume exclusive supply from European blending facility.
DECISIONS/APPROVALS
2nd Qtr.
'80
O CD
rcoo
It-
STLCOPCB4057468
TIMING
ACTIONS
DECISIONS/APPROVALS
*
STLCOPCB4057469
DRAFT
GO/NO GO CRITERIA - MCS 1839 IN TRANSFORMERS
Commercial Testing/Pilot Plant Stage (through 6/76): A. Functionality'
1. Compatibility with transformer materials is a must and necessarily comes from the transformer builders.
2. Compatibility with Askarels is a high want, though not a must; would improve odds of supplying the 350$ one-time retrofit requirement.
B. Fire-Resistance: 1. Establishment of a standard will not be complete at this stage, but we should at least demonstrate equivalence to silicones and any other visible and viable candidate.
C. Medical/Environmental: 1. EC 202 must be approved.
2. Some approach to the TCB issue must be defined and
approved. Might be:
a. Program to find alternate diluent.
b. Acceptance of TCB burden by customers
(i.ev
does the blending).
c. Vigorous defense of TCB by Hooker.
DSW 442331
STLCOPCB4057470
Page 2
D, Profitability:
1. Price/performance7 must be bfett^eerr^xthnan silicones
by 20-W. ~
//U I \ 7 C
II. Interim Manufacture/Large Scale Sales . ' If; C 5 !i .3
A. Capital/Cost: 1. This section assumes that facilities (probably Everett) can be found for 6-8H pounds/production, with NFC such that payout time can be less than 2 years at the prices previously assumed.
B. Franchise Protection:
'
1. To move ahead on this step, a rationale must have
been developed and accepted. With a small investment
a
and fast payout ,/know-how/reputation franchise m^y
U
V
be acceptable.
/
Fire Protection: 1. Before this step is taken, some recognized standard
for fire-resistant must have emerged --
D. Medical/Environmental: 1. The TCB issue must be fully resolved.
QSW 442932
STLCOPCB4057471
Page 3 III. Full Commercialization/Dedicated Plant
A. Profitability; 1. The investment must satisfy the normal financial criteria.
B. Franchise Protection: 1. Either patent-ability or long-term contracts (with take-or-pay) must be established.
C. Medical/Environmental; 1. An alternate diluent must be identified and shown to be viable.
DSW 442933
STLCOPCB4057472
TKO*.l |f<AM( A LOCTAMON, David Wood-St. Louis-B2SD
CATt
urucCT OKrRENLt
January 19, 1976
TELEPHONE REPORT LUKE HART, G.E. 1/19/76
TO
FILE
J. J. Zeman-B2SK D. L. Sliney-B2SB C. Paton M. A. Petrilli-1010
I called Hart to alert him to the need for Monsanto to make certain raw material commitments within the next two weeks, and to ask if G. E. plans were currently aimed at 4th quarter, 1976, conversion or some later date.
Hart's response was:
1. G, E. preferred orderly transition to rapid transition.
2. Orderly transition could be related to Federal EPA call for 0 discharge by mid-1977.
3. It was no benefit for G. E. to convert long before
the rest of the industry.
.
4. G. E. are meeting the State and Federal EPA in Albany this week to try and get the State timetable in line with the Federal timing. If they can achieve this goal, orderly transition program can be adopted.
5 They hope to resolve this in 4-5 us as soon as they have decision.
/deb
IN - 10 REV. 1/72
DSW 442934 STLCOPCB4057473
-
To Supply G.E. With Pull-Scale Production of MCS 1238 IO/I/76
.
2/2/76
2/9A6
2/17/76 2/20/76
3/3/76
3/8A6 3/31/76 V30A6 5/31A6
7/31/76
9/1A6
10/1/76
10/31/76 12/76
6/77 6/76
12A 8
- Economics for pricing MCS 1238 interim and long term - Research geared to supply 40M lb./month MCS 1238 - Identify toll-converters for MIPB/TXS
- Site determination for blending MCS 1238 - Site determination for long-term manufacture of MCS
1238 including blending
- Pricing information (interim and long-term) on MCS 1238 to G.E.
- Potential meeting with Westinghouse to switch trans former fluid grades
- AR submittal on blending - G.E. response to Monsanto on interim commitment to
MCS 1238
- Sign contracts with toll-converters on MIPB/TXS
- Interim/long-term MCS 1238 pricing to other customers
- G.E. response on long-term MCS 1238 commitment
- Other customer response on interim commitment to MCS 1238
- Approval of P.I.R. for A.R. to manufacture MIPB and TXS - AR approval for blending capacity increase
- Start-up blending - Complete 90-day feeding tests
- First shipment of MCS 1238 from interim plant
- Other customer long-term commitment to MCS 1238
- Approval of AR to manufacture MIPB and TXS
- Complete 12 months feeding tests
- Complete 24 months feeding tests
- Start-up commercial facility
CP/cs 1/20/76
DSW 442935
STLCOPCB4057474
To Initiate Industry Conversion to MCS 1238 Beginning 1/1/77, Converting G.E. by 6/30/77 With Rest of Domestic Capacitor Industry by 12/31/77
2/2/76 2/9/76
2/13/76 2/17/76 2/20/76 3/1/76 3/15/76
4/1/76 4/30A6 6/30/76 1/1/76 9/1/76
10/31/76
12A6
I/1A7 6/30A7
7/1/77
12/31A7
6A8
- Economics for interim/long-term pricing of MCS 1238 - Research geared to supply 40M lb./month MCS 1238
- Site determination for blending of MCS 1238 - Site determination for interim and long-term mfr.
of MIPB and TXS
- P.I.R./P.A.R. for blending facilities if Everett is chosen site (AR already written for WGK)
- Interim/long-term pricing on MCS 1238 to G.E.
- Potential meeting with Westinghouse to switch trans former fluid grades
- AR submittal on blending - GE response on interim commitment to MCS 1238
- Decision from Plasticizer Division to discontinue phthalyl chloride (to allow TXS mfr.)
- Decision on long-term Coolanol rafg. location
- P.I.R./A.R. approval for A.R. to manufacture MIPB and TXS
- G.E. response to Monsanto on long-term commitment to MCS 1238
- Other customer response to Monsanto on interim com mitment to MCS 1238
- 00 Building dedicated to TXS
- 90-day feeding tests complete
- Other customer long-term commitment to MCS 1238
- AR to manufacture MIPB and TXS
- First major volume shipments from interim production
- 12-month feeding test data - G.E. conversion to MCS 1238 complete
- Start-up of long-term facilities if Everett is chosen location for MIPB and MCS 1238 blending and 00 Building for long-term TXS
- Completion of domestic capacitor industry conversion to MCS 1238
- Two-year feeding studies complete
12/76
CP/cs 1/20A6
- Start-up of long term facilities if sites other
than Everett (MIPB/blending) or 00 (TXS) are chosen
DRAFT
BUSINESS PLAN FOR REPLACEMENT OF
PCB DIELECTRICS
1) Capacitors a) Selection of MCS 1238: properties, advantages, vulnerability.
b) Decisions needed: sites, timing, capacity, alternatives.
c) Events chart.
d) Approach to economic evaluation.
2) Transformers a) Selection of a candidate: possibility of a franchise position.
b) Decision diagram.
c) Retrofit opportunity.
'.
3) Impact on other polyphenyls derivatives a) Economic dependence.
b) Areas for further study.
DS\N 442937
STLCOPCB4057476
TIMING
____________________ACTIONS______________________ _______________ CONTINGENCIES/CHECK POINTS
Jan. 1976
DSW 442938
Feb. 1976
v#
\\ .--^
1/31]
1/31
Analyze Federal testing protocol if required.
Research geared to 40M pounds/month production.
iKl
2/2 Decision on location for
a.\5--;
interim MIPB & TXS.
' -i3^8 0) ;Xj-
2/9 Decision on sites for in
axL-aAo- house manufacture of MIPB
and TXS. (j
2A0
Complete pricing study for both short and long term.
.v - *') _
2/16
Visit to GE on pricing.
Visit to Westinghouse on transformer blend grade change to facilitate interim blending.
approval of WGK
lelnU d. ing
project.
'x-x r
, , I ., ' )i %'.*
STLCOPCB4057477
DSW 442939
STLCOPCB4057478
DSW 442940
*
STLCOPCB4057479
TIMING
ACTIONS
CONTINGENCIES/CHECK POINTS
STLCOPCB4057480
TIMING October 1976
10/1
ACTIONS Begin shipments from WGK. f-j
3\
10/15 ARDT from CED to Roger Beal
AR grade sales forecast to Roger Beal.
CONTINGENCIES/CHECK-POINTS
. ,7- -
Customer long-term (commitment)
to 1238.
^3
November 1976
11/15 Final draft AR complete.
DSW 442942
STLCOPCB4057481
DSW 442943
TIMING December 1976
ACTIONS
CED begin. Project Definition Report.
CONTINGENCIES/CHECK POINTS
AR approval for in-house manufacture of MIPB and TXS.
1st Qtr, 1977
1/22
Demonstrate debottleneckedblending rate at JtfGK. f/v ^
fvZsL
u
STLCOPCB4057482
TIMING 2nd Qtr., 1977
ACTIONS
CONTINGENCIES^ CHECK POINTS
a
0/77 Begin field construction of MIPB and TXS Facility.
6/77 90-day results from chlorine feeding study.
3rd Qtr., 1977
STLCOPCB4057483
TIMING 4th Qtr., 1977
ACTIONS
CONTINGENCIES/CHECK POINTS
o s w 442945
12/77 Final shipments of Aroclor 1016.
Begin decontamination of equip ment and tank cars.
1st Qtr., 1978
1/78 - 6 month inhalative study results.
Decontamination work complete.
STLCOPCB4057484
TIMING 2nd Qtr., 1978
ACTIONS
3rd Qtr., 1978
CONTINGENCY/CHECK POINTS
4/78
<>
CD
^r
Results of 2 year chronic studies on MIPB & TXS.
5 0) Q
4th Qtr., 1978
Startup in-house manufacture of MIPB & TXS.
Demonstrate rate and quality.
STLCOPCB4057485
AGENDA - 2/16/76 PCB PLANNING TASK FORCE
fo/ZC =-
1) Status and Feedback - D. Wood & W.B. Papageorge 2) New format of Emergency Plan - J.R. Savage 3) Proposed format for Business Plan - J.R. Savage 4) Draft 1238 Events Chart - J.R. Savage 5) Approach to Short-term and Interim Manufacture
(Transformers) - J.R. Savage 6) Retrofit Opportunity - R. Davis 7) Meeting dates for rest of January
PI'.lo- ; O-v
jt-j <
DSW 442947
STLCOPCB4057486
DRAFT
BUSINESS PLAN FOR REPLACEMENT OF
PCB DIELECTRICS
1) Capacitors
.
a) Selection of MCS 1238: properties, advantages,
vulnerability.
b) Site selection issues.
c) Events chart.
d) Alternatives and fail-back positions.
e) Approach to economic evaluation.
2) Transformers a) Selection of a candidate: possibility of a franchise position.
b) Events chart.
c) Retrofit opportunity.
3) Impact on other polyphenyls derivatives a) Economic dependence.
b) Areas for further study.
- DSW 442948
STLCOPCB4057487
TIMING Jan. 1976
ACTIONS
CONTINGENCIES/CHECK POINTS
Feb. 1976
1/31 1/31
Analyze Federal testing protocol if required.
Research geared to 40M pounds/month production.
2/2
2/9 2/15 2/16
Decision on location for interim MIPB & TXS.
Complete pricing study for both short and long term.
Decision on sites for in house manufacture of MIPB and TXS.
PED for TXS by TSC1 route from Research to CED.
Visit to GE on pricing.
Visit to Vfestinghouse on transformer blend grade change.
1/21 AR approval of WGK interim blending project.
2/2 AR approval for MIPB flashing
DSW 442949
STLCOPCB4057488
TIMING March 1976
ACTIONS
CONTINGENCIES/CHECK POINTS 3/1 Feedback from GE. Need favor
able response.
April 1976 May 1976
3/15 PED for MIPB from Research to CED.
3/15
Complete business/economic review for go/no go recommenda tion to CAC.
4/1 Customer commitment to interim manufacture program.
4/15 Results of various acute toxicit; tests.
Final shipments of 100-42 to Westinghouse.
DSW 442950
STLCOPCB4057489
TIMING June 1976
ACTIONS
6/15
Decontamination of used equipment for MCS 1238 blending complete.
July 1976
CONTINGENCIES/CHECK POINTS PIR approval on project for in-house manufacture of MIPB and TXS.
Results of various feeding studies. AR approval for debottlenecking of blending system.
DSW 442951
STLCOPCB4057490
TIMING August 1976
ACTIONS
CONTINGENCIES/CHECK POINTS
Sept. 1976
8/15
Release tank cars from Aroclor 1016 service for decontamination and con
version to MCS 1238 service.
9/1 Start up WGK blending
9/1 90 day feeding test results on MIPB and TXS.
9/15 Demonstration of rate and quality at WGK.
DS\N 442952
STLCOPCB4057491
TIMING October 1976
10/1
ACTIONS Begin shipments from WGK.
CONTINGENCIES/CHECK POINTS
10/15 ARDT from CED to Roger Beal.
AR grade sales forecast to Roger Beal.
Customer long-term commitment to 1838.
November 1976
11/15 Final draft AR complete.
\ \
STLCOPCB4057492
TIMING December 1976
ACTIONS
CED begin Project Definition Report.
CONTINGENCIES/CHECK POINTS
AR approval for in-house manufacture of MIPB and TXS.
1st Qtr, 1977
O O)
t\
tNo)
07 fc.
STLCOPCB4057493
TIMING 2nd Qtr., 1977
ACTIONS
CONTINGENCIES'' CHECK POINTS
3/77 Begin field construction of MIPB and TXS Facility.
6/77 90-day results from chlorine feeding study.
3rd Qtr., 1977
DSW 442955
STLCOPCB4057494
TIMING 4th Qtr., 1977
ACTIONS
CONTINGENCIES/CHECK K)INTS
12/77 Final shipments of Aroclor 1016.
Begin decontamination of equip ment and tank cars.
1st Qtr., 1978
1/78 - 6 month inhalative study results.
Decontamination work complete.
DSW 442956
STLCOPCB4057495
TIMING 2nd Qtr., 1978
ACTIONS
3rd Qtr., 1978
CONTINGENCY/CHECK POINTS
4/78 Results of 2 year chronic studies on MIPB & TXS.
4th Qtr., 1978
Start rip in-house manufacture
of MIPB & TXS.
.
Demonstrate rate and quality.
dSNN 442957
STLCOPCB4057496
In connection with our discussion on preparing a time table for Mr. Fitzgerald on the various events which comprise the phasing out of PCB's and phasing in of replacement products, we probably want to think of an attachment which shows areas of uncertainty, vulnerability or concern -- call it what you will. Further, and if we don't have the answer at the moment as we consider various alternatives,we probably want to postulate on the capital requirement, not only of new plant but of obsolescing old plants such as Krummrich should we completely phase out of it by 1978 or 1979.
/rd (dictated but not read)
c
Earle H
Jr.
DSW 442958
STLCOPCB4057497
DIELECTRICS BUSINESS PLAN - GOALS 1. Eliminate further risk from the PCB issue to
Monsanto's image or assets. 2. Re-establish a profitable business in dielectric
fluids with products that satisfy environmental criteria.
0S\N 442959
STLCOPCB4057498
NON-PCB CAPACITOR DIELECTRICS - MCS 1238
DATE 1/21/76 2/2/76
2/9/76 2/16/76
4/1/76 7/31/76
9/1/76 10/1/76 12/76 6/77 6/78 12/78
_________________________ACTION______________________________
AR approval of WGK blending facility.
Approval of location (converters) for interim manufacture of MIPB & TXS.
Research geared to supply 40M lbs/mo TXS from JFQ
Economics for pricing interim and commercial.
AR for flashing MIPB approved.
Determine sites for commercial manufacture.
Meeting with G.E. - pricing, etc.
Meet with Westinghouse - to change transformer grades.
'
Customer interim commitment to 1238.
Approval of PIR for AR to manufacture MIPB and TXS.
AR approved for blending capacity increase.
Start-up blending.
-
-
Complete 90-day feeding tests.
First shipment from interim plant.
.. .
Customer long-term commitment to 1238.
Approval of AR to manufacture MIPB and TXS
Complete 12 months feeding tests.
Complete 24 months feeding tests.
Start-up commercial facility.
REB/mah 1/12/76
DSW 442960
STLCOPCB4057499
1) 1. Due to G. E. request and managements desire to see
MCS-1238 established as rapidly as possible, 9/1/76, interim production (i.e., blending) of MCS-1238 start-up was established per mfg. input. (10/1/76 supplies to customers.)
2. It was believed that a rapid G. E. acceptance of 1238
would swing industry over to MCS-1238 in
6 months.
3. As a result, forecast of 3.3 M lb. in 4th Quarter, 1976, and 14.9 M lb. (domestic + initial supplies to Canada and other export customers) in 1977 was realistic.
4. Since mid-December, CED/Mfg. have been targeting on 9/1/76 start-up.
2) After EHH/RGP mtg. with G. E., it would appear that G. E. prefers a slower timetable than 9/1/76 (e.g., G. E. has not committed to 1238 as their PCB alternative and cannot do so until after February 16 meeting at which commercial proposal will be presented). The lack of a G. E. decision has made it all but impossible to get total industry commitment in time for 10/1/76 conversion. Indeed, capacitor customers viewpoint at the Jan. 14 mtg. with EPA will seek to establish 12-18 months test program on PCB alternatives. This approach
. was spelled out to RGP/DW at the EIA PCB Ad-Hoc group meeting of Jan. 7-8.
3) It appears clear, however, that by the 4th Quarter of 1976, the industry test program will be at a stage where they will begin to place capacitor units in the field for service life tests and at this point, we believe our 40 M lb./month pilot plant capacity will be exceeded. The latest forecast for MCS-1238 in Jan./Feb./March is close to pilot plant capacity which does indicate a very much stepped-up customer activity on non-PCBs.
4) Once full-scale industry conversion begins, marketing still feels their forecast volumes of MCS-1238 are valid. What is really in question is the initial date of full-scale conversion. Marketing does feel that 10/1/76 is unrealistic.
DSW 442961
STLCOPCB4057500
5) Marketing-recommends that we revert to our initial plan issued in September, 1975, which called for an orderly transition to MCS-1238 over a 24-month period. The 9/1 10/1/76 date got established solely to meet a G. E. emergency which does not seem to be materializing or to be their pre ferred plan. The PCB Task Force should recommend the establish ment of an optimum conversion plan with 10/1/77 being the latest target date. David Wood 1/13/76
DSW 442962
STLCOPCB4057501
Monsanto
FROM 1NAME f. L
Richard J. Davis - B2SF
r.TE
January 14, 1975
suejccT RCFCRtMCt
PCB PLANNING TASK FORCE
-
TRANSFORMER FLUID RETROFIT OPPORTUNITY
TO
R. E. Beal
- B2SB
T. H. Bottini
- B2CA
W. H. Duffey
- EISA
M. E. Gibbs
- W1A
C. P. Orr
- G2VJD
W. B. Fapageorge - B3NB C. Paton ` - B2SK
J. R, Savage J. C. Weber
- B3NH - B2SK
D. Wood
J. J. Zeman
- B2SC
- B2SK
Please review the attached outline regarding a transformer fluid retrofit program. Be prepared to comment on it at the task force meeting -- Friday, January 16.
kk
------
/KyC -
Richard J. Davis
DSW 442963
STLCOPCB4057502
PCB PLANNING TASK FORCE TRANSFORMER FLUID RETROFIT OPPORTUNITY
There are some one hundred thousand askarel transformers in place in the United States containing a total of,about three hundred million pounds of PCB base fluid. These transformers are valued at an estimated one billion dollars. Seventy percent of them are less than ten years old. Top up for these transformers represents about one million pounds per year of fluid. Replacement over ten years would represent a demand of thirty million pounds per year of dielectric fluid plus whatever flushing medium is needed.
If there is some broad national program to drain the PCB base fluids out of these transformers, and if Monsanto has a PCB replacement fluid program for new transformers, what should Monsanto's role be regarding the retrofit opportunity?
1. No participation; 2. Sell fluid to transformer manufacturers; 3. Sell fluid to transformer users; 4. Dispose of the PCB's if they are drained; 5. Involve in a service of retrofit?
These and other postures are possible. The following out lines the issues to be resolved to answer this question.
Product
1. Do we have a proved, environmentally qualified transformer fluid? Accepted as fire resistant by FM?
2. Is it compatible with askarel transformer (design insulation, sealants, etc.)? Some or all transformer models?
3. Is it suitable for top up in askarel transformers? .
4. If not, is it suitable after a reasonable drain and
flush procedure?
.
5. What would the flush fluid be?
6. How does our fluid compare to potential competition?
OS'N *42964
STLCOPCB4057503
Market Volume and Timing
1. Where are these (domestic) transformers? Type, size,
user, location, age, fluid fill.
-
2. What is the total quantity of askarel in them?
3. What volume of fluid would be needed for top up or flush and replace? When?
4. What pressures or legislation are state and federal agencies likely to impose?
Procedure
1. Will transformer users have to dispose of their askarel because of a lav/ or because of unavailability of a com patible top up fluid?
2. Will replacement fluids allow top up? or drain, flush and fill?
3. If top up, who supplies the fluid and instructions for retrofit to the transformer user:
- transformer manufacturers (including Allis Chalmers and others who once made them),
- fluid manufacturer or
y
- service companies.
4. If drain, flush and replace, who performs the service?
5. What roles do the transformer manufacturers want to play?
Incineration
1. What incineration load will result? Volume, timing, storage.
2. What incineration capacity is needed in what locations? What is available (Monsanto, G.E., others)? How will capacity be increased sufficiently?
Manufacturing 1. How will we manufacture/purchase the needed volumes of
flushing and replacement fluids?
DS\N 442965
STLCOPCB4057504
Law
1. Who is responsible for performance of each transformer retrofitted?
2. Who will be responsible for PCB entering the ecology during draining, flushing, transportation, storage and incineration of askarels?
Public Relations 1. What would be the risks to Monsanto's image if we were to
handle and transport PCB's and concentrate volumes at incineration sites? Economics 1. Sales of fluids for retrofit programs? Profit opportunity. New capital required.
DSW 442966
STLCOPCB4057505
MCS 1239
1. Approach to short-term manufacture:
a. Process in 00 Building is O.K.
b. Conflicts with phthallyl chloride schedule and desire for TXS rate demonstration.
c. Plasticizers Division probably willing to relinquish control if Functional Products makes a commitment.
2. Approach to Interim Manufacture:
- a. Everett fit may be good -- CED pursuing.
b. 00 Building probably, much too small -- and TXS competes.
c. Toll manufacture of 1839 (or perhaps TXS) a possibility.
d. 6-8M pounds/year desired (as blend).
.
3. Need on both points to have dialogue with Plasticizers and make some commitments.
DSW 442967
STLCOPCB4057506
D3W 442968
STLCOPCB4057507
24
PLANT REPORT AROCLOR/BIPHENYL GROUP
DISTRIBUTION
NEWPORT:
D.B. SHEARN
J. WHITTAKER C.A. WILTSHIRE J.H. WILLIAMS INFOR. CENTRE
LLN:
R.A. BAXTER
ST. LOUIS:
D. DANNA R.A. POHL J.C. WEBER
ANNISTON:
B.O. SEVERSON
_ BRUSSELS:
Monsanto
F. MACDONALD
COMPANY CONFIDENTIAL
This information is confidential in its nature, for use in Monsanto's business. It shall be retained by the recipient, not copied or loaned to others in the company. AM requests for duplicate copies or initial copies for individuals or departments not included in the distribution tables must be forwarded to the originating department.
!!
/ I
!I
t
<. f' !i 1i
fj
1 1 ' I
if--
I!
<5 2616
DSW 442969
STLCOPCB4057508
MAY 1976
Accident statistics:
Disabling Serious Minor
Month
0 0 1
Y.T.D.
0 0 2
Production (kg)
Aroclor 1254 Aroclor 1260 Aroclor 1342 Polyphenyl HB. 40 Pyroclor 5 Pyroclor 15 Aroclor 1342 El HC1 ex PCP/Aroclors HC1 ex Silester
30 876 10 166 356 570 523 079 163 667 60 565 17 000 12 261 328 013 77 320
Major Raw Material Usages
Catalyst to HB.40 T.C.B. to Pyroclor 5 T.C.B. to Pyroclor 15 Benzene to Fresh Poly
0.14 (0.125) 35.65 (32.0) 34.12 (32.0) 108.2 (107.5)
Quality
No quality complaints received.
Operational Highlights
A slightly more troublesome month on Biphenyl when, following a factory power surge, a leak was noted on a bend weld inside the furnace. This took several days to rectify. Several split changes were made to protect HB.40 production.
On Aroclors and Pyroclors, operations continued on a 7 day week basis with Aroclor 1342 drums being stockpiled against the Russian June shipment. Pyroclor was blended to order without problem.
HB.40 production was at a record rate of 5 845 kg/day beating the February performance of 5 705 kg/day. 66 OOO kg of stockpile Santowax C was processed.
P.C.B. Control
Bulk weekly effluent samples averaged 244 ppb for the month. There was no obvious reason for this marginal upward trend against the previous six months levels of less than 200 ppb. 90 tonnes of waste P.C.Bs were removed to disposal sites this month.
Mechanical Highlights The major problem web the furnace weld failure.
continued.. . .
DSW 442970
STLCOPCB4057509
-2-
Technical Highlights
Emphasis continues on obtaining data at different 'split' levels.
Productivity (m anhours/100 kg)
Aroclor 0.31 (0.31) Polyphenyl 0.26 (0.23) H.B.40 0.44 (0.44)
Overtime Working
Aroclor Chlorine
% 0/T
18.4 15.2
Y.T.D. w/end 29.5.76
Variance Analysis $ ( ) = Gain
Product Group 22
Actual
Month Forecast
Month
Forecast
Y.T.D. Actual Budget Qtrly
Pri ce Performance Perf. Vol. Unsched.
20 (37) (5) 20
20 (23) (4) 18
19
(ID (3) 44
116 (124) (25) 175
-
-
248
'48
(11) (11) 2 70
TOTAL
(2) 11
49
142 248 296
J.H. WILLIAMS
DSW 442971
STLCOPCB4057510
*-\^ypi\_nyis / Aroclors ,, I9_5
f
0 o o
r Sbo
VT
71 ~i !>
0
6oo
J cJ C : i f) (
ce <4oc
Moe
t/>
01 3oo
At 'od tusf s. 12 C ftP *C"t T 7 ic
iC J
t< 2oc J
j "Zoo
lOC
o J FUAUJJASONO
I'
o JFUAMJJAS OHO
'_1T j t
\SO
2? M 2?
Mo
m 2o-
o l3o
I 12c o
i < >
IN IV- ; r
I Ml
C0 ho 3
V <.1 r 7 S 5r
-
ho los J
X ICO
ioc
JFMAMJJAtOHQ
J F M A U J J A SOHO
U, <r V)
O'lS
>* ;r >r
j)
; z'aI 02
nS O-II
r
ti o>io-
cf
.c
~7 r L.
J FUAUJJASONO
K>
4 !V
v, -I
Sou ^60.
Vj a
3cc-
V i2ct>1
ti
} loo 1 li
O
J F At A U J J A SOHO
DSW 442972
STLCOPCB4057511
cid Recovery (ex. PG'P/A? 1976
f
sf <J $
T
5
t
J
u
>5
d
a
<c -<
i |
a
JFMANJJAS OWI>
JFMAUJJASONO
JFHAMJJASOHD oSnN 442^3
STLCOPCB4057512
PLANT REPORT AROCLOR/BIPEENYL GROUP
DISTRIBUTION
NEWPORT
D.B. SHEARN J. WHITTAKER C.A. WILTSHIRE J.H. WILLIAMS INFO. CENTRE
LLN ST. LOUIS
ANNISTON
R.A. BAXTER
D. DANNA
R.A. POHLY 2
J.C. WEBER
"
B.O. SEVERSON
BRUSSELS
F. MACDONALD
DSW 442974
STLCOPCB4057513
APRIL 1976 SAFETY
Accident Statistics
Disabling
Serious Minor
Month O O O
Y.T.D.
O O 1
PRODUCTION (Kg)
Aroclor 1254. Aroclor 1260. Aroclor 1342. Polyphenyl H.B. 40 Pyroclor 5 Pyroclor 15 Acid ex Silester Acid ex PCP/Aroclors
i
MAJOR RAW MATERIAL USAGES
Catalyst to HB40 T.C.B. to Pyroclor 5 T.C.B. to Pyroclor 15 Benzene to fresh Poly.
36 41 379 549 175 49 34 96 341
833 886 627 177 891 205 080 7 90 718
0.13 23.3 27.9 107.5
(0.125) (32.0) (32.0) (107.5)
QUALITY
No quality complaints received.
OPERATIONAL HIGHLIGHTS
Biphenyl
A good trouble free run with a 36 day decoke
cycle. Fresh Polyphenyl Benzene usage was on standard at
107.5 and a further split trial was completed.
Aroclors & Pyroclors Operations reverted to 7 day working on a temporary basis with the objective of stockpiling to meet future high East European 1342 business. Pyroclor was blended to order without problems.
BB40
There were few mechanical problems and production was
only lOO Kg/day short of the February record rate. 91,LOO
Kg of stockpile Santowax C was processed and gave a poor catalyst usage.
P.C.B. Control Bulk weekly effluent samples averaged 127 ppb for the month, a marginal improvement on the March level of 168 ppl'
Further P.C.B. waste stock review completed at end of month. All liquid stocks have now been incinerated and a start made on the disposal (Encapsulation) of the smaller capacitors.
DSW 442975
STLCOPCB4057514
2- -
MBCKANICAL HIGHLIGHTS No major problems this month.
TECHNICAL HIGHLIGHTS
Further split trials completed for future optimisation calculations.
PRODUCTIVITY (manhours/100 kg)
Aroclor 1342 Polyphenyl H.B. 40
0.30 0.26 0.45
(0.30) (0.26) (0.45)
OVERTIME WORKING
Aroclor HCl/Chlorine
Percent 0/T
17.6 18.1
Y.T.D. (w/ending 24th April)
VARIANCE ANALYSIS
$ ( ) = Gain
Product Group 22
Actual
Month
Forecast
Month
Qtrly
Price Performance Perf. Volume Unsch. Capacity
27 (28) (2)
17
23 (11) (4)
19
17 3
(3) 47
Y.T.D.
Actual Budget Qtryl
96 (87) (20)
155
201
29 -
(8) 226
TOTAL
14
27
64
144
201
247
v
J.H. WILLIAMS
DSW 442976
STLCOPCB4057515
r*wypr._nyis i At_ 19_S
sf
o o 0
J
7 Sbo
r
r
o
T
4
6co
i cJ C > : ^ f
(f *4oc
J
C2oo
~7 - tv
C> ^ FUAMJJASOHD
f
,,o00
l/> $
<8
^ 1J
*
A < M > ,'S
AP
7-1
t
3oo -
4l !
20oc . 2 c
loo
o ------------------
--
./ FMAMJJ AS 0 N 0
'Ll
M o o o
>u
o
N I
6E Vt
0
CO
X
./ r m a h j j a Soho
>
"j a
flfs>
<c
Soo
\A
-J AGO'
U
7 a \C
Vi
CL $CO'
nS v 2ct>
ir
ti
?l |oo
i
./ F M A M J J A SOHO
/
DSW 442977
STLCOPCB4057516
^cid Recovery (cx. P C^P/A^ 1976
3
f $
a
U
loo ' J l" 1
<*} -JJ c 0
<?& y>
TT.*h J FMAMJJASOHO
-<
.0 0
JFMAMJJ AS OVD
JFMAMJJA90ND
JFHAMJJASOHD DSW 44297 S
STLCOPCB4057517
DEPT. 246 - 19 OPERATIONS REPORT
AROCLORS - 811.00
PRODUCTION -- TOTAL AROCLORS (29.7M # In 1975) <fw.2H t In 1974) (42.2M It In 1973)
MONTH
JAN.
FEB.
MARCH
APRIL
MAY
JUNE
JULY
' AUG.
ACTUAL ' SCHEDULED' ACTUAL YTD
3,397,499 3,062,003 4,185,73' 1.035,051
3,397,499 3,062,003 4,185,73' 1.035.051 3,397,499 5,459, 502 |l0,645,23( 11.680.28
SEPT.
ht\Y 2 0 t.
OCT.
NOV. '
1 '1
1
PRODUCTION - AROCLORS, BY KIND
1016 1242 1254
'
2,190,013 1,925,214 2,738.52C 811.422 ' 478,027 424,262 618,57C . - 0 -
729,459 712,527 828,644 223.629
_
--
1 1
I-
-- ------------- --
! i1
. *
r
i
_r .
!
i1 .I
PERCENT YIELD ON BIPHENYL, STD. 98.0% (100.25 In 1975) (98.59 in 1974) (98.98 in 197-3)
MONTH
1 99.32
102.58 j 101.17
q^'77
"
YTD i 99.32 ! 100.84- | 100.97 | lno.53
----- DSW 442979 -
1 1
.
.
i
'1
!
i
----------.....
i
__________L
___
AVERAGE QUALITY OF 1242 EG LOTS (1975 Avgs. on 21 Lots:
TCC ! 0.20 RESISTIVITY 194,825 POWER FACTOR | 0.40
0.26 i85,875 1 0.37
0.27 160,550
0.16
0.22 65.700
0.036
NO. OF LOTS
2
j2
I1
ix
0.23 ppm; 154,600 x 109; 0.21%)
/ i . i
i
STLCOPCB4057518
DEPARTMENT 246 - 197 OPERATIONS REPORT
AVERAGE QUALITY OF MCS - 1016 LOTS (1975 Avgs. on 78 Lots: 0.14 ppm; 241,600 x 10 ; 0.19Z; 0.07%)
MONTH TCC
Oc' c
JAN.
FEB. 0.13
MARCH | APRIL j MAY |
0.11 1 0.13
l
I
JUNE
JULY
AUG.
SEPT.
RESISTIVITY
264,920 264,708 171,277 ! 111.022
i
POWER FACTOR HBH'S
0.21
1 0.15 j
NO. OF LOTS } 9
0.28 0.16
12
0.25 0.19
16
0.12
0.16 **
r--A-
...
i
i 1
i \
1
OCT.
SAFETY (6 minor ini. and 0 serious In 1975)
MINOR SERIOUS
0 00 0 00
2 11 0' 1 t
| 1
QUALITY COMPLAINTS (Formal and Informal) (A In 1975)
NUMBER
|0
I 0 T2
iO
PERSONNEL (1975: OVERTIME O.T. YTD EXTRA HOURS E.H. YTD ABS. HRS. ABS. HRS. YTD S.T.ABS.HRS.YTD
O.T. 9.9%; E.H. 3.3%; Abs. 5.5%)
14.4 14.4
23.4 18.6
14.5 17.0
I 10.4 15,2
4.5
7.7 12.6
14.3
4.5 6.0 8.6 10,1
0.6 3.2 2.3
0.1
0.6 1.8 2.0
1.5
0.6 ! 0.8
0.9
0.7
-------------- 1-----------------i----------------
1 1 1 I l |f
1 i 1
1 i
AROCLOR INVENTORY (1975 Avgs: Whse. 310M t. Dept. 714M ft)
WHSE.
1 54 r 9 3fj 270,370 320,890 297.810 1
DEPT.' TOTAL
`
864,706* 917,958 1,276,589 253.825 1 1,019,6361.188.328 1,600,479 551.635 |
! ! 1
NOV.
DEC.
VH*980
STLCOPCB4057519
DEPARTMENT 25 OPERATIONS REPORT PYRANOLS (810.90)
PRODUCTION - TOTAL PYRANOL,S (15.9M #, in 1975)
MONTH
JAN.
FEB. MARCH
ACTUAL
1.120.0821 965,367 1,552,168
SCHEDULED
1.120.082 965,367 1,552,168
(15.7M #i in 1974) (13.4M // ;in 1973)
APRIL i MAY
JUNE ' JULY '"
318,1531
i
ACTUAL YTD
1,120,082 2,085,449 3,637,617 3.955.77d___________
AUG.
-- SEPT. . OCX, . NOV.
1 1
DEC.
PRODUCTION -- PYRANOLS, BY KIND
1242 CM 70/30 Ai3B3B-3
378,1511 364,307 666,280 ` 570,928 527,416 885,888
171.003 73,644 -0-
r
1 ..
!;
i!
VO 00
000 _
Q
79.1761 140.1771
'i
1
t
1 i ',
i
............ -- - ------ :--------- -- '.
1
" "j
.
1. ..
PERCENT YIELD ON TCR - STD. 98.0% (99.43 in 1975) (98.24 in 1974)
MONTH YTD
96.40 ! 96.98 96.40 96.66
1 .96.32
100.27
96.53 ` ___ 9.6.90 L__________
J
PYRANOL INVENTORY (1975 Avgs: Whse. 147M #;
WHSE.
1 173.232 313.713 437.296
DEPT.
1 545.053 348,660 541,224
: OTAL
! 718,285 662,373 1 1 '
978,520
Dept. 238M (?) 435.059
'
441.272 876.331
... !
,
1i 1 t
JANUARY
' FEBRUARY MARCH '
DEPT. 246/259 1976 OPERATIONS REPORT
HIGHLIGHTS
Total Aroclor production for the mon th was the highes t since October, 1974, due in large part to an increas ed Aroclor 1016 demand. The timing could not have been better, as Dept. 246 has been required to run full out since 1/18 to keep the
chlorine cell-house on-line during a Dept. 233 production outage.
The Pederal and State of Illinois EPA visited
the department on 1/27, gathering sewer and selected
air samples. There has been no feedback regarding
their visit. Several members of the Business Group
also toured the area on 1/28.
.
A press release late this month announced Monsanto's
intentions for eventual phase-out of the P4CB business.
A program for decontamination of existing facilities
is being developed.
.
Department 246 continued to run fast rates and work overtime to keep the cell-house on-line the first half of February. 1016 demand continued high with some short delays resulting from a lack of available tank cars. The department is attempting to maximize inventories to cover the outage during the April Acid Division turnaround. Bill Engman assumed the position of Operating Superintendent for WGK Zone "A", effective this month.
Total Aroclor production was the highest in nearly two years. Inventories were built to a level to cover the April outage incurred during the Acid Division turn around .
Two service complaints were filed in March regarding the appearance and possible spillage of Aroclor 1016 on tankcar exteriors.
Department 246 was down 4/3 - 4/23 per the Acid Division Turnaround. Numerous Department 246 repairs were accom plished during this period including: replacement of //2 batch chlorinator top; changed out Therminol system; and welded new nozzel on Itl intermediate. The off-gas scrubber liquor cooler failed 4/23 and was replaced with a 3" pipe.
Bill Crabtree underwent successful hip surgery 4/20. Dale Rochell is acting foreman during his absence.
DSW 442982
STLCOPCB4057521
/ 6.
DSW 442983
STLCOPCB4057522
Monsanto
"ME SUBJECT
REfERENCL TO
A. E. Leisy - Krumm.ri.ch Plant
March 31, 1976
AROCLOR PHASE-OUT OPERATIONS
Air
W. C. Engman C. Paton D. Wood -
B2SK B2SD
R. A. Pohl B2SB
The time is approaching when it will be necessary to implement detailed plans for phasing out of the Aroclor business. These plans should address themselves to, among other things:
1. Economics of operating at continually lower volumes and the consequence of this on income.
2. Disengaging ourselves from our customers, especially those who take small volumes and may not be in position technically to survive without Aroclors.
3. Plant posture on customer service as it impacts on manufacturing costs - for example, expenditures on auxiliary or spare equipment used to minimize delivery delays when customer surge orders occur.
4. Posture in the marketplace regarding returned waste Aroclors after shutdown of WGK production facilities. This is important from economics of the plant incinerator and budget planning for 1977 onward.
5. Raw material and finished goods inventory management as it relates to planning for either a stated cut-off date or a surprise customer(s) withdrawal.
Some direction is required to clarify for me whether the K. P. C. for dielectrics has this responsibility or whether some other vehicle will be used. To start things moving I have attached a volume-cost graph for Aroclor 1016.
N 10 REV. 1 72
emz Att.
DSW 442984
STLCOPCB4057523
r
Crj CV : ^>
1)
Uw
IX-
xo~
C4
m
4 V*
fT.
-1
j 1 -2 /i--^ j !? p>rf ! J .;s ! h-m ! Vf ! j T I J ! ; ' i Y j . A' j i
`!I
' l
.j-.i.!.-. i___
...1-- I
: .... I ; :
!
'! i . I
"T--
:t
44-
! jI .
'"......;'"...........i
--: i ;
'(
A & C.L.0 $. I v l L
:
i
j
'
Fko p L'cr / o >/
covr ;.
3?.o
/ / cVjT
;30,D
~ii --i
........ ;_J:
' , /:
/
i 7,
I /:
4 !.
-
\ /.
: 4
;
,
4-i-!-J-L
I I
J.
J-20',P
! Z.SM
'
\ 2 ow ..I
)krn.
/p/tfi. ;
0-5 M
ii
_.N outU l Y ; P'&t>pucr7f/0'/ \ J
ii
SIV 442985
I
K|* P- .Jfti'f'/f yc. 3/4/4
STLCOPCB4057524
DEPARTMENT 790 - 1976 OPERATION
/f>/ "
W * 3 !97$
JANUARY FEBRUARY
MARCH
January was an excellent month with the incinerator operating at a near record pace. The Venturi was cleaned out twice during the month. PCB losses to the sewer were high at over 5 lbs. per day for the last three days of the month. This loss was traced to the west aroclor sump which had received a trailer' of wash water from 246. Plans are to empty the sump and clean out any residue which may be causing an emulsion.
John Peduzzi replaced Gary Johnson as Supervisor of the incinerator as of January 1, 1976.
In February, the Ray 0 Tube failed and the incinerator was shut down for repair and the plenum was cleaned of built up solids.
High solids content material from little Mo storage tank caused considerable difficulty during the month. The solids clogged the pumps and strainers in the system preventing waste from flowing to the incinerator".
Currently feed tanks are being supplied from drums and other freshly received waste sources. Additional larger strainers will be installed to clean up the solids.
The west Aroclor sump was cleaned out to reduce the PCB losses from this sump to the sewer.
The incinerator needed cleaning of solids build in the plenum early in March. The degree of build up required entering the oxidizer and the unit was shut down for inspection and repairs.
The contactor tube weir ring was corroded and was repaired.
The scrubber column packing was replaced and the scrubber was relined with ceil cote 164. The old packing had suffered mechanical damage and considerable residue buildup.
Two rings of brick work in the oxidizer were repaired with Ram 90 and the plenum was also patched with Ram 90- The total turnaround took 17 days.
DSW 442986
STLCOPCB4057525
DEPARTMENT 790, AROCLQR INCINERATION, 1976 OPERATIONS REPORT
`1CNTH
' | JAN.
FEB. [ MARCH
POUNDS BURNED 620,479 512,351
288,560
BURNED YTD PERCENT OST % OST, YTD OSR % OF DE. OSR % YTD
620,479 1.132.830 1,421,390
94.13!
76.43!
37*0#
94. W70.93!
85.83! .
69.1*
76.63!
" 83-9%
70.93!
73.43!
75.3*
1 APRIL !
MAY
JUNE 1 JULY
AUGUST i SEPT.
OCT:.
1
1 NOV.
| 1 DEC.
INVENTORY, POUN DS
BULK REC.
. 324,713 186.340 172.954
BULK MO. END 1,433,56y 1,323,450 1,364,109
DRUMS REC.
136,24b 215,892 156,265
DRUMS MO. END
13,500
DRUMS EMPTIED
136,245 215,892 142,765
"- ' '
'
IXTRA HOURS
E. H. YTD 1VERTIME IT HRS. YTD ,BS. HRS. iBS. HRS. YTD
28 .28
7 7 18.5 18.5
8 5 __ 15^8
22.3 12.7
23./ ZQJ
20.2
17-3 6.1
10.4 21.1 20.8
;afety :inor INJ. iERIOUS INJ.
1 .. 0 00
0 0
' - i.
. DEPT. 246 - 197 DERATIONS REPORT
.
. .7 ' AROCLORS - 811.00
PRODUCTION TOTAL AROCLORS (29.7M it In 1975) <40.2M it in 1974) (42.2M it in 1973)
MONTH
-
ACTUAL `
JAN.
FEB.
MARCH
APRIL
3,397,499 3,062,003 4,185, 73'
MAY
JUNE
| JULY
1
' AUG.
1
SCHEDULED'
3,397,499 3,062,003 4,185,73'
i
ACTUAL YTD 3,397,49916,459, 502 10,645,231
... .... L.
PRODUCTION - AROCLORS, BY KIND '
1016 1242 1254
'
2,190,013 1,925,214 2,738,526 ' 478,027 424,262 618,57(
729,459 712,527 828,64'
,j
*-
i
1
1
1
'
,
/?. y
' APR '3-.373
SEPT. j OCT. _ NOV. 'J
1 DEC.
1
1i .
j
i!
'*
]
j
"
!
" "I
... -j
j .
'
J
i
PERCENT YIELD ON BIPHENYL, STD. 98.OX (100.25 in 1975) (98.59 in 1974) (98.98 in 1973)
MONTH YTD
1
i 99.32 i 1 99.32
102.58 100.84
101.17 100.97 | .
-i
DSW 442988
1 1
-
_ ..
"!
!
.
AVERAGE QUALITY OF 1242 EG LOTS (1.975 Avgs. on 21 Lots:
rcc
0.20
0.26
0.27
r
RESISTIVITY
94,825 85,875
160,550
POWER FACTOR NO. OF LOTS
0.40 2
0.37 2
0.16 1:
1 :
0.23 ppm; 154, 600 x 109
1
i
/ .
1 ' .
1
0.21%)
.
i
1
STLCOPCB4057527
DEPARTMENT 246 - 1976 OPERATIONS REPORT
\AVERAGE QUALITY OF MCS - 1016 LOTS (1975 Avgs. on 78 Lots: 0.14 ppm; 241,600 x 10 ; 0.19%; 0.07%)
1 MONTH
I :I JAN.
FEB. ! MARCH i! APRIL ii MAY ;!
JUNE I JULY i
^ AUG.
SEPT.
TCC
0.09
0.13 | 0.11 i
i
i
RESISTIVITY
264,920 264,708:171,277 !
!
!
POWER FACTOR 1 0.21
0.28
0.25 j -
j'
!
!.
HBH'S
i .0.15
0.16
0.19
ii
;
'' f j
NO. OF LOTS
:9
i 12
16. i
I:
: ;
OCT.
NOV.
DEC.
SAFETY (6 minor Ini. and 0 serious In 1975)
MINOR SERIOUS
0 0 01 0 0 o.l-
!' j
.
QUALITY COMPLAINTS (Formal and Informal) (4 in 1975)
NUMBER
00
..! . . ;
PERSONNEL (1975 OVERTIME O.T. YTD EXTRA HOURS E.H. YTD ABS. HRS. ABS. HRS. YTD S.T.ABS.HRS.YTD
O.T. 9.9%; E.H. 2 .3%; Abs. 5.5%)
14.4 14.4
4.5
23.4 18.6
7.7
14.5
''
17.0 i
12.6 j
.
! i
J
4.5 6.0 8.6. !
i
0.6 3.2 7.3 ,
.
0.6 1.8 2.0 i 0.6 0.8 0.9 ;
! i
- :v.
' <: j : i
: ` !
AROCLOR INVENTORY (1975 Avgs: Whse, 310M Dept. 714M #)
WHSE. '
' 1 54.9 90t 270.370 320,890
.1
DEPTTOTAL
864,706! 917,958 1,276,589 1
1,019,6361.188.328 1,600,479
!
r
i i
i:
....
--- ------- :;!----------- 11l------- --i . ': ! 1 :i 1 !
i
I
1 1.
: 1
DSW 442989
DEPARTMENT 259 OPERATIONS REPORT PYRANOLS (810.90)
-P--R--O--D--U--C-T--IO--N---------T--O--T-A--L---P--Y--R--A--N--O--L1S------(--1--5--.-9-M----I1t---i-n----1--9--7--5-)---(-1--5---.-7-M----It.i--i-n----1--9--7--4-)n-(-1---3--.-4-M----#-;--in 1973)
. MONTH
JAN. '
FEB. MARCH
APRIL
MAY | JUNE ' JULY
ACTUAL SCHEDULED ACTUAL YTD
1,120.082 965,367 1,552,168 j 1,120,082 965,367 1,552 j 168.1
1,120,08212,085,449 3,637,617
j !
i
' 1'
'
AUG.
SEPT.
OCT, '
i NOV. !
DEC.
-
i __ i
PRODUCTION -- PYRANOLS, BY KIND
1242 CM
--------- 378.151
364,307 666,280
70/30 A13B3B-3
" 570,928
i71,003
i
. ii
! r !
527,416 885,888 ''
73,644 -0-
i' .
ii i
i
j.
i i i
i'
. 1
1
i
.1 1
. :.
; 1.
,
!
i
i ZT_L . '
i `. J.
r !
i !
1! li
____________________ ..
.j i I-
-1
ii :_________ i____________
!. i
PERCENT YIELD ON TCR - STD. 98.05: (99.43 in 1975)'(98.24 in 1974)
MONTH
96.40 96.98
96.32
.. . J
YTD '
' 96.40 96.66
96.53 '
!!
..
PYRANOL INVENTORY (1975 Aygs: Whse . 147M #; Dept. 238M It)
WHSE. DEPT. TOTAL
-
173.232 313,713 437,296 ' 545,053 348,660 541,224
718,285 662,373 978,520
j '|
1
1 .1
".I .!
[
i
.
-
i
.i
i
,_L
I
DSW 442990
STLCOPCB4057529
JANUARY
FEBRUARY MARCH
DEPT. 24 / 2 59
1976 OPERATE NS REPORT HIGHLIGHTS
Total Aroclor production for the month was the
highest since October, 1974, due in large part
to an increased Aroclor 1016 dem and. The timing
could not have been better, as Dept. 246 has been
required to run full out since' 1/iS to keep the
chlorine cell-house on-line during a Dept. 233
production outage.
.
The Federal and State of Illinois EPA visited
the department on. 1/27,. gathering sewer and selected
air samples. There has been no feedback regarding
their visit. Several members of the Business Group
also toured the area on' 1/2 3.
-'
A press release late this month announced Monsanto's
intentions for eventual phase-out of the PCB business.
A program for decontamination of existing facilities
is being developed.
. .
Department 246 continued to run fast rates and work 'overtime to keep the cell-house on-line the first half of February. 1016 demand continued nigh .with
some short .delays resulting from a lack of available tank cars. The department is attempting to maximize inventories to cover the outage during the April Acid Division turnaround. Bill Engman assumed the position of Operating Superintendent for WGK Zone "A", effective this month.
Total Aroclor production was the highest in nearly two
years. Inventories were built to a level to cover the
April outage incurred during the Acid Division turn
around-.'
.'
Two service complaints were filed in March regarding the appearance and possible spillage of Aroclor 1016 on tank car exteriors.
DSW 442991
STLCOPCB4057530
/ DEPT. 246 - 1976 'ERATIONS REPORT AroclOW - 811.00
PRODUCTION -- TOTAL AROCLORS (29.7M if In 1975) <40.2M if in 1974) (42.2M # in 1973)
MONTH ACTUAL ' SCHEDULED'
JAN.
FEB.
MARCH
3,397,499 3,062,003 3,397,499 3,062,003
APRIL
MAY
JUNE
JULY
AUG.
ACTUAL YTD 3,397,499 5,459, 502
7.
SEPT.
OCT.
NOV.
--
-
PRODUCTION - AROCLORS, BY KIND
1016
2,190,013 1,925,214
1242
''
* 478,027 424,262
--
1254
' j 729,459 712,527
--
.
!
.-
--
s/f
DEC.
CM
<y>
CM
5
C/3 o
I
--1
PERCENT YIELD ON BIPHENYL, STD. 98.0% (100.25 in 1975) T98.59 in 1974) (98.98 in 197-3)
MONTH YTD
99.32 99.32
102.58 100.84.
i
* AVERAGE QUALITY OF 1242 EG LOTS (1975 Avgs. on 21 Lots: 0.23 ppm; 154,600 x 109; 0.21%)
TCC RESISTIVITY POWER FACTOR NO. OF LOTS
0.20 94,825
0.40
0.26 |85,875 I 0.37
2 2
/ <
STLCOPCB4057531
DEPARTMENT 246 - 1976 OPERATIONS REPORT
MONTH TCC RESISTIVITY POWER FACTOR HBH'S
JAN.
FEB.
0.09
0.13
264,920 264,708
0.21
0.28
0.15
0.16
MARCH
APRIL
MAY
JUNE
JULY
NO. OF LOTS
9 12
SAFETY (6 minor ini. and 0 serious in 1975)
MINOR SERIOUS
00 00
QUALITY COMPLAINTS (Formal and Informal) (4 In 1975) NUMBER
PERSONNEL (1975: OVERTIME O.T. YTD EXTRA HOURS E.H. YTD ABS. HRS. ABS. HRS. YTD S.T.ABS.HRS.YTD
O.T. 9.9%; E.H. 3.3%; Abs. 5.5%)
14.4
23.4
1
14.4
18.6
4.5
7.7
4.5 0.6 0.6 0.6
6.0 3.2 1.8 0.8
1
I" l ____________ 1__________
AROCLOR INVENTORY (1975 Avgs: Whse. 310M i"tJ. Dept. 714M if)
WHSE.
154.9 5o| 270.370
DEPT.
864,706| 917,958
TOTAL
1,019,6361.188.328
I
AUG.
SEPT.
OCT.
NOV.
DEC.
CO a>
5*
cn
o
DEPARTMENT 259. OPERATIONS REPORT PYRANOLS (810.90)
--PRODUCTION - TO.TAL PYRANOL;S (15.9M #i in 1975)
MONTH
JAN. ' | FEB.. MARCH
ACTUAL
1.120.082! 965,367
SCHEDULED
1.120.082 965,367
(15.7M 0 I in 19'7'4) i (13.4M # ;in 1973)
APRIL i MAY j JUNE ! JULY
ii
|i
ACTUAL YTD
1,120,082!2',085,449
____ i_ _ _ _ _ L_
AUG.
SEPT.
1 OCT.
! NOV.
1
i 1
i
!
i
DSW 442994
PRODUCTION -- PYRANOLS, BY KIND
1242 CM . '
-- 378.1 51 364,307
70/30
* 570,928 527,416
A13B3B-3
1.71,003 73,644
.
1
I 1
. 'i
#
!. '.
1
I- !
-i i
1
1
,'
i
j `.
i 11 j 1
1
I
PERCENT YIELD ON TCR - STD. 98.0% (99.43 in 1975)'(98.2% in 1974)
MONTH YTD
96.40 1 96.98 96.40 1 96.66
.
PYRANOL INVENTORY (1975 Avgs: Whse. 147M II;
WHSE.
.
1 173.232 313.713
DEPT.
1 545.053 348,660
TOTAL
| 718.285 662,373
Dept. 238M //)
1 i
hi
"
J
____
--
.. ..... .
STLCOPCB4057533
JANUARY FEBRUARY
DEPT. 246/259
1976 OPERATIONS REPORT
HIGHLIGHTS
Total Aroclor production for the month was the highest since October, 1974, due in large part to an increased Aroclor 1016 demand. The timing could not have been better, as Dept. 246 has been required to run full out since 1/18 to keep the chlorine cell-house on-line during a Dept. 233 production outage.
The Federal and State of Illinois EPA visited the department on 1/27, gathering sewer and selected air samples. There has been no feedback regarding their visit. Several members of the Business Group also toured the area on 1/28.
A press release late this month announced Monsanto's intentions for eventual phase-out of the PCB business. A program for decontamination of existing facilities is being developed.
)
Department 246 continued to run fast rates and work overtime to keep the cell-house on-line the first half of February. 1016 demand continued high with some short delays resulting from a lack of available tank cars. The department is attempting to maximize inventories to cover the outage during the April Acid Division turnaround. Bill Engman assumed the position of Operating Superintendent for WGK Zone "A", effective this month.
DSW 442995
STLCOPCB4057534
R. A. Pohl January 6, 1976 PCB1S INCINERATION
E. H. Hardison, Jr.
R. G- Potter D. L. Sliney
The following are answers to the questions which you raised in your December 30, 1975 request to Dave Sliney:
1. "How many pounds annually do we destroy as a service to others or ourselves? in connection with this question. What is the cost of destruction per pound, as opposed to What we charge?".
Going into 1975 we had an inventory of 3.2M pounds of PCB's and during the year we generated 469M pounds from our Aroclor operations and received 1,505M pounds of PCB's from customers. We incinerated 3,574M pounds during the year at a cost of $0.11-$0.12 per pound. From December 1, 1974 thru August, 1975 customers were billed at $0.05 per pound plus an $8.00 per drum handling charge. Beginning September 15, 1975, customers were billed at $0.08 per pound plus an $8.00 per drum handling charge.
2. "Have we any backlog of waiting destruction and, if so, how much in terms of pounds and elapsed time to destroy?".
January 1, 1976 PCB's inventory was 1.6m pounds, it is estimated by December 31, 1976 the inventory will be essentially zero on the assumption we do not receive an abnormally large return of PCB's in the month of December from customers. The plant will take every opportunity during 1976 to better the December 31, 1976 estimate.
In addition to Incinerating PCB's, the WGK incinerator handled 800m pounds of OKA, PHA, chloro-phenols, and Santophen I residues during 1975.
/sb
R. A. Pohl
DSW 442996
***
STLCOPCB4057535
J m 7* Littich/WGKFROM (NAME ft LOCATIONl
_CATE
s
December 31* 1975
SUBJECT
;
INCINERATOR ACCOUNTING
REFERENCE
:
TO :
A. E. Leisy ^R^A. Pohl-B2SB-GO
B. Ratliff-B3SF-G0
9AV s -
cc= J. E. Has tings-GO D. T. Hughes
W. R. Paries
A. G. Frerking
A. J. Koenig-GO G. Turner
A. Nagel
W. 0. Jackson
J. Wriston
GO
Many methods to account for incinerator activity have been employed during the past five plus years that the WGK incinerator has been operating. The basic cause for this constant changing of methodology has been the need to adjust to the ever changing business group policies and modes of operation of this department.
The pendulum has constantly swung from all customers paying an incineration fee to most customers being allowed to return all or most of their material free of charge and then back to most customers being charged eight cents per pound plus handling charges for every pound returned to WGK for burning. Also, much work was done in 197^ to allow for other plant residues to be disposed of.
As a result of the aforementioned, an Accounting oversight in regard to the practice of matching revenue and expense has occurred. An entry is being made charging the Aroclor Department and crediting deferred income for $93*728 in December business to correctly reflect 1975 activity through November.
A detailed summary of the current status and all procedures to be followed by plant personnel during the December closing and thereafter is attached.
If you have any questions, please call.
. jg
Attach.
IN - 10 REV. 1/72
J. T. Littich DSW 442997
STLCOPCB4057536
I. STATUS AS OF NOVEMBER 30, 1975
ATTACHMENT I
As of November 30, 1975, department tank inventory is as follows:
Material
Date of Receipt
Quantity Deferred
In Lbs.
Income Amt.
PCBs - Dielectrics
Prior to Dec. 1974
533,392
PCBs - Dielectrics
PCBs - Dielectrics .
Dec. 1974 thru Aug. 1975
Sept. 1975 thru Nov. 1975
955,740 $57,459
378,844
36,269
PCBs - Dielectrics - Total
Dept. 246 Montars ONA Residue
Jan. thru Nov. 1975 Nov. 1975
1,867,976 /.&
20,5^5
3,464
$93,728
Remarks
Customers billed @.03/lb. for a total of $16,002. Decision made to include only 1975 material in December adjustment.
Customers billed @.05/lb. plus $8/drum handling charge as of Dec. 1, 1974
Customers billed @.08/lb. plus $8/drum handling charge as of Sept. 15, 1975.
In-plant material.
In-plant material.
Total Material On Hand for Incineration - 11/30/75
1,891,985
STLCOPCB4057537
INCINERATOR ACCOUNTING PROCEDURES EFFECTIVE 12/1/75
ATTACHMENT II
1. Prepare December journal entry for deferred income adjustment as of November j50, 1975 (see Attachment I).
Responsibility - G. Turner/B. Faries
2. Beginning with December activity:
a. Notify A. Nagel-WGK and C. R. Field-GO that all dielectric billings to customers should now be credited to deferred
income account 02-003-50316-000 not 02-0QJ>-10868-000.
Change division code to 45 beginning with January billings.
Responsibility - J. Wriston
b. Reconcile 10868 account until all billings prior to December have cleared and reconcile 50316 account beginning with December activity.
Responsibility - B. Faries
c. Continue to distribute monthly cost to all users based on pounds burned. In respect to PCB material, first deplete the inventory of any material returned free of charge (if and when received). Secondly, deplete the inventory of the material for which customers have been billed per Attachment I using the FIFO method. Thus, no entries to deferred income nor the Aroclor Department will be made for the first 555*392 pounds of PCBs burned. Thereafter, debit deferred income and credit Aroclors according to Attachment I tiers considering all material returned after November 30, 1975 as an addition to the material received since September 1975 until billing rate changes occur.
Responsibility - B. Faries
3. Adjust ending inventory of December monthly PCB status report to agree with physical by showing an inventory adjustment of +97,261 lbs.
Responsibility - J. Wriston
4. Coordinate all future book and physical inventory adjustments as they occur.
Responsibility - J. Wriston/A. Frerking
5. As of January 1, 1976, special manufacturing jobs 8l487 and 8l488 which were opened in 1972 to collect cost of burning "returned free material" will be closed.
STLCOPCB4057538
Incinerator Accounting Procedure - Effective 12/1/75
ATTACHMENT II
6. As a result of Item 5 above, collect freight billed back to customers will be charged by the Traffic Department as 597 expense to the incinerator (89990) instead of the 81487 account.
Therefore, a) Traffic must be notified of this change, and b) account 89990 must be credited and deferred income debited for this freight when copy of invoice to customer is received.
Responsibility - B. Faries
7. Instruct C. R. Field-GO to send copies of invoices to customers directly to B. Faries-WGK.
Responsibility - B. Faries
DSW 443000
STLCOPCB4057539
I ^ ty C t vO (\$joo..oh.
i ' ;UHC p{S
- !`?7S-
ft
rn
l^prt. \'>'l ^ V 33 *> Oo^l
>Wt (PtT /Oo\> Ot c >
"Torfw
1 W i > u Cir ^,ooo
l^iOOO /o <oo o
3 V?-. 3 V' `-roC)
0.0 0 /2<5b6 77,35c I1 5b,75 K 5'5,3oc <y3,<?,&
''
(19o mi jjCr
^ 3; / / 3 le 0,35?, >5, 2 // /5V, 9 3? Pta }P7 rl . /3 v, 3 3 5 } /5, f? ^ 533,533) /Vf(*?r/ /33, ^5/ 7,574 tSS ,</?<?
i,S(>I$3>%
'~T~OVf\ V__ /o /,//3 -
JS^Si ,0 /Y --
019,00/ 7?? '
//</. 335" ' /3 3, 55/ p l7).Srtl P3,P57'
/39, /5o /?9 5^4
W* 4JU.
3 7oO I'rijY.
5 /7v
/
/ -gTTi
DSW 443001
STLCOPCB4057540
DSW 443002
ITEM _5 -- ATTACHMENT A
PCB SUMMARY
MONSANTO KRUMMRICH PLANT, SAUGET, ILLINOIS
Origin Customer Returns, records exist
1971 1149
1972 a
307j
1973 3214
Customer Returns, records do not exist
1564
170^
170
Monsanto, records do not exist
634
603
359
Monsanto, records do not exist
400
400
--
Monsanto, records exis t
93 320 68
Total receipts
3840
6105
3811
Destroyed by Incineration
1303
3386
4838
Dif ference
Inventory Ll/L/75
Landfilled Montars es timated (no records)
150
140
110
MONSANTO ANNISTON. ALABAMA PLANT
Chlorinated terphenyls landfilled (no records)
PCB's landfilled
3932 150
1658 24
0
/
P |Y ^
1974 1695
-- --- 570 2265 2902
_
x \\ 19 7 5^ , Total
<1109 '
10246
3435
-- 1596
-- 800
322
1373
1431
17452
2808
15237
2 215
2199
110
510
5590
0 0 174 5764
STLCOPCB4057541
W. G. KRUMMRICH DISCHARGE PCB STATUS
A. LOSS
1. Our current measurable losses from the plant to the environment are approximately one pound per day. This equates to approxi mately 0.001 parts per billion PCB's in the Mississippi River at average flow rates. Level of PCB's into the ambient atmosphere are less than Threshold Limit Values using sampling and analytical techniques currently available. Presently we are manufacturing at a rate of 70,000 to 100,000 pounds per day PCB's.
2. The EPA presently has no formal PCB discharge limits although it has proposals under consideration which call for ambient water concentrations (i.e., if you sampled a natural body of water at random) at levels not to exceed 0.001 parts per billion.
B. PREVENTATIVE MEASURES
1. In our manufacturing area, we have acted to prevent loss of PCB's in the environment by literally making the department a "concrete bathtub". Drainage is collected in an isolated PCB sewer system with settling basins to insure PCB containment in case of accidental spill or equipment failure with the capa bility of monitoring the effluent from the department.
2. Storage tanks are blanketed with nitrogen to eliminate tanks "breathing", and mist eliminators have been installed in vapor lines to eliminate the possibility of PCB's leaving the manufacturing area.
3. An incinerator was installed to safely dispose of PCB's. 4. The key to our continued success in controlling PCB's is in
our maintaining a high housekeeping level. 5. A chemical waste treatment plant is under construction which
should further lower the PCB's to the environment by adsorption. 6. Completion of a planned regional treatment plant should reduce PCB's to the environment to potentially a negligable value.
DSW 443003
RAP 12/31/75
STLCOPCB4057542
M t'VijX-
iA^f-
><r/
.A
1o .A
1^0
) , So i./e
o_j>^ &.M
Ab
/. 6 2-^ 77 f
/, ?<3
oo
iA c
AA
s.f
7 77JO ICrj*uL
--, c-y A lO
A (A
Ai-u$^- x< <\
3,0
L?
3,(=
3,0
IA . ^Kl
^1,2-
<1.3
3 L1'
l-3u <-r
OS\N 443004
STLCOPCB4057543
in
I. V
Jtfonnfi i.%
oS$> jfl
" 33/o-Tf:-
s/j/tyl
i, :/*
\Aotif \%
(< ~l z-jf (5^
A V/ 3, 0
m>,rro /', 3ft/
/-
W/to Llf`
Cc(
i.j
y.f -Lb
2.7 I - I
i-l i.|
0 - n 4 l (z^
lc.< ,43
/. &
.43
C
3,7
3.0
7, v
<V. ^
2. ^
-2-7
7. /
/</LC{
f 16Tjo7rD>
\(X t
/f/2
f
oif-
,
^3*V
/ 6 C7-, ^7^
(41$?>"& 0 coz^
& $ I.?? r
0.<'L-fiJr
, /U/bJl Ji K fe /
DS\N 443005
STLCOPCB4057544
'3.t; i
-Y
/
2#
^ 2*0
$.o /1 <*=>
Z-OuJ
r< -
(3 o c /2 <& t-
/y/ (\x
Pc 6 5
u_
/PC; /* /. <3 ^ Ac>
/,'& P /.'D
'/*> />*.
O7 /_.o 7" A
7 4'o
7 '>>'
"/.ou.1
/ ^ f f iw * f,-
H'^i/Jcc
^.
DSW 443006 STLCOPCB4057545
// . Cto A/*7" 7YAj
"
prtoa-cie
/L/Z*}.
"~
6!.pcv/c^~ /a'_7'7 PcpAA<^-
AS*
p)(fp ~Aa/je- /r^^ecAjuy dm*TM j^q fao/ g& //^ p?
/ff&ejj?? /(f7
^
.............. Jkv/Y # -- ------------ -...... -
oj
/tfotv PtcJer. /V/2
Oy
/2//2
I >k. h7
'/a
.20
4.06S
4-IVt
/OZo
6-^y
.</A
. 40 .
j.m
? SS *
... /200
G-tjq Z ro
________ go ............ 3- 97
7. l/Lj L *
.n /?fO
Z> - o>
/(?>.
ol. f 0
r. 7/2 r ___ n>o
i^/o J
6'V?
' So
^___\f^c^^'ca^Zn~y /?yv%su___ J 'Coo,______________________
sQttyizcPZ /7ncr2P cj/
^ czz/ 0/
?v/
$Zi^.. CsAjLcJz,
c^v e&A/Zt /f^TutAcj^
&h&7
^Uyo d/WC ^cKt/l' (2&rTMyu'
CZJpz^? <0tv c--
/Ty^w
f/P......
/^kP
ypT
________________________________________________________________________ ________
~'
YY'S (jJs&PfaJ.>, \^,'ca<P cj rta /<Apj
^
ccn^/ cj&s rn^/o^
'gp^pi 7& Ykua,
cyi~^ 7P<2At &>
^ . _______________________^
<7^
(72sl^
SW 443007
STLCOPCB4057546
-
Bari M. Potter - General Offices - B2HK
December 10, 1975 Aroclor 1489
Gary Johnson 1740
C. Paton R. Munch
PBfci D. Mayer A. Leiay D. Wood
DEC ' 1 <9^
B2SC TIB B2 1740 1740 B2SC
In our conversation this afternoon I indicated David Wood would like to determine if there is any deterioration of electrical properties of the Aroclor 1489 that is on hand.
In discussing this with your foreman, X found that they initially sampled 18 drums out of 120 produced in April, 1975. There is no schedule for re-testing these electrical properties. You indicated you will arrange for samples in accordance with David's request. Will you please see that the analysis reaches the carbonees of this memo?
I am attaching a copy of David's letter for your information. In answer to hie question on inventory, I am told there are 89 drums at 590 lbs. each and six cans at 55 lbs. each for a total of 52,840 lbs.
Your assistance is appreciated.
BMP*cat
Sari M Potter
os* 443008
V
STLCOPCB4057547
R. H. Munch
TIB
December IS, 1975
Aroclor 1489
D. vtfooc
H25C
G. A. V"R. C. E.
Johnson - 1740 Leisy - 1740 A. Pohl - B2SB Paton - B2SC M. Potter - 32NK
As was agreed when we discovered that much of the Aroclor
1489 in the MG'K warehouse is above the specification limit of 5.0% max power factor, we have taken material from drum
#49, the one with the highest power factor, and batch
refined it in the lab. The results are given below:
Aroclor 1489 Drum #40 Properties
WGK Original
Power Factor
2.90
Resistivitv
-- - i
- -
1200
DK 6.49
WGK 12/12/75
9.35
1250
6.50
Research, as
'
receive 12/16/75
7.98
1144
6.50
Research after batch refining
1.70
2448
6.47
You will note that lab batch refining produces very satis factory material from the drum of 1489 with the poorest properties. Since the capacitor manufacturer will routinely purify the material before use, he will not suffer any penalty from the fact that the material no longer meets our specification. He should, however, be told what the dissipation factor is.
It is difficult to be certain what has caused the deteriora tion. It is tempting to believe that drum contamination may have caused it since one drum has remained within specs. If the problem were inherent to the fluid, all drums should have behaved alike unless there is an extreme difference of temperature of storage from drum to drum.
:kl
R. II. Munch
0s'#J a439
STLCOPCB4057548
David Wood-St. Louis-B2SD December 9, 1975 ABOCLOR 1489
E M. Potter B2NK
C. Baton Rt Munch-TIB R. Pohl^pF C 9
-^Aroclor 1489 BU Dec. 30th
1875
EOC indicate a 1976 need for Aroclor 1489 of 50-100 M lbs. We are trying to develop a more precise number.
In the meantime, please advises
1) Current inventory Aroclor 1489.
2) Because of the impact of TXS on electrical properties of Aroclor 1489, please advise if any date was set for retest of electrical properties of Aroclor 1489. If none was set, I believe we should sample every 20th drum to ensure no major fall off in properties. If current inventory has fallen off in quality, we could have a TXS availability problem to meet Aroclor 1489 and MGS 1238 needs.
/deb
David Wood
DSW 443010
STLCOPCB4057549
, AltUCLUK^/FYKANULS
1976 IlONTHrr^PERATIONS REPORT . W. G. KRUMMRICH PLANT
E.L. Moore Pohl ;
R.G. Potter
K.W A. ! G, I
flint Le i sy Johnson
PRODUCTION
JUL 8 ^
AROCLORS
0.16 Month 016 YTD 74 2 Mo. 24 2 YTD 2 54 Mo. 25_4_ YTD
(811.00) (1975: 1016 - 14,247M#; 1242-^573 Mlbs. ;1254- 8891 Mlbs. Total 29,709M lbs;
JAN.
FEB.
MARCH APRIL
MAY
JUNE
JULY AUG.
SEPT.
2,190.013 1,925,214 2,738,520 811,422 ',026,639 1,824,55 .
2.190.013 4.115.227 6,853,747 7,665,169 5,691,808 LI,516359
478.027 424,262 618,57C -0-
61,329 262,97 )
478,027 902,289 1,520,859 1,520,859 L,582,188 L,845,167
729,459 712,527 828,644 323,629 "598,196 ~452,467
729.459 1.441.986 2,270,63C 2,494,259 3,092,455 3,544,922
1974 Total OCT.
40,172M lb1 s. NOV.
DSW 443011
otal Month oral YTD
3.397.49S 3,062,003 4,185,732 1,035,051 2,686,164 2,539,997 3.397.499 6.459,502 10645236 11680287 L4366451 16906448
IRANOLS (810.90) (1975: CM-6,811M//; 70/30-7,244M lbs; A13-3-l,762H lbs: Total - 15 ,913M lbs; 1974 Total - 15,700 M lbs.
JAN.
FEB.
MARCH APRIL
MAY
JUNE
JULY
AUG.
SEPT.
OCT.
NOV.
DEC .
1 Mo. t YTD 0/30 Mo. 0/30 YTD 1.3B3B-3 Mo. 1.3U3B-3 YTD
.. 3Z8151 278151 570928
5Z0928. 171QQ3 171003
364307
7.42458
527416
1098232 73644
244647
666280 98800 1408738 1507538
885888 79176 '
1984232 2063408 -0- 140177
244647 384824
-01507538
341430 2404838
-0384824.
269780 1777318
197114 2601952
121284 506108
ot.nl Month 3tnl YTD
1120082 965367 1552168 318153 341430 588178 1120082 2085449 3637617 3955770 4297200. 4885378
STLCOPCB4057551
)
V ARIANCES
TOTAL /Pyranols/
AROCLORS ($M)
JAN.
F rom Std.
I'orf.
Price
llnsch.
Total
F .com Quarterly Est. Pcrf.
DEPARTMENTS 746/759 AROCLORS/PYRANOLS
1976 MONTHLY OPERATIONS REPORT W- G. KRUMMRICH PLANT
---------------- -----------------------------------------------------------
.
FEB.
MARCH
APRIL
MAY
JUNE
JULY
AUG.
84G 5G
108L 19L
'.
68G
SEPT.
OCT.
2
o TcJo-
CO Q
NOV.
DEC. 1
Comments:
.
-T--E--C---H--N--I-C---A--L--,---P--R---O--J--E--C---T--S-
None
' DEPARTMENT 746/759 AROCLORS/PYRANOLS
1976 MONTHLY OPERATIONS REPORT W. G. KRUMMRICH PLANT ,
-----------------------------------------------------------------------------
'
PROPERTY ADDITIONS/REPLACEMENTS None
i
CO o C<OT
^U)
D
STLCOPCB4057552
DEPARTMENTS 746/759 AROCLORS/PYRANOLS
1976 MONTHLY OPERATIONS REPORT W. G. KRUMMRICH PLANT
OPERATIONAL COMMENTS Aroclor 1016 bottoms generation far exceeded Aroclor 1259 demand this month, resulting in the need to load out approximately 145,000 lbs. of residue for incineration. A special !anufacturing job (account 814.24) was established to collect the charges related to burning bottoms (i.e. raw material value, incineration expense; tank car moves, etc.). This system will go into operation in July. Boil down on the 1016 column runs is being "squeezed" to reduce the percentage of bottoms. We've contacted Dowell Industrial Cleaners this month for purposes of a rough estimate to decontaminate the goods in process vessel throughout the department for their eventual disposal.
DSW 443014
STLCOPCB4057553
Monsanto
thom .name a location,
P.R. Kucera, W. G. Krummrich Plant
DATE
s
SUBJECT
:
REFERENCE
:
TO :
February 8, 1978
R. A. Pohl B2SB
L. Burks
D . Cissell
W . En gman
*
S . Finkels tein 4 B3SE
A. Koenig
- B2SK
A. Leisy
A. Lewis
W. Smith
- B3SE
Attached is the status of Aroclor shutdown costs through January and an update to estimated costs for February, prepared by Bill Engman and myself.
/ tm attachment
Paul Kucera
IN - 10 REV. 1 '72
DSVV 443015
STLCOPCB4057554
AROCLOR SHUT-DOWN COST PROJECTION
ACCOUNT 702-81467
DESCRIPTION
PLANT COST ESTIMATE (4/77)
Retirement toss'
Dept. Equip. Capitalized Spares Total.................................
392M Depreciation 30M
DEC. YTD
99M 26M
JAN. ACT.
FEB. EST.
20M --
20M
Dismantling Expense Dept. Equip. Shipping & Landfill Tankcars--Remove liners
Total.................................
500M 350M 15M
Total =
23M -- --
148M
78M --
--
98M
90M 50M
160M
721-81451
Decontamination Cleaning Storages & 1016 Column Incineration of Solvents Tankcar--Replace Valves
Total..................................
17 5M 13M
135M
Misc. Directs Total =
137M 10M
--
147M
-- -- --
--
745-81468
Decommissioning Expense GIP Inventory Incineration--GIP Inv.
Total.................................
100M 52M
. 15 2M
Total =
86M 56M 142M
-- --
Project Related Grand Total
1962M
437M
758-81469
Incineration of 1016 Bottoms on hand after . July shutdown
In-plant incin. =
Misc. Directs =
Rollins Inc.
=
Total. . =
19M* 45M 251M 277M
98M
-- -- -- --
160M
TOTAL COST...
714M
98M 160M
O C/3 g P>
W O
03
COMMENTS
STLCOPCB4057555
yfl?Y P&t'v <*-!/' o
1977 OPERATIONS REPORT
DEPT. 246
JANUARY The HC1 off-gas condenser failed (Item 427) and was retubed. Some moisture got into the HCl storage tank (knockout tank) and the moisture probe did come in, as it should. The knockout tank was not damaged. A Biphenyl shortage cost 72 hours of operation.
FEBRUARY Sewer losses were high due to the failure of the Brink element in the "blow Brink catch tank." The element fell to the bottom, but was not discovered until the sewer losses were reported high. The new element was not installed properly and the sewer losses remained high until the Brink element was sealed tight. An operator error contamianted a -3 blend with 1016. This material cannot be brought into specs but our sales department is trying to sell it. Another -3 blend was made with 1254 that was contaminated with the same 1016. This material can be brought into specs but can't be sold as normal -3 due to the 1016 in it. Our sales people are also trying to sell this blend. Each blend is --'13,000 gallon. The Biphenyl shortage continued in February.
MARCH The Biphenyl shortage continued during March. Sewer losses were very low, indicating the Brink element in the blow Brink catch tank is holding very well. Cleaned hard Ferric Chloride from the bottom outlet and outlet valves
on //7 and #8 chlorinators again. Inspected the top trays in the 1016 column. A few bolts were loose on the top tray, but no repairs were necessary. An attempt was made to S.I.A.M. the column pot, but the bolts on the top manway cover could not be removed by our maintenance people. Unless a problem develops no further attempts will be made.
DSW443017
STLCOPCB4057556
1977 OPERATIONS REPORT DEPARTMENT 246
Page 2 W.G.K.
APRIL
A normal run of 1242 (20,000 gal.) was made, analyzed and 8 drums filled. The
drums are being stored in the drum room, and four will be used for "samples" of
typical material per J. Coleman Weber's memo dated 3/10/77.
'
All thl 1242 left, after the 8 drums were filled, was made into 1016. The entire 1242 distillation system has been blown empty, including the absorber.
Ten loads of Biphenyl were received in trailers because tank cars were not arriving in time to continue operations.
The department shut down on April 22 due to Dept. 213 turnaround and was down the rest of the month, and probably will be down several more days.
1254 produced from 1016 residue still has a MUNCH that is higher than the spec max. The reason is not known.
The two settling basins were pumped out, a total of 52 drums.
DSW 443018
STLCOPCB4057557
DEPT. 266 - 1977 OPERATIONS REPORT
AROCLORS - 811.00. 811.04
10DUCTI0N -- TOTAL AROCLORS (29.6M it in 1976)(29.7M 0 in 1975)(40.2M 0 in 1974)(42.2M 0 in 1973)
>NTH :tual
JAN.
FEB.
1010619 jl979605
MARCH 1489968
APRIL 2030595
MAY
JUNE
JULY
1 | AUC.
1
T' 1 SEPT.
i.
HEDULED ' TUAL YTD
.
1010619 jl979605 1010619 12990224
f
1489968 4480192
2030595 6510787
i
OCT.
NOV.
DEC.
.
ODUCTION - AROCLORS. BY KIND
16 915943 1475118 1127513 1634066
42 ' 54
" 83376 11300
0 504487
0' 362455
0 396529
--
'n
sg <
i
1 .1
wr-> 1 CD 1
7CENT Y
ITH -)
BIPHENYL, STD. 98.0% (100.21 in 1976)(100.25 in 1975)(98.59 in 1974)
98.52
99.68 I 99.47
98.61
98.52 1
i
99.27
99.34
99.11
'9 ;RAGE QUALITY OF 1242 EG LOTS (1976 avgs. on 13 lots: 0.20 ppm; 110,330 x 10 ; 0.18)
ISTIVITY ER FACTOR
nr t otc
______ . --
--
______
--
-- . -----
--
--:
0.24 78500
0.210
t
/
L_
-
. .
i |I 1 . .. !
1
DEPARTMENT 246
1977 OPERATIONS REPORT
XVERAGE QUALITY OF MCS - 1016 LOTS (1976 Avgs: on 1 o7 lots: 0.11 ppm; 228,033 x 109; 0.22; 0.18%)
IONTH rcc IESISTIVITY
'OWER FACTOR 'ENT/HEXA
JAN. 0.11 115350 0.188 0.19
FF.R. 0.156 385765 0.209 0.15
MARCH 0.148 202426 0.164 0.13
APRIL 0.153 148931 0.219 0.14
MAY JUNE JULY
AUG.
SEPT.
OCT.
NOV.
IO. OF LOTS
499
8
SAFETY (2 minor lnl. & 0 serious In 1976) (6 minor lnj. and 0 serious In 1975)
IINOR
002
0
ERIOUS
000
0
UALITY COMPLAINTS (Formal & Informal) (2 In 1976)(4 In 1975)
UMBER
Ijl
ERSONNEL (1976: O.T. 11.2%; E.H. 7.2Z; Abs. 1.1Z)
VERTIME T. YTD
10.3 10.3
15.7 13.0
15.1 13.8
11.5 13.3
XTRA HOURS
7.1
15.4 . 26.0
14.6
H. YTD
7.1
11.2
16.7
16.2
BS. HRS.
1.0
0.6
1.1
.9
BS. HRS. YTD 1.0 0.8 0.9 .9
10CL0R INVENTORY (1976 Avgs: Whse. 217M
HSE.
134910 122910 180450
EPT. OTAL
522547 657457
1085943 1208853
762776 943226
Dept. 960M If) 179250 972097 1151347
-- TYFC.
os\N 4020
*r
STLCOPCB4057559
RODUCTION _O_N_T_H CTUAL CHEDULED CTUAL YTD
DEPARTMENT 259, OPERATIONS REPORT PYRANOLS (810.90)
TOTAL PYRANOLS (8.7M If In 1976)(15.9M# In 1975) (15.7M If in 1974)(13.4M It <n ig7?1
J.A..N. .'. i.' _F_E_B. !--_M_A_R_C_H I A..P..R..I.L !I MAY
111 JUNE J.U..L..Y.
A..U.G,, .
SEPT.
487377
481929 415522
496553 j
i
1
487377 487377
481929 415522 ' 969306 1384828
496553 | 1881381 |
j j
1 1
OCT.
NOV.
i
DEC.
RODUCTION -- PYRANOLS, BY KIND
242 CM 0-30 -13B3B-3 .
0 95598
0 292032
0 148364
391779 189897 1
267158
1J
oi 102928 393625
r i ii
,
i .
i ! J j
!
ERCENT YIELD ON TCB--STD. 98.OZ (97.40 in 1976)(99.43 in 1975H98.24 in 1974)
IONTH TD
96.74 96.74
60.97 75.83
95.90 80.96 '
96.53 ! 84.69 |
j i.
.
---- ----------- --
i !
!
i
ir
!'
1
.
1
| |'
| j
YRANOL INVENTORY (1976 Avgs: Whse. 336M #: Dept: 415M #) (1975 avgs: Whse: 147M #; Dept: 238M #)
,,qF iEPT .
OTAL
. | 366,3891 504,038 506,623 469,147
i 127,995 174,692
6,019 0
| 494,384j 678,730 512,642 469,147
' .|
--
....... .......... :-----------------
DSW 443021
STLCOPCB4057560
DEPT. 790 - 1977 OPERATION
JANUARY FEBRUARY
MARCH
The incinerator was down for 19 days for Weir ring repairs. The Venturi has a crack that must be repaired during the next extended shutdown.
The Incinerator was down for 11 days for plenum repairs, The Venturi crack was repaired. The waste inventory is holding steady at 2 million pounds.
Reasons for the overtime in February were: Absence 20% of total. Openshift 80% of total.
546,000 lbs. were burned in March. We were down for four days for plenum refractory repairs.
Reasons for overtime in February were: Openshift 94.1% Medical Reasons 5.9%
OS'N 443021
STLCOPCB4057561
INCINERATION I0NTH POUNDS BURNED BURNED YTD PERCENT OST ft OST, YTD OSR % OF DE. OSR % YTD
(1976 5,946 M lbs. 66.6 OST 81.3 OSR)
JAN. 232512 232512
FEB.
MARCH
428755 546,185
661267 1,207,452
APRIL
37.1
50.4
84.4
37.1
44.1
58.0
67.4
98.3- . ,, 69.6
67.4
84.6
77.1
MAY
JUNE
JULY
AUGUST
SEPT. OCT.
NOV.
DEC.
c*7 c4 cD -----
c*O ---
5_ w D
INVENTORY, POUN 3S
BULK RtC.
290072
BULK MO. END
2042204
DRUMS REC.
49231
DRUMS MO. END DRUMS EMPTIED
74500 20731
298000 2068223
82274 53500 103274
345,248 1,960,285
39,399 0
92,899
PERSONNEL - PE RCENT REGU LAR HOURS (Includes 'henol Hanc 1 i nq)
EXTRA HOURS
0.0
O.o 4.3
E. H. YTD OVERTIME
0.0 11.1
0.0 1.5 6.3 4.5
DT HRS. YTD
11.1
8.8 7.9
ABS. HRS. ABS, HRS. YTD
3.5 3.5
1:3 0 2.4 1.5
:afety
.
11 NOR INJ.
SERIOUS INJ.
0 0
01 00
STLCOPCB4057562
Klonscnto
I HOM :IMM!
W. J. Hoerr B1NC
5unjrcr
HE*EHfNCl
June 8, 1976
TANK CARS EMPLOYED IN AROCLOR, INERTEEN AND PYRANOL SERVICE
TO R. A. Pohl - B2SB
C. B. Sigler ^ D. Wood - B2SD E. M. Potter - B2NK A. J. Koenig - B2SC A. E. Leisy - 1740 G. Turner - 1740
The following is a list of tank car information requested for tank cars in subject services.
Supplier Leased
Car No.
Monthly Le
Lease Expiration Date
GATX 95669 GATX 32454 GATX 32455 GATX 32456 GATX 32457 ACFX 4590 GATX 74836 NATX 6507 ACFX 23874
$ 135 J2) 165 bo 165 J 0 165 ^V) 165
150 190 190 165 '\
UStiO HVSO HKTu v V' J \^!>0 'j
\ ^ 15
Monsanto Owned* ^ 00
6/30/77
11/30/78 11/30/78 11/30/78 11/30/78 3/31/77 2/28/78 7/31/77 4/30/79
Car No.
MONX 837 MONX 838 MONX 839 MONX 8600 MONX 8601 MONX 8602 MONX 8603 MONX 8604 MONX 8605 MONX 8606 MONX 8607 MONX 8608 MONX 8609 MONX 8610 MONX 8611 MONX 8612 MONX 8613 MONX 8614
Asset Value
$13,933 13,933 13,933 19,136 19,136 19,136 19,136 19,136 19,136 19,135 19,136 19,136 19,136 19,136 19,136 19,136 19,136 19,136
Net Book Value .
$ 19 19 19
5,600 5,600 5,600 5,600 5,600 5,600 5,599 5,600 5,600 5,600 5,600 5,600 5,600 5,600 5,600
yY
DSW 443024
STLCOPCB4057563
R. A. Pohl
2- -
Monsanto Owned (cont')
Car No.
Asset Value
MONX 8615 MONX 8617 MONX 8618 MONX 8619 MONX 8620 MONX 8621 MONX 8622 MONX 8623 MONX 8624 MONX 8625 MONX 8626 MONX 8627 MONX 8700 MONX 8701 MONX 8702 MONX 8703 MONX 8704 MONX 8705
$19,136 19,136 19,136 19,135 19,135 19,135 19,135 19,135 19,135 19,136 19,136 19,136 16,860 16,860 16,860 16,860 16,860 16,860
June 8, 1976
Net Book Value 5/31/76
$ 5,600 5,60,0 5,600 5,599 5,599 5,599 5,599 5,599
5,599 5,600 5,600 5,600 4,934 4,934 4,934 4,934 4,934 4,934
7v b
) 60
/ S' .6 7 (? * JC
/6 / t ^
DSW 443025
STLCOPCB4057564
DEPARTMENT 790 - 19/6 OPERATION
JANUARY FEBRUARY
MARCH
January was an excellent month with the incinerator operatinq at a near record pace. The venturi was cleaned out twice during the month. PCB losses to the sewer were high at over 5 lbs. per day for the last three days of the month. This loss was traced to the west aroclor sump which had received a trailer of wash water from 246. Plans are to empty the sump and clean out any residue which may be causing an emulsion.
John Peduzzi replaced Gary Johnson as Supervisor of the incinerator as ot January 1, 1976.
In February, the Ray 0 Tube failed and the incinerator was shut down for repair and the plenum was cleaned of built up sol ids.
High solids content material from little Mo storage tank caused considerable difficulty during the month. The solids clogged the pumps and strainers in the system preventing waste from flowing to the incinerator.
Currently feed tanks are being supplied from drums and other freshly received waste sources. Additional larger strainers will be installed to clean up the solids.
The west Aroclor sump was cleaned out to reduce the PCB losses from this sump to the sewer.
The incinerator needed cleaning of solids build in the plenum early in March. The degree of build up required entering the oxidizer and the unit vas shut down for inspection and repairs.
The contactor tube veir ring vas corroded and vas repaired. The scrubber column packing vas replaced and the scrubber vas relined vith ceil cote 164. The old packing had suffered mechanical damage and considerable residue buildup.
Two rings of brick vork in the oxidizer were repaired with Ram 90 and the plenum was also patched with Ram 90- The total turnaround took 17 days.
DSW 443026
STLCOPCB4057565
DEPARTMENT 790 - 1976 OPERATION
Page 2
APRIL -X
MAY
JUNE
A new monthly waste burned record was set in April. A combination of new scrubber packing and low BTU value fuel helped break the
old record of 692,137 Lbs.
i)
The new larger strainers are successfully removing the solids from Little Mo storage tank.
The Venturi was cleaned but once during the month. April was an all round excellent month.
In May, 62^,000 Lbs. of wastes were burned. The plenum was cleaned of solids build up early in the month.
The incinerator has less than a two month inventory of wastes at this time.
A test was conducted on burning meta-fractions waste from Dept. 221. A visible nitrogen oxide plume was observed during the test. Further experimentation will be required to determine if meta fractions can be successfully burned in the plant incinerator.
On the last day in May, the department was shut down to repair a section of refractory that had fallen from the plenum roof. The repairs should take about 10 days.
The Venturi was cleaned once during the month.
The department started up on June 7 after repairs were made to the plenum.
With the excellent operations this year, Little Mo has been emptied of residue. The remaining water layer will be settled in the incinerator sump and sewered. Little Mo will be cleaned and inspected and should be back in service during August.
Current plans are to rebrick the incinerator starting in September. The job is expected to take 7 weeks and sufficient storage will be available at the incinerator to hold all anticipated residue during this period.
The new ductwork from the quench pot to the Venturi has been installed with a teflon expansion joint to replace the teflon boot used in the past.
DS'A' 443027
STLCOPCB4057566
DEPARTMENT 790
1976 OPERATION
Page 3
JULY
AUGUST SEPTEMBER
In July 623,000 lbs. of the new 1016 residue were received from the Aroclor department. With the new residue and the shutdown for rebricking, the inciner ator will rapidly accumulate a several month inventory of wastes to be burned.
Little Mo was cleaned, inspected and returned to service in late July.
The plenum was cleaned of solids build up once during the month.
The teflon expansion joint installed last month in the quench pot ductwork has failed and must be modified to give reliable service.
Testing was completed on the burning of meta-fractions. They can be burned with out a visable nitrogen oxide plume if mixed at 10%-15% with other wastes. However even at this level the nitrogen oxide emissions are 2000 m.g./c.m. Nitrogen oxide emissions are not limited by current environmental legislation. A full test report will be published at a later date.
There are no plans for further tests at this time.
August was another good month with 614,519 Lbs. of waste burned.
The single gun burner was installed and tested and found to give satisfactory service. This burner should reduce solids accumulation in the plenum.
Wash water from Aroclor tank car cleanings began to be received in August. The Aroclor was allowed to settle and the clean water was decanted to the sewer.
The incinerator is scheduled for a 7 week shutdown for oxidizer rebricking. The shutdown is to begin September 2.
The rebricking of the oxidizer is proceeding as scheduled.
A spray nozzel designed to reduce Venturi build-up has been installed.
DSW 443028
STLCOPCB4057567
DEPARTMENT 790, AR0CL0R T "TINERATION, 1976 OPERATIONS REPORT
INCINERATION '-IC.'iT:-. POUNDS BURNED
(1\: 976_. 4,546ii M lbs., i\58.67 UST, '70,97 OSR>) 1
; JAK. 1 FES. ; MARCH
APRIL ! MAV
JUNE
62U.479 512,351
288,560
706,887
624,529 588,821
1 J'JLv : 627,111
AUGUST SECT. tt-------------
614,519 80,594
OCT.
BURNED YTD PERCENT OST
620,479 94.1%
1,132,830 1,1*21,390 2.128,277 2,752,806 3,341,627 3968738
/6.4%
3T.0fo
95.
82.3^
69.4% 85.2
4583251 4663851 92.21 00.3%
% OST, YTD
94.1%
85.8%
69.1$
75-7^
77-0$
75.8% 77.1
79.01 70.4%
OSR % OF DE.
70. y%
76.6%
83-9*
82. ji
81.6*
94.2% 79.1
71.71 103.9%
OSR % YTD
70.9%
/3.4%
75 -yf>
77- 5$ 78.U*
80.8% 80.6
79.21
80.6%
1 NO' .
INVENTORY, POUNDS
BULK REC.
324./T3 186,340
3ULK MO. END 1,433,569 1,323,45u
172.954 1,364,109
249,760 1,068,895
--to.
136,24b 21b,892 156,265
161.913
JRUMS MO. END
13,500
0
1RUMS EMPTIED
136,245 215,892 142,765
175,413
238,302 738,947
7?rQ7Q 0
72,979
284,382 623874 509,355 542500 144,587 69291
55,000 60791
89,587 635QQ___
717774 640375 672873 1443225
72329 133020
--
77551 0
210571
PERSONNEL - PERCENT REC'JLAR HOURS ,(loc ludes Phenol Handling)
.XTRA HOURS H. YTO
128 8,5
2S | 1 5.8
20.2 17-3
0.0 13-3
0.0 11.6
'VERTIME
7 1 22.3
6.1
17.8
26.0
:T HRS. YTD 2S. HRS.
7 18.5
| 12.7
I 23./
10.4 21.1
11-9 30.2
14.2 19-7
3S. HRS. YTD
18.5 i 20.7
20.8
22.7
22.3
0.0 10.0 21.5 15.2
0.1 19.2
0.0 8.8 26.6 16.6 1.3 17.0
0.0
7 . fi 14.7 16.3
0.1 14.7
0.0 7.3 5.4 16.3 0.0 14.1
]
i 1
i 1
. J_ |
rI
1
!
i 1
!
i
_L |
i::.j. 2RIOU5 INJ
1 |0 0 !0
DSW 443029
10
J_ _ 2_ _ _
0 0
0 i -------0---- 1r 0
0i
01
0
0 o|
0 0I
j i
; !
STLCOPCB4057568
Monsanto
FSOM (NAME A LOCATION
J. M. Wriston. Jr./WGK
October 6, 1976
Monthly Incinerator Status Report
D. T. Hughes
061 8 1976
V. Brawley A. J. Koenig - G.O. A. Frerking B. Ratliff - G.O.
W. C\-. ^Eonghml a'n G.O.
J. Peduzzi
R. W. Flint A. E. Leisy D. L. Cissell D. Wood - G.O. J. Labanosky W. Faries P. R. Kucera
The following is the monthly Incinerator Status Report including all activity through September 1976.
Material Returned For Incineration - (Pounds)
September 1976
Y.T.D.
Dielectrics - (Billings to Customers) --
51,061
930,099
In-Plant PCB's - (Other than Dept. 246) -
Dept. 246 - T/C Wash/Drums Dept. 246 - Residue Dept. 246 - Montars
Acidifier
_ -
r
Dept. 226/81082
-
33,248 17,500 490,206 21,658
3,604
175,607 353,816 1,451,280 261,840
34,285
Dept. 237/81084
-
-0-
152,159
Dept. 237/81085
- 69,623
585,199
Dept. 237/81080
- -0- 24,041
Dept. 239/81088 Dept. 237/81087 TOTAL RETURNED FOR INCINERATION
- 144,936
740,856
-- -0-
1,614
_
831,836 Lbs.
4,710,796
DS\N 443030
STLCOPCB4057569
D. T. Hughes Monthly Incinerator Status Report
Page 2 10/6/76 WGK
Status of Incineration
Prior Year's Receipts August Y.T.D. Receipts September 1976 Receipts
Prior Year's Incineration August Y.T.D. Incineration September 1976 Incineration On Hand, 10/1/76 To Be
Incinerated
Lbs.
19,036,219 3,878,960 831,836
23,747,015 17,443,129
4,583,257 80,594
1,640,035
Billings to Customers (Dielectrics)
September 1976
Incineration Charges Handling Freight
$ 5,245 896 325
$ 6,466
Ad ) -
(139) ( 48) (269) (456)
Y.T.D.
$ 82,928 12,505 1,067
$ 96,500
J. M. Wriston, Jr. /nm
DSW 443031
STLCOPCB4057570
Monsanto
fHOM iNAMf. ft LOCATION.
David Wood-St. Louis-B2SD
Date
subject
September 7, 1976 DIELECTRICS, 1977
REFERENCE
TO
cc R. E. Beal-B2SB
R. A. Pohl-B2SB SfP 7 ST?
C. Paton-B2SB
W. C. Engman/A. Leisy-1740
The forecast which G. E. communicated to J. Fitzgerald was considerably lower than that presented to you and Dr. Paton when you visited Hudson Falls recently. The major difference is Aroclor 1016 which is 2 M lbs. less the earlier forecast. Since the new forecast is the official corporate G. E. number, I strongly recommend that we adjust the 1977 Dielect'ric_Doniestic Budget down wards by 2 M lbs. from 17 M to 15 M lbs.
The transformer fluid forecast was not significantly different from that which we already had in our budget I do not favor altering the transformer budget.
/deb
David Wood
DSW 443032
STLCOPCB4057571
DEPARTMENT 790 - 19/6 OPERATION
SEP 1 5 1976
JANUARY FEBRUARY
MARCH
January was an excellent month with the incinerator operating at a near record pace. The venturi was cleaned out twice during the month. PCB losses to the sewer were high at over 5 lbs. per day for the last three days of the month. This loss was traced to the west aroclor sump which had received a trailer of wash water from 246. Plans are to empty the sump and clean out any residue which may be causing an emulsion.
John Peduzzi replaced Gary Johnson as Supervisor of the incinerator as ot January 1, 1976.
In February, the Ray 0 Tube failed and the incinerator was shut down for repair and the plenum was cleaned of built up sol ids.
High solids content material from little Mo storage tank caused considerable difficulty during the month. The solids clogged the pumps and strainers in the system preventing waste from flowing to the incinerator.
Currently feed tanks are being supplied from drums and other freshly received waste sources. Additional larger strainers will be installed to clean up the solids.
The west Aroclor sump was cleaned out to reduce the PC losses from this sump to the sewer.
The incinerator needed cleaning of solids build in the plenum early in March. The degree of build up required entering the oxidizer and the unit was shut down for inspection and repairs.
The contactor tube weir ring was corroded and was repaired. The scrubber column packing was replaced and the scrubber was relined with ceil cote 164. The old packing had suffered mechanical damage and considerable residue buildup.
Two rings of brick work in the oxidizer were repaired with Ram 90 and the plenum was also patched with Ram 90- The total turnaround took IT days.
DSW 443033
DEPARTMENT 790 - 1976 OPERATION
Page 2
APRIL MAY
JUNE
A nev monthly waste burned record was set in April. A combination of new scrubber packing and low BTU value fuel helped break the old record of 692,137 Lbs.
The new larger strainers are successfully removing the solids from Little Mo storage tank.
The Venturi was cleaned out once during the month. April was an all round excellent month.
In May, 624,000 Lbs. of wastes were burned. The plenum was cleaned of solids build up early in the month.
The incinerator has less than a two month inventory of wastes at this time.
A test was conducted on burning meta-fractions waste from Dept. 221. A visible nitrogen oxide plume was observed during the test. Further experimentation will be required to determine if meta fractions can be successfully burned in the plant incinerator.
On the last day in May, the department was shut down to repair a section of refractory that had fallen from the plenum roof. The repairs should take about 10 days.
The Venturi was cleaned once during the month.
The department started up on June 7 after repairs were made to the plenum.
With the excellent operations this year, Little Mo has been emptied of residue. The remaining water layer will be settled in the incinerator sump and sewered. Little Mo will be cleaned and inspected and should be back in service during August.
Current plans are to rebrick the incinerator starting in September. The job is expected to take 7 weeks and sufficient storage will be available at the incinerator to hold all anticipated residue during this period.
The new ductwork from the quench pot to the Venturi has been installed with a teflon expansion joint to replace the teflon boot used in the past.
DSV\J 443034
STLCOPCB4057573
DEPARTMENT 790
1976 OPERATION
Page 3
JULY AUGUST
In July 623,000 lbs. of the new 1016 residue were received from the Aroclor department. With the new residue and the shutdown for rebricking, the inciner ator will rapidly accumulate a several month inventory of wastes to be burned.
Little Mo was cleaned, inspected and returned to service in late July.
The plenum was cleaned of solids build up once during the month.
The teflon expansion joint installed last month in the quench pot ductwork has failed and must be modified to give reliable service.
Testing was completed on the burning of meta-fractions. They can be burned with out a visable nitrogen oxide plume if mixed at 10%-15% with other wastes. However even at this level the nitrogen oxide emissions are 2000 m.g./c.m. Nitrogen oxide emissions are not limited by current environmental legislation. A full test report will be published at a later date.
There are no plans for further tests at this time.
August was another good month with 614,519 Lbs. of waste burned.
The single gun burner was installed and tested and found to give satisfactory service. This burner should reduce solids accumulation in the plenum.
Wash water from Aroclor tank car cleanings began to be received in August. The Aroclor was allowed to settle and the clean water was decanted to the sewer.
The incinerator is scheduled for a 7 week shutdown for oxidizer rebricking. The shutdown is to begin September 2.
DSW 443035
STLCOPCB4057574
DEPARTMENT 790, AR0CL0R ' "INERATION, 1976 OPERATIONS REPORT
**InUMTTf l~ POUNDS BURNED BURNED YTD PERCENT OST % OST, YTD OSR % OF DE. OSR % YTD
JAN.
620,479
620,479
94.1%
FES.
f
MARCH
APRIL
512,351
288,560
706,887
MAY
JUNE
JULY
624,529 588,821 627,111
1,132,830 1,421,390 2,128,277 2,752,806 3,341,627 3968738
/6.4%
37-0?;
95 M
82.yf>
69.4%
85.2
AUGUST t SEPT. 0C~. --"--"--
614,519
4583257
92.23
94.1%
85.8%
69 .vf>
15-1$
77-0^
75.8%
77.1
79.03
70. y%
76.6%
83.9*
82.3^
81.6%
94.2% 79.1
71.73
70.9%
/3.4%
75-3^
77.5$
78.4$
80.8% 80.6
79.23
I
NO'. .
INVENTORY, POUNDS
3ULK REC. 3ULK MO. END
324,/13 186,340 172,954
249.760
1,433,56y 1,323,45U 1,364,109 1,068,895
ELLS RFC.
136,24b 215,892 156,265
161.913
DRUMS MO. END
13,500
0
DRUMS EMPTIED
136,245 215,892 142,765
175,413
99ft r 70? 738,947
72,979 0
72,979
284.382 623874 509,355 542500 144,587 69291
55,000 60791
89,587 63500
717774 672873
72329 133020
'ERSONNEL - PE RCENT REGULAR HOURS .(Iocludes
IXTRA HOURS
28__________ I____ 8b
20.2
!. H. YTD OVERTIME
28 15! 8 7 1 22.3
17-3 6.1
;T HRS. YTD
7 | 12.7
10.4
3S. HRS.
la.5 | 23./
21.1
,3S. HRS. YTD
18.5 | 20.7
DSW 443036
20.8
'henol Hanc !1 ina)
0.0 0.0
13-8
11.6
17.3 11-9 30.2 22.7
26.0
14.2
19.7 22.3
| 0.0 10.0
0.0 8.8
1 21-5
26.6
15.2
16.6
| 0.1 j 1.3 | 19.2 | 17.0
AFETY [.nos ir;j. ERIOUS INJ.
| 10 0 10
0 0
0 |0 0 0|
1 00
0
1
0 0
0.0 7.6 14.7 16.3 0.1 14.7
0
1i 11
ir ;1
11
Ii J1 11
STLCOPCB4057575
rhow ,nm! iia.,cN, David Wood-St. Louis-B2SD
D4Tt.
July 21, 1976
SUHJLCT
AROCLOR RAIL CARS
r f r r. n c i
TO
A. Leisy-1740
fe fiif
W. W. Withers J. A. Alley C. Paton
jwi 2 t m
Confirming our telephone conversation today, 7/21/76,
I discussed the rail car situation with Wayne Withers
because of the possibility of invalidation of our
indemnification agreements if we shipped products in
unsound rail cars. Wayne requested that as cars are
cleaned and inspected, that we keep copies of a formal
signed inspection certificate giving a clearance before
cars are put back into service. He expressed a personal
preference that such certificates be signed by some
independent inspector or by somebody clearly qualified
within Monsanto. Since I did not know in detail our
normal procedure, I undertook to bring his concern to
your attention.
Thank you.
/deb
David Wood
STLCOPCB4057576
Monsanto
TROM (NAME A LOCATiONi G. L. Johnson, W. G Krummrich Plant
SUBJECT REFERENCE
TO
June 18, 1976 DEPT. 246/259 DECONTAMINATION
A.E. Leisy
K.E. C . F. T.N. W.C. 0.K. R.A. M.D.
Boucher Buckley Carrico Engman Hotto Pohl Rachell
B2SB .
2 2 SCV
Attached is the data accumulated for "decontamination" of equipment in the Aroclor Department (Table 1). While somewhat limited, this information suggests cleaning techniques for two circumstances: 1) major pieces of equipment in contact with finished goods; and 2) major pieces of equiment in contact with crude or goods in process.
The recommended route for those items in contact with finished goods is similar to that used for decontamination of #17 storage. A partial list of these pieces of equip ment is given in Table 2. Advantages of this technique include: 1) ability to drain or pump water washes through sand filters and directly to the sewer, 2) minimal solid waste disposal or liquid incineration required; 3) after clean-up, equipment may be dismantled via gas torch. Some of the drawbacks of this method are: 1) time involved in filling, heating, circulating, and draining equipment; 2) the need for personnel to enter the equipment for the clay and kerosene cleaning steps; 3) the applicability to only equipment in contact with finished goods. Also of note is that #17 storage is equipped with an eductor, thereby greatly enhancing its circulation capabilities.
The water washing technique would probably not be suitable for decontamination of equipment in contact with goods in process, since these items may have lime, FeCl^, tars, rust, scale, etc., relatively impervious to the water washes. This list would contain most of the remaining equipment in the department. One means for cleaning these items would be the use of solvent or detergent washes prior to or in combination with water washes. As seen from the data on detergent cleaning T/C's MONX 8601 and MONX 8604, a relatively PCB free surface resulted from a single wash. While the tank cars were a finished goods application
IN - \0 REV 1 '7?
DSW 443038
STLCOPCB4057577
A. E. Leisy DEPT. 246/259 DECONTAMINATION
Page 2 6/18/76 WGK
(rather than goods in process), this data would imply a much easier and efficient cleaning can result using a detergent or solvent wash rather than straight water washes. Other advantages of this technique are the applicability to most pieces of equip ment throughout the department, and less likelihood of personnel entering equipment. Drawbacks are the need to collect the washes/ rinses (or accept increased solubility of PCB's in the sewered washes), eventaul disposal of these washes, and lack of proper spray equipment or cleaning apparatus for use in many department vessels. When a solvent wash (kerosene, crystallite, etc.)is used, it is unlikely that equipment dismantling via gas torch would be a very safe approach.
Aside from immediate pumps and recirculation lines, neither of these techniques addresses itself to the decontamination of transfer lines, heat exchangers, pumps, etc. Ken Boucher and myself are pursuing the possibility of using Dow Industrial cleaners for these applications, and its potential for use on vessels throughout the department, including the Aroclor 1016 column.
If there are any questions, please contact me.
/ tm
6 Gary L. Johnson
0SV\l 443039
STLCOPCB4057578
TABLE I
DECONTAMINATION TEST RESULTS
Date
Item/Description
Method/Action
Concentration PCB's in Wash Water (ppb)_______
Equiv. PCB's in Wash Water
1/22/76
#17 finished goods storage, Pump out residual heel, dried floor
22M gal. aluminum tank,
with attapulgus clay and swept up, filled to
pump, and cartridge filter. overflowing with water, heated with plate coils
and top entering steam sparger, circulated 2 days
and sampled water at 75C.
40,420
7.50 lbs.
3/4/76
Drained previous wash through drum of sand, refilled tank to overflowing with water, heated, circulated two days and sampled water at 80C.
9,450
1.75 lbs.
3/19/76
Drained previous wash through drum of sand, dried floor with attapulgus clay and swept up, wiped floor and 5 feet of side wall down with kerosene soaked rags, refilled to one-third with water, heated, circulated two days and sampled water at 100C.
118
0.1 oz.
4/1/76
Drained previous wash through drum of sand, refilled to one-half with water, heated, circu lated two days, and sampled water at 100C.
408
0.7 oz.
1/22/76
Tank car MONX 8601, 8M gal. aluminum tank.
1/30/76
H
6/16/76
Tank car MONX 8604, 8M gal. aluminum tank.
If
DSW 443040
Drained residual heel, washed with DuBois chemical (caustic based) detergent using Butterworth spray nozzle, flushed with water, wiped down with kerosene soaked rags, filled with water, heated, sampled water at 40C.
360
Resampled same water as above only at 100C.
1,010
Same as step 1 on T/C MONX 8601 (1/22/76) except car only 2/3 full and water at 100C.
178
Water to be drained, car detergent washed again, wiped down with kerosene rags, refilled with water and heated. Results to be reported at later date.
-----
v
0.4 oz..
1.2 oz. 0.2 oz.
EM NO.
117 118 119 139 142 143 146 147 328 314 340 343 348 508 515 530 532 534 539 540 542 545 558 559 560 561 562 159 154 164 178
TABLE II
FINISHED GOODS SERVICE, WATER WASH APPLICATIONS
NAME
#9 Storage #10 Storage #11 Storage #2 Receiver #1 Blend #2 Blend #1 F. Prod. #2 F. Prod. L.E. Rec. #17 Storage #18 Storage #19 Storage #5 Absorber #3 Receiver #4 Receiver #3 Surge #1 Absorber #3 F. Prod. #2 Absorber # 3 Ab s o r b e r #4 F. Prod. #4 Absorber #14 Storage #15 Storage #12 Storage #16 Storage #13 Storage #1 Mix #3 Mix #2 Mix #4 Mix
DESCRIPTION
20M gal. aluminum tank 20M gal. aluminum tank 20M gal. aluminum, tank 1M gal. 2M gal. zinc-tin lined steel 2M gal. zinc-tin lined steel 2M gal. zinc-tin lined steel 2M gal. zinc-tin lined steel 5M gal. steel tank 22M gal. aluminum tank 22M gal. aluminum tank 22M gal. aluminum tank 3' dia x 15* 316 S.S. column 1M gal. monel tank 1M gal. monel tank 1M gal. aluminum tank 3' dia x 15' 316 S.S. column 1M gal. aluminum tank 3' dia x 15' 316 S.S. column 3* dia x 15' 316 S.S. column 1M gal. aluminum tank 3' dia x 15' 316 S.S. column 22M gal. aluminum tank 22M gal. aluminum tank 22M gal. aluminum tank 22M gal. aluminum tank 22M gal. aluminum tank 13M gal. steel tank 20M gal. s.s. tank 15M gal. s.s. tank 20M gal. s.s. tank
tank tank tank tank
DS\N 443041
STLCOPCB4057580
_ C? . Cl .
DEPARTMENT 790 - 1976 OPERATION
JVt 2187*
JANUARY FEBRUARY
MARCH
January was an excellent month with the incinerator operating at a near record pace. The venturi was cleaned out twice during the month. PCB losses to the sewer were high af over 5 lbs. per day for the last three days of the month. This loss was traced to the west aroclor sump which had received a trailer of wash water from 246. Plans are to empty the sump and clean out any residue which may be causing an emulsion.
John Peduzzi replaced Gary Johnson as Supervisor of the incinerator as of January 1, 1976.
In February, the Ray 0 Tube failed and the incinerator was shut down for repair and the plenum was cleaned of built up sol ids.
High solids content material from little Mo storage tank caused considerable difficulty during the month. The solids clogged the pumps and strainers in the system preventing waste from flowing to the incinerator.
Currently feed tanks are being supplied from drums and other freshly received waste sources. Additional larger strainers will be installed to clean up the solids.
The west Aroclor sump was cleaned out to reduce the PCB losses from this sump to the sewer.
The incinerator needed cleaning of solids build in the plenum early in March. The degree of build up required entering the oxidizer and the unit was shut down for inspection and repairs.
The contactor tube weir ring was corroded and was repaired. The scrubber column packing was replaced and the scrubber was
relined with ceil cote 16k. The old packing had suffered
mechanical damage and considerable residue buildup.
Two rings of brick work in the oxidizer were repaired with Ram 90 and the plenum was also patched with Ram 90- The total turnaround took 17 days.
DS
STLCOPCB4057581
DEPARTMENT 790 - 1976 OPERATION
Page 2
APRIL MAY
JUNE
A new monthly waste burned record was set in April. A combination
of new scrubber packing and low BTU value fuel helped ^reak the
old record of 692,137 ^bs.
'
The new larger strainers are successfully removing the solids from Little Mo storage tank.
The Venturi was cleaned out once during the month. April was an all round excellent month.
In May, 624,000 Lbs. of wastes were burned. The plenum was cleaned of solids build up early in the month.
The incinerator has less than a two month inventory of wastes at this time.
A test was conducted on burning meta-fractions waste from Dept. 221. A visible nitrogen oxide plume was observed during the test. Further experimentation will be required to determine if meta fractions can be successfully burned in the plant incinerator.
On the last day in May, the department was shut down to repair a section of refractory that had fallen from the plenum roof. The repairs should take about 10 days.
The Venturi was cleaned once during the month.
The department started up on June 7 after repairs were made to the plenum.
With the excellent operations this year. Little Mo has been emptied of residue. The remaining water layer will be settled in the incinerator sump and sewered. Little Mo will be cleaned and inspected and should be back in service during August.
Current plans are to rebrick the incinerator starting in September. The job is expected to take 7 weeks and sufficient storage will be available at the incinerator to hold all anticipated residue during this period.
The new ductwork from the quench pot to the Venturi has been installed with a teflon expansion joint to replace the teflon boot used in the past.
DSW 443043
STLCOPCB4057582
DEPARTMENT 790, AR0CL0R T' "INERATION, 1976 OPERATIONS REPORT
INCINERATION (1976 4,546 M lbs., 58.67 UST, 70.97 OSR)
: f[1: i
i1
l! jI
MONT!-.
\ JAN. ! FEB. | MARCH j APRIL !
MAY
JUNE ! JULY
POUNDS BURNED 620,479 512,351
288,560 706,887
624,529 588,821
BURNED YTD
620,479 1 ,132.83U 1,421,390 2,128,277 2,752,806 3,341,627
PERCENT OST
94.1% /6.4%
3T 0$
' 95-4/
82.31
69.4%
% OST, YTD
94.1% 85.8%
69 1$
75.7$ 77*0$
75.8%
OSR % OF DE.
70. y% 76.6%
83-9^>
82.31o
81.6/0
94.2%
OSR % YTD
70.9%
/3.4%
75-3#
17-51
78. hi
80.8%
1: 1
| AUGUST ! SEPT. OCT.
i 1 NOV.
j Dr
INVENTORY, POUN DS
BULK REC. 3ULK MO. END
324,/l3 186,340 172.954 1 ,433,56y 1 ,323,450 1,364,109
136,24b 215,892 156,265
DRUMS MO. END
13,500
DRUMS EMPTIED
136,245 215,892 142,765
249,760 1,068,895
161,913 0
175,413
238,302 738,947
72,979 0
72,979
284,382 509,355
144,587 55,000
89,587
PERSONNEL - PE RCENT REGULAR HOURS .(Includes
IXTRA hours I. H. YTD OVERTIME
28 --8. 5____ 20.2
28
15.8
_____mi.
7 22.3
6.1
)T HRS. YTD
7 12.7 ' 10. A
-BS. HRS. .3S. HRS. YTD
"a* 18.5
23./ 20.7
21.1 20.8
3henol Hanc;j 1 inq)
0.0 0.0
13.8
11.6
17-8 11.9 30.2 22-7
26.0 14.2
19*7 22.3
DSW 443044
;afety 'INOR INJ. - E-.R--I-O--U--S-----I-N--J--.------
1 0
0 0
0 0
00 00
0.0 10.0 21.5 _ 15 -u_________
0.1 1 19.2
0 0
\
t, - fcfNWWf*'1
STLCOPCB4057583
0
DEPT. 246 - 19, OPERATIONS REPORT /.
AROCLORS - 811.00, 811. 04
J A V f g.
PRODUCTION -- TOTAL AROCLORS -(40,172,736m'# in 1974) (42.18M // in 1973)(38.99M # in 1972)(43:5M # in 1971)
MONTH ACTUAL SCHEDULED ' ACTUAL YTD
jar** *"Teb .
MARCH
2,642,646 2,545,073 3,344,779 2,642,646j2,54.5,073 3,344,779
APRIL
MAY
JUNE
.
1
2.763.875 2,242.106 1,202*4511.
2.768.875 2,242,106 1,202,451j
JULY
AUC.
SEPT.
OCT.
NOV.
2,120,6( 2,120,6(
2,458,81? 52
2,458,85 52
-g3-,1-1--2--4--,-8--9---93,124,899
1,080,068 2,080,068
2,466,297 2,466,297
. DEC. 2,712,916 2,712,916
2,642,646(5,187,719 8,532,498 11,301,37: 13,343,4 79
116,866,59
2.1^325,41
3 72.450.309
!4,530,377
26,996,67'
`29,709,59
14, 743,930'
1016 1242 1254. MONO 1221
` '
1,042,522 1,182,390 1,386,351 1,250,034 840,256 690,500 1,215,56: [1,054,275 1,688,340 911,667 1,254,481 [l, 730,242
693.065 712.809 820,492 533,628 443,071 169,030
394,43 C , 670,756 682,622 400,404 585,666 466,761
907,059 649,874 1,137,936
9857213 958,779" 342,921 >
510,66^ 733,783
753,937 767,997
626,150 516,433 I
1 l
. ,, *520
PERCENT YIELD ON BIPHENYL, STD. 98.0% (1974-98.59)(1973-98.98%)(1972-99.96%)(1971-100.75%)
MONTH YTD
. 98.69 98.69
99.41 '99.05
100.89 99.76
99.79 99.76
100.30 99.85
100.64 99.92
100.66 100.01
98.06 ' . 99.76
103.81 100.31
. .
101.50 100.41
97.27 100.11
101.63 100.25
C/) AVERAGE'.QUALITY OF 1242 EG LOTS (1974 Avgs. on 19 Lots: 0.27 ppm; 119..008 x 10^; 0.31%)
o TCC
o -oo
RESISTIVITY
DO POWER FACTOR
t*
0 01
NO. OF LOTS
^1
Ol
oo
0.23
0.32
83,705 226,130
0.38 2
0.20 3
0.24 125,725
0.24 2
0.21 191,167
0.28 2
0.23
0.25
290,362 226,475
0.08 2
0.16 ' 1
2
--
0.22
0.15
0.27
/ 112,312 70,775 100,175
--.
0.13 . . fl,?R
0.20
0 2 . 2
2
0.23 70,600
0.23 1
0.15 L02,450
0.09 1
DEPARTMENT 246 - 1975 OPERATIONS REPORT
AVERAGE QUALITY OF MCS - 1016 LOTS (1974 Avgs. on 123-Lots: 0.1*4 ppm; 1- 87,027 x 10_9;? _0_.2, 2. %;: 0.21%)
MONTH '
JAN.
FEB.
MARCH
APRIL
MAY
JUNE.
JULY
AUG. .. SEPT.
TCC RESISTIVITY
0.18 164,550
. 0.15
0.15
118,568 169,929
0.13 266,325
0.13 512,215
0.17 253.775
0.12 435,497
0.19 140,587
0.13 nq.un
POWER FACTOR
0.19
0.16
0.28
0.17
0.08 . 0.09
0.19
0.19
0.19
PENT/HEXA
0.12
0.14
0.09
0.08
0.06
0.07
0.06
0.04
n Ac
OCT. 0.12 190,460 0.30 0.10
NOV. 0.12
. 210,285 0.17 0.03
DEC. 0.12 282,768 0.27 0.07
NO. OF LOTS
4
8
6
8
6 '6
7 4 --10______ 4
SAFETY (6 minor ini. & 0 serious in 1974)(1 minor & 1 serious in 1973)(5 minor & 1 serious in 1972)
MINOR
1
10
10
1
10 0
SERIOUS
0.
00
00
0
00 0
1 0
QUALITY COMPLAINTS (Formal & Informal) (3 in 1974)(4 In 1973)(16 in 1972)
NUMBER
1
00
00
1
0 0 1 0
.
7
0 0
1
8
0 0
0
PERSONNEL (1974: O.T. 11.5%; E.H. 4.2%; ABS: 5.5%) (1973: O.T. 11.1%; E.H. 4.0%; ABS. 5.6%)
'
OVERTIME
10.9
10.3
11.7
8.9 8.1
3.4 8.0
8.4 23.1 . 4.8
O.T. YTD
10.9
10.6
11.0
10.4
10.0
9.0 8.9
8.8 :
10.1
9.6
EXTRA HOURS
10.2
11.7 ` 8.6
1.6 1.8
0.0 0.0
0.0 0.0 2.0
E.H. YTD
10.2
10.9
10.1
8.0 6.9
. 5.8
5.1
4.5 4.1 3.9
ABS. HRS. ABS, HRS. YTD
9.3 9.3
7.4 10.8 8.3 .9.2
8.2 3.3 8.9 7.9
2.6 2.3 7.1 ' 6.5
1.6 ` 5 .-9 t
13.6 6.6
2.1 6.1
S.T.ABS.HRS.YTD
2.2
1.5
1.1 ' 1.0
1.2
1.0 0.9
0.8 0.7
0.9
AROCLOR INVENTORY (1974 Avg: Whse. 660M //, Dept. 948M #) (1973 Avg: Whse. 589M If, Dept. 1,195M ft)
WHSE. DEPT.
501,440 616,450 555,85C 509,090 1,186,498 609,650 1,208,334 990,943
256,890 230,090 711,558 353,030
193,810 204,760 834,838 537,590
231,680 158,480 974,088 230,537
TOTAL
1,687,938 1,226,IOC 1,764,184 1,500,032 979,448 583,120 1,028,648 742,350 1,205,768 389,017
12.6 9.8 0.0
10.9 9.9 0.0
3.6 3.3 0.9 ?. 9
5.7 5.5 0.9 1.0
'
150,560 321,676
119.170 607.522
472,236 726,692
STLCOPCB4057585
DSW 443046
DEPARTMENT 259 'OPERATIONS REPORT i
PYRANOLS (810.90)
PRODUCTION -
'month ACTUAL SCHEDULED ACTUAL YTD
TOTAL PYRANOLS (15.7M // in 1974; 13.37M // in 1973)(14.9M // in 1972)(19.0M # in 1971)
-------------------,------------------ 1------------------
i------------------- i------------------
JWW*"*F*FEB.. : MARCH
APRIL 1 MAY
JUNE JULY
AUG.
SEP'feftttlmftCT.
| NOV. j DEC.
L,611,578 1,511,06o| 1,612,047j 1,680,28^1,152,456 h .012. 050 995,267 1,512,60? 1,544,044! 1.362,507)982,488 . j 936,7,
1,611,578 1,511,06o| 1,612,047 1,680,28^1,152,456 i,012,050 995,267 1,512,60? 1,544,044 1,362,5071,982,'488 j 936,7:
1,611,578 jj, 122,638|4,734,685 6,414,974(7,567,430 js, 579,48o'>,574,747 |ll,087,35^2i631i40p,993,907(14,976,39515^13^;
PRODUCTION -- PYRANOLS, BY KIND
1242 PPO 70-30 A-13-B-3B-3 1489 54201-KJ
.
876,560 *' 732,790
2,228
--
777,040 534,370
547,740 672,746
199,650 391,561
-- . '--- .
1.
1
1 i-
1J
1I
1 ..
619,460l 726,434) 253,330
70,800. 10,265
1
i1
444,500 283,440 643,284 649,208 .
64,672 79,402 __ -
|
l
! i * .
373,700 569,862
51,705
__
--
759,900 689,844
50,490 ' --------
12,375
582,500 774,192 187.352
-
503,020 581,220 |461,8!
616,602 262,180 |372,8!
242,885 139,088 1102,02 i
--
. .
* J
!
- i
.1
i............
1
j
YIELDS (TCB,. Std. 98.0% (1974 Actual 98.24.)
TCB MO. TCB YTD
98.37 98.37
99.12 98.76
101.04 99.74 `
99.96 99.80
1 99.03 1 1O0.44
99.68
99,79
PYRANOL
UHSF. *. DEPT.
INVENTORY `
(1974 Average: Whse. 325M
209,262 227,936
139.254 125,218 334,224 259,836
//, Dept. 317M//) **
219,233 139_, 642
313,161 217,256
159,643 55,020
TOTAL
437,198 473,478 385,054
453,949 356,898 214,663
'
'1
!
DSW 443047
100.49 99.86
98.59-. 99.76
98.49, 99.52
1 _
98.43 ) 99.65 ' 99.72
99.40 ! 99.42
99.43
132,706 126,330 259,036
161.886 123.555 242,432 276,352 404,318 399,907
98,884 224,656
133,437 L21.874 '402,000. 177,780
323,540-- 535,437 (299,654
.
STLCOPCB4057586
DEPT. 246/259 1975 OPERATIONS REPORT
HIGHLIGHTS
JANUARY
The Aroclor 1016 sales lull continued through January,
while Pyranol demand remained high. The first 1016 .
column run since mid-December was completed 1/21.
During the interim, some 1142 from the continuous
chlorinators was reworked as feedstock for the batch
chlorinators to meet 1254 demand.
.
Repairs were performed to the top of #1 intermediate storage 1/23-1/25, and the department resumed air blowing of crude 1142 1/27. No increase has been noticed in daily department PCB losses. The coil in #3 mix tank failed 1/15 resulting in some upsets to Pyranol production. Modifications.are nearing completion at month's end to permit the demonstration of isomerization of Mono residue to Aroclor 1242' early in February. This will result in about one Week outage on 1242/1254 production.
FEBRUARY MARCH
The department successfully demonstrated the conversion of "Mono" residue into electrical grade Aroclor 1242' during the week of 2/10. The run proceeded better than expected with only minor difficulties. This demonstra tion complicated an already ."tight" Aroclor 1254 situation, with 1254 and Pyranols back ordered at month's end.
The Aroclor 1016 sales lull continued through February. The reflux return line to the column was replaced 2/12 2/14, and the two 1016 Porocel columns changed out 3/5 3/7. By ch anging out the Porocel it is hoped that finished goods 1016 fluorescence will return to a "normal" blue cast per "pre-Vicksburg" chlorine supply days.
Pyranol/1254 demand continued at a high pace through the month. The straight takeover still classification was temporarily expanded 3/17 by one man to permit 3 shift, 5 day operations.
Aroclor counter appears Samples
1016 movement remained slow. The forward flow was recalibrated 3/27. Finished goods 1016 to have returned to its "normal" blue fluorescence. were forwarded to Research 3/18.
DS\N 443048
STLCOPCB4057587
DEPT. 246/259 1975 OPERATIONS REPORT - HIGHLIGHTS
Page 2 WGK
APRIL
Aroclor 1254/Pyranol demand remained high and the department is staying even with orders at month's end; A 120 drum batch of MCS-1489 was completed late in the month. This batch was made without benefit of a Porocel column and used only earth treatment to upgrade. A small batch of Inerteen 54201-KJ was blended for Westinghouse using Aroclor 1016 in place of Aroclor 1242.
The chlorine cell house had a turnaround the week of 4/5, and the acid division for ten days starting 4/19. During these periods, many repairs were accomplished in Department 246 including patches on the residue receiver, mystery tank, and HC1 header, and replace ment of the blow tank, ductwork and catalyst timer valve.
The department had two visitors from the National Institute of Occupational Safety and Health (NIOSH) on 4/8. They were escorted by A. E. Leisy and G. L. Bratsch.
.
MAY JUNE
JULY
Aroclors/Pyranols operates at a significantly reduced rate to maintain low finished goods inventories. . The temporary still job to increase 1242/1254 production expired 5/14.
Monthly production was at an all time low to minimize finished goods inventories and due to little demand. Orders are expected to pick up slightly in July.
A quality complaint was received On low Epoxide level in a Pyranol A13B3B-3 blend to G.E., Pittsfield. Laboratory analytical error was the cause. G.E. Hudson Falls has detected a very slight indication of aliphatic hydrocarbons in a recent Aroclor 1016 shipment. This matter is under consideration of our research group.
.
The Department 246 turnaround went as scheduled the week of July 14.
Among the repairs were: relocation of the catalyst mix tank pump
(Project 5734); replacement of the "mystery" tank (Project 6412);
changeout of #7 chlorinator heat exchanger; cleaning of #2 blow tank
(1154) air spargers and #3 (1254) receiver; and repairs to the top 9
trays of the 1016 column. The first 1016 column run after the tray
repairs.was performed under "normal", unmodified, pre-October
operating conditions. The run proceeded as expected and all material
was in specification.
.
.
DSW 443049
STLCOPCB4057588
DEPT. 246/259 1975 OPERATIONS REPORT - HIGHLIGHTS
Page .3 WGK
AUGUST
Production picked up slightly in August, although continuing on the slow side. The No. 2 intermediate tank was dismantled and replaced during August with insulation and piping connections to be performed at a later date. The department was down 8/21-8/22 for Dowell cleaning of the off-gas line between Depts. 236/217. Checks of this line between Depps. 246 and 236 showed it did not need cleaning.
SEPTEMBER
The Aroclor Department had the honor of hosting some distinguished visitors during the month of September, including a CBS National
News crew 9/16, retiring Board Chairman Charles Sommer 9/17, and
the Corporate Housekeeping Committee 9/24. Department 246 was one
of the two operating departments cited by the Corporate Inspectors
for its exceptional appearance.
.
The continuous blow tank was cleaned early in the month. A slight improvement was realized in the reduction of soluble HC1 in the unlined crude 1142.
Overall production was the highest since March of this year, reflecting demand prior to an October price increase.
One quality complaint was received during September regarding high moisture content of a 1242 CM drum order. It is believed a wrong analysis was typed on the final certificate.
OCTOBER NOVEMBER
Demand slowed slightly in October. An attempt was made toward the end of the month to build a slight inventory in preparation for the Acid Division turnaround mid-November, but late orders soon negated the effort. A biphenyl outage mid-month necessitated trucking biphenyl up from Anniston. The demister element in the system tank was changed out 10/16.
Dept. 246 was down 11/15 - 11/22 due to the Acid Division turnaround, and again 11/24 - 11/26 due to a chlorine allocation. When Dept. 246 came on line the following weekend, numerous failures and leaks on the HC1 off-gas highline hampered operations into December. The failures were occurring between the Dept. 236 and Dept. 217 sections of the highline, and one thought to be a result of water getting into the line.
During the Acid Unit T/A, numerous Dept. 246 repairs were accomplished, including reworking the sewering valve, replacing the 8" valve and a section of the off-gas line outside the handrail, Dowell cleaning and hydrostating of the off-gas condenser, and changing out the #3 chlorinator mist eliminator. '
STLCOPCB4057589
DECEMBER
Department operations were hampered the first half of December due to numerous highline failures at Dept. 236. Cause of the failures is under investigation. T.V. station Channel 2 visited the Department December 3. Aroclor 1016 production in December was the highest this year.
Virgil Brawley began a one-month temporary assignment as 246 supervisor mid-December. This was done to relieve Gary Johnson who was placed on a temporary special assignment to perform economic evaluations in conjunction with CED.
I
DSW 443051
STLCOPCB4057590
Monsanto-
TIONlFROM (NAME & LOCATION* Gary L. Johnson - WGK
DATE
July 9, 1976
SUBJECT
SPECIAL MAN^JOB 246 DECONTAMINATION
TO
John T. Littich
CC: V. Brawley
L. Burks
W. C. Engman
A. E. Leisy
R. A. Pohl - B2SB
G A. . Turner
rjui 1 s is.
Would you please open a special manufacturing account
number to collect the charges associated with decontamination
of existing idle Department 246/259 equipment. Typical
charges to this account would include labor, materials,
laboratory, supplies, etc. This special account will be
closed monthly to the^Aroclor conversion center (811.00),
expense class 6 36.
--
If you have any questions, please contact me.
eb
DSW 443052
STLCOPCB4057591
STLCOPCB4057592
^icnsrnto
W. A. Smith - General Offices - B3SE
K'./'rv.
November 30, 1977 W. G. Krummrich Incinerator
W. S. Clark
-B3SC
*^
Messrs: R. E. Beal J. E. Hastings M. F. Mee B. Ratliff L. B. Rubin
-B2SB -
-B2NL
d& MS
1' / M.C.I. is proceeding with the retirement-in-place of the WGK incinerator ' as originally planned. They have increased the total loss from $523.9M . to$573.9M due to the addition of $50M for decontamination. They have advised that the Corporate Controller has approved the timing for recording the loss and that they expect the final approval by Executive Vice President, Louis Fernandez, by the first week of December. However, M.C.I. accounting advises that they will probably record the loss and make the allocation to M.I.C. in December business.
Following is the current breakdown of the loss:
_ Retirement Loss
Dismantling Cost
-
TIMING FOR RECORDING LOSS
1977
1978
1980-81
' 178.9
-------
100.0
225.0
TOTAL 178.9
325.0
Decontamination Cost
. 20.0
50.0
70.0
Total charge to obsolescence
198.9
150.0
225.0
573.9
if>7 f
^ &{ ^
Breakdown of Allocation:
MIC-Specialty Chemicals Detergents & Phos. Total M.I.C.
64% 32% 96%
127.3 63.6
190.9
96.0' 48.0 144.0
144.0 72.0
216.0
367.3 183.6 550.9
MCI-Process Chemicals
4%
8.0 6.0
9.0 .
23.0
TOTALS
-r ! 100%
198.9
150.0
225.0
.5..7--3--.-9-- u
The above action seems inconsistent with the Corporate Policy for losses over $500M as pointed out in M. F. Mee's letter to Messrs. D'. R. Daues and j F. A. Stroble (copy attached). The determining factor seems to be the I "remaining asset life". If this life is one year or less we should book the ; total loss in 1977, and if the lifo is two years or more we would only accelerate the depreciation as I interpret the policy. The action planned does not fit: either alternative.
OSNN 4054
STLCOPCB4057593
W. A. Smith
November 30, 1977 W. G. Krummrich Incinerator
W. S. Clark
2-
There may be a possibility of applying NIC's policy to this loss since our share to be incurred within one year is $334.9M (96% x Ret. Loss 178.9 + 1978 dismantling $100M + decontamination $70M). Under our policy we would book the loss to be incurred within one year in the current period. This would still leave $216M of dismantling to be recorded in 1980-81 time frame. Please keep in mind that these are Total H.I.C. numbers and that they would be split between Specialty Chemicals and Detergents and Phosphates..
Please let me know if you desire to pursue the possibility of taking part of the dismantling loss in 1977 business. Otherwise, it will be recorded according to M.C.I.'s plan
W. A. Smith
WAS:j s
DSW 443055
STLCOPCB4057594
M. F. Meo - U21IL
Novcmbor 2, 1977
RETIREMENT PJ^QUEST NO. 2934 W.G.K. INCINERATOR
Messrs. D. R. Daues F. A. Stroble
bcc: Mr. L. B. Rubin
With respect to the subject request, I have some difficulty
with the financial considerations being proposed. I would
summarize this difficulty as follows:
' _
' It seems inconsistent to propose retiring assets from service on the one hand and not to recognize the attendant financial obligation to dismantle them cn the ether, in the same time period.
. What benefit, or what express purpose is being served by promoting the expeditions retirement of potentially
; unuseable assets without likewise encouraging their expeditions dismantling, particularly in view of the
- time periods being suggested in this request.
.
The request proposes 1977 recognition of the lesser
part ($179H) of the potential financial exposure ($524)'.
' Assuming this is the most appropriate course of action,
. is this piece by itself, without its related part(s),
- ' a matter material enough in substance to warrant the
*
treatment proposed.
. ..
. If, as the request states, "it appears increasingly . remote that there will be a need for further use of ' the remaining facility" etc., is it appropriate to extend the financial process on the subject to 1930/31?
.
My overall concern on the subject is consistency of treatment and any precedents that stand to be established. If the concern I have registered here is appropriate, MIC stands ready to assist in pressing for an effective 1977 and longer-term resolution.
If further discussion on the subject is in order, please post me.
av
CKIHIW S<X*2 A' J-lOWa [.
Michael F. Meo .
DSVV 443056
! i
STLCOPCB4057595
the costs as per D.E. Crook's letter of 6/9/77.
As Boh Pohl pointed out, if there were a policy allowing relief after a two year period, we would want to take advantage of it. Having the facility available as stand by or as a vehicle to negotiate better disposal costs would be of economic benefit to the surviving occupants, but of no value to our Division. However, as you point out, the "two year policy" is MIC only and therefore does not apply in this situation.
jmd Attachment
A J/ Koenig
IN - 10 R F. V 1 ' 7 2
DSW 443057
STLCOPCB4057596
The purpose of this memo is to outline a basis for distribution of costs associated with the incinerator at the W. G. Krummrich Plant, which can be agreed upon by both MIC and MCI.
BACKGROUND
The incinerator (about ten years old) was constructed to serve the Aroclor Department at the Krummrich Plant. Prior to 1975, it was used almost exclusively for MIC products (primarily Aroclors). Beginning in 1975, MCI products also began to use the incinerator. (See attached Usage Schedule.) With the retirement of the Aroclor Department at W. G. Krummrich the incinerator will have little use and plans are to shut it down in October, 1977. It will be kept on a stand-by basis for the W. G. Krummrich Plant until the pro posed St. Louis area incinerator is commissioned (about 1-1-80).
'I PROPOSED COST DISTRIBUTION
1. Excess incinerator equipment (two storage tanks) previously used only by MIC will be retired
ii (Gross Cost $27M - Net 0) and dismantled shortly. MCI will process the retirement request and allocate the Obsolescence Expense 100% to MIC.
.2 Stand-by Costs (Depreciation, Insurance, Taxes)
during the period from 10-77 to 1-1-80 would be allocated to occupants of the Krummrich Plant on the basis of the average usage over the last 2^ years. This would be the cost distribution of the higher obsolescence (retirement - depreciation) if the facility were retired now.
i 3. Obsolescence Costs associated with the retirement
of the incinerator (estimate at 12-31-79) would be
based upon the previous usage of the incinerator over the past 2^ years.
/
-continued-
dsnn *058
STLCOPCB4057597
W. G. KRUMMRICH INCINERATOR
June 91 1977
Page Two
MCI proposes that the above itemized cost distributions be made as incurred unless, the stand-by status of the incin erator (currently planned from 10-77 to 1-80) is altered, in which case the basis for cost distribution in Items (2) and (3) above would have to be reviewed and revised if appropriate.
/aw Attachment
D. E. Crook Manager, Financial Services
/^S
0/uy/7 7
-c//? /vy fa/ctd
A/c. /c /i* c
Oryrr.
7/O/a
&
4tl//Ho.
//c~ flee*-* './<
t+.
A/-fo
/- /`GO 3-V /
STLCOPCB4057598
DSW 443060
INCINERATION BY OPERATING COMPANY AND BY PRODUCT
1975
1976
Mav YTD 1977
Total
Customer Return s (Aroclors) MIC-Dlv. 45 1,596,973' 1,139,793 179,^73 2,906,239
Dept. 246 (Aroclors)
MIC-Dlv. 45
393,394 3,036,374 . 409,244 3.844,012
Product SlO-92 (Plrllpenta) MIC-Dlv. 03
3,309
42,553
7.749
53,610
Product 910-80 (Cr-93# 2,4 DCP) Product 910-95 (PCP) Product 910-98 (Sant. 1) Product 810-94 (ffiS^a/4 DICH) Product 810-97 (93# 2, 4 DCP)
" II II II II
.0 228,077 162,042 ' 251,137
0
24,041 722,716 963,040 169,410
l,6l4
3,351 259.021 457,834
0 0
. 32,392 1,209,314 1,532,916
420,547 1,614
Depts. 219-222 (ONA - PNA)
MCI-D1V. 02
60,071
261,421 101,988
425,182
TOTAL YEAR
2,695,003 6,362,964 1.423,559 10,481,526
MIC-Dlv. 45 MIC-Dlv. 3 MCI-Dlv. 2
. 74# 24# 2#
' 66# ' 30# 4#
41#
52# "93
7#
64# 9 4#
Projection:At the present there are several people Involved In making; a decision as to
whether burning In the plant or sending out. No valid number available at
this clme.
'
Paul KucefJa 5/2/77
STLCOPCB4057599
fROM iN<M[ ft LOCATION i
W. A. Smith - General Offices - B3SE
DATE
.
SUQJCCT
:
RfKNLNCt
:
June 14, 1977
W. G. Krummrich Incinerator MCI Proposal
CC: R. E. Beal
- B2SB
T. M. King
- B3SA
A. J. Koenig - B2SK
R. A. Pohl
- B2SB
TO
:
J. E. Hastings
'
: ; 1 :> IM V .
The proposal from MCI for distribution of the continuing fixed stand-by cost and the eventual obsolescence expense is reasonable and equitable. However, I would use either the current year's usage (93% MIC) or the last full year of operation which was 1976 (96% MIC.) as the basis of distribution. This is more in line with past practice and MIC policy for this type of thing. I do not believe that the last 2 1/2 years usage (96% MIC) is a valid basis although in this particular case it doesn't make much difference. This point is not covered in existing Corporate Bulletin. The only reference to "time" is in the MIC Controller's Bulletin (VI-C-1) which states "A Business Group vacating a multi product equipment center will share in obsolescence losses incurred in the following two-year period". This would indicate that the vacating division is off the hook after two years. However, in this specific case I don't believe we can impose MIC policy on an MCI host plant nor would it be equitable to do so.
I have received comments from R. A. Pohl and A. J. Koenig and other than the two-year question the division is in general agreement with the proposal.
The values for the incinerator are as follows:
Gross Asset Value
5/31/77 $ 710M
1/1/80 $ 710M
Net Block Value Dismantle (Est. 5/77) Decontaminate (Est. 5/77)
Retirement Loss
396M
242M
-7^2Hy
$ 698M
$ 544M
The Corporate Policy for extraordinary obsolescence would require the write-off of the net book value over the remaining life if over $500M if the asset life is two years or more. Therefore, it appears that this item is not covered by the Corporate Bulletin except that the "spirit and intent" be applied to lesser values. Under the MIC Bulletin we would write-off the net book value over the remaining life if it amounts to $250M to $500M. Again, the amount is too small to be classified as extraordinary unless dis mantling is included.
DSW 443061
STLCOPCB4057600
June 14, 1977 Mr. J. E. Hastings Page Two
I recommend that we accept the MCI proposal with the distribution of cost based on 1976 usage. If the incinerator is re-activated or the status changes relating to the St. Louis area incinerator a prompt review and adjustment would be in order.
/cb
W. A. Smith
os'N
STLCOPCB4057601
Monsanto
f : * , .oc i onhOM iNami , :
m. Wriston, Jr./WGK
subject
January 3, 1978
; Monthly Incinerator Status Report
TO : L. L. Dearing
cc A. J. Koenig - G.O. J. W. Mollo
A. Frerking
A. E. Leisy
-KTA. Pohl - G.O.
D. L. Cisse
W. C. Engman
D. Wood - G
J. Peduzzi
J. Labanosk
W. Crabtree
P. R. Kucer
S. Finkelstein - G.O. T. Iggens
The following is the monthly Incinerator Status Report in cluding all activity through December 31, 1977.
Material Returned for Incineration - (Pounds)
December, 1977
Y.T.D.
Dielectrics - (Billings to Customers) -
-0-
261,743
In-Plant Waste - (Other Than Dept. 246)-
-0-
134,734
Dept. 246 - T/C Wash/Drums
- -0-
433,300
Dept. 246 - Residue
- -0- 1,281,942
Dept. 246 - Montars
- -0-
346,872
Dept. 246 - ODCB (Aroclor Decont.)
-
-0-
163,820
Acidifier
Dept. 226/81082
- -0-
20,618
Dept. 237/81085
- -0-
467,839
Dept. 239/81088
- -0-
683,634
Dept. 237/81080
- -0-
11,403
Dept. 237/81084
- -0-
15,414
TOTAL RETURNED FOR INCINERATION
- -0- 3,821,319
STLCOPCB4057602
L. L. Dearing Monthly Incinerator Status Report
Page 2 12-30-77 WGK
Status of Incineration
Prior Year's Receipts November, Y.T.D. Receipts December, 1977 Receipts
Prior Year's Incineration November, Y.T.D. Incineration December, 1977 Incineration Pounds For Contract Incineration On Hand, 1/1/78, To Be Incinerated
Pounds
25,399,183 3,821,319
0
29,220,502 23,389,260
4,002,640
0
1,828,602 0- -
Billings To Customers (Dielectrics)
December, 1977
Incineration Charges
0$ - 0-
0$ - -
Adj.
-0-0-0-
Y.T.D.
$29,869 4,134
$34,003
James M. Wriston, Jr. /nm
DSW 443064
STLCOPCB4057603
IVr i-s ton .
December 6, 1977 Monthly Incinerator Status Report
TO L. L. Dearing
A. J. Koenig - G.O. J. W. Molloy
A. Frerking
A. E. Leisy
2TTk. Pohl - G.O.
D. L. Cissell
W. C. Engman
D. Wood - G.O
J. Peduzzi
J. Labanosky
W. Crabtree
P. R. Kucera
S. Finkelstein - G.O. T. Iggens
The following is the monthly Incinerator Status Report in cluding all activity through November 30, 1977.
Material Returned for Incineration - (Pounds)
November, 1977
Y.T.D.
Dielectrics - (Billings to Customers) -
-0-
261,743
In-Plant Waste - (Other Than Dept. 246) -
-0-
134,734
Dept. 246 - T/C Wash/Drums
- -0-
433,500
Dept. 246 - Residue
- -0- 1,281,942
Dept. 246 - Montars
- -0-
346,872
Dept. 246 - ODCB (Aroclor Decont.)
-
-0-
163,820
Acidifier
Dept. 226/81082
- -0-
20,618
Dept. 237/81085
- -0-
467,839
Dept. 239/81088
-0- 683,634
Dept. 237/81080 ^ Dept. 237/81084 :
-0- 11,403 -0- 15,414
TOTAL RETURNED FOR INCINERATION
- -0- 3,821,319
DSv\| 443065
i
( \
\
i
STLCOPCB4057604
L. L. Dearing Monthly Incinerator Status Report
Page 2 12/6/77 WGK
Status of Incineration
Prior Year's Receipts October, Y.T.D. Receipts November, 1977 Receipts
Prior Year's Incineration October, Y.T.D. Incineration November, 1977 Incineration Pounds For Contract Incineration * On Hand, 12/1/77 To Be Incinerated
Pounds
25,399,183 3,821,319
0
29,220,502 23,389,260
4,002,640
0
1,670,400 158,202
^Inventory To Be Incinerated - (By Dept./Mat'1.)
Aroclors Montars Dept. 219-222 Dept. 236-237 Dept. 239
151,272 0 0
6,930 0
158,202
Billings To Customers (Dielectrics)
November, 1977
Incineration Charges Handling
$ -0 -0
5 -0-
Adj.
-0-0-0-
Y.T.D.
$29,869 4,134
$34,003
/nm
James M. Wriston, Jr.
DSW 443066
STLCOPCB4057605
iJ L -~i c j ;.j
DEPT. 790 - 1977 OPERATION
JANUARY J f
The incinerator was down for 19 days for Weir ring repairs. The Venturi has a crack that must be repaired during the next extended shutdown.
MARCH APRIL MAY
The Incinerator was down for 11 days for plenum repairs. The Venturi crack was repaired. The waste inventory is holding steady at 2 million pounds.
Reasons for the overtime in February were:
Absence
20% of total.
Openshift 80% of total.
546,000 lbs. were burned in March. We were down for four days for plenum refractory repairs.
Reasons for overtime in February were: Openshift 94.1% Medical Reasons 5.9%
Removal of build up from the plenum caused 8 days downtime in April. Reasons for overtime in April were:
Absence 4.2% Vacation 53.0% Openshift -25.5% Housekeeping 4.2% Extra Work 13.0%
.
Four separate incidents caused 18 days downtime in May. These were the scrubber column repair, quench column gasket failure, plenum clean out, and city water outage.
Reasons for overtime in May were:
Vacation 45.5% Openshift 36.4% Extra work 0.9% Grievance 0.9%
DSW 443067
STLCOPCB4057606
June
JulyAugust
Quench column gasket failure and quench pot repairs caused 13 days downtime In June. The current quench column gasket repair Is temporary and is expected to fall again In the near future.
Reasons for overtime were:
'
Absence 0.7$ Vacation 68.1$
Extra Work 6.7$ Open Shift 23.3$ Transportation difficulties
1.1$
A Venturi duct failure and plenum refractory failure caused 12 days downtime in July. We expect to end Incineration operations in October of this year.
Reasons for overtime were:
Absence 56.0$ of total Vacation 6.2$ of total
Training 5*1$ of total Open Shift 12.5$ of total Extra Work 12.5$ of total Grievance 1.5$ of total Transportation difficulties Not Coded 6.2$ of total
.4$ of total
An excellent run with only minor repairs required during the month. PCB wastes from Little Mo are being shipped for outside incineration. The incinerator is still scheduled to shutdown operation in October.
Reasons for overtime were:
Absence 5*0$ of total Vacation 66.4$ of total Open Shift 19.0$ of total
Extra Work 4.7$ of total Transportation difficulties
4.7^ of total
os* 443068
STLCOPCB4057607
September
October November
Another good month, leaving only 250,000 lbs. to be burned before permanent shutdown of the incinerator. The unit was down for plenum clean out at the end of the month.
Reasons for overtime were:
Absence 27-3% of total
Training 18.2$ of total Open Shift 36.^$ of total Extra Work 9*1$ of total Grievance 9*1$ of total
The Incinerator burned 454,972 lbs. and shut down permanently in October. All that remains is to ship the contents of Little Mo and all tank heads out for incineration.
Reasons for overtime were:
Absence
62.7% of total
Vacation
3.9% of total
Training
3.9% of total
Open Shift
73.5% of total
Extra work
2.0% of total
Transportation
difficulties
3.9% of total
Some residual solids remain to be melted out of Little Mo and two tank heads remain to be cleaned out. All operations at the Incinerator should be complete by the end of 1978.
Reasons for overtime were:
.
Extra work
100% of total
DSW 443069
STLCOPCB4057608
DEPARTMENT 790, AR0CL0R INCINERATION, 1977 OPERA-IONS REPORT
NCINERATION
(1976 5.946 M lbs. 66.6 OST 81.3 OSR)
3NTH 3UNDS BURNED JRNED YTD ircent OST OST, YTD 5R % OF DE. 5R % YTD
JAN. 232512 232512
37.1 37.1 67.4 67.4
FEB. 428755 661267
50.4 44.1 98.3 84.6
MARCH 546,185 1,207,452
84.4 58.0 69.6 77.1
APRIL 349,418 1556780
71.3 61.1 62.8 70.7
MAY
JUNE JULY
AUGUST
SEPT. OCT.
271,106 265,806 510266 512122 450354
454972
1,827,886 2,093,692 2603958 3116080 5566454 4002640
51.9
50.6
51.1
83
78 37.4
59.4
57.9
57.5
60
6? 63.9
56.2
57.2 110
65
6l 130.9
68.0
66.6
72
70
69 ___ 68.7
NOV. 0
4002
-
DEC.
O O CO
5_
0a5
J-VEN'T-WO"R'Y, - 'POwwU-N"|DS
ILK REC.
290072
ILK MO. END
2042204
:UMS REC.
49231
:UMS MO. END :UMS EMPTIED
74500 20731
298000 2068223
82274 53500 103274
345,248 1,960,285
39,399 0
92,899
230,654 1876892
88,681 0
88,681
217,808 132,820 898442 454900 269100
1.767,019 L,699,468 1915815 2056842 1236874
13,195 0
36,85! 27171
41,000
0
45049 37000
206220 115000
13,195 (4145) 68171 8049 L8220
(648600) (90100) 224092 158202
00 00
115000
0
TRA HOURS
H. YTD ERTIME
HRS. YTD S. HRS. S. HRS. YTD
0.0 0.0 11.1, 11.1
3.5 3.5
FETY NOR INJ. R'lOUS INJ.
0 0
0.0 4.3 22.4 8.9
0
18.6
17.0
2.3
1.3 0
0.0 1.5
6.8 7.8 6.2
8.5
9.6
8.9
8.2 7.7
6.3
4.5
25.3
12.3
22.3
l6.6 22.4
12.8
16.6
0.9
8.8
7.9
11.5
11:6
13.1
14.1 15.2
15.0
15.1
14.3
1.3 0
1.1 1.1 0.1
9.3
0.1
2.8
11.7
0
2.4 1.5
1.4 1.4 1.2
2.8
2.4
2_-_5____
3.3
3.1
01 00
0 0
3 0.
0
21
00
00
0
0 ____Q______ 0
0
STLCOPCB4057609
Monsanto
J. M. Wriston, Jr./WGK
OAH November 4, 1977
sue jfc t Rff fHfNCt
Monthly Incinerator Status Report
TO : D. T. Hughes
A. J. Koenig - G.O. J. W. Mol1o
A. Frerking
A. E. Leisy
B. Ratliff - G. 0.
D. L. Cisse
LS^'k. Pohl - G.O. D. Wood - G
W. C. Engman
J. Labanosk
J. Peduzzi
W. Faries
W. Crabtree
P. R. Kucer,
The following is the monthly Incinerator Status Report ineluding all activity through October, 1977 .
Material Returned For Incineration - (Pounds)
Dielectrics - (Billings to Customers)
October, 1977 _ -0-
Y.T.D. 261,743
In-Plant Waste - (Other Than Dept. 246)-
-0-
134,734
Dept. 246 - T/C Wash/Drums
_ -0-
433,300
Dept. 246 - Residue
- -0- 1,281,942
Dept. 246 - Montars
- -0-
346,872
Dept. 246 - ODCB (Aroclor Decont.)
- 96,200
163,820
Acidifier
Dept. 226/81082
- -0-
20,618
Dept. 237/81085
- -0-
467,839
Dept. 239/81088
- -0-
683,634
Dept. 237/81080
- -0-
11,403
Dept. 237/81084
- -0-
15,414
TOTAL RETURNED FOR INCINERATION
96,200
3,821,319
DSW 443071
STLCOPCB4057610
D. T. Hughes Monthly Incinerator Status Report
Page 2 11/4/77 WGK
Status of Incineration
Pounds
Prior Year's Receipts September Y.T.D. Receipts October, 1977 Receipts
Prior Year's Incineration September Y.T.D. Incineration October, 1977 Incineration Pounds For Contract Incineration *On Hand, 11/1/77 To Be Incinerated
25,399,183 3,725,119 96,200
29,220,502 23,389,260
3,547,668 454,972
1,580,300 248,302
^Inventory To Be Incinerated - (By Dept./Mat'1.)
Aroclors Montars Dept. 219-222 Dept. 236-237 Dept. 239
215,443 9,552 1,000
20,307 2,000
248,302
Billings To Customers (Dielectrics)
October 1977
Adj .
Incineration Charges Handling
1
O 1
$-0-0-
-0-0-0-
Y.T.D.
$29,869 4,134
$34,003
/nm
James M. Wriston, Jr.
DS\N 443072
STLCOPCB4057611
Monsanto
f^z ^
Aroclor wastes on hand 4/1/77 Total Additional PCB Wastes (all sources)
Total wastes to be burned after 4/1/77
Will burn WGK 4/1-- 9/1
Total wastes to be burned after 9/1/77
1.5 M # 2.3M #
3.8M #
1.4M #
2.4M #
Current estimate is as follows:
Aroclor wastes on hand 4/1/77 Total Additional PCB Wastes (all sources)
1.5M # 2.5M #
4.0M #
Burned WGK 4/1-- 9/1 Burned Rollins 7/1-- 9/1 Total burned 4/1 -- 9/1
1.3M # 0.6M #
Total wastes to be burned after 9/1/77
1.9M # 2.1M #
The 0.2M # additional waste is primarily the 157M # of A13B3B-3 contaminated with Aroclor 1016 which we thought was sold in April but since have had the order cancelled.
If you have any further questions, please call.
/ tm
W. C. Engman
4430^ qS'N
IN - 10 REV. 1 72
STLCOPCB4057612
CONTAMINATED MATERIALS DISPOSAL AGREEMENT
THIS AGREEMENT, made and entered into as of this day of , 1977, by and between Monsanto
Company, a Delaware corporation, having its general offices at 800 North Lindbergh Boulevard, St. Louis, Missouri 63166 ("Monsanto") and Nuclear Engineering Company, Inc., a California corporation having its principal place of business at 9200 Shelbyville Road, Louisville, Kentucky 40222 ("NECO").
W I TNESSETH:
WHEREAS, Monsanto has certain equipment and materials which have been in contact with and contaminated by polychlorinated biphenyls, as listed and described in Schedule A attached hereto and made a part hereof ("Contaminated Materials"), which Monsanto desires to have disposed of by NECO in a most safe and efficient manner; and
WHEREAS, NECO represents to Monsanto that it possesses the requisite expertise, facilities and legal right to dispose of the Contaminated Materials in a safe and efficient manner, in full compliance with all applicable governmental laws, rules, regulations, orders, ordinances, actions and requests, and in accordance with the terms and conditions of this Agreement, and
WHEREAS, NECO has been advised by Monsanto of potential harmful effects and environmental concerns associated with the
osVJ A0l4
STLCOPCB4057613
-2-
Contamlnated Materials and with polychlorinated biphenyls, has been provided a copy of the EPA PCB Criterion Document, and understands the nature and characteristics of said Contam inated Materials and of polychlorinated biphenyls; and
WHEREAS, NECO desires to undertake said disposal and to conduct the same in accordance with all of the terms and conditions of this Agreement;
NOW, THEREFORE, in consideration of the payments to be made by Monsanto to NECO as herein provided, and the mutual covenants and agreements contained, Monsanto hereby engages NECO, and NECO hereby agrees, to receive, handle, and dispose of the Contaminated Materials upon the terms and conditions hereinafter set forth.
1. Term and Termination. This Agreement shall commence on the date first above written and shall continue in full force and effect until all Contaminated Materials have been disposed of or until terminated by either party providing the other party with at least thirty (30) days' prior written notice of termi nation. NECO's warranties and representations set out in Section 6 of this Agreement- and the confidentiality provisions set out in Section 11 of this Agreement shall survive any termination or expiration of this Agreement.
2. Description - Warranty. (a) A general description of the various types of Contaminated Materials to be delivered to NECO for disposal are set out in Schedule A. NECO recognizes and understands that since it is impossible to describe precisely
DS\N 443075
STLCOPCB4057614
-3-
all Contaminated Materials, the Contaminated Materials in Schedule A may vary in size, structure and quantity from shipment to ship ment. However, Monsanto will exercise its best efforts to accurately and precisely describe the Contaminated Materials in each shipment on the Hazardous Waste Shipment Record Form accompanying such shipment. Monsanto warrants that in any event the Contaminated Materials in each shipment shall be only those Contaminated Materials in Schedule A and the Hazardous Waste Shipment Record Form. It is expressly understood by the parties, however, that all Contaminated Materials have been in contact with and are presently contaminated by polychlorinated biphenyls. Should Monsanto desire to have NECO dispose of any contaminated materials which vary from the general description set out in Schedule A, Monsanto shall make a written request to NECO to that effect prior to shipment of such varying contaminated materials. NECO will rely solely on Schedule A and the Hazardous Waste Shipment Record Form for the general description of the Contaminated Materials, and for a description of the materials in each shipment, and NECO shall not be required to analyze, sample or test such Contaminated Materials, provided, that NECO shall be required to examine the general description in Schedule A and the Hazardous Waste Shipment Record Form prior to disposal of the Contaminated Materials to determine whether the Contaminated Materials are sufficiently described thereon to enable NECO to properly dispose of such Contaminated Materials.
^ 443076
STLCOPCB4057615
-4-
(b) NECO shall within fifteen (15) days after delivery of the Contaminated Materials, give notice to Monsanto of Contaminated Materials which vary from the general descriptions thereof as set forth in the attached Schedule A and Hazardous Waste Shipment Record Form and which, as a result thereof, are unsuitable for disposal at NECO's disposal facility. For such varying Contaminated Materials, Monsanto agrees to pay NECO all inspection, transportation and handling costs actually, reasonably and necessarily incurred by NECO, both to NECO's place of disposal and return to Monsanto's plant or to such other storage or disposal facility designated by Monsanto. Such inspection, transportation and handling charges shall not be paid if NECO fails to give such notice within said fifteen (15) day period.
(c) For Contaminated Materials which vary from the general description set out in Schedule A and the Hazardous Waste Shipment Form, but which remain suitable for disposal at NECO's disposal facilities, Monsanto agrees to reimburse NECO for increased costs actually, reasonably, and necessarily incurred by it in disposing of such varying Contaminated Materials, provided (i) that NECO notifies Monsanto in writing prior to disposal or within fifteen (15) days after delivery, whichever comes first, that the cost of disposal is increased as a result of the Contami nated Materials varying from the general description, specifying the nature of the variance, its best estimate of the increase in cost, and an explanation of such increase in cost and (ii)
oSMM 443077
STLCOPCB4057616
-5-
that Monsanto shall have the right to inspect the Contaminated Materials before disposal to determine whether such variance does exist. If Monsanto and NECO disagree as to the extent of such variance and the amount of the additional cost of disposal, and cannot reach a mutually acceptable compromise, the varying Contaminated Materials shall be returned in the same manner and under the same conditions as set out in Para graph 2(b). NECO shall not be reimbursed for such increased cost if it fails to give such notice prior to disposal or within said fifteen (15) day period, whichever comes first. Such payments for either the return or increased cost of disposing of any varying Contaminated-Materials by Monsanto shall be the limit of Monsanto's liability to NECO, except as stated in Paragraph 7? for such varying Contaminated Materials. Subject to only Monsanto's obligations under Paragraph 3 to package, label, placard and load the Contaminated Materials in accordance with all applicable Federal and State DOT regulations and other applicable governmental regulations as provided to Monsanto by NECO, Monsanto MAKES NO OTHER REPRESENTATIONS OR WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, AS TO MERCHANTABILITY, FITNESS FOR PARTICULAR PURPOSE, OR ANY OTHER MATTER WITH RESPECT TO THE CONTAMINATED MATERIALS, WHETHER USED ALONE OR IN COMBINATION WITH OTHER SUBSTANCES.
3. Del 1 very. By prearrangement between the parties, Monsanto shall deliver the Contaminated Materials to NECO.
DSW 443078
STLCOPCB4057617
-6-
NECO shall supply or arrange for the transport vehicles or facilities necessary to properly and safely transport the Contaminated Materials from Monsanto's W. G. Krummrich Plant ("Plant") to NECO's disposal site. Deliveries shall be made during normal working hours, Monday through Friday, except holidays, in accordance with a schedule which shall be mutually agreed upon by the parties hereto. Monsanto shall be solely responsible for loading the Contaminated Materials into or onto the transport vehicles or facilities arranged for or supplied by NECO. NECO shall be solely responsible for securing the Contaminated Materials after they have been loaded. In no event, except when mutually agreed upon in writing by duly authorized representatives of the respective parties, shall NECO be required to load the transport vehicles or facilities at Monsanto's Plant.
4. Title and Risk of Loss. Title to and Risk of Loss for the Contaminated Materials shall pass to NECO upon delivery by Monsanto at Monsanto's Plant. For the purpose of this Agreement, delivery is deemed to occur when the Contaminated Materials have been loaded into or onto the transport vehicles or facilities arranged for or supplied by NECO to transport said Contaminated Materials and such loaded vehicles or facilities have departed from Monsanto's Plant.
5. Price. Monsanto shall pay to NECO for disposal of the Contaminated Materials a fee as determined in accordance with "Schedule B," attached hereto and made a part hereof. NECO
DSW 443079
STLCOPCB4057618
-7-
shall invoice Monsanto upon disposal of the Contaminated Materials,
and agrees to retain copies of such invoices for a period of at
least two (2) years. Payments shall he due and payable by
Monsanto thirty (30) days from the date of receipt of each
invoice, if such invoice is accurate.
6. Disposal - NECO's Representations and Warranties.
NECO represents and warrants to Monsanto that:
(a) NECO is engaged in the business of disposing of
hazardous industrial wastes by landfill and has experience and
expertise in the disposal of industrial equipment and materials
contaminated by polychlorinated biphenyls. NECO shall perform
all obligations hereunder in a workmanlike manner and consistent
with its expertise.
(b) All Contaminated Materials delivered to NECO by
Monsanto hereunder shall be disposed of by landfill at an
approved hazardous waste landfill site at Sheffield, Illinois,
and none of such Contaminated Materials, distillate, residue
or any component thereof shall be directly or indirectly salvaged,
reclaimed, or distributed.
(c) NECO shall comply with all governmental orders,
regulations, ordinances, actions or laws of the United States
or of any state, county, township or municipal subdivision or
other governmental agency in effect during the term of this
Agreement which may be applicable to the receipt, possession,
handling, transportation, or disposition of Contaminated
Materials.
qSVM 443080
STLCOPCB4057619
-8-
(d) NECO has received a general description of the Contaminated Materials, that it is familiar with the hazardous nature thereof, and that it has the knowledge and expertise to handle, haul and dispose of the Contaminated Materials in a safe and efficient manner, as such Contaminated Materials are generally described in Schedule A and the Hazardous Waste Shipment Record Form.
(e) NECO shall allow Monsanto representatives to have access to NECO's disposal site from time to time during the term hereof, during normal business hours and with at least five (5) days written notice in order to enable said Monsanto representatives to inspect the disposal operations conducted hereunder.
(f) NECO shall obtain all permits, licenses and/or other documentation required to comply with applicable govern mental orders, regulations, ordinances, actions or laws, and agrees to furnish copies of the same to Monsanto upon request and at Monsanto's expense, and NECO agrees to furnish copies of any agreements or other documentation relating to the obligations and representations, of NECO contained in this Agreement.
7. Indemnity. NECO shall indemnify and hold Monsanto, its employes and agents harmless from and against any and all liabilities, claims, damages, penalties, actions, suits, losses, cost3 and expenses (including cost of defense, settlement and reasonable attorneys' fees and expenses), whether the foregoing are based in contract, negligence, strict liability or other legal theory, for any personal injuries, including death, and/or
DSW 443081
STLCOPCB4057620
-9-
property damage, or for any contamination of or adverse effect on humans, domestic animals, aquatic and wildlife, food, animal feed or the environment, arising out of or in connection with the receipt, possession, handling, distilling, use, resale, transfer or disposal of the Contaminated Materials, distillates or residues therefrom or any components thereof and such per sonal injuries, including death, and/or property damage are caused by NECO, its employes, agents, or contractors. Monsanto, if it so elects, shall have the right to tender its own defense, which right shall include, but not be limited to, the selection of counsel and the preparation of Monsanto*s defense. Notwith standing the foregoing, NECO shall not be required to indemnify or hold Monsanto, its employes and agents harmless in the event (a) the Contaminated Materials vary materially from the general descriptions (referred to in Paragraph 2 hereof and set forth in the attached Schedule A and the Hazardous Waste Shipment Record Form) and have not been determined to be suitable for disposal pursuant to Paragraph 2(c) hereof; and such variance is the cause of such personal injury, including death, and/or property damage, or (b) such personal injury, including death and/or property damage is caused by the acts of omission of Monsanto (i) in labelling, placarding or packaging the Contami nated Materials contrary to all applicable Federal and State DOT regulations or other applicable governmental regulations, as provided to Monsanto by NECO, or (ii) while loading the Contaminated Materials onto NECO's transport vehicles or facilities.
DSW 443082
STLCOPCB4057621
-10-
8. Excuse of Performance, Performance under this Agreement, except for the payment of money for services per formed, may be suspended by either party in the event of: act of God, war, riot, fire, explosion, accident, flood, sabotage; lack of adequate fuel, power, raw materials, labor, containers or transportation facilities; compliance with governmental requests, laws, regulations, orders or actions; breakage or failure of machinery or apparatus; national defense requirements or in the event of labor trouble, strike, lock-out or injunction (provided that neither party shall be required to settle a labor dispute against its own best judgment); or any other event beyond the reasonable control of such party, which event prevents the delivery, transportation, acceptance or disposal of the Contaminated Materials. Any party claiming the existence of an excuse of performance shall promptly notify the other party of its existence, expected duration and effect on this Agreement.
9. In all operations under this Agreement, NECO shall strictly comply with all safety and security regulations of the Plant.
10. Insurance by NECO. (a) NECO shall not begin the performance under this
Agreement until: (i) It has obtained all the insurance herein after required;
(ii) It has furnished a copy of its contract of insurance satisfactory to Monsanto; and
DSW 443083
STLCOPCB4057622
-11-
(iil) The contract of Insurance evidencing NECO's
coverage has been approved by Monsanto.
(b) Every contract of insurance providing the coverages
required herein shall contain the following clause: "No reduction,
material alterations, cancellation or expiration of this policy
shall become effective until thirty (3) days after the date
written notice is received by Monsanto Company, 800 North
Lindbergh Boulevard, St. Louis, Missouri 63166, Attention:
Michael A. Pierle."
(c) NECO shall take out and maintain, at its expense,
for the duration of this Agreement, at least the following insurance:
Coverage
Limits
(1) Workmen's Compensation
Statutory
(2) Employer's Liability
$500,000 each occurrence
(3) Public Liability (Bodily Injury)
$1,000,000
(4) Public Liability (Property Damage)
$1,000,000
(5) Automobile Liability (Bodily Injury)
S200,000 each person $500,000 each occurrence
(6) Automobile Liability (Property Damage)
$50,000 each occurrence
(d) Such insurance shall cover all of NECO's contractual
liability under Paragraph 7 above and shall be in amounts no less
than those set forth in items (3) and (4) of subparagraph 10(c)
above.
DSW 443084
STLCOPCB4057623
-12-
11. Confidentiality. Each of the parties hereto shall treat as confidential property and not disclose to others during or subsequent to the term of this Agreement (except as is necessary to perform, the work hereunder or as required by law and then only on a confidential basis satisfactory to the other party) any information (including any technical information* experience or data) regarding the other party's plans, programs, plants, processes, products, costs, equipment, operations or customers which may come within the knowledge of such party, its officers or its employes in the performance of the work hereunder, without in each instance securing the prior written consent of the other party. In addition to the foregoing, NECO shall also treat as confidential and shall not disclose to others information relating to the chemical composition of the Contaminated Materials and/or the quantity of Contaminated Materials delivered to it by Monsanto. The foregoing obligations shall survive the termination or expiration of this Agreement. Nothing herein, however, shall prevent either party from dis closing to others or using in any manner information which it can show:
(a) Has been published and has become part of the public domain other than by acts, omissions or fault of such
party or its employes;
(b) Has been furnished or made known to such party by third parties (other than those acting directly or indirectly for or on behalf of the other party) as a matter of legal right
DSW 443085
STLCOPCB4057624
-13-
and without restriction on disclosure; or (c) Was in its possession prior to the disclosure
thereof by the other party to such party. 12. Independent Contractor. NECO is and shall perform
this Agreement as an independent contractor and, as such, shall have and maintain complete control over all of its employes and operations. Neither NECO nor anyone employed by it shall be, represent, act, purport to act or be deemed to be the agent, representative, employe or servant of Monsanto.
13. Assignment. Neither party shall assign its rights or delegate its performance hereunder (whether by operation of law or otherwise) without the prior written consent of the other party, and any attempted assignment or delegation without such consent shall be void. Either partjr shall have the right to terminate this Agreement without delay following receipt of notification of such attempted assignment or delegation.
14. Waiver. Any waiver by either party of any provision or condition of this Agreement shall not be construed or deemed to be a waiver of any other provision or condition of this Agreement, nor a waiver of a subsequent breach of the same pro vision or condition, unless such waiver be expressed in writing and signed by the party to be bound.
15. Notice. Any notice, request, approval or other document required or permitted to be given under this Agreement shall be in writing and/or by telephone. If by telephone, such notice, request, or approval shall be confirmed in writing. All
DSW 443086
STLCOPCB4057625
-14-
-
written notice, requests, or approvals shall be deemed to have
been sufficiently given when delivered in person or deposited
in the U.S. mail, postage prepaid, for mailing by certified or
registered mail, return receipt requested, and addressed as
follows :
If to Monsanto, addressed to:
Monsanto Company W. G. Krummrich Plant Sauget, Illinois 62201
Attention: D. M. Francisco
Copy to:
Frank Basile
If to NECO, addressed to: Nuclear Engineering Company, Inc. P. 0. Box 7246 Louisville, Kentucky 40207 Attention: Mr. Dowell Buckner
General Manager, Chemical Division or to such other address or addresses as may be specified in writing from time to time by either party.
16. Headings. Paragraph headings are for convenience only and are not to be construed as part of this Agreement.
17. Controlling Law. The validity, interpretation and performance of this Agreement shall be governed and construed in accordance with the laws of the State of Illinois.
18. Entire Agreement. This Agreement represents the entire understanding and agreement between the parties hereto relating to the disposal of the Contaminated Materials and supersedes any and all prior agreements, whether written or oral, that may exist between the parties regarding same. No terms, conditions, prior course of dealings-, course of performance,
DSW 443087
STLCOPCB4057626
-15-
usage of trade, understanding or agreement purporting to modify, vary, supplement or explain any provision of this Agreement shall be effective unless in writing, and signed by duly authorized representatives of both parties, and no modifi cation shall be effected by the acknowledgement or acceptance of purchase order, shipping instruction forms, or any other forms containing terms and conditions at variance with or in addition to those set forth herein.
IN WITNESS WHEREOF, Monsanto and NECO have each caused this Agreement to be executed by its duly authorized representa tive as of the day and year first set forth above.
NUCLEAR ENGINEERING COMPANY, INC By: Title:
MONSANTO COMPANY By: Title:
DSW 443088
STLCOPCB4057627
Monsanto
A. J. Koenig - B2SK
Date subjecr HEfEHENCL
November 9, 1977
AROCLOR OBSOL/DECOMMISSIGNING
cc R. E. Beal W. S. Clark E. T. Mollica
Pbhl1 P. R. Kucera
TO : W. R. Parrish W. A. Smith
B3SA B3SA
1740
The attached worksheet reflects best estimate of costs for the WGK plant as updated today.
The numbers fairly well speak for themselves. Potential devia tions are in the areas of dismantling and tank car decontamina tion. Outside contracts for dismantling and equipment disposal are being negotiated at this time. So far no tank cars have been returned for decontamination. We will not know much more until first quarter 1978 on them.
1977 costs for November and December are premised on no inter ruption in the plant*s operations.
Newport obsolescence and decommissioning costs for their PCB phaseout was questioned at the time of Europe's recent budget review. John Mason confirmed that their earlier estimate was still in order - their reserve is adequate to cover expected costs. John Newton, Brussels office, also confirmed the adequacy of the numbers to Roger Beal at about that same time.
/rd
Attachment
Koenig
qS\N 4430S9
STLCOPCB4057628
SPCJAL7y (Lhfaucms Dm -- Puajct/qajal Pfiobocrs ....
w&k Anaccofi Dept ORs^iescEiice aud Dzcortmiss/otJtvG-
/Aj3 /V7
Total. Cost
EsT'1977
'Ee$R\IE'
PltEsT !! >o A?os
Retwemeut Loss &ept &<?>utP CAPITA U7L D.SPAf?e>
7~otx)i_
D|5flnmjTi-MJSL_tP
D/>7 g>o< P SHPP/Mfc-LflU ftpnjil,
^"<3`gsag
Total
VEtWT/mwmoH CLE/UJ/Hfr SlMA&G-
tahkz 4 lotLtoun,
lAiaHEPATB-SouJeH) Tauk Cag CueAm b
RPL ^/>SKg?S/Wwi
7otjqe
'Total O&SQL ; (V&-Q3 -361Q+)
T)ECOMM/SS/OAI/V&.
Gr IP )a) \JEfjTOAX
-Stored /aj v lUCWEkATe'&lP
Torflu
Project 7or/a
leas "77 Cos 7 /^7 Cost
Reserve- A
rik*h:
'I f?SP<?V
H/'l6<BUf* C"11tA l.rtll .N WB.'t *AA WYHING BOUND
STLCOPCB4057629
Monsanto
Monsanto Company 600 N. Lindberph Boulevard St. Louis, Missouri 63166 Phone: (314) 694-1000
November 4, 1977
LAW DEPARTMENT
R. Lee Armbruster Corporate Counsel Nuclear Engineering Company, Inc. 9200 Shelbyville Road, Suite 526 P. 0. Box 7246 Louisville, Kentucky 40207
Dear Lee:
Please find enclosed our re-draft of your proposed contract for disposal of PCB contaminated materials. As I indicated to you in previous conversations, it incorporates our earlier negotiations of the purchase order addendum currently in use.
I am looking forward to receiving your response to this draft.
CT/sg Enclosure
Clarence Thomas Attorney
bcc:
Frank Basile - 1740 W. B. Papageorge - E3NJ
R. A. Pohl - B2SB F. G. Wohlschlaeger - B2SC
David Wood - B2SD
DSW 443091
STLCOPCB4057630
11/3/77
CONTAMINATED MATERIALS DISPOSAL AGREEMENT
THIS AGREEMENT, made and entered into as of this day of , 1977, by and between Monsanto Company, a Delaware corporation, having its general offices at 800 North Lindbergh Boulevard, St. Louis, Missouri 63166 ("Monsanto") and Nuclear Engineering Company, Inc., a California corporation having its principal place of business at 9200 Shelbyville Road, Louisville, Kentucky 40207 ("NECO").
WITNESSETH WHEREAS, Monsanto has certain equipment and materials which have been in contact with and contaminated by polychlorinated biphenyls, as listed and described in Schedule A attached hereto and made a part hereof ("Contaminated Materials"), which Monsanto desires to have disposed of by NECO in a most safe and efficient
manner; and
WHEREAS, NECO represents to Monsanto that it possesses the requisite expertise, facilities and legal right to dispose of the Contaminated Materials in a safe and efficient manner, in full compliance with all applicable governmental laws, rules, regulations, orders, ordinances, actions and requests, and in accordance with the terms and conditions of this Agree ment, and
DSW 443092
STLCOPCB4057631
-2-
WHEREAS, NECO has been advised by Monsanto of potential harmful effects and environmental concerns associated with the Contaminated Materials and with polychlorinated biphenyls, has been provided a copy of the EPA PCB Criterion Document, and understands the nature and characteristics of said Contam inated Materials and of polychlorinated biphenyls; and
WHEREAS, NECO desires to undertake said disposal and to conduct the same in accordance with all of the terms and conditions of this Agreement;
NOW, THEREFORE, in consideration of the payments to be made by Monsanto to NECO as herein provided, and the mutual covenants and agreements contained, Monsanto hereby engages NECO, and NECO hereby agrees, to receive, handle, and dispose of the Contaminated Materials upon the terms and conditions hereinafter set forth.
1. Term and Termination. This Agreement shall commence on the date first above written and shall continue in full force and effect until all Contaminated Materials have been disposed of or until terminated by either party providing the other party with at least thirty (30) days' prior written notice of termination. NECO's warranties and representations
DSW 443093
STLCOPCB4057632
-3-
set out in Section 6 of this Agreement and the confidentiality provisions set out in Section 11 of this Agreement shall survive any termination or expiration of this Agreement.
2. Description - Warranty. (a) A general description of the various types of Contaminated Materials to be delivered to NECO for disposal are set out in Schedule A. NECO recognizes and understands that since it is impossible to describe precisely all Contaminated Materials, the Contaminated Materials in Schedule A may vary in size, structure and quantity from shipment to shipment. However, Monsanto will exercise its best efforts to accurately and precisely describe the Contaminated Materials in each shipment on the Hazardous Waste Shipment- Record Form accompanying such shipment. It is expressly understood by the parties, however, that all Contaminated Materials have been in contact with and are presently contaminated by polychlorinated biphenyls. Should Monsanto desire to have NECO dispose of any contaminated materials which vary substantially from the general description set out in Schedule A, Monsanto shall make a written request to NECO to that effect prior to shipment of such varying contaminated materials. NECO will rely solely on Schedule A and the Waste Shipment Record Form for the general description of the Contaminated Materials, and NECO shall not be required to analyze, sample or test such Contaminated Materials, provided, that NECO shall
DSIV 443094
STLCOPCB4057633
-4-
be required to examine the general description in Schedule A and the Waste Shipment Record Form prior to disposal of the Contaminated Materials to determine whether the Contaminated Materials are sufficiently described thereon to enable NECO to properly dispose of such Contaminated Materials.
(b) NECO shall within fifteen (15) days after
delivery of the Contaminated Materials, give notice to Monsanto
of Contaminated Materials which vary materially from the
general descriptions thereof as set forth in the attached
Schedule A and Hazardous Waste Shipment Record Form and which,
as a result thereof, are unsuitable for disposal at NECO's
disposal facility. For such varying Contaminated Materials,
Monsanto sgrees to pay NECO all inspection, transportation
and handling costs actually, reasonably, and necessarily incurred by
NECO, both to NECO's place of disposal and return to Monsanto's plant
or to such other storage or disposal facility designated by
Monsanto. Such inspection, transportation and handling charges
shall not be paid if NECO fails to give such notice within
said fifteen (15) day period.
(c) For Contaminated Materials which vary materially from the general description set out in Schedule A and the Hazardous Waste Shipment Form, but which remain suitable for disposal at NECO's disposal facilities, Monsanto agrees to
DSW 443095
STLCOPCB4057634
-5-
reimburse NECO for Increased costs actually, reasonably, and nec essarily incurred by it in disposing of such varying Contaminated Materials, provided (i) that NECO notifies Monsanto in writing prior to disposal or within fifteen (15) days after delivery, whichever comes first, that its cost of disposal is increased as a result of the Contaminated Materials materially varying from the general description, specifying the nature of the variance, its best estimate of the increase in cost, and an explanation of such increase in cost and (ii) that Monsanto shall have the right to inspect the Contaminated Materials before disposal to determine whether such variance does exist. If Monsanto and NECO disagree as to the extent of such variance and the amount of the additional cost of disposal, and cannot reach a mutually acceptable compromise, the varying Contami nated Materials shall be returned in the same manner and under the same conditions as set out in Paragraph 2(b). NECO shall not be reimbursed for such increased cost If it fails to give such notice prior to disposal or within said fifteen (15) day period, whichever comes first. Such payments for either the return or increased cost of disposing of any varying Contaminated Materials by Monsanto shall be the limit of Mon santo^ liability to NECO for such varying Contaminated Materials. Subject to only Monsanto's obligations under Paragraph 3 and its obligation to package, label, placard and load the Contaminated
DSW 443096
STLCOPCB4057635
-6-
Materials, Monsanto MAKES NO OTHER REPRESENTATIONS OR WARRANTIES OP ANY KIND, EXPRESS OR IMPLIED, AS TO MERCHANTABILITY, FITNESS FOR PARTICULAR PURPOSE, OR ANY OTHER MATTER WITH RESPECT TO THE CONTAMINATED MATERIALS, WHETHER USED ALONE OR IN COMBINATION WITH OTHER SUBSTANCES.
3. Delivery. By prearrangement between the parties, Monsanto shall deliver the Contaminated Materials to NECO. NECO shall supply or arrange for the transport vehicles necessary to properly and safely transport the Contaminated Materials from Monsanto's VI. G. Krummrich Plant ("Plant") to NECO's disposal site. Deliveries shall be made during normal working hours, Monday through Friday, except holidays, in accordance with a schedule which shall be mutually agreed upon by the parties hereto. Monsanto shall be solely responsible for loading the Contaminated Materials into or onto the transport vehicles or facilities arranged for or supplied by NECO. NECO shall be solely responsible for securing the Contaminated Materials after they have been loaded. In no event, except when mutually agreed upon in writing by duly authorized representatives of the respective parties, shall NECO be required to load the transport vehicles or facilities at Monsanto's Plant.
4. Title and Risk of Loss. Title to and Risk of Loss for the Contaminated Materials shall pass to NECO upon delivery by Monsanto at Monsanto's Plant. For the purpose of this Agreement, delivery is deemed to occur when the Contaminated
0SW 443087
STLCOPCB4057636
-7-
Materials have been loaded Into or onto the transport vehicles or facilities arranged for or supplied by NECO to transport said Contaminated Materials and such loaded vehicles or facilities have departed from Monsanto's Plant.
5. Price. Monsanto shall pay to NECO for disposal of the Contaminated Materials a fee as determined in accordance with "Schedule B, " attached hereto and made a part hereof. NECO shall invoice Monsanto upon disposal of the Contaminated Materials, and agrees to retain copies of such invoices for a period of at least two (2) years. Payments shall be due and payable by Monsanto thirty (30) days from the date of receipt of each invoice, if such invoice is accurate.
6. Disposal - NECO's Representations and Warranties. NECO represents and warrants to Monsanto that: -
(a) NECO is engaged in the business of disposing of hazardous industrial wastes by landfill and has experience and expertise in the disposal of industrial equipment and materials contaminated by polychlorinated biphenyls. NECO shall perform all obligations hereunder in a workmanlike manner and consistent with its expertise.
(b) All Contaminated Materials delivered to NECO
by Monsanto hereunder shall be disposed of by landfill at an
approved hazardous waste landfill site at Sheffield, Illinois,
and none of such Contaminated Materials, distillate, residue or
any component thereof shall be directly or indirectly salvaged,
reclaimed, or distributed.
DSW 443098
STLCOPCB4057637
-8-
(c) NECO shall comply with all governmental orders, regulations, ordinances, actions or laws of the United States or of any state, county, township or municipal subdivision or other governmental, agency in effect during the term of this Agreement which may be applicable to the receipt, possession, handling, transportation, or disposition of Contaminated Materials.
(d) NECO has received a general description of the Contaminated Materials, that it is familiar with the hazardous nature thereof, and that it has the knowledge and expertise to handle, haul and dispose of the Contaminated Materials in a safe and efficient manner, as such Contaminated Materials are generally described in Schedule A and the Hazardous Waste Shipment Record Form.
(e) NECO shall allow Monsanto representatives to have access to NECO's disposal site from time to time during the term hereof, during normal business hours in order to enable said Monsanto representatives to inspect the disposal operations conducted hereunder.
(f) NECO shall obtain all permits, licenses and/or other documentation required to comply with applicable governmental orders, regulations, ordinances, actions or laws, and agrees to furnish copies of the same to Monsanto upon request and at Monsanto's expense, and NECO agrees to furnish copies of any agreements or other documentation relating to the obligations and representations of NECO contained in this Agreement.
DSW 443099
STLCOPCB4057638
-9-
7. Indemnity. NECO shall indemnify and hold Monsanto, its employes and agents harmless from and against any and all liabilities, claims, damages, penalties, actions, suits, losses, costs and expenses (including cost of defense, settlement and reasonably attorneys' fees and expenses), whether the foregoing are based in contract, negligence, strict liability or other legal theory, for any personal injuries, including death, and/or property damage, or for any contamination of or adverse effect on humans, domestic animals, aquatic and wildlife, food, animal feed or the environment, arising out of or in connection with the receipt, possession, handling, distilling, use, resale, transfer or disposal of the Contaminated Materials, distillates or residues therefrom or any components thereof by NECO or others, and Monsanto, if it so elects, shall have the right to tender its own defense, which right shall include, but not be limited to, the selection of counsel and the preparation of Monsanto's defense. Notwithstanding the foregoing and provided NECO has properly performed its duties and obligations under this Agreement, NECO shall not be required to indemnify or hold Monsanto, its employes and agents harmless in the event (a) the Contaminated Materials vary materially from the general descriptions thereof set forth in the attached Schedule A and the Hazardous Waste Shipment Record Form and have not been determined to be suitable for disposal pursuant to Paragraph 2(c) hereof, and such variance is the cause of such personal injury, including death, and/or property damage, or (b) such personal injury, including death.
DSW 443100
STLCOPCB4057639
-10-
and/or property damage is caused by the negligence of Monsanto (i) in labelling, placarding or packaging the Contaminated Materials contrary to applicable DOT regulations, or (ii) while loading the Contaminated Materials onto NECO's transport vehicles or facilities.
8. Excuse of Performance. Performance under this Agreement, except for the payment of money for services per formed, may be suspended by either party in the event of: act of God, war, riot, fire, explosion, accident, flood, sabotage; lack of adequate fuel, power, raw materials, labor, containers or transportation facilities; compliance with governmental requests, laws, regulations, orders or actions; breakage or failure of machinery or apparatus; national defense requirements or in the event of labor trouble, strike, lock-out or injunction (provided that neither party shall be required to settle a labor dispute against its own best judgment); or any other event beyond the reasonable control of such party, which event prevents the delivery, transportation, acceptance or disposal of the Contaminated Materials. Any party claiming the existence of an excuse of performance shall promptly notify the other party of its existence, expected duration and effect on this Agreement.
9. In all operations under this Agreement, NECO shall strictly comply with all safety and security regulations of the Plant.
DSW 443101
STLCOPCB4057640
-11-
10. Insurance by NECO. (a) NECO shall not begin the performance under this
Agreement until:
(i) it has obtained all the insurance herein after required;
(ii) It has furnished a copy of its contract of of insurance satisfactory to Monsanto; and
(iii) The contract of insurance evidencing NECO's coverage has been approved by Monsanto.
(b) Every contract of insurance providing the coverages required herein shall contain the following clause: "No reduction, material alterations, cancellation or expiration of this policy shall become effective until thirty (30) days after the date written notice is received by Monsanto Company, 800 North Lindbergh Boulevard, St. Louis, Missouri 63166, Attention: Michael A. Pierle."
(c) NECO shall take out and maintain, at its expense,
for the duration of this Agreement, at least the following insurance:
Coverage
Limits
(1) Workmen's Compensation
Statutory
(2) Employer's Liability
$500,000 each occurrence
(3) Public Liability (Bodily Injury)
(4) Public Liability (Property Damage)
$1,000,000
$1,000,000
.
(5) Automobile Liability (Bodily Injury)
$200,000 each person $500,000 each occurrence
(6) Automobile Liability (Property Damage)
$50,000 each occurrence
DSW 443102
STLCOPCB4057641
-12-
(d) Such insurance shall cover all of NECO's con tractual liability under Paragraph 7 above and shall be in amounts no less than those set forth in items (3) and (4) of subparagraph 9(c) above.
11. Confidentiality. Each of the parties hereto shall treat as confidential property and not disclose to others during or subsequent to the term of this Agreement (except as is necessary to perform the work hereunder or as required by law and then only on a confidential basis satisfactory to the other party) any information (including any technical information, experience or data) regarding the other party's plans, programs, plants, processes, products, costs, equipment, operations or customers which may come within the knowledge of such party, its officers or its employes in the performance of the work hereunder, with out in each instance securing the prior written consent of the other party. In addition to the foregoing, NECO shall also treat as confidential and shall not disclose to others infor mation relating to the chemical composition of the Contaminated Materials and/or the quantity of,Contaminated Materials delivered to it by Monsanto. The foregoing obligations shall survive the termination or expiration of this Agreement. Nothing herein, however, shall prevent either party from disclosing to others or using In any manner information which it can show:
(a) Has been published and has become part of the public domain other than by acts, omissions or fault of such party or its employes:
STLCOPCB4057642
-13-
(b) Has been furnished or made known to such party by third parties (other than those acting directly or indirectly for or on behalf of the other party) as a matter of legal right and without restriction on disclosure; or
(c) Was in its possession prior to the disclosure thereof by the other party to such party.
12. Independent Contractor. NECO is and shall perform this Agreement as an independent contractor and, as such, shall have and maintain complete control over all of its employes and operations. Neither NECO nor anyone employed by it shall be, represent, act, purport to act or be deemed to be the agent, representative, employe or servant of Monsanto.
13. Assignment. Neither party shall assign its rights or delegate its performance hereunder (whether by operation of law or otherwise) without the prior written consent of the other party, and any attempted assignment or delegation without such consent shall be void. Either party shall have the right to terminate this Agreement without delay following receipt of notification of such attempted assignment or delegation.
14. Waiver. Any waiver by either party of any provision or condition of this Agreement shall not be construed or deemed to be a waiver of any other provision or condition of this Agree ment, nor a waiver of a subsequent breach of the same provision or condition, unless such waiver be expressed in writing and signed by the party to be bound.
SW 443104
STLCOPCB4057643
-14-
15* Notice. Any notice, request, approval or other
document required or permitted to be given under this Agreement
shall be in writing and/or by telephone. If by telephone, such
notice, request, or approval shall be confirmed in writing. All
written notices, requests, or approvals shall be deemed to have
been sufficiently given when delivered in person or deposited
in the U.S. mail, postage prepaid, for mailing by certified or
registered mail, return receipt requested, and addressed as
follows :
If to Monsanto, addressed to:
Monsanto Company W. G. Krummrich Plant Sauget, Illinois 62201
Attention: D. M. Francisco
Copy to:
Frank Basile
If to NECO, addressed to:
Nuclear Engineering Company, Inc.
P.0. Box 7246
Louisville, Kentucky 40207
.
Attention: Mr. Dowell Buckner General Manager, Chemical Division
or to such other address or addresses as may be specified in
writing from time to time by either party.
16. Headings. Paragraph headings are for convenience only and are not to be construed as part of this Agreement.
17. Controlling Law. The validity, interpretation and performance of this Agreement shall be governed and construed in accordance with the laws of the State of Missouri.
DSV\f 443105
STLCOPCB4057644
-15-
l8. Entire Agreement. This Agreement represents the entire understanding and agreement between the parties hereto relating to the disposal of the Contaminated Materials and supersedes any and all prior agreements, whether written or oral, that may exist between the parties regarding same. No terms, conditions, prior course of dealings, course of performance, usage of trade, understanding or agreement purporting to modify, vary, supplement or explain any provision of this Agreement shall be effective unless in writing, and signed by duly authorized representatives of both parties, and no modifi cation shall be effected by the acknowledgement or acceptance of purchase order, shipping instruction forms, or any other forms containing terms and conditions at variance with or in addition to those set forth herein.
IN WITNESS WHEREOF, Monsanto and NECO have each caused this Agreement to be executed by its duly authorized repre sentative as of the day and year first set forth above.
MONSANTO COMPANY By: __________________________ _ Title:
NUCLEAR ENGINEERING COMPANY, INC. By: Title:
D$W 443106
STLCOPCB4057645
Monsanto
FROM (NAME ft LOCATION j
-
DATE
.
SUBJECT
:
REFERENCE
:
TO :
November 3, 1977 PCB FACILITIES DECONTAMINATION
AND DISMANTLEMENT PROGRAM
E. T. Mollica
CC: F. J. Holzapfel A. E. Leisy - 1740 D. Wood
Attached is a summary of our program for decontamination, dismantlement and disposal of the W. G. Krummrich plant PCB assets. Dr. Miller in his October 27, 1977 -- Preliminary 1978 Budget Review CAC -- memo requested your providing him with our program.
In the request for retirement of worldwide PCB assets to Mr.Hanley the statements, "--this retirement will include the decontamination and dismantlement of the Aroclor and Pyranol facilities at the W. G. Krummrich plant and trans portation of the dismantled equipment to an approved toxic landfill. The existing tank car fleet will be decontaminated and used in controlled service," could be interpreted to mean all the PCB facilities would be landfilled except tank cars. From the attached summary you will note we are salvaging a limited number of large storage tanks, a stainless steel tower, etc.
You may want to point out to Dr. Miller that there is an incon sistency between the retirement request and our actual program.
If you need additional details relative to the program, contact me.
RAP/cp Att.
R. A. Pohl
IN - 10 REV. 1 72
DSW44310r
STLCOPCB4057646
PCB FACILITIES DECONTAMINATION AND ____ DISMANTLEMENT PROGRAM
With the publication of more stringent proposed EPA PCB's incineration operating guidelines, we opted to avoid major capital expenditures to upgrade the W. G. Krummrich plant incinerator in order to be in EPA com pliance by January 1, 1978 by contracting with Rollins Environmental Services of Houston the incineration of some 2.5 million pounds of PCB's before year end. In addition it was to the plant's advantage, if possible, in its relationships with the EPA to eliminate the incineration of PCB's by the time all PCB shipments were completed -- October 31, 1977. PCB's shipments to Rollins commenced in July and will be completed by the end of November. PCB's continued to be incinerated at WGK until the failure of the incinerator in October. The decision not to repair it triggered the decontamination and dismantlement of the PCB handling equipment associated with the incinerator.
Since the termination of PCB production in July, the facilities decontamination program has been underway preparing equipment for dismantlement and disposal. Equipment designated not worth salvaging and/or cannot be decontaminated to meet the EPA PCB's regulations of less than 500 ppm PCB's in the final solvent wash will be buried in an approved toxic landfill located near Sheffield, 111. owned and operated by Nuclear Engineering Company.
PCB chlorinators and small tanks that cannot be decontaminated will be used as containers to hold small PCB contaminated items such as valves, fittings, gaskets, insulation, etc. These containers will be sealed prior to leaving the plant as well as all PCB piping that cannot be decontaminated. The dis mantled facilities will be trucked to the landfill in Nuclear Engineering equipment.
Equipment that can be decontaminated will be available for use within Monsanto in non-finished product services with one exception -- the equipment will not be used in food and fine chemicals manufacture. The salvageable equipment is limited to large raw material and product tanks, stainless steel tower, a few heat exchangers, control room and panel instruments.
The two in-plant PCB waste shuttle tank cars age and condition do not warrant the capital required to rehabilitate them for road service. These two tank cars will be buried in the landfill. The 45 PCB tank car fleet will be de contaminated, all fittings and insulation removed and replaced with new fittings and insulation. The fittings and the insulation will also be buried in the landfill. The only exception to the above tank car plan is 10 to 12 tank cars will replace Luling plant's ammonia nitrate shuttle tank cars between ACL and ammonia nitrate department, which can no longer be economically repaired. These 10+ tank cars will only be decontaminated and the fittings and insulation not replaced.
DSW 443108
STLCOPCB4057647
-2-
The refitted decontaminated PCB tank cars will remain in Monsanto service for transporting and/or storage of materials that are not either finished products or materials used in food and fine chemicals manufacture. After the tank cars have been in Monsanto service for five years they will be tested for PCB's to determine whether the tank cars can be sold if no longer needed.
PCB contaminated wash waters from the tank car cleaning operations and/or equipment will either be contract incinerated or the PCB's removed by a carbon bed treatment and the carbon buried in an approved landfill.
RAP 11/3/77
DSW 443109
STLCOPCB4057648
DEPT. 790 - 1977 OPERATION
JANUARY FEBRUARY MARCH APRIL
MAY
The incinerator was down for 19 days for Weir ring repairs. The Venturi has a crack that must be repaired during the next extended shutdown.
The Incinerator was down for 11 days for plenum repairs. The Venturi crack was repaired. The waste inventory is holding steady at 2 million pounds.
Reasons for the overtime in February were:
Absence
20% of total.
Openshift 80% of total.
546,000 lbs. were burned in March. We were down for four days for plenum refractory repairs.
Reasons for overtime in February were:
Openshift 94.1%
.
Medical Reasons 5.9%
-
Removal of build up from the plenum caused 8 days downtime in April. Reasons for overtime in April were:
Absence 4.2% Vacation 53.0% Openshift 25.5% Housekeeping 4.2% Extra Work 13.0%
Four separate incidents caused 18 days downtime in May. These were the scrubber column repair, quench column gasket failure, plenum clean out, and city water outage.
Reasons for overtime in May were:
Vacation 45.5% Openshift 36.4% Extra work 0.9% Grievance 0.9%
DSW 443110
STLCOPCB4057649
June July August
Quench column gasket failure and quench pot repairs caused 13 days downtime in June. The current quench column gasket repair is temporary and is expected to fail again in the near future.
Reasons for overtime were:
Absence 0.7$ Vacation 68.1$
Extra Work 6.7$ Open Shift 23.3$
Transportation difficulties
1.1$
A Venturi duct failure and plenum refractory failure caused 12 days downtime in July. We expect to end incineration operations in October of this year.
Reasons for overtime were:
Absence 56.0$ of total Vacation 6.2$ of total
Training 5*1$ of total Open Shift 12.5$ of total Extra Work 12.5$ of total Grievance 1.5$ of total Transportation difficulties Not Coded 6.2$ of total
.4$ of total
An excellent run with only minor repairs required during the month. PCB wastes from Little Mo are being shipped for outside incineration. The incinerator is still scheduled to shutdown operation in October.
Reasons for overtime were:
Absence 50$ of total Vacation 66.4$ of total Open Shift 19.0$ of total Extra Work 4.7$ of total Transportation difficulties
4.7$ of total
OS'N
STLCOPCB4057650
September
Another good month, leaving only 250,000 lbs. to be burned before permanent shutdown of the incinerator. The unit was down for plenum clean out at the end of the month.
Reasons, for overtime were:
Absence 27*3$ of total Training 18.2$ of total Open Shift 36.4$ of total
Extra Work 9.1$ of total Grievance 9*1$ of total
.
DSW 443112
STLCOPCB4057651
iCINERA'TION ONTH IUNDS BURNED ;rned ytd ERCENT OST OST, YTD SR % OF DE. SR % YTD
DEPARTMENT 790, AROCLOR INCINERATION, 1977 OPERATIONS REPORT
(1976 5,946 M lbs. 66.6 OST 81.3 OSR)
JAN. 232512 232512
37.1 37.1 67.4 67.4
FEB. 428755 661267
50.4 44.1 98.3 84.6
MARCH 546,185 1,207,452
84.4 58.0 69.6 77.1
APRIL
MAY JUNE JULY AUGUST SEPT. OCT.
349,418 271,106 265,806 510256 512122 450354
1556780 1,827,886 2,093,692 260395s 3116080 ^664^4
71.3
51.9
50.6 51.1
83
78
61.1
59.4
57.9 57.5
60
6?
62.8
56.2
57.2 110
65
61
70.7
68.0
66.6 72
70 ,,___ 69___
NVENTORY, POUN ps
'
JLK REC.
290072
JLK MO. END
2042204
'UMS REC.
49231
(UMS MO. END (UMS EMPTIED
74500 20731
298000 2068223
82274 53500 103274
345,248 1,960,285
39,399
0
92,899
230,654 1876892
88,681
0
88,681
217,808 132,820 898442 454900 269100
1,767,019 L, 699,468 1915815 2056842 1236874
13,195
0
36,85! 27171
41,000
0
45049 37000
206220 115000
13.195 (4145) 68171 8049 I2822O
TRSONNEL - PE RCENT REGULAR HOURS (Includes 1 'henol Hanc11 inq)
:tra HOURS
0.0
0.0 4.3 22.4 8.9
H. YTD
0.0
0.0 1.5
6.8 7.8
'ERTIME
11.1
6.3
4.5
25.3
12.3
' HRS. YTD
11.1
8.8
7.9
11.5
.11.6
;s. HRS.
3.5
1.3 0
1.1 1.1
:S. HRS. YTD
3.5
2.4 1.5
1.4 1.4
0 6.2
22.3 13.1
0.1 1.2
18.6
8.5 16.6 14.1
9.3 2.8
17.0
2.3
9.6 8.q 22.4 12.8
15.2 15-0
0.1 2.8 2.4 __2-5____
NOV.
DEC.
<< 5
<k
O
F,ETY NOR INJ. R=IOUS INJ.
0 0
01 00
0 0
3 0. 0 2 1 0 0 0 0 _ .Q_____
STLCOPCB4057652
Monsanto
mJFROM iNAME ft LOCAT.ONi
M. Wriston, Jr./WGK
DATE
October 3, 1977
subject FFEBENCE
=Monthly Incinerator Status Report
TO
:D. T. Hughes
cc: A. A. B. . W. JW.
J . Koenig Frerking Ratliff A. Pohl C. Engman Peduzzi Crabtree
- G.O.
G.O. G.O.
J. W. Molloy A. E. Leisy D. L. Cissell D. Wood - GO J. Labanosky W. Faries P. R. Kucera
The following is the monthly Incinerator Status Report in cluding all activity through September, 1977.
Material Returned For Incineration - (Pounds)
September 1977
Y. T. D .
Dielectrics - (Billings to Customers -
-0-
261,743
In-Plant Waste - (Other. Than Dept. 246)-
-0-
134,734
Dept. 246 - T/C Wash/Drums
- 206,220
Dept. 246 - Residue
- 124,900
Dept. 246 - Montars Dept. 246 - ODCB (Aroclor Decont.)
_
-0 67,620
433,300 1,281,942
346,872 67,620
Acidifier
Dept. 226/81082
- 2,574
20,618
Dept. 237/81085
- 36,387
467,839
Dept. 239/81088
- 35,721
683,634
Dept. 237/81080
- 1,898
11,403
Dept. 237/81084
-- -0-
15,414
TOTAL RETURNED FOR INCINERATION
475,320
3,725,119
IN - 10 REV 1 - 7 2
DSW 443114 STLCOPCB4057653
D. T. Hughes Monthly Incinerator Status Report
Page 2 10/3/77 WGK
Status of Incineration
Pounds
Prior Year's Receipts August Y.T.D. Receipts September 1977 Receipts
Prior Year's Incineration August Y.T.D. Incineration September 1977 Incineration Pounds For Contract Incineration *0n Hand, 10/1/77 To Be Incinerated
25,399,183 3,249,799 475,320
29,124,302 23,389,260
3,116,080 431,588 835,500
1,351,874
*Inventory To Be Incinerated - (By Dept./Mat11.)
Aroclors Montars Dept. 219-222 Dept. 236-237 Dept. 239
1,268,136 49,880 1,029 25,338 7,491
1,351,874
Billings To Customers (Dielectrics)
September 1977
Adj
Y.T.D.
Incineration Charges Handling
$ -0 -0
$ -0-
-0-0-0-
$29,869 4,134
$34,003
/ nm
James M. Wriston, Jr.
STLCOPCB4057654
Monsanto
F"" ,NAME " LOCAT,ON' l. Burks/W. G. Krummrich Plant
OATE : September 23, 1977
subject
EFEENCE
, DSpOSition 0f Unsaleable Aroclor
and Pyranol Finished Goods
:
TO
Steve M. Finkelstein B-3-SE General Offices
CC; D. L. Cissell
W. C. Engman P. R. Kucera
f^
A. E. Leisy A. J. Koenig - (B-2-SK) G.O.
f?t Befit l L.'
We have at the plant $22,834 of Aroclor and Pyranol finished goods inventory that has no market.
At the request of W. C. Engman, Operating Superintendent, this material will be written off in September as inventory loss via plant cost system against the decommissioning accrual account 45-03-46915. .____
The material is in the process of being physically transferred from the warehouse to the incinerator with month-end completion as the target date.
The following is an itemized listing of Finished Goods to be written off in September:
Product
Container
Lbs.
Unit
Dollars
81093 81095
(1) Can
(25) Drums (6) Cans
60
14750 330
.33333
.28583 .26666
$ 20
4216 88
81098
(41) Cans
2460
.29430
724
81103
(27) Drums (12) Cans
16200 720
.23703 .22083
3840 159
81104
(6) Cans
330 .22424
74
81110
(87) Drums
52200
.26270
13713
TOTAL FINISHED GOODS WRITE-OFF SEPT. 87050
$ 22834
If you have questions or comments, please give me a call.
STLCOPCB4057655
Monsanto
G. Robert Sido G.O. General Offices
DATE SUBJECT HE*EHENCE
TO
September 23, 1977
PCB CONTAINER MARKINGS
EPA Regulations 40 CFR 761
B2SD - J. A. ALLEY 1740 - W. C. ENGMAN B1NB - R. C. ISHAM F3EB - R. H. JOSLIN 1740 - A. LEISY 1740 - J. PEDUZZI F3EB - A. E. PETERSON
CC D1K _ W. R. COREY B3NJ - G. F. FORT E3NJ -- W. G. PAPAGEORGE B2SD -- D. WOOD
B2SB R. A. POHL B2NK - E. M. POTTER EISA - M. PIERLE B2NJ - C. SIGLER F3ED - R. SIMPSON 1850 - P. WARNER B2SK -- J. C. WEBER
Toxic Substances Control Act Regulations under authority of Section 6(e)1 requires rules for marking and disposal of PCBs. While the proposal of May 24, 1977 in the Federal Register has not finalized it is expected to issue shortly with little variation from the proposal. Under this assumption even if we are extensively out of the PCB manufacture and distribution business, it still requires that manufacturing facilities label transformers, capacitors, hydraulic equipment, etc. containing PCB products with markings such as shown on the attached exhibit I. Copy on this exhibit shows text from the proposal Annex V 761.44, titled "Marking formats", which describe the label to use for various sizes of equipment.
For convenience of plants and operations that need these, the labels can be ordered through this office in units of 1000, using the print plate number in the lower right hand corner. They are pressure sensitive, weather resistant stickers that will adhere to the units.
If Monsanto is still packaging, holding or shipping any PCB con tainers the specifications for labeling them that now exist must remain as such, plus the addition of the appropriate sticker in exhibit I. Generally the M^l would be required.
The EPA Regulations applies to all persons who manufacture, process, distribute in commerce, use, or dispose of PCBs. Since persons in clude local, state and federal governments, the applicability is very broad. About the only exemption would be for small PCB capacitors that are used in private housing units.
GRS/vk Enc.
DSW 443111
STLCOPCB4057656
Exhibit I
r
i CAUTION
CONTAINS
i i
PCBs
i (Polychlorinated Biphenyls)
i
A toxic environmental contaminant requiring i special handling and disposal in accordance
with U.5.Environmental Protection Agency Regulations 40 CFR 76f for Disposal Information contact the nearest U.S. E.PA. i Office. __
i In cose of accident or spill, coll toll free the U.S.Coast Guard Notional Response Center?
l
800:424-8802
Ml1
CAUTION
CORTAIU
PCBs
(PtlyckltriiiM llphwvU)
A toxic environmental contaminant retiring special handling and disposal In accordance .with U-S.EnvIronmenta! Protection Agency Regulations 40 CFR 761 for Disposal
Information contact the neatest U-S. LPA Office.
In cose of accident or spill, call toll free the USCoast Guard National Response Center,
800:424-8802
,
CAUTION-CONTAINS
PCBs
FOR PROPER DISPOSAL INFORMATION CONTACT U.S. ENVIRONMENTAL
PROTECTION AGENCY*.
Annex V
761.44 Marking formats.
The following formate shall be used for marking: ' (a) Large PCB Mark--Mr,--Mark Ml shall be as shown in Figure 1. with black letters and striping on a white back ground and shall he suiHaiently durable to equal or exceed the life (including storage for disposal) of the equipment or container. The size of the mark . h: h be at least 15.25 cm inches) on each side. If the PCB equipment is too small to accommodate this size, the mark may be reduced in sire proportionately down to a minimum of 5 cm id inches) on each side.
(b) Small PCB Mark--Ms--Mm k Ms shall be as shown in Figure 2, with id:.ok letters and striping on a white back ground, and shali be svoiiciently durable
to equal or exceed (he life (including storage for disposal; of the equipment or container. The mark, shall be a rectangle 2.5 by 5 cm (1 inch by 2 inches). If the
PCB equipment-is too small to accom modate this size, the mark may be re duced In. size proportionately down to a minimum of 1 by 2 cin (.4 by .8 Inches).
STLCOPCB4057657
DSW 443118
Monsanto
FROM -NAME & LOCATION',
.T . M. Wrist on
September 2, 1977
Tr.
Monthly Incinerator Status Report
WGK
TO
: D. T. Hughes
CC; V. Brawley
J. W. Molloy
A. J. Koenig - G.O. A. E. Leisy
A. Frerking
D. L. Cissel
B. Ratliff - G.O.
D. Wood - G.
^rlT. Pohl - G.O.
J. Labanosky
W. C. Engman
W. Faries
J. Peduzzi
P. R. Kucera
The following., is. the monthly Incinerator Status Report
including all activity through August, 1977.
Material Returned for Incineration - (Pounds)
August 1977
Dielectrics - (Billings to Customers) -
15,049
In-Plant PCB's - (Other Than Dept. 246) -
2,500
Dept. 246 - 'T/C Wash/Drums Dent. 246 - Residue Dept. 246 - Montars
- 27,500 - 349,400- 25,000
Acidifier
Dept. 226/81082
- 2,574
Dept. 237/81085
- 43,752
Dept. 239/81088
- 34,174
Dept. 237/81080
- -0-
Dept. 237/81084
- -0- ,
TOTAL RETURNED FOR INCINERATION
- 499,949
Y.T.D. 261,743 134,734 227,080 1,157,042 346,872
18,044 431,452 647,913
9,505 15,414 3,249,799
IN 1 : F< F v. 1 '72
DSW 443119
STLCOPCB4057658
D. T. Hughes Monthly Incinerator Status Report
Page 2 9/2/77 WGK
Status of Incineration
Pounds
Prior Year's Receipts July Y.T.D. Receipts August 1977 Receipts
Prior Year's Incineration July Y.T.D. Incineration August 1977 Incineration Pounds for Contract.Incineration *0n Hand, "9/1/77 To Be
Incinerated
25,399,183
2,749,850 499,949
28,648,9T2 23,389,260
2,603,958 512,122
195,900 1,947,742
^Inventory To Be Incinerated - (By Dept./Mat'1.)
Aroclors Montars Dept. 219-222
Dept. 236-237 Dept. 239
1,648,113 119,912 10,160 107,172 62,385
1,947,742
Billings To Customers (Dielectrics)
August 1977
Adj.
Incineration Charges Handling
$2,230 408
$2,638
$ -(16)
$(16)
Y.T.D.
$29,869 4,134
$34,003
James M. Wriston, Jr. ak
OSNN 443120
STLCOPCB4057659
Monsanto
NAME a LOCATION
LAW DEPARTMENT
Clarence Thomas - E3NH
July 22, 1977
cc
Changes in the Rollins PCB Waste Disposal Contract
o R. A. Pohl - B2SB
Pursuant to our telephone conversation relative to
the 124 per pound price for the disposal of PCBTs,
I have informed Rollins that you have approved such
price and that the contract will be executed as
changed by Rollins.
CT/jhf
Clarence Thomas
IOC REV. 6/75
DSW 443121
STLCOPCB4057660
Monsanto
A,FROM N A M r
LOCATION.
R. A. Pohl - B2SB
August 11, 1977
F. J. Holzapfel
REFERENCE
WGK PCB'S INCINERATION CONTRACT ROLLINS
TO
Dr. L. A. Miller B3SA
Upon Mike Pierle's return from vacation, he was requested to contact Philipbar: of Rollins to clarify why there had been a change in PCB's incineration fee from $0.10 to $0.12 per pound. Mike reconfirmed he had not been in any further discussions with Philipbar relative to the $0.10 incineration fee after his initial discussion with Philipbar in early May.
Philipbar acknowledged that he had not discussed the increase with Mike, but had instructed his lawyer to include it in the contract at the time his lawyer met with Monsanto lawyers and Mike to resolve differences in contract content. Mike was not present for the first part of the contract discussions among the lawyers which covered setting the fee. Mike followed up with our two lawyers, Clarence Thomas and Frederick Provorny to verify the incineration fee had been discussed and increased $0.02 per pound. Their only recollection of discussing price was the Rollins lawyer had remarked that the pricing of the fee was a steal at $0.10 per pound.
Mike has voiced his displeasure to Philipbar over the increase, but was not able to have the fee reduced. Philipbar pointed out that beginning January 1, 1978, PCB's incineration fee will be $0.15 per pound. This increase will not affect the disposal of our PCB wastes under contract until February 1, 1978. Any PCB wastes for incineration after February 1, 1978 will !be a minimum amount generated from decontaminating the PCB tank car fleet.
Another PCB incineration contractor was contacted by Mike who gave a price of $0.15 per pound and on further negoti ations quoted $0,125 per pound.
In summary, the lack of a firm written quote prior to entering contract negotiations with Rollins provided an opportunistic opening to Philipbar to increase the fee for incinerating PCB wastes.
R. Vhv .Pohl
RAP/cp
DSW 443121.01
STLCOPCB4057661
Monsanto
LAW DEPARTMENTTWOM .N1M( a LOCATION,
July 28, 1977
PCB Waste Disposal
A. Blase
E3NH
C. Engman/A. E. Leisy
R. Kellogg CS4f
A. Pierle EISA
A. Pohl
B2SB
A. Provorny B2SC
Wood
B2SD
1740
Please find enclosed a copy of the recently executed contract with Rollins for the disposal of PCB's. As you know, this contract is the result of tough negotiations and, accordingly, includes several major concessions. This is particularly true in the areas of indemnity, transfer of title and risk of loss and warranty. It should also be noted that we have agreed to a price of 12^ per pound and that we have agreed to negotiate the viscosity specifications for Schedule A.
If you have any questions, please contact me.
Clarence Thomas
CT:ckk Enclosure
443122 STLCOPCB4057662
WASTE DISPOSAL AGREEMENT
THIS AGREEMENT, made and entered into as of this 20th day of July, 1977, by and between Monsanto Company, a Delaware corporation, having its general offices at 800 North Lindbergh Boulevard, St. Louis, Missouri 63166 ("Monsanto"), and Rollins Environmental Services, Inc., a Delaware corporation with offices at One Rollins Plaza, Wilmington, Delaware 19899 (hereinafter called "Contractor").
WITNESSETH:
WHEREAS, Monsanto has certain industrial waste material containing polychlorinated biphenyls as described in Schedule A attached hereto and made a part of and any derivations thereof or supplements or amendments thereto as mutually agreed upon by the parties pursuant to the terms and conditions of this Agreement (hereinafter called "Waste"), which Monsanto desires to have disposed of by Contractor in a most safe and efficient manner; and
WHEREAS, Contractor represents to Monsanto that it possesses the requisite expertise, facilities and legal right to dispose of the Waste in a safe and efficient manner, in full compliance with all applicable governmental laws, rules, regulations, orders, ordinances, actions and requests, and in accordance with the terms and conditions of this Agreement; and
Dsw 443123
r STLCOPCB4057663
-2-
WHEREAS, Contractor has been advised by Monsanto of potential harmful effects and environmental concerns associated with the Waste and with polychlorinated biphenyls; understands the nature and characteristics of said Waste and of polychlori nated biphenyls; and
WHEREAS, Contractor desires to undertake said disposal and to conduct the same in accordance with all the terms and conditions of this Agreement;
NOW, THEREFORE, in consideration of the payments to be made by Monsanto to Contractor as herein provided, and the mutual covenants and agreements herein contained, Monsanto hereby engages Contractor, and Contractor hereby agrees, to receive, handle, store, treat and dispose of the Waste upon the terms and conditions hereinafter set forth.
1. Term and Termination. This Agreement shall commence on the date first above written and shall continue in full force and effect until December 31* 1977. Contractor's warranties and representations set out in Section 6 of this Agreement and the confidentiality provisions set out in Section 10 of this Agreement shall survive any termination or expiration of this Agreement.
2. Quantity. Contractor agrees to dispose of the Waste at its facility
DSW 443124
STLCOPCB4057664
-3-
at Deer Park, Texas, in quantities set out in Schedule B, attached hereto and made a part hereof. Monsanto estimates that the total quantity of Waste to be disposed of hereunder shall be no less than 1.5 million pounds and no more than 3 million pounds. Should Monsanto have additional quantities which it desires Contractor to dispose of in excess of the estimated 3 million pound maximum, and should Contractor agree to dispose of such additional Waste, it is agreed that disposal of same will take place at Contractor's Deer Park, Texas, facility in accordance with the terms and conditions of this Agreement.
3. Delivery. a. Monsanto shall deliver the Waste in Monsanto's
tankcars to Contractor's facility at Deer Park, Texas. Contractor shall promptly notify Monsanto of the time of arrival of each shipment at such facility.
b. The quantity of Waste delivered by Monsanto to Contractor shall be determined from the gross and tare weights ascertained by railroad weighing of each tankcar before the Waste is loaded onto or into it and after said Waste has been loaded. The difference shall be deemed to be the correct weight for the purposes of this Agreement unless proven to be incorrect.
c. Shipment of the Waste shall be made during normal working hours, Monday through Friday, except holidays, in accordance with Schedule B attached hereto.
DSW 443125
r *
STLCOPCB4057665
-4-
d. Monsanto shall be solely responsible for clean ing and purging each tankcar after delivery and removal of the Waste by Contractor. In no event shall Contractor be required to purge or clean any tankcar.
4. Title and Risk of Loss. Title to, all risk of loss of, and all other incidents of ownership of the Waste and all material deemed to be Waste under this Agreement shall pass from Monsanto and vest in Contractor F.O.B. Contractor's Deer Park, Texas, facility.
5. Price.
"j^P\a. Monsanto .shall pay Contractor for the disposal
. re. It trbti-L cckk)
n
of Waste at the rate of -$6^10--(4;en--een^e) per pound, as such
weight is determined under subsection 3(b) of this Agreement,
for Contractor's performance of disposal services in accordance
with this Agreement. Contractor shall invoice Monsanto upon
receipt of the Waste, and Contractor agrees to retain copies
of such monthly invoices for a period of at least two (2) years.
Payments shall be due and payable by Monsanto thirty (30) days
from the date of receipt of each invoice, if such invoice is
accurate.
b. The parties hereto further agree that, if at any time, any Municipal, Local, State, Federal and/or Interstate Agency or Compact shall issue or cause any order(s), regulation(s),
DSW 443126
STLCOPCB4057666
-5-
notice(s), tax(es), fee(s), charge(s), assessment(s) and/or communication(s) of any nature which require Contractor to make additional investments in plant or equipment and/or incur additional costs at Contractor's Deer Park, Texas, facility, the rate charged hereunder shall be proportionately increased on the basis of Monsanto's throughput at Contractor's Deer Park, Texas, facility. In the event Monsanto disagrees with the amount of the rate adjustment, Monsanto may terminate this Agreement thirty (30) days prior to the effective date of the rate adjustment. Failure of Monsanto to terminate shall result in the automatic adjustment of the rates charged hereunder. Termination under this provision shall not relieve Monsanto of liability for any payment of sum or sums due or to become due Contractor pursuant to this Agreement prior to the effective date of such termination.
6. Disposal-Contractor's Representations and Warranties. Contractor represents and warrants to Monsanto that:
a. Contractor is engaged in the business of treat ment and disposal of hazardous industrial wastes by several types of technology and has experience and expertise in the disposal of polychlorinated biphenyls. Contractor represents that the Waste will be incinerated in an incineration system approved for disposal of polychlorinated biphenyls and meeting all requirements of applicable laws, regulations, orders and codes. All Waste delivered to Contractor under this Agreement
DSW 443127
STLCOPCB4057667
6-
Kill be disposed of by means of this incineration system. Con tractor will not in any manner salvage or reclaim any components of the Waste or sell or distribute the Waste or any component thereof.
b. Contractor Mill alloM Monsanto representatives to have access to the Contractor's disposal facilities from time to time during the term hereof, during normal business hours in order to enable Monsanto representatives to inspect the disposal operations conducted hereunder.
c. Contractor Mill comply Mith all governmental orders, regulations, ordinances, actions or laMS of the United States or of any state, county, township or municipal subdivision or other governmental agency which may be applicable to the receipt, possession, handling or disposition of Waste.
d. Contractor will obtain all permits, licenses and/or other documentation required in order to comply with such governmental orders, regulations, ordinances, actions or laws, and agrees to furnish copies of the same to Monsanto upon request and at Monsanto's expense, and Contractor agrees to furnish copies of any agreements or other documentation re lating to the obligations and representations of Contractor contained in this Agreement.
DSW 443128
STLCOPCB4057668
-7-
e. Contractor has received adequate warning regard ing the nature and characteristics of the Waste and of poly chlorinated biphenyls, that it has the knowledge and expertise to handle, store and dispose of the Waste in a safe and effi cient manner, and that it will receive, handle, treat and dispose of all Waste as hazardous material.
7. Waste -Warranty.
a. The description of the Waste is set forth in
Schedule A hereto. In addition to the description set forth
in Exhibit A attached hereto. Waste shall include any Indus
trial waste which the parties mutually agree upon prior to
shipment by Monsanto and each shipment of industrial waste
which Contractor agrees to dispose of after it has notified
Monsanto, pursuant to this paragraph, that such shipment does
not conform to the description in Schedule A. If Contractor
does not notify Monsanto within forty-eight (48) hours after
delivery of such shipment that the materials shipped are not
Waste, or if Contractor disposes of all or any part of such
shipment at any time within forty-eight (48) hours of delivery
prior to notifying Monsanto that such shipment is not Waste,
.
materials delivered and/or disposed of shall be deemed to be
Waste for all purposes, including without limitation, the
r-
ro
g
following paragraph.
b. Monsanto represents and warrants that each shipment shall conform to the description of Waste set forth in Schedule A attached hereto or to such other description to which the parties may have agreed upon pursuant to the preceding
STLCOPCB4057669
paragraph. Except as expressly provided in the preceding sen tence, MONSANTO MAKES NO REPRESENTATION OR WARRANTY OF ANY KIND, EXPRESS OR IMPLIED, AS TO MERCHANTABILITY, FITNESS FOR PARTICULAR PURPOSE, OR ANY OTHER MATTER WITH RESPECT TO THE MATERIALS SUPPLIED HEREUNDER, WHETHER USED ALONE OR IN COMBINATION WITH OTHER SUB STANCES. Notwithstanding the foregoing, Monsanto agrees to accept for return at its sole expense and be solely responsible for such return of any shipment which is not Waste or deemed to be Waste pursuant to this Agreement.
8. Indemnity. a. Immediately upon passage of title, risk of loss
and all other incidents of ownership to Contractor of each shipment of Waste or material deemed to be Waste pursuant to this Agreement, Contractor agrees to indemnify, defend, and save Monsanto, its present, post and future directors, officers, employes and agents harmless' from and against any and all liabil ities, penalties, demands, claims, causes of action, suits, losses, < damages, costs and expenses (including cost of defense, amounts paid in settlement and reasonable attorneys' fees) which any or all of them may hereafter suffer, incur, be responsible for or pay out resulting from any contamination of or adverse effect on humans, domestic animals, aquatic and wildlife, food, animal feed or the environment by reason of Contractor's possession, handling, treatment or disposal of Waste or material deemed to be Waste or as a result of bodily injuries (including death) to any person or damage (including loss of use) to any property occurring to, or caused in whole or in part by. Contractor (or _ any of its employes), or any person, firm or corporation (or
DSW 443130
STLCOPCB4057670
-9-
any employe thereof) directly or indirectly employed or engaged by Contractor, or, Monsanto (or any employe thereof). Upon request of Monsanto, Contractor shall promptly defend any such demand, claim, or cause of action.
b. During the period extending from the departure of any shipment of the Waste from Monsanto's plant until delivery to Contractor's Deer Park, Texas facility, Monsanto agrees to indemnify, defend, and save Contractor, its present, past and future directors, officers, employes and agents harmless from and against any and all liabilities, penalties, demands, claims, causes of action, suits, losses, damages, costs and expenses (including cost of de fense, amounts paid in settlement and reasonable attorney' fees) which any or all of them may hereafter suffer, incur, be responsible for or pay out resulting from any contamination of or adverse effect on humans, domestic animals, aquatic and wildlife, food, animal feed or the environment by reason of Monsanto's possession, transportation or handling of such shipment or as a result of bodily injuries (including death) to any person or damage (including loss of use) to any property occurring to, or caused in whole or in part by, Monsanto (or any of its employes), or any person, firm or corporation (or any employe thereof) directly or indirectly employed or engaged by Monsanto, or. Contractor (or any employe thereof). Upon request of Contractor, Monsanto shall promptly defend any such demand, claim, or cause of action.
9. Insurance by Contractor. a. Contractor shall not begin the performance under
this Agreement until:
*>'H
v
STLCOPCB4057671
-10-
(1) It has obtained all the insurance herein after required;
(11) it has furnished certificates of insurance satisfactory to Monsanto;
(iii) The certificates evidencing Contractor's coverage have been approved by Monsanto.
b. Every contract of insurance providing the cover ages required herein shall contain the following clause: nNo reduction, material alterations, cancellation or expiration of this policy shall become effective until thirty (30) days after the date written notice is received by Monsanto Company, 800 North Lindbergh Boulevard, St. Louis, Missouri 63166.''
c. Contractor shall take out and maintain, at its
expense, for the duration of this Agreement, at least the follow
ing insurance:
Coverage
- Limits
(1) Workmen's Compensation
(2) Employer's Liability
(3) Public Liability (Bodily Injury)
`
w Public Liability (Property Damage)
Statutory $500*000 each occurrence $1,000,000
$1,000,000
(5) Automobile Liability (Bodily Injury)
$200,000 each person $500,000 each occurrence
(6) Automobile Liability (Property Damage)
$50,000 each occurrence
DSW 443132
STLCOPCB4057672
-11-
10. Confidentiality. Contractor shall treat as confidential property and not disclose to others during or subsequent to the term of this Agreement, except as is necessary to perform the work hereunder (and then only on a confidential basis satisfactory to Monsanto), any information (including any technical information, experience, of data) regarding Monsanto's plans, programs, plants, processes, costs, equipment, operations or customers which may come within the knowledge of Contractor, its officers or its employes in the performance of this Agreement, without in each instance securing the prior written consent of Monsanto. Contractor shall also treat as confidential and shall not disclose to others, except as required by law, information relating to the chemical composition of Waste and/or the quantity of Waste delivered to it by Monsanto. Hie foregoing obligations shall survive the termination or expira tion of this Agreement. Nothing herein, however, shall prevent Contractor from disclosing to others or using in any manner information which Contractor can show:
a. Has been published and has become part of the public domain other than by acts, omissions or fault of Con tractor or its employes;
b. Has been furnished or made known to Contractor by third parties as a matter of legal right and without restriction on disclosure; or
DSW 443133
STLCOPCB4057673
-12-
c. Was in its possession prior to the disclosure thereof by Monsanto to Contractor.
11. Excuse of Performance.
The performance of the Agreement may be suspended by either
party in the event of: Act of God, war, riot, fire, explosion,
accident, flood, sabotage; lack of adequate fuel, power, raw
materials, labor, containers or transportation facilities; com
pliance with governmental laws, regulations, orders or action;
breakage or failure of machinery or apparatus, national defense
requirements or any other event beyond the reasonable control of
such party or in the event of labor trouble, strike, lockout or
injunction (provided that neither party shall be required to
settle a labor dispute against its own best judgment); which
event prevents the delivery, transportation, acceptance or
disposal of Waste.
.
12. Independent Contractor. Contractor is and shall perform this Agreement as an independent contractor and, as such, shall have and maintain complete control over all of its employes and operations. Neither Contractor nor anyone employed by it shall be, represent, act, purport to act or be deemed to be the agent, representative, employe or servant of Monsanto.
DS\N 443A34
STLCOPCB4057674
-13-
13. Assignment. Neither party shall assign its rights or delegate its performance hereunder (whether by operation of law or otherwise) without the prior written consent of the other party, and any attempted assignment or delegation without such consent shall be void. Either party shall have the right to terminate this Agreement without delay following receipt of notification of such attempted assignment or delegation.
14. Waiver. Any waiver by either party of any provision or condition of this Agreement shall not be construed or deemed to be a waiver of any other provision or condition of this Agreement, nor a waiver of a subsequent breach of the same provision or condition, unless such waiver be expressed in writing and signed by the party to be bound.
15. Notice. Any notice, request, approval or other document required or permitted to be given under this Agreement shall be in writing and/or by telephone. If by telephone, such notice, request, or approval shall be confirmed in writing. All written notices, requests, or approvals shall be deemed to have been sufficiently given when delivered in person or deposited in the U.S. mall, postage prepaid, for mailing by certified or registered
dsnn
STLCOPCB4057675
-14-
nail, return receipt requested, and addressed as follows:
If to Monsanto, addressed to:
Monsanto Company W. G. Krumrarich Plant Sauget, Illinois 62201
Attention: Arthur E. Leisy
If to Contractor, addressed to:
Rollins Environmental Services, Inc. One Rol1 ins Plaza Wilmington, DE 19899
Attention: William B. Philipbar, Jr.,
or to such other address or addresses as may be specified in
writing from time to time by either party.
16. Headings.
.
Paragraph headings are for convenience only and are not
to be construed as part of this Agreement.
17. Controlling Law. The validity, interpretation and performance of this Agreement shall be governed and construed in accordance with the laws of the State of Texas.
18. Entire Agreement. This Agreement represents the entire understanding and agreement between the parties hereto relating to the disposal of the Waste and supersedes any and all prior agreements,
DSW 443136
STLCOPCB4057676
-15-
whether written or oral, that may exist between the parties regarding same. No terms, conditions, prior course of dealings, course of performance, usage of trade, understanding or agree ment purporting to modify, vary, supplement or explain any provision of this Agreement shall be effective unless in writing, and signed by duly authorized representatives of both parties, provided that any such agreements relating to the description or definition of Waste may be made by telephone and confirmed in writing in accordance with Paragraph 15 of this Agreement.
. IN WITNESS WHEREOF, Monsanto and Contractor have each caused this Agreement to be executed by its duly authorized representative as of the day and year first set forth above.
MONSANTO jOOMPANY
By K/^
TH-f-io General Manager, Specialty Chemicals Division
ROLLINS ENVIR0NM2SNTAL SERVICES, INC. By Un A v vojLpGatl/
Title
' r * ----------------------- CPo
DSNN443A3T
STLCOPCB4057677
SCHEDULE A
Waste Description
Waste will contain the following by weight:
(1) Oil, as No. 5 process PCB
5-15# 70-85#
Chlorobenzenes
2-5#
Unidentified
2-6#
Solids
less than 1.0#
(2) PCB
98-100#
BTU value per.pound for the Waste is estimated to range from
, - , .7 000 12 000
Viscosity specifications will be mutually established by September 1,
DSW 443A38
STLCOPCB4057678
SCHEDULE B Shipments and Quantity Shipments will be made monthly and will range from 400,000 600,000 pounds in tankcar quantity. Monsanto will provide all tankcars. Contractor will make its best efforts to minimize the amount of time which it holds Monsanto's tankcars, but in no event shall Contractor hold any tankcar more than six (6) days after delivery of Waste. This period will be extended only with the consent and permission of Monsanto.
DSW 443139
STLCOPCB4057679
DEPT. 790 - 1977 OPERATION
JANUARY FEBRUARY MARCH APRIL
MAY
The incinerator was down for 19 days for Weir ring repairs. The Venturi has a crack that must be repaired during the next extended shutdown.
The Incinerator was down for 11 days for plenum repairs. The Venturi crack was repaired. The waste inventory is holding steady at 2 million pounds.
Reasons for the overtime in February were: Absence 20% of total. Openshift 80% of total.
546,000 lbs. were burned in March. We were down for four days for plenum refractory repairs.
Reasons for overtime in February were: Openshift 94.1% Medical Reasons 5.9%
Removal of build up from the plenum caused 8 days downtime in April. Reasons for overtime in April were:
Absence 4.2% Vacation 53.0% Openshift 25.5% Housekeeping 4.2% Extra Work 13.0%
Four separate incidents caused 18 days downtime in May. These were the scrubber column repair, quench column gasket failure, plenum clean out, and city water outage.
Reasons for overtime in May were:
Vacation 45.5% Openshift 36.4% Extra work 0.9% Grievance 0.9%
DSW 443140
STLCOPCB4057680
JUNE
Quench column gasket failure and quench pot repairs caused 13 days downtime in June. The current quench column gasket repair is temporary and is expected to fail again in the near future.
Reasons for overtime were:
Absence 0.7% Vacation 68.1% Extra Work 6.7% Open Shift 23.3% Transportation difficulties
1.1%
DSW 443141
STLCOPCB4057681
INCINERATION MONTH POUNDS BURNED BURNED YTD PERCENT OST % OST, YTD OSR % OF DE. OSR % YTD
LM.r nr, i iilii i / ju, akuiluk i nu i rttKH I i UH, i3/< UFtKMllUfrS KEPQRT
(1976 5,946 M lbs. 66.6 OST 81.3 OSR)____________________________________________________
JAN. 232512 232512
FEB.
MARCH
428755 546,185
APRIL 349,418
MAY 271,106
JUNE 265,806
JULY
661267 1,207,452 1556780 1,827,886 2,093,692
AUGUST
SEPT.
37.1
50.4
84.4
71.3
51.9
50.6
37.1
44.1
58.0
61.1
59.4
57.9
67.4
98.3
69.6
62.8
56.2
57.2
67.4
84.6
77.1
70.7
68.0
66.6
OCT.
NOV.
DEf
INVENTORY, POUNDS
BULK REC.
290072
BULK MO. END
2042204
DRUMS REC.
49231
DRUMS MO. END DRUMS EMPTIED
74500 20731
298000 2068223
82274 53500 103274
345,248 1,960,285
39,399 0
92,899
230,654 1876892
88,681 0
88,681
217,808 132,820
1.767,019 1,699,468
13,195
36,85!
0 41,000
13,195 (4145)
PERSONNEL - PE RCENT REGU LAR HOURS (Includes 'henol Han< llinq)
EXTRA HOURS
0.0
0.0 4.3 22.4 8.9
E. H. YTD
0.0
0.0 1.5
6.8 7.8
OVERTIME
11.1
6.3
4.5
25.3
12.3
OT HRS. YTD
u-1
8.8
7.9
11.5
11.6
ABS. HRS.
3.5
1.3 0
1.1 1.1
ABS. HRS. YTD
3.5 2.4
DSW 443142
1.5
1.4 1.4
SAFETY MINOR INJ. SERIOUS INJ.
0 0
01 00
0 0
3 0
0
6.2 22.3 13.1
0.1 1.2
i 4
-
STLCOPCB4057682
DEPT. 790 - 1977 OPERATION
JANUARY FEBRUARY
MARCH APRIL
MAY
The incinerator was down for 19 days for Weir ring repairs. The Venturi has a crack that must be repaired during the next extended shutdown.
The Incinerator was down for 11 days for plenum repairs. The Venturi crack was repaired. The waste inventory is holding steady at 2 million pounds.
Reasons for the overtime in February were: Absence 20% of total. Openshift 80% of total.
546,000 lbs. were burned in March. We were down for four days for plenum refractory repairs.
Reasons for overtime in February were: Openshift 94.1% Medical Reasons 5.9%
Removal of build up from the plenum caused 8 days downtime in April. Reasons for overtime in April were:
Absence 4.2% Vacation 53.0% Openshift 25.5% Housekeeping 4.2% Extra Work 13.0%
Four separate incidents caused 18 days downtime in May. These were the scrubber column repair, quench column gasket failure, plenum clean out, and city water outage.
Reasons for overtime in May were:
Vacation 45.5% Openshift 36.4% Extra work 0.9% Grievance 0.9%
DSW 443143
STLCOPCB4057683
INCINERATION -ONTH OUNDS BURNED 'URNED YTD ERCENT OST . OST, YTD :SR % OF DE. 'SR % YTD
DEPARTMENT 790, AR0CL0R INCINERATION, 1977 OPERATIONS REPORT
(1976 5,946 M lbs. 66.6 OST 81.3 OSR)
JAN. 232512 232512
FEB.
MARCH
428755 546,185
APRIL 349,418
MAY 271,106
661267 1,207,452 1556780 1,827,886
37.1
50.4
84.4
71.3
51.9
37.1
44.1
58.0
61.1
59.4
67.4
98.3
69.6
62.8
56.2
67.4
84.6
77.1
70.7
68.0
JUNE
JULY
AUGUST
SEPT.
OCT.
NVENTORY, POUN DS
ULK REC.
290072
ULK MO. END
2042204
RUMS REC.
49231
RUMS MO. END RUMS EMPTIED-
74500 20731
298000 2068223
82274 53500 103274
345,248 1,960,285
39,399 0
92,899
230,654 1876892
88,681 0
217,808 1.767,019
13,195 0
88,681
13.195
ERSONNEL - PE RCENT REGU LAR HOURS (Includes 'henol Hanc11 inq)
XTRA HOURS
0.0
0.0 4.3 22.4 8.9
. H. YTD VERTIME
0.0 11.1
0.0 6.3
1.5 6.8 7.8
4.5
25.3
12.3
T HRS. YTD
11.1
8.8
7.9
11.5
11.6
BS. HRS.
3.5
1.3 0
1.1 1.1
BS. HRS. YTD
3.5
2.4 1.5
1.4 1.4
NOV.
DEC.
< ' __
P
(n 3
AFETY INO.R INJ. ERIOUS INJ.
0 0
01 00
0 0
3 0
STLCOPCB4057684
Monsanto
-
fOM ,NAMf A LOCAT.ON, J. M. WlT 3. S t OII , Jr./WGK
date June 7, 1977
SUBJECT cERcNCt
: Monthly Incinerator Status Report
TO : D. T. Hughes
cc-V. A. A. B.
W. J.
Brawley
J. Koenig Frerking Ratliff A. Pohl C. Engman Peduzzi
- G.O.
G.O. G.O.
J. W. MollO; A. E . L e i s y D. L. Cissel
D. Wood - G. J. Labanosk) W. Faries
P. R. Kuceri
The following is the monthly Incinerator Status Report including all activity through May, 1977.
Material Returned for Incineration - (Pounds)
May 1977
Y.T.D.
Dielectrics - (Billings to Customers) -
81275
260748
In-Plant PCB's - (Other Than Dept. 246)-
28346
130234
Dept. 246 - T/C Wash/Drums Dept. 246 - Residue Dept. 246 - Montars
Acidifier
- -0-0
- 32908
108500 157642 176010
"""
S
Dept. 226/81082
- 2574
10322
Dept. 237/81085
- 34626
293647
Dept. 2 3 9/S10 3 3
- 50120
507954
Dept. 237/81080
_ 1154
9505
TOTAL RETURNED FOR INCINERATION
- 231003
1654562
N - \C RrS V . 1 - 7 2
DSVV 443145 STLCOPCB4057685
D. T. Hughes Monthly Incinerator
Status Report
Page 2 6/7/77 WGK
Status of Incineration
Lbs .
Prior Year's Receipts April Y.T.D. Receipts May, 1977 Receipts
Prior Year's Incineration April Y.T.D. Incineration May, 1977 Incineration *0n Hand, 6/1/77 To Be
Incinerated
25,399,183 1,423,559 231,003
27,053,745 - 23,389,260 - 1,556,780 - 271,106
1,836,599
*Inventory To Be Incinerated - By Dept./Mat'1,
Aroclors Montars Dept. 219-222 Dept. 236-237 Dept. 239
1,267,644 103,036 46,159 276,064 143,696
1,836,599
Billings to Customers (Dielectrics)
May 1977
Adj .
Incineration Charges Handling
$12,183 248
$12,431
$(1,272) 126
$(1,146)
Y.T.D.
$29,957 2,472
$32,429
J. M. Wriston, Jr. / nm
DS\N 443146
STLCOPCB4057686
Monsanto
FROM <NAME & LOCATION i
E. R. Billen, Sauget, Ijjinois
l(OM r,L
April 7, 1977 .g/lA
SUBJECT
REF ERENCE
TO
.^-Mr. R. A. Pohl B2SB
J. W. Boehm w. c. Engman
R. w. Flint A. E. Leisy J. Peduzzi M. A. Pierle E1SF
W. L. Smull J. C. Weber - B2SK
To shut down our incinerator on 8/31/77 requires:
1. Burning an inventory of 2.4M lbs., plus any decontamination from the Aroclor dept, shutdown (est. ^M), in another facility. This could be bulk loaded.
2. This quantity could be reduced by burning all wastes, other than PCB, outside starting as soon as practical. This is a 165M Ib/month load.
To shut down by year end, these no`s are:
1. 850M lbs.
2. 0- -
The department will run out of fuel in March if we take on no new wastes.
The above assumes we stop receipts of customer PCB wastes on 8/31/77-
E. R. Billen /md
IN - 10 REV. 1/72
OSVM 443147
STLCOPCB4057687
3>
May 27, 1977
Mr. William Philipbar, President Rollins Environmental Services One Rollins Plaza Wilmington, Delaware 19899 Dear Bill: Attached please find two copies of proposed contract to cover disposal of Monsanto's polychlorinated biphenyl waste materials at your facility in Houston, Texas. If you find the contract acceptable, please sign and return one original to me. Should further discussion be necessary, I would appreciate receiving a telephone call to that effect early the week of May 30. Bill, obviously we are anxious to do business as quickly as possible. I would appreciate your prompt attention. Sincerely,
Michael A. Pierle Manager, Environmental & Energy Affairs MAP:HS Attachment bcc: Holly N. Brandstetter - B2SC
R. A. Pohl - B2SB
osVJ 443148
STLCOPCB4057688
-3-
representations and warranties set forth in Section 6 of this Agreement are found to be or become untrue. Contractor's warranties and representations set out in Section 6 of this Agreement and the confidentiality provisions set out in Section 10 of this Agreement shall survive any termination of this Agreement.
2. Quantity
Contractor agrees to dispose of the Waste as shipped
by Monsanto in quantities up to 500,000 pounds per calendar
month during the term of this Agreement. Monsanto estimates
that the total quantity of Waste to be disposed of hereunder
shall be no less than 1.5 million pounds and no more than
3 million pounds. Should Monsanto have additional quantities of Waste which it desires Contractor to dispose of in excess of the estimated 3 million
pound maximum, and should Contractor agree to dispose of such
-
additional Waste, it is agreed that disposal of same will take
place at Contractor's Baton Rouge, Louisiana facility in accordance
with the terms and conditions of this Agreement.
3. Shipment
a. Monsanto shall ship the Waste in tank cars and/or tank trucks (at Monsanto's option) to Contractor's plant at Houston (Deer Park), Texas.
r
b. The quantity of Waste shipped from Monsanto ' s plant to
Contractor shall be determined from the gross and tare weights
DSW 443149
STLCOPCB4057689
-4-
ascertained by railroad weighing of the transport vehicle before the Waste is loaded onto or into it and after said Waste has been loaded. The difference shall be deemed to be the correct weight for the purposes of this Agreement unless proven to be incorrect. *
c. Shipment of the Waste shall be made during normal working hours, Monday through Friday, except holidays, in accordance with a schedule which shall be mutually agreed upon by the parties hereto.
4. Title and Risk of Loss Title to, all risk of loss of, and all other incidents of ownership of the Waste shall pass from Monsanto and vest in Contractor when Monsanto has loaded the Waste into the trans port vehicles at Monsanto's plant at Sauget, Illinois.
5. Price Monsanto shall pay Contractor for the disposal of Waste at the rate of $0.10 (ten cents) per pound, as such weight is determined under Subsection 3(b) of this Agreement, for Contractor's performance of disposal services in accordance with this Agreement. Contractor shall submit appropriate monthly statements to Monsanto, and Contractor agrees to retain copies of said monthly statements for a period of at least
DSW 443150
STLCOPCB4057690
-7-
f. Contractor has received adequate warning regarding the nature of the Waste and of polychlorinated biphenyls, that it has the knowledge and expertise to handle, haul, store and dispose of the Waste in a safe and efficient manner, and that it will receive, handle, transport, treat and dispose of all Waste as hazardous material.
7. Warning; Claims; Limited Liability a. A general-description of the Waste is set forth
in Schedule A hereto; however,-Contractor acknowledges and agrees that it understands the nature and characteristics of the Waste and that the composition and consistency of the Waste may vary from shipment to shipment because of variations in process operations and other factors. Contractor agrees to sample each tank car and tank truck of the Waste and to analyze each such sample within thirty. .(30). days of Contractor's receipt thereof in order to determine suitability for disposal at Contractor's facility. All claims for any cause whatsoever (whether based in contract, negligence, strict liability or otherwise) shall be deemed waived unless made in writing and re ceived by Monsanto within thirty (30) days after Contractor's . receipt of the Waste.
DSW 443151
STLCOPCB4057691
-11-
b. Every contract of insurance providing the cover ages required herein shall contain the following clause: "No reduction, material alterations, cancellation or expiration of this policy shall become effective until sixty (60) days after the date written notice is received by Monsanto Company, 800 North Lindbergh Boulevard, St. Louis, Missouri 63166."
c. Contractor shall take out and maintain, at its expense, for the duration of this Agreement, at least the follow ing insurance:
Coverage
(1) Workmen's Compensation
(2) Employer's Liability
(3)
Public Liability (including contractual
(4) Public Liability (including contractual
liabilitv;
(Property Damage)
(5) Automobile Liability .
(Bodily Injury)
(6)
Automobile Liability (Property Damage)
Limits
Statutory $500,000 each occurrence $1,000,000 combined single limit Same as (3) above
$200,000. each person ... $500,000 each occurrence $50,000 each occurrence
10. Confidentiality
Contractor shall treat as confidential property and not dis
close to others during or subsequent to the term of this Agreement,
except as is necessary to perform the work hereunder (and then
DSW 443152
STLCOPCB4057692
SCHEDULE A GENERAL DESCRIPTION OF WASTE
The Waste to be disposed of by Rollins Environmental Services, Inc., is estimated to contain from 85% up to 99.9% polychlorinated biphenyl. Presently known variables which may be present in some or all shipments of the Waste are listed below:
Dibenzyl parachlorophenol Miscellaneous chlorophenols Organic high boilers ' The above components, as well as other materials and compounds in the Waste, may vary in composition from shipment to shipment and/or from time to time depending on raw materials, the method and rate of operation and other factors.
DSW 443153
STLCOPCB4057693
CHEM-DYNE Corporation
Chemical Destruction Reclamation Synthesis Landfill Environmental and Engineering Consulting
500 FORD BOULEVARD HAMILTON, OHIO 45011
PHONE: 513/868-7091
W1 2 S llll
May 23i 1977
Monsanto Chemical Intermediates Co. 800 N. Lindbergh Boulevard St. Louis., Missouri 63166
Attention: Mr. M. A. Pierle
Dear Mike:
I contacted Captain Bruhns regarding the PCB burn. He is forwarding the data to Rotterdam to obtain a quotation.
The Vulcannus was awarded the Project Orange disposal contract and is now loading for the burn off Guam. They plan to be back in the United States sometime in September. This appears to be good timing for your requirements.
In case the question is raised^ should Monsanto decide to go with disposal on the Vulcannus., you would be invoiced directly by Ocean Combustion Service.
CHEM-DYNE has a brokerage arrangement with O.C.S. and will assist In resolving any problems which may crop up.
Very truly yours3
CHEM-DYNE CORPORATION
WLK/dm
William L. Kovacs,, Vice-President
STLCOPCB4057694
DSW 443155
STLCOPCB4057695
I
JOHN O. MOO MAW
ATTORNEY AT LAW
Office 364-4702 Home 364-4949 Area Code 812
March
15,
S EAST MAIN STREET BLOOMFIELD. INDIANA 47424
1973
Mr. Lon P. MacFarland MacFarland, Colley, Blank and Jack Attorneys at Law Middle Tennessee Bank Building Columbia, Tennessee 38401
Re: Bloomfield Silo Co., Inc.
Dear Mr. MacFarland:
I have had a conference with Mr. Autrey with respect to our recent telephone conversation and he has advised me that the Company is inclined to accept your offer of $12,941.26 as a settlement for the reconstruction and labor costs of the specific silos mentioned in our state ment of December 1 9, 1 972 , which totaled^$28,071 .1 1 and would execute an indemnity bond with respect to any future claims as to the silos themselves.
You will notice from copies of the enclosed statements that there are other claims made against Bloomfield Silo Co. for loss of silage which we have not paid and which have not been resolved. In none of these cases has any action been taken on the part of the claimant to pursue the claims since.the statements were furnished, however, you will re call when you were here Mr. Autrey mentioned to you that there were other claims being made against Bloomfield Silo Co. which they had not paid and had no intention of paying. Obviously we are not in a position to execute a release that would cover any conceivable liability that might arise from the enclosed or other persons.
The Company does not intend to voluntarily pay any of these claims for loss of silage, however, this does not mean that someone might institute an action. You will notice that each one of the persons who are claiming loss of silage have received a completely new silo.
To summarize our present position, we are willing to accept $12,941.26 in full settlement of our statement of December 19, 1972, which totaled $28,071.11 and will execute an indemnity agreement with respect to any future claims from the persons named relating to the silos themselves.
DSW 443156
STLCOPCB4057696
JOHN O. MOOMAW
ATTORNEY AT LAW
Page 2 March 15, 1973 Mr. Lon P. MacFarland
Tp|.E#HONES:
Office 384-4702 Home 384*4949 Area Code si 2
8 EAST MAIN STREET BLOOMFIELD, INDIANA 47424
However, I think you will appreciate that we can not include
on our indemnity agreement coverage of any conceivable claim
that might arise with actual loss to silage. We would be
willing to certify in such agreement that any and all future
claims for whatever reason will be denied and that no voluntary
payments will be made by this Company to anyone unless we are
required to do so by reason of some court action or with the
consent of your Company. I am sure that I forwarded copies of
the enclosed to either Mr. Karl F. Meyer of the Travelers or
to Mr. Park in St. Louis sometime ago, however, I do not find
that I ever sent copies of them to you.
.
JOM/fc Encs
DSW 443157
STLCOPCB4057697
^-1 y A.I? I 2
I3LL. IPxIThP e xLO OxaHA-Af vlcoi.ipiald i:tv
I the uni si-signad do hereby certify that the foilo-..ir~
is a true an? correct estimate oh loss on camirr. sii? ;-
0 ton of silage at $12.0C per ton Labor on destroying damaged silage
hhlG.C 4-4G.CO
Loss of rail's due to damaged silage
s-. 1700.00
fotal
-. 'j jj-.O Ot
Subscribed and st'orn to before by Vernon 3. lie Gov/an this the 24 day of April 1375
/ commission expires 1-10-1^72
DSW 443158
STLCOPCB4057698
April 17, 1972
Bear Sirs: In regards to the silo I bought fro;.-' you, the senior
you put on it i?as not acceptable by the Board of Health. 3o in order for you to repair it I had tc trite ay silage out and couldn't feed it. I lost IS feet of silage which figures 144 tons in the bottom of ry silo.
According to Cumberland C?CA and Hugh Hurst, County Extension Agent, figuring my lose up at 912.00 per ton for silage and 92.00 per ton for labor you now owe me 92,015.00.
Sincerely Yours,
-tfTSTATh: OF T3ITTUC;:
Finis Flynn Route 1 Box 52 ITancy, Xy.
42544
00111"/ OF PULASKI
Suscribed and sworn to before me by Finis Flynn this ivth.
c.ay of April 2n 1972
I:ly commission expires 1-10-72
cy Public
DSW 443159
STLCOPCB4057699
/ ro 3L0CFFI2ID SILO COl.'JAri'
Istinate of Oanaysc. silage
..ancy, ..7.
April 1/,- Vi
275 ton took out of silo.
County Ayants estimate
$12.00 per ton total loss $3300.00
G TAT3 OF izcirruciif COUFrf OF PULASAJ
Subscribed and sworn to before me by Farcus Fuse
this 14 day of April 1972.
.
i'y comission expires 1-10-74
1
DSW 443160 STLCOPCB4057700
_
/jy
cJ y~cr
y ^-*.^_
; //,
zy^z 7\;) -// 7zl_
: S' S'?
_.,;y,y. ij X
<
ct^ 1772^-?^ ^zC/^A^-_y
Cfy
Z~<-til
c cy
^ tr^z-'-icf ''>/7
/*
/.
yy^..
q/-
V .> Z-ySZ<L-* y^'iyy'p-yzcu. c.
y
y.. .- - ^-7? y y7*z??k, ^ ft>y ^'
^7cS~a -^7/ yTyt. crp7:-
'^'2- ^^yye 73^^ X/
y ^-c^^Ay yA,
DSW 443161
STLCOPCB4057701
-39
/
CV^ fts cz^<- -^ctf
y'y'L-f --rZfo*t...l/''c.','J/'t.C^
,y,, V..
1,4-- 0'* \
y*c C.
r<^a_J
/3-<^X73f2_ y^--i- -c3 S'cs^c iff ^i2--e--^ <_,. A, _/
W - c '-' c
/ aj
yf?yy~i^2 cc-^.<zJ
S--K.
/pyAX. 73tpA JTJ ^
/X7
Tfyf. J?7/- 3 77 X
DSW 443162
STLCOPCB4057702
VERIFICATION .OF CLAIM
STATE OF KENTUCKY COUNTY OF PULASKI...SCT:
The affiant, Clifford Ard, of Route 1, Box 66, Nancy, Pulaski County, Kentucky, being first duly sworn, states that the Bloomfield Silo Company of Bloomfield, Indiana, constructed a silo upon the farm of this affiant; that thereafter he filled said silo with five hundred forty (540) tons of silage which he used to feed his milk cows; that in the fall of 1971 tests were made by the Kentucky Board of Health which disclosed that the milk being sold by this affiant was contaminated with a substance, the name and details of which are not known to this affiant; that it was sub sequently discovered that the substance contaminating said milk came from the materials used in the silo constructed by Bloomfield Silo Company as aforesaid.
That this affiant thereupon had to destroy two hundred fifty (250) tons of silage valued at Twelve ($12.00) Dollars per ton remaining in said silo; that the reasonable cost for the re moving of said two hundred fifty (250) tons of silage from said silo was Two ($2.00) Dollars per ton; that due to the fact that this affiant was unable to refill said silo, he was required to handle five hundred forty (540) tons of silage twice since same was placed in temporary storage until it could be placed in silo; that the reasonable cost of handling said silage an additional time . is the sum of Two ($2.00) Dollars per ton; that as the direct and proximate result of a substance contaminating the silage placed in said 'silo and the necessity of removing and destroying same and of temporarily storing new silage this affiant incurred expense of Four Thousand Five Hundred Eighty ($4,580.00) Dollars; that the aforesaid sum is just, true and correct; that there are no setoffs or credits due; that this affiant ought to recover of the Bloomfield Silo Company the sum of Four Thousand Five Hundred Eighty .($4,5S0.00) Dollars with interest from date of this claim at six (6%) percent per annum.
DSW 443163
STLCOPCB4057703
QaHLQ
Subscribed and sworn to before me by Clifford Ard of Route
/
1, Box 66, Nancy, Kentucky, this
day of April, 1972.
My commission expires
'Oc^,
Notary Public Pulas'ki County, Kentucky
mm
DSW 443164
STLCOPCB4057704
JOHN O. MOOMAW
ATTORNEY AT I^AW
Office 304-4702 Home 304-4949 Area Code 812
*8 EAST MAIN STREET BLOOMFIELD, INDIANA 47424.
January 31, 1973
Mr. Lon P. MaoFarland MacFarland, Colley, Blank and Jack Attorneys at Lav/ Middle Tennessee Bank Building Columbia, Tennessee 384 01
Re: Bloomfield Silo Co., Inc.
Dear Mr. MacFarland:
It was very enjoyable meeting v/ith you and talking about our immediate problem with reference to the above. As I promised you when you left I did sit dov/n v/ith Mr. Autrey fco see if I could obtain a figure to be submitted for settle ment purposes only. Mr. Autrey agreed to do this and has submitted to me a figure that he says the Company has discussed and would be willing to accept.in place of the $28,071.11 figure submitted in their Memorandum of December 19j 1972. He also stated that he could not possible submit this as a bargaining figure since it was a substantial loss to the Company at such a reduction.
The new figure which the Company will accept is $16,455-26 and relates to the same items in the December 19th statement.
I am aware of the fact that v/e are both going to be gone for a period of time and you probably will not be able to get an answer before you return, hov/ever, I did promise to get this out before I left.
Hope v/e have the pleasure of meeting again in the near future.
Yours very truly.
JOM/fc Enc. 1
John 0. Moomaw
DSW 443165
STLCOPCB4057705
BLOOMFIELD SILO CO., INC..
TELEPHONE 812-384-4305. 812-384-4154
620 SOUTH JEFFERSON
BLOOMFIELD, INDIANA 47424
January 25, 1973
Material and Labor used in repairing and bebuildin<r Bloomfield Silos because of the use of Cumar Containing PCB's.
Mr. Walter Ballard, Route 2, Loretto, Kentucky 12'x40* Silo; Cleaned walls, refinished inside $ 266.26
Mr. Clifford
Route 1, ^ancy Kentucky
20'x60' Silo; Taken down and rebuilt with new
Concrete Staves.
$2,530.00
Finis Flynn, ^outel, Nancy Kentucky
20,x60* Silo; Taken down and rebuilt with new
Concrete Staves.
$2,745.00
Also Scraping inside of 20`x60' and refinishing. $ 935,00
Mr. Vernon McGowan, Jabez, Kentucky 20'x60' Silo; Taken down, and rebuilt with new Concrete Staves.
$2,745.00
Mr. Marcus Muse, Route 1, A*ancy Kentucky 20'x60' Silo; Taken down and rebuilt back with new Concrete ^taves. Also Scraping inside a 20'x60' and refinishing.
$2,745o00 $ 935,00
Rollan Shuffett, Route 1, Greensburg, Kentucky 20,x60' Silo; Taken down and rebuilt with new Concrete Staves.
$2,745.00
John DeBoard, 16'x40' Silo; inside.
Somerset, Kentucky Scraping walls and refinishing
$ 375,00
Lonnie Gene A^ams, Route 4, Martinsville, Ind.
IS'xSO' Silo; Vails scraped and refinished
$ 434.00
Total
Signed Mr. Rex Autrey, Vice-President
$ 16,455.26
DSW 443166
STLCOPCB4057706
i'vlx(
P LJ^L Cvr
^ -/ 7^-
V1CT0RC0AFT
764 7 NATIONAL TURNPIKE
LOUISVILLE KY 40214
ESTAB
197"
VICTOR PETAL PRODUCTS CORP
525 NORTHLAND RO
CINCINNATI 0 4 5240
FRANK BFNSIECK GEN MGR
NED SETTLE SALES
TON KE HP PUR
EKP.
M
F ' SOT .
CAST ALUMINUM LAWN FURNITURE `
7INYI SPECIALTY MANUFACTURING
P 0 BOX 2P237
LOUISVILLE KY 4022C
E STAB
1956
TELEPHONE I5D2) 228-1143
P P DAVIS GEN MGR
EMP.
5M
12F 17T
VINYL PLASTIC BINDERS
SCREEN PROCESS PRINTING
POLYETHYLENE PACKAGING
CO
!\ ST A INDUSTRIES INC
4655 ILL I NO I S AVS
.
LOUISVILLE KY 4"213
t STAB
1963
TELEPHONE (5021 459-3050
J T BROOKS MGR
EKP.
1AM
5F
19 T
WOOD FURNITURE
RIGID URETHANE PRODUCTS
ENRY VOGT MACHINE CO
1 HOC- W PRMSRY
LOUI SVI LLE KY A021P
ESTAB
188C
TELEPHONE (502 I 63A-9411
HENRY V HEUSER PRE S
HAROLD B HDRC.ESON SALES MGR
jnSEPH KING MGR PUR DEPT '
EMP. 12P0H
75F 1275T
FABRICATED PLATE WORK
GRAY I RON CASTINGS
VALVES AND FITTINGS
OGT VAULT CO INC
6C1C AC TI ON AVE
LOUISV ILL E KY 40218
ESTAB
19A2
TELEPHONE I 5021 A51-D9A6
FRANK VOGT PRES
JOHN P VOGT SALES C PUR
EMP.
JAM IF
15T
CONCRETE BURIAL VAULTS
'
DICE OF ST MATTHEWS
3922 CHENOWETH SO
LOUI SVILLE KY AD20 7
ESTAB
19A9
TELEPHONE C502I 895-5436
WATTERSON ENTERPRISES INC
LOUISVILLE KY
BRUCE B VANOUSEN PRES
DAVID A SCHANSBERG GEN MGR
EKP.
10M
1BF
2 BT
NEWSPAPER
JOB PRINTING
.
ULCAN-HART CORP
20C6 NORTHWESTERN PKWY
LOUISVILLE KY 40203
ESTAB
1917
TELEPHONE (5021 778-2791
3600 N POINI EOULEVAPC
BALTIMORE MD
WALTER E HELLER INDUSTRIES INC
105 WEST ADAMS ST
CHICAGO ILL 60603
C E OATES EX EC VP
W J VANDP.1CK SALES mgr
C P SIHPSON PUR AGENT
EMP.
2 32 M
15F 2A71
COMMERCIAL FOOD SERVICE EQUI pKf NT
' CUl^
L'/^. r /*\ r> n a r i ^
V^I,UO*VMr l iiU
r% i r'v r-
UUIUC
VAGNEPS BAKERY 5729 PRESTON HIGHWAY
LOUISVILLE KY A0219
ESTAB
1957
TELEPHONE (5021 969-0530
Ervin wagner partner
.EMP.
3M
7 F IDT
BAKERY PRODUCTS
WALKER BAG CO INC
120 N 10TH ST
LOUISVILLE KY 40252
ESTAB
1891
TELEPHONE (5021 533 -0285
S C WALKER JR PRES
MARK 0 OBRIEN PLANT MCR
EMP.
20M
?6F
46 T
BURLAP, COTTON BAGS
POLYPROPYLENE BAGS
ERNEST WALKER PRESS
841 S 6TM ST
LOUI SVI LLE KY 40203
ESTAB
1910
TELEPHONE (5021 5e4-3553
ERNEST WALKER PRES
MALCOLM FENTRESS PUR AGENT
EMP.
7M
3F 10T
JOB PRINTING
LITHOGRAPHIC PRINTING
ENGRAVING
SAM WAP.RFN t SON STONE CO INC
822 S 24TH ST
LOUISVILLE KY 40211
.
ESTAB
1922
CLIFFORD DIEBOLO PRES
EMP.
24M
F 24 T
FABRICATED BUILDING STONE
WERSTER SPORTSWEAR CO
1 205 C- WASHINGTON ST
LOUISVILLE KY 4D206
ESTAB
1960
TELEPHONE (5021 564-8283 #1.35 W BOTH ST
NEW YORK N V
BERNARD HERBERT MGR
"NEW YORK N Y
EKP.
8M
8F 16T
MENS OUTERWEAR
MENS kAlNWEAR
'
___
WE (ST INDUSTRIES INC
ICO WE I ST PLACE
LOUI SVI LLE KY 40206
ESI AB
1963
TELEPHONE "(5021 897-5357
M C WE I ST PRES
FRANK hinkebe in pur acent
EKP.
8H
F 8T
ELECTRONIC CONTROL UNITS
POLETHYLENE CONVERTING EOJIPMENT
EVAN WELCH SON FURNITURE
3802 SOUTHERN PKWY
LOUI SVI LLE KY 40214
ESI AB
`1937
CO
TELEPHONE (502) 361-4289
HAROLD WELCH OWNER
EMP.
1 rt
F IT
FURNt TUBE
WESTERFIELO-BONTE CO
619 WE ST KENTUCKY ST
LOUISVILLE KY 40203
ESTAB
1910
TELEPHONE (502) 5 85-461 6
SAM A CLYTHE PRF.S TRFAS
W Al LAN BLYTHE SECY
MP.
)4M
3F I7T
LEGAL AND FINANCIAL PRINTING
V.HEELING CORRUGATI NG CC
134'
'
1424 S 15TH ST
LCUI SVILLE KY 4021C
ESTAB
153 5
TELEPHONE (502)634-0541
WHEELING - PITTSBURGH STEEL C
P O BOX HR
PITTSBURGH PA 15235
F J FOX MGR
`
J A HOWELLS SALES MGR
J F DRANE PUR AGENT
EMP. 8K 4F 12T
CORRUGATED STEEL CULVERT PIPE
GALVANIZED ROOFING
EXPANOEO METAL
WHIP-MIX CORP
361 FARMINGTON AVE
LOUISVILLE KY 40217
ESTAB
1925
TELEPHONE (5021 637-1451
E A STEINBOCK JR PRFS
HAP.VEY W S0LL1NGER V?
JOHN 0 REILLY PUR AGENT
EHP.
SDK
45 F
95T
DENTAL MATERIALS, E5UIPMENT
WHITE OAK COO?ERACE CD
BERNHEIM LANE BOX 16097
LOUISVILLE KY 4021O
ESTAB
19^5
TELEPHONE 1502) 637-2379
JOSEPH E SEAGRAM SONS I SC
375 PARK AVE
NEW YORK N Y 1C022
V WELLNITZ GEN MGR
MARSHALL MCKENZIE SST MGR
C H WRIGHT PUR AGENT
EMP.
1054
2F 1D2T
WHISKY BARRELS
WHITFHOUSE BRACE SHOP
657 S 2ND ST
LOUISVILIE KY 40202
ESTAB
194 P
TELEPHONE (5021 S23-3499
HRS WILSON WHITf.HOUSr OWNER
EMP. 2M If 3T
ORTHOPEDIC SURGICAL BRACES
GEORGE V.' WHITESIDES CO INC
3048 MICHIGAN OR
LOUI SVILLE KY 40212
ESI AO
1946
TELEPHONE (502) 775-4492
GEORGE W WHITESIDES PRFS
SELMA L HFT Z PUR AGENT
EM?.
I3M
?F 1ST
CONCRETE CURING COMPOUNDS
EPOXY COMPOUNDING
WIFLANO CABINET CO 1320 E WASHINGTON ST
LCUISVILLE KY 402C6
ESTAB
1961
TELEPHONE (502) 534-3565
R 9 W I ELAND OWNER
EMP.
6rt
F 6T
CABINETS STORE FIXTURES, COUNTER TO? S
0 0 HILLI ARSON C CO INC
1901 PAYNE ST
LOUISVILLE KY 40206
ESTAB
1946
TELEPHONE (502) 895-2436
G H NIXON PRES
G RICHARD JONES PLANT MCR
G RICHARD JONES PL MGR
EMP.
15M
2 F 17 T
CARAKE.L COLORING
MALT SIRUPS
'
WINE SCHULZ INC 90 3' SAMUEL ST LOUISVILLE KY 40254
' DSW 443167
STLCOPCB4057707
fr* *<** f* e <
D-U-N-S No.
NAME - ADORCSS
tmp Yrr CoP* CoJ luting
DU N-S No.
''
NAME ADDRESS
tinp Y Oxl* Con. Rxt.ng
00-904-5600 ^0-906-4862 00-927-41 >9 00-904-5000
00-941-3949 01-948-5833 04-965-1425 00-108-6750 00-825-2280 00-835-3765
00-601-1407
00-434-5831 ,.
05-074-7419 -*
00-492*1409 00-227-7473
00-227-7465
00-238-1879 04-759-2652
00-733-4592 04-785-9053 04-786-7627 ; * 00-333-7094 00-316-6147 .. 00-344-6846
00-335-6243
; 00-656-1872 * 04-380-8377
t 00-734-8345 05-134-6195 03-282-0144
00-630-9496 O 00-831-7679 . 00-734-8345
- 00-806-6987
05-069-0460
05-235-3422 00-904-9198 01-514-3858 00-407-1824
`
WHITCIAW CANDY CO
See WMf'sw w A ?< Co Inc Medford Or*
WHI1CIAW GLEN
logging P
St.it P.-i-te
Wash 99140
WHITFLAW JOHN R
log Cc^tr r
807 Sivuce Ccnjiee Dam Wash 9911G
WHITELAW W A 6 CO INC
N
W Fountnsup M Candy
518 W 6th Wolford Or* 97501
.
WHITEIEY nxn.incs
P.st Fixtur.t P
4138 N M.**.vippi rontood Or* 97217
WHITEIEY INDUSTRIES INC
*R
833 Woburn Wilmington Mass01SC7
WHITEIEY OPTICAL
Specif*!** N
166 VV Main St Lancaster Ohio 43130
'
WHITEL1GHT INDUSTRIAL 01V
See White Met Rofimq & Stamping* Vt
WHITELINE PAINT CO*
Mfg Paint R
1520 Spcncc St Los Angeie* Cal 90023
WHITEMAN ENTERPRISES* Concrelo Hdig Eqp S
13020 Pierce St Pacoima Cal
P 0 Bc-x 787 Pa;o?ma Cal 91331
'
WHITEMAN MFC CO*
Welding Tweha* P
1312 11th MusVrgon Mich
P 0 Bos 5 Muiknjon Mich 49440
WHITEMAN ROBERT N
Cabinet Shop N
1203 Henry Ave Elkins W V 26241
WHITEMAN YACHT CO
* Yacht* P
SCO F St Chula Vis'.a Cal 92021
WHITEMANS SHADE SHOP Window Shade* N
195 Church Detroit Mch 48203
WHITEMAflSH CONVERTERS INC
R
Mfg Ppr Converter*
S/E Cottmn F,. Hastxk Philadelphia Pa 19111
WHITEMARSH CONVERTERS INC
N
Mfg Ppr Convener*
4041 Rdge Ave Philadelphia Pa 19129 '
WHITEMARSH PRINTER
See S*t*re Charles Leroy Pi Washington Pa
WHITEMERS MOBILE HOME PRODUCTS
P
Mobile Home Fuller*
Summerland $t Valdosta Ca 31G01
WHITCMORE MANUFACTURING CO ' '
See V.-hiterTiore Manufacturing Co Tex
WHITCMORE MFG CO
'*
See Whdmrve Rc!*-xl A Fremont Cal
'*' *
WHITEN FRANK CONCRETE PRODUCTS
N
Concrete Pdt* 1127 Vollry Rd Fairfield Ala 35064
WHITENER CARPET CO U S Hwy 4 1 $ Datton Ga 30720
N
WHITENER EARL HOSIERY MILL
**
N
Men* Hoaiory
Nr Hwy 10 Vale N C 20168
**
-*
WHITENER HGSICRY CO INC
R
Mens Misses Hosiery
331-B 8:h St Dr Sc Hickory N C *
P 0 eoa 1741 HicItXY N C 23601
- >` -
WHITENER LUMBER CO INCCollege St Ext Ncwi-i_sry S C
*J
s
P 0 Box 697 Newberry S C 29106
*
WHITES AUTO FISHER
*
* ' *
See White Brother* Inc Pine Bluff Atk WHITES BATTERY SERVICE
' '*
N
W Scrap Mil Rbl Bat
' 1412 Nw 2Pth St Tori W'orth Tex'7G10G
"*
WHITES C E CO
See White* Charles E Waco Tex '* '* ' '
WHITES CANDIES
See Candy Enterprises Inc Miami Fla * ' *
WHITES CEMENT SPECIALTIES
* Mfgret N
S Seaboard Ave Venice Fla
''
P 0 Cox 907 Venice Fla 33595
* **'
WHITES CERAMIC STUDIOS
v ' M
5400 So Km<v,t.wy St tous Mo 63109 '
WHITES CERAMICS
Sec White Mi'dred t Santa Marta Cal
WHITES CHARLES E
Tr Rpr fit Mtrl* N
6007 New Me Gregor Waco Tex
*,
P 0 Box 71 G2 Waco Tex 7G710
WHITES CONCRETE PRODUCTS INC
>
* Concrete Pdt Pottry
5131 Oak Or Pavtdena Tex
**
63 64
70
63
62 07 64 69 * 67 *. ' ' Lr*.
`
WHITES DRAPERIES INC
Mfr Draperies
518 1/2 S Capital Iowa City Iowa
P 0 Box 710 tow* City towa 52240
'
WHITES DRAPERY SHOP
Custom Order
1C3 Adams Drive Newport New* Va 23G01
WHITCS ELECTRONICS INC
Octecu Units
1011 P'ejsant Vc'ty Sweet Home O'e 97J86
WHITCS FARM DAIRY INC Dairy % Tc* Milk
211 MiO-ll* St Arustv>tt Mass 02743
WHITES t\f\CHG\AS$ INDUSTRY Mfg Boat*
. N Hwy 33 Grove land fla 32736
N 66
N . 63 S S N C3
DC2 ' CB2 DD3
CC1 ---- GG2
1 3A3
CC2
FF3 * '
1. .. . HH2 - ccv'
r* 002 1
GG2 * *
CC3 - EE2 ' ; * ' *
--M-i -0 * -1--
v * \`k f F2 ' '' *-'. ' - *
2
CE2
---
002 ' .r
-( v_
' HM2 1
* '* -- ' -* EE2 .
02-465-3453 WHITE*; gift SHOP
Cnm.Ttrcal Prtg N 02
S Cannon Blvil 'AMneprji.* N C
CC3
03-228-0033
P 0 Po 7M')- Ks'.i.opoi'l N C
1
WHITES HERB OUTnCAMO SALES
R tio.il* Mt/ M Boat*
P
* __
17? W Rlh $t rrn.indma Och Fie 32034
04-219-0058 WHITES LOCKER SERVICE INC 113 S Mam Wrvylwarrt low#
Ml Proc H 65
EE3
04-967-5333
P 0 Bnx IPG Woodward Iowa 50276 WHITES lUMHER
A 0 ] t Mi h Chmpn J<Ke* Milt* Pa
Swmll ft 68
P 0 Rof 36
M.ili Ti 15640
00-719-3832 WHITES r.-.ACHir.'E SHOP N Of Town Ca'.hon Ona
Mihp Dirt Cootf N '
CB3
P 0 Ec 80 CaiKion OUa 73016
00-330-2975 00-013-1732
WHITES MACHINE SHOP
'
4330 Parv-rmiM Rd Knoxville T*nn 37919
WHITCS MINES
*
N
FF2 *'"
See White fl L Co Uvalde Tex
00-812-0200 V7HITES MINES INC
Rck CrtHg Asphlt Mx N
62
3A1
116 Trav* San Antonio Tex
P 0 Box 421 San Antonio Tex 70700
00-813-8166 WlirTES MINES INC
Asphalt Hot Mix X
7043 VaunSn Otvd Abitene Tex
.
P 0 Rgx 5643 Alj.lcne Tx 79605 00-601-8665 WHITES MINES INC
Mining ft
**
Brady Hwy Brownwood Tex
P 0 Bo* 518 Brownwood Tex 70301 04-949-7167 WHITES *M2A
-
- .
See White Josrph B 0*ckson Tenn
04-434-2848 WHITCS PRECISION GRINDING Machmcihoo N 67 3014-9 S H.Viiday Santa Ana Cal 92705
CG3
00-410-4683 WHITES PRINTING SERVICE
*N
5757 P,>rV BKd Pmen.ts Park Fla 33565
'
EE2
00-805-6079 WHITES PRINTING SHOP
Job Punting N
1023 Norma Shreveport La 71103" '
FF2
04-799-6376 W'HITES PRODUCTS CO
See White Dnna'd F Noble OH#
"
00-614-9555 WHITCS PURITY- DAIRY
*,
See DJhien Letter K'.-not N D
-
00-111-5641 WHITES QUAINT SHOP
See White Indu-.tnes Inc Westfield Mass
02-633-S37B WHITES SANDING
Wood Sanding N
CE1
7770 E Jcffft'son St Paramount Cat 90723 00-906-4841 WHITES SHOE SHOP INC Mfr Pel Repar Shoes n
8A1
00-433-C638 04-125-9333
W 430 Mam Si*ane Wash 93201
WHITES SIMON S0f*S
Monuments
Rt 40 M?*n St Box D Claysvlfe Pa 15323
'
WHITES SIMON SONS . . Monument*
503 Wshngtn Rd PittsNirgh Pa 15221
*
p N
CB1 4 4
00-303-8010 WHI1ES SLIP COVERS 6 DRAITRIES
'N
.
Slip Cvr Draperies
OCJ
219 Newton St SaMbury Md 21801
03-496-1857 WHITES TRAIL-A-WAY
'
See Security Mobile Homes Inc Reno Nev -
00-811-6394 WHITES UVALDE MINES
*
See Wti.te R L Co S^n Antonio Tex
01-124-8770' WHITES WELDlfJG 6 BODY SHOP INC Mfg Dump Trailer*
P
cc:
00*490-7390
Mill St Elmer N J 03318
*
WHITES WELDING REPAIR
* Fabrication Welding
M
GG'
hh;
` North Pole Alsk
3 **
00-42G-96920O-732-92G1
P 0 Do. 54 North Po'e Alsk S970S '
WHITES WELDING SHOP
M Orna !rn VVlJg
7003 C2'or<io St Middletown Ohio 4S042
WHITESCORO MFG CO INC Wmnx 0ieJ5O-
103 CoilmsviUe St White^boro Tex 7G273
M S
62
-- --
00-750-2768 WHiTESBORO NEWS RECORD
See Texoma Pubhshmg Co* Whncsuoro-Tex 04-73I-3G89 WHITESIDE DRFSS CO Connocl Mlg Wn Dr* R
GS
---
W/S Central Ave Burlington N J
P 0 Do. 704 (lurlioqron N J 06016 - '
*
00-429-6711 . WHITESIDE HOME IMPROVEMENT
ftSee Whiteside Mfg Co* Dotawv.ve Ohio'
00-429-6711 . WHITESIDE MFG C0`
At Crcopf'S 6 Genlr
62
CC2
' 309 lioycs $t Uelav/ore 0fo
'
05-137-1307 00-638-4^52
P 0 Do. 372 DclAwsre Ohio 43015 WHITESIDE ORNAMENTAL IRON CO-
' Iron Future*
7414 Ptrvelanr! Ave Cotuinl'US Oh*0 43211 ----
WHITESIDES GEORGE VY CO' Solvent* L Coatmgs
N P
70
FF2
__
CB1
3048 Mich.q/m Dr lo;usvMc Ky 40212
04-641-09C*6. 'Whiteson'sales coup------------------------- Hoistr
97 Kenneily St Hjcensack N J 07601 ;
01-230-4697 WHITESIONE OAKERY INC
1710 Bronxdjie Ave Bronx N > u^4b2
00-333-6143 WHITrSTONC CHEMICAL CORP
Mlg
Mam Si White Stcme S C 20360
00 S52-23&8 WHIYESTONE MFG CORPORATION
-
M4-: Sm Aircrti'P*rt
-N-4 '62 N 62
ft 63
N 63
"--
CC3 OCI
00-240-7039
43197 Vvlurtier Mrmot Cal 923^3 '
WHITfSTONE PACKING CORP
Provnion*
630 38 Crtvxri St Bronx N Y 10474'
R
1
DSW 443168
5128
STLCOPCB4057708
JOHN O. MOOMAW
ATTORNEY AT LAW
TELEPHONES: Office 384-4702 Home ?S4*4949
Area Code ei2
e EAST MAIN STREET BLOOMFIELD, INDIANA 47424
December 20, 1972
Mr. Phoclon S. Park, Sr.
Attorney cb Law
800 North Lindbergh Boulevard
St. Louis, Missouri 63166
Dear Mr. Park:
Enclosed is an itemized list of materials and labor
on jobs resulting from the use of the substance in question
to this date. You will note names and addresses if con
firmation of these facts are required.
.
I understand from Mr. Autrey the Vice President that there are still additional claims being presented.
Please give me some response to this as soon as possible.
JOM/fc Enc. 1
/
DSW 443169
STLCOPCB4057709
BLOOMFIELD SILO CO., INC.
TELEPHONE 812-384-4305. 812-384-4154
620 SOUTH JEFFERSON
BLOOMFIELD, INDIANA 47424
December 19, 1972
Material and Labor used in repairing and rebuilding Silos because of the use of Cumar containing PCB's.
Mr, Walter Ballard, ^oute 2, Loretto Kentucky 12'x40' Silo; Cleaned vails, refinished inside
$ 266.26
Mr, Clifford Ard, Route 1, Nancy Kentucky 20*x60' Silo; Taken down and rebuilt with new Concrete Staves,
$5,025.17
Finis Flynn, Route 1 Nancy ^entucky 20,x60l Silo; Taken down and rebuilt with new Concrete Staves, Also Scraping inside of 20'x60' and refinishing
$5,025,17 935,00
Mr, Vernon McGowan, Jabez, Kentucky 20,x60' Silo; ^'aken down and rebuilt with new Concrete Staves
$5,025.17
Marcus Muse, Route 1, Nancy Kentucky 20,x60' Silo; Taken down and rebuilt back with new Concrete Staves Also Scraping inside a 20*x60' and refinishing
$5,025.17 935.00
Rollan Shuffett, Route 1 Greensburg, ^entucky 20,x60* Silo; Taken down and rebuilt with new Concrete Staves
$5,025.17
John DeBoard, Somerset, ^entucky 16'x40' Silo; Scraping walls and refinishing inside.
'
Lonnie Gene Aj&ms, Koa-te
Martinsville, Ind,
18'x60` Silo; Walls cleaned and .refinished
$ 375.00 $ 434.00
Total
$28, 071.11
Signed Mr, Rex Autrey, Vice-President
DSVJ 443170
STLCOPCB4057710
"3"
April 17, 1972
Dear Sirs: In regards to the silo I bought from you, the sealer
you put on it was not acceptable by the Board of Health. SO in order for you to repair it I had to take r.y silage out and couldn't feed it. I loot 16 feet of silage which figures lifA tons in the bottom of r.y silo. '
According to Cumberland CPCA and Hugh Hurst, County Extension Agent, figuring my lose up ;at 12.00 per ton for silage and 2.00 per ton for labor you now owe me 2,016,00-,
Sincerely Tours,
-Z-
Finis Flynn Route 1 Box 52 Haney, Ky.
3TATIL OF KST'T.UCmr
COITTY OF PULASKI
.'
Suscribed and sworn to before me by Finis Flynn this lYth.
day of April Sz 1972
My commission expires 1-10-72
Notary Public
i A - h. .
DSW 443171
STLCOPCB4057711
t
April 24, 1272"
BLUIFIELD GILO COUPAiGT IvX00:.5T2LD IID/
I the undersigned, do hereby certify that the following
is a true and correct estimate of loss on damiged silage.
SO ton of silage At $12.00 per ton
- . OOoO.OO
Labor on destroying damaged silage
' i/iciO.GO
Loss of milk due to damaged silage
. ' $ 1700.00
Total $ 3,140.00
State of Kentucky County of Pulaski
//
Subscribed and sworn to before by Vernon 9. lie Gowan this the 24 day of April 1272
Uy commission expires 1-10-1^72
Litany Fublic
DSW 443172
STLCOPCB4057712
i.
TO BL00MFI3LD SILO COMPATY l6timate of damaged silage
Taney, Ty. April 14,1:72
275 ton took out of silo.
County Agents estimate
$12.00 per ton total loss $3300.00
STAT30F K3TTUCKY COUim OF PULASKI
Subscribed and sworn to before me by Marcus Muse
this 14 day of April 1972.
Kotpfry Public Ky commission expires 1-10-74
i : 7.
..
DSW 443173
STLCOPCB4057713
0 S\N
Ac- y^.^-xA
7~?ya^-^_ ^eA-*~---yjit -*--<_
!
C&^, ^Az-z^n-x^ ccz-^-ay^
t^-'J'L-ce-FySCt-^
yAtZ^^AALL.
'<>^*A*--C-ZZ1
~-C-t_^ ^<2~epy&^~ <Z>-~Z~-t^ A<A,
ji r sC^
^AAc-^2^
,/l^aJiL ~A~<*~ePAAdu /^ggsAStt-AA,
-^^3-cA-^1 c/^c^ ^^r-*c_ <2/7*-
AAA ^z^yAy-e. t^-AA^cAf' ^i<S~a
^,yjL^.<^zau.
^A^g^e.
&-&t ^aAsL < f jc^/ sy^ ^aa
/^/
*z- z^r^ti-o^
1
y^U.cAe/^c^. i
s^i^cO- c-iAczA^AAAzcA i
cO <t
'/Oly*^. z-z-^^-c. 25 ^c-erzr>^ cx^ay ^2~t"ZK'Ls -<*.
e:~^5^czs&4Aiz^<zJ &&2:. /0*pz cTjv
-^`1 ? !f'
STLCOPCB4057714
VERTIFICATION OF CLAIM
STATE OF KENTUCKY
COUNTY OF PULASKI...SCT:
The affiant, Clifford Ard, of Route 1, Box 66, Nancy,
Pulaski County, Kentucky, being first duly sworn, states that the
Bloomfield Silo Company of Bloomfield, Indiana, constructed a silo ,
up.on the farm of this affiant; that thereafter he filled said silo
with five hundred forty (540) tons of silage which he used to feed
his milk cows; that in the fall of 1971 tests were made by the
Kentucky Board of Health which disclosed that the milk being sold
by this affiant was contaminated with a substance, the name and
details of which are not known to this affiant; that it was sub
sequently discovered that the substance contaminating said milk
came from the materials used in the silo constructed by Bloomfield
Silo Company as aforesaid.
,,
That this affiant thereupon had to destroy two hundred
fifty (250) tons of silage valued at Twelve ($12.00) Dollars per
ton remaining in said silo; that the reasonable cost for the re
moving of said two hundred fifty (250) tons of silage from said
silo was Two ($2.00) Dollars per ton; that due to the fact that
this affiant was unable to refill said silo, he was required to
handle five hundred forty (540) tens of silage twice since same
was placed in temporary storage until it could be placed in silo;
that the reasonable cost of handling said silage an additional
time is the sum of Two ($2.00) Dollars per ton; that as the direct
and proximate result of a substance contaminating the silage placed
in said silo and the necessity of removing and destroying same and
of temporarily storing new silage this affiant incurred expense of
Four Thousand Five Hundred Eighty ($4,580.00) Dollars; that the
aforesaid sum is just, true and correct; that there are no setoffs
or credits due; that this affiant ought to recover of the Bloomfield
Silo Company the sum of Four Thousand Five Hundred Eighty'($4,580.00)
Dollars with interest from date of this claim at six (6%) percent
per annum.
')F .' .fi -a.
OS^1
STLCOPCB4057715
'^Subscribed and sworn to before me by Clifford Ard of Route 1, Box 66, Nancy, Kentucky, this,^A~X2^day of April, 1972.
My commission expires
2T
Y* V'
OS'N 443116
STLCOPCB4057716
STn,!l f tre*< \`X3 .:=* k Y* ' *A`,j:n 1i,.VSfc MMliooomt--Ess5SCCTfrlfia^vj
jyf&>,r,,y/*:'
Oneida nit^n,
V4
I
OS*
./
STLCOPCB4057717
I f.rr:
V--
S-8
I I
. STATUS REPORT ON jj 3 i THE CHEMISTRY AND TOXICOLOGY
OF POLYCHLORINATED BIPHENYLS (PCB) OR AROCLORS
AS OF JUNE 1, 1970
'Bureau of Foods, Pesticides and Product Safety Food and Drug Administration Public Health Service
Department of Health, Education and Welfare Washington, D.C.
FDA status reports are intended for internal use only and their distribution and availability are therefore limited. They should not be cited as a publication in the scientific literature. The status report does not constitute a statement of FDA policy, but is solely meant as a summary evaluation of the problem area covered to date. Status reports may include interim progress and incomplete developments of unfinished research, which are specifically protected from disclosure under the Freedom of Information Act.
C"
Li.
DSW 443178
STLCOPCB4057718
' Page 3
ei at levels of approximately 27 ppm were detected in a sample of shredded
` \jectcd an^ examined os pert of the Apri 1-May-, 1971 market basket survey.
off0'" materials, packaging materials, and finished products were collected
f0|low-up inspection ct the manufacturer. Analyses of samples of raw materials
'd who of from the production line and cleaned wheat and cuttings from bag)
d no PCS contamination. PCB residues were defected in scmples of bleached
lined chipbocrd and boxes used for packaging shredded wheat at levels of
'^rn and 17.6 ppm respectively. Examination of a sample of the finished product
\cged on the dey of the inspection disclosed that PCB, if present, were less than
^firmation levels. Analyses of five samples from previous production lots showed
contamination of the shredded wheat in all five scmples renging from 0.3 to
j$>ppm. Follow-up inspections of the plants fabricating the packaging materials
fho\ved that recycled peper v/as being used to make the boxes and dividers.
.
in August 1971, Cincinnati District analyzed samples of various packaging materials.
PCB residues ranged from 1.9 to 433 ppm. The highest level was detected in a box .
intended to be used in pcckoainn saltines.
.
4. PCB CONTAMINATION DUE TO LEAKAGE OF HEAT EXCHANGE FLUID
Heat exchange fluids containing PCB are used in certain pasteurization equipment. Problems to date have involved direct PCB contamination of animal by-products intended for animal feed purposes.
` leakage of the heat exchanger fluid from equipment at the East Coast Terminal,
--Wilmington, N. C. ccused ihe PCB contamination of fish meal which was then used
OS a component of animal feed. A.nalyses or 166 scmples of shell eggs from chickens
fed the contaminated feed showed 117 scmples with PCB levels ranging from a trace
fo 4.2 ppm. PCB residues in 55 scmples were cbove 0.5 ppm. ' Fourteen of 29 samples
of catfish fed PCB contaminated fish meal were found fo conicin PCB residues renging
from a trace fo 3.1 ppm.
''
.
Since the incident at East Coast Terminal, suspected leakage of PCB from equipment
has allegedly caused confcmination of animal by-products and animal feeds at three
other plants. Investigations cf these other plcnts are continuing.
,
5. -PCB IN PAINT AND SEALANT
In 1970 dairy silos treated with paint and sealant containing PCB resulted in extensive ^contamination of dairy herds and raw milk in Ohio and Kentucky. Reportedly, painty
and sealant with PCB has since been removed from the market.
------ /
SW 443l7g
STLCOPCB4057719
PROGRAM 7306.02
i
_t
approach
j# Inspectorial
Districts are responsible for follow-up investigations including inspections if necesscry to determine the source of any PCB contamination detected.
The Districts should work with the Regional A;iilk and Food Consultants end state and ' local officials to determine sampling sources ard to facilitate follow-up activities.
I There will be no CP-1P Issuance by EDRO for this program.
*
2. Sample Collection
*
.
'
The attached disfrief/sfate sampling schedule has been developed from available information regarding the milk production of each stete for both bottling and manufacturing use. Districts should mcke every effort to collect the samples as specified and to distinguish befv/een milk for bottling and milk for manufacturing use. It is recognized that in some instances the latter will not be possible.
Sampling sources should be selected on a random basis to reflect milk production
ond usage within each stete. Samples may be collected from both interstate and
introstote sources.
'
District
State
-ATL-DO
- -- -------------------------------------------
Georgia1 Florida Alabama Mississippi Tennessee North Carolina South Carolina
Samples 40 5 7 3 4 6^ 6 3'
Manufacturing Mi Ik Samples 12
--
--
I 1 3X |
2
Total Scm: 52 5 7 4 5 9 75
BLT-DO
Maryland Virginia West Virginia
13 6
6
I
3 16
I7
I7 12
Transmittal no. 72-8 (2/3/72)
DSW 443180
PAGE 2
STLCOPCB4057720
Report Prepared toy
Issued
by
feshington, D.C. 20250
DSW 443181
A previous FDA pesticide surveillance program for FY 71 and 1st quarter of FY 72 shoved the following levels of PCBs in various feeds and feed components:
Product
' No. Sample si'
Percent Positive
Hays, natural Hays, dehydrated Silage Grain, whole Grain, ground Cereal byproducts Oilseed byproducts Animal byproducts Fish byproducts
104 46 81
105 50 43 41 25 23
1/ Includes imports.
1 0 2.7 0 4.0 0 0 8 35
Range of Positive
(ppm)
-' 0.15-1.12
T-0.32
1.08-1.32 0.2 -5.0
PCB-Containing Paints and Sealants
This problem was identified originally when the Ohio State
Department of Agriculture detected PCB residues in milk
samples from the Cincinnati milkshed. They traced the
contamination to the walls of concrete stave silos which
had been painted with PCB-containing paint. PCBs have
also been used in silo sealants.
have
^y, Tennessee, North Carolina,
West Virginia and Pennsylvania; but information about the
number of contaminated silos on a national basis is lacking,
Prior to 1968, one of the paints used to coat the interior of concrete-stave silos contained Aroclor 1254. Igreggi? centered in Ohio and
o/in Tennessee, the materiil was only used to seal the joints between the staves.
DS\N 443182
STLCOPCB4057722
11 Field studies by the Animal Science Research Division
i.p fqd^ The PDA-proposed guideline for PCB residues in '
milk is 2.5 ppm in milk fat. Invariably, a dairyman with
PCB-contaminatcd silos will produce milk exceeding the
guideline for at least that part of the year when silage
is fed. Milk from four farms in Tennessee where only the
silo joints were coated with PCB-containing paint has been
examined by ASRD. The residue levels were about..5 ppm in ~~
milk-fat when silage was being fed.
.. -
' ............................ ..
N
The Aroclor 1254 residues in silage occur mainly within
2 or 3 inches of the silo wall. As one progresses down
the silo, it is possible to detect small amounts of PCB
several feet from the wall. The levels of PCBs found in
-/
...
silage have ranged from 3.A to 31 ppm within A inches and
from 0.1 to 0.27 ppm from 6 to 2A inches from the wall
^Skrentny et al. 1971).
'
In addition to paints and sealants for silos, PCB-containing paints, putties, and water-proofing compounds have been used on animal feed troughs and other surfaces. In one Instance where a feed trough for swine was coated with a sealant containing Aroclor 125A, chips from the bottom contained 8000 ppm PCBs. Similarly finished feed trans ported in a newly painted hopper car contained 6.5 ppm of Aroclor 12A8.
3. Plastic Materials
The PCB contamination' of eggs from laying hens in New York State, which led to the incrimination of a bakery byproduct meal used in the laying mash, is an example of PCB contami nation from plastic wrappings. It appears that the amounts of these materials ground up with the bakery byproducts were sufficient to explain the PCB contamination.
4. Heat Transfer Exchanger Fluids
PCBs have been used extensively as heat transfer exchanger fluids because of their high flash points. Leaks on a hot surface or into a furnace present a fire hazard with
DSW 443183
STLCOPCB4057723
B. Effect of PCBs on Animals and Transfer to Animal Food Products
1. Dairy
Fries (1971) has found that cows fed 200 mgs of Aroclor 1254 daily for 60 days produced milk containing 50 ppm of PCBs in the fat. When PCB feeding was stopped, the level in the milk fat dropped from 50 to 24 ppm in 10 days. Thereafter, the concentration decline was approximately 17. per day. Concentration of PCBs in the milk fat was not related to stage of lactation or level of milk production. Milk from cows fed uncontaminated silage can contain 1 to 2 ppm of PCBs in the milk fat.
Routine surveillance methods in the past have not been I adequate to detect PCB levels exceeding the guideline
in the individual dairyman's herd.
,FDA,
I results of FDA surveys, the overall milk supply'does I
mot present a significant health hazard to the general)
public^ There may be a possible hazard, however, to 1
the individual farm family if they consume milk produced
on the farm. Assuming consumption of one quart of milk
per person per day with an average contamination of
.Z.5 ppnujn the fat, an individual could consume as much .
as^ lOjng of PClT'per`"year. Whether or not this level
of intake over several years would constitute a health
hazard is not known, but a total intake equal to 1/10
/of the minimum short-term dose known to produce clinical
defects in the Japanese experience could occur in a 5-year period at this rate.
/ I
Field and laboratory studies by ASRD indicate that the rate of dynamics of Aroclor 1254 milk secretion is identi cal to the residue behavior of the DDT metabolite, DDE. Aroclor 1254 is resistant to metabolic degradation, and it is transferred efficiently to milk fat or to body fat. It requires about 6 to 8 weeks to reduce milk residues by one-half after the cow is placed on clean feed. No practical method has been found for speeding up the decontamination of the animal. Charcoal appears to be somewhat effective in the prevention of absorption when fed with PCB-containing silage but has no value in removing body stores.
DSW 443184
17
'.Cull dairy animals from farms with contaminated silos I '.could be expected to have tissue residue levels of PCB
l\i exceeding 5 ppm in the fat. In general, the tissue
'residue levels would be similar in magnitude to the milk residue levels. Silage is not a significant feed for fattening cattle; therefore, it is probable that no other class of meat would be contaminated from this
source.
Practical methods for handling the contaminated silos short of complete abandonment have not been developed. A feasible method would have to cost significantly less than the price of a new silo.
Temporary expedients have been attempted. Since most of the contamination is adjacent to the wall, some /individuals have discarded the material within 3 or 4 inches of the wall. ASRD and the University of Kentucky have examined milk from several farms where this was attempted. Residue levels were reduced but 'did not consistently fall below the guideline.
A plastic barrier installed as the-silo.jis filled shows promise as an effective temporary expedient. "Very little PCR penetrates through the barrier; however, as in the case of attempting to avoid the material next to the wall, this method is impractical with mechanical unloading and one cannot be certain that the barrier I will be used In future years.
PCBs are quite soluble in a number of nonpolar solvents. Thus, with the appropriate selection of solvent, it should be possible to wash most of the PCBs off the walls.
tee).
uif^rdht^5^erds.
'* H Tnnr-r*
m
Another method of removing the PCBs from the silos would be sandblasting. The cost of sandblasting has been established at more than half the price of a new silo
l osw 443185
STLCOPCB4057725
18
C
and in many cases would exceed the depreciated value ' . of the existing silo. Sandblasting also creates a sig
nificant dust problem; thus, it is possible that one
would remove the PCBs from the silo wall but spread it I to the other areas around the farm.
2. Poultry
.
.
Rehfeld et al. (1971) have recently reported that the maximum tolerance of chicks to PCBs, containing 48% chlorine, is approximately 50 ppm in the diet. Symptoms observed in chicks fed PCBs included depressed weight gain, edema, gasping for breath, hyperpericardial fluid, internal hemorrhaging, depression of secondary sexual characteristics, and an increase in liver as a percent of body weight. Several of these symptoms were present when levels of more than 20 ppm of PCBs were fed.
Scott et al. (1971) fed four levels (0.5 to 20 ppm) of Aroclor 1248 to White Leghorn hens for 8 weeks and measured the effect on egg production; egg breaking strength; fertility; hatchability of fertile eggs; feed consumption, and PCB content of eggs, adipose, and other tissues. No effect was observed on feed intake, breaking strength of eggs, or fertility. Egg production was reduced 10 and 13% after 8 weeks when 10 and 20 ppm of PCBs, respectively, were fed. At these levels, the eggs contained 3 and 7 ppm, respectively.
The two lowest levels of dietary supplemental PCBs, h 0.5 and 1.0 ppm, resulted in plateau levels in eggs of
!j 0.2 and 0.45 ppm, respectively, and 3.1 and 6.6 ppm in | adipose tissue after 8 weeks. The ratio of PCB in eggs j compared to that in adipose tissue of the hens ranged | from 1:12 to 1:15.
i The effect upon hatchability was more dramatic than egg production. The lower levels of 0.5 and 1.0 ppm of PCB produced no effect, but the 10 ppm level of PCB reduced hatchability in 4 weeks to 65 percent, and the 20-ppm level almost completely eliminated hatchability of the eggs. At this higher level, the embryos in eggs died during the 21st day of incubation.
DSW 443186
i
\
t
1
t
t
l
STLCOPCB4057726
36 Adams Bevenue Bowman Britton Cox
Crosby Dahm
SURVEY OF RESEARCH IN AGRICULTURE
- Looking for DDT, chlorinated hydrocarbons, and PCBs In rainwater.
- Working on analytical method to determine residues in water and sewage.
- Working on method to separate from DDT and DDE.
- Studies are being conducted to determine the levels of several of the PCBs which influence hatchability when added directly to the egg or when added to the diets of laying hens. Tissue and egg residues are being analyzed.
- (1)
Developed a method using chromous chloride reagent to distinguish toxaphene from PCBs, singly or in mixtures, in any substrate, but primarily in water.
(2) Tables of "p-valves" in several solvent pairs were determined for all visible GC peaks from five com mercial Aroclors in order to provide an additional confirmation procedure for distinguishing pesticides from PCBs. Although different "p-valves" were obtained for ,,-DDE and the PCB peak having the same GC retention time, the standard deviation of the method permitted too much overlap for reliable confirmation.
(3) During the analysis of 111 egg product samples thought to be contaminated with PCBs, it was found that a simple hexane solution from a Florisil column would separate PCBs from naturally occurring inter fering substances in the eggs.
- Study the effects of sunlight on PCB when suspended in water and hydrocarbons. Found that there Is a breakdown of PCBs.
- Several mink have been collected in the Iowa area and analysis of fat, brain, and liver for PCBs and chlorinated hydrocarbons will be made. Levels will be correlated with age.
- Found PCBs (Aroclor 1254) in sealant in silos. The milk from cows eating this silage contained levels of PCBs in excess of that considered safe by FDA."-
1
Willett Young
39
Aroclor 1242 was extensively investigated in rats and Japanesequail and caused an increase in liver weight and liver lipids and lowered liver vitamin A concentration and content.
Aroclor 1254 has been used in silo coatings. ...In a detailed study of one herd, the rate of elimination of PCB residues from milk followed approximately the same | kinetics as DDE. Treatment with activated carbon and/or phenobarbital did not enhance the rate of PCB elimination from cows.
- Research objective is to eliminate PCB residues from a / contaminated dairy herd by (1) covering PCB coating in
silo; (2) elimination of fat pools in dairy animals; and (3) centrifuging milk to remove fat-soluble PCB contamiv nants.
- Analyzed PCB levels in diets, feces, and urine samples of preadolescent girls fed diets typical of low-income families. Also checked levels in paper bags, marking tags, turkey fat, heavy fowls, eggs, and poultry feeds.
!i
i
i
I I
I t I i it (
i
t
|
f i
''N f
DSV\( 443188 l '\
STLCOPCB4057728
JOHN O. MOOMAW
ATTORNEY AT LAW
TELEPHONES: Office 384-4703 HOME 384-4949
Area Code 812
a EAST MAIN STREET BLOOMFIELD. INDIANA 47424
December 20, 1972
Mr. Phocion S. Park, Sr. Attorney d; Law 800 North Lindbergh Boulevard St. Louis, Missouri 63166 Dear Mr. Park:
Enclosed is an itemized list of materials and labor on jobs resulting from the use of the substance in question to this date. You will note names and addresses if con firmation of these facts are required.
I understand from Mr. Autrey the Vice President that there are still additional claims being presented.
Please give me some response to this as soon as possible.
JOM/fc Enc . 1
DSW 443189
STLCOPCB4057729
BLOOMFIELD SILO CO., INC.
TELEPHONE 812-384-4305. 812-384-4154
620 SOUTH JEFFERSON
BLOOMFIELD, INDIANA 47424
December 19, 1972
Material and Labor used in repairing and rebuilding 1 Silos because of the use of Cumar containing PCB's.
Mr. Valter Ballard, Route 2, Loretto Kentucky 12'x40' Silo; Cleaned vails, refinished inside
$ 266.26
Mr. Clifford Ard, Boute 1, Nancy Kentucky 20*x60' Silo; Taken down and rebuilt with new Concrete Staves.
#5,025.17
Finis Flynn, Route 1, Nancy ^entucky 20'x60' Silo; Taken down and rebuilt with new Concrete Staves. Also Scraping inside of 20'x60' and refinishing
#5,025.17 935.00
Mr, Vernon McGowan, Jabez, Kentucky 20'x60' Silo; ^'aken down and rebuilt with new Concrete Staves
#5,025.17
Marcus Muse, Route 1, Nancy Kentucky 20'x60' Silo; Taken down and rebuilt back with new Concrete Staves Also Scraping inside a 20'x60t and refinishing
#5,025.17 935.00
Rollan Shuffett, Route 1 Greensburg, ^entucky 20'x60' Silo; Taken down and rebuilt with new Concrete Staves
#5,025.17
John DeBoard, Somerset, ^entucky lG'xAO' Silo; Scraping walls and refinishing inside.
# 375.00
Lonnie Gene Ajams, ^oute 4, Martinsville, Ind. IS'xSO' Silo; Walls cleaned and refinished
# 434.00
Total
#28, 071.11
Signed Mr. Rex Autrey, Vice-President
0S\N 443190
STLCOPCB4057730
JOHN O. MOOMAW
attorney at law
Office 364*4702 HOME 364*4949 Area Code 612
B EAST MAIN STREET BLOOMFIELD. INDIANA 47424
November 16, 1972
Mr. Karl F. Meyer, Supervisor The Travelers Insurance Company 522 Olive Street St. Louis, Missouri 63101
Re: Monsanto Company Bloomfield Silo Company - Aroclor
Dear Mr. Meyer:
On April 17th we wrote to you for Bloomfield Silo Company regarding damages suffered by them as the result of using the product known as "Aroclor1'.
On June 19th you finally replied that you were investigating the matter and would advise us within a short time .
It has now been eight months since our original letter and six months since your reply. I feel sure that you have had time to complete your investigation. My client has paid substantial claims in labor and materials directly connected with the use of the product sold by Monsanto and feel that they should be reimbursed for their losses.
Please let us know your intention in this matter promptly.
JOM/fc
DSV\J 443191
STLCOPCB4057731
JOHN O. MOOMAW
ATTORNEY AT LAW
Telephones; Office 384*4702 HOME 384*4849
o Area Code 612
S EAST MAIN STREET BLOOMFIELD. INDIANA 47424
April 17, 1972
Mr, Karl F. Meyer, Supervisor - The Travelers Insurance Company ----522--Olive Street
St. Louis, Missouri 63101
'
' Dear~Mr. Meyer:
--------------- Bloomfield Silo Company has consulted me with respect
to damages suffered by them as the result of using Monsanto's
product known as "Aroclor':.
.
To date they have expended the sum of $5,639.60 in
___ labor and materials directly, connected with the use of
the' product sold by Monsanto. Many other claims are
` presently being made against this Company for the same
reason and it is the feeling of my client that they should
be reimbursed for any loss sustained by them in this
___ respect.
-
Please let us know your intention in this matter as soon as possible.
JOM/fc
STLCOPCB4057732
U. S. DEPARTMENT OF
'Boom 602 ffulsin 3uilding
222 E. Ohio Street
Indianapolis, Ird. 46204
NAME-AND TITLEOF INOtVIOUAL
0.
-
TO:
jNUMBER AND SJR&ET
tool
~ f\
NOTICE OF INSPECTION
l/f ..
'
DATE
t- N- 7/
i **---- /. an
7__________ ....................... .
-:
__________
-.................
Notice of inspection is hereby given.pursuant to Section 704(a) of the Federal Food, Drug, and Cosmetic Act ~21 U.S.C. 374(a)_7* and/or Section 11(b) of the Federol Hazardous Substances Labeling Act /CIS U.S.C. 1270(b)J7* and/or Section 511(d) of the Federal Food, Drug, and Cosmetic Act os added by the Drug Abuse Control Amendments of 1965 C21 U.S.C. 360a(d)C.
Q
* Set below.______________________________
SIGNATURE (Food and Drug Administration Inspector)
M
Section 704 of the Federal Food, Drug, and Cosmetic Act /~21 U.S.C. 374.7 is quoted below:
during the period covered by the inspection. Each such inspection shall be commenced and completed with reasonable promptness. The provisions of the second sentence of this subsection shall not apply to--
Sec. 704. (a) For purposes of enforcement of this Act, officers or employees
(1) pharmacies which maintain establishments in conformance with any
duly designated by the Secretary, upon presenting appropriate credentials and
applicable local laws regulating the practice of pharmacy and medicine
written notice to the owner, operator, or agent in charge, are authorized (1)
and which are regularly engaged in dispensing prescription drugs, upon
to enter, at reasonable times, any factory, warehouse, or establishment in
prescriptions of practitioners licensed to administer such drugs to patients
which food, drugs, devices, or cosmetics are manufactured, processed, packed,
under the care of such practitioners in the course of their professional
or held, for introduction into interstate commerce or after such introduction, or
practice, and which do not, either through a subsidiary or otherwise,
to enter any vehicle being used to transport or hold such food, drugs, devices,
manufacture, prepare, propagate, compound, or process drugs for sale other
or cosmetics in interstate commerce; and (2) to inspect, at reasonable times
than in theregularcourse of their business ofdispensing or selling drugs at retail;
and within reasonable limits and in a reasonable manner, such factory, ware
(2) practitioners licensed by law to prescribe or administer drugs and who
house, establishment, or vehicle and all pertinent equipment, finished and
manufacture, prepare, propagate, compound, or process drugs_solely for use
t unfinished materials, containers; and labeling therein. In'the case of fifty----------factory, warehouse, establishment, or consulting laboratory in which pre
in the course of their professional practice; (3) persons who manufacture, prepare, propagate, compound, or process
I scription drugs are manufactureJ, processed, packed, or held, inspection shall extend to all things therein (including records, files, papers, processes,
drugs solely for use in research,teaching, or chemical anelysisand not for
male; ... .
....
.____________
.
controls, and facilities) bearing on whether prescription drugs which are adult
(4) such other classes of persons as the Secretary may by regulation
erated or misbranded within the meaning-of this Act, or which may not be
exempt from the application of this section upon a finding that inspection as
manufactured, introduced into interstate commerce, or sold, or offered for sale
applied to such classes of persons in accordance with this section is not
by reason of any provision of this Act, have been or are being manufactured,
necessary for the protection of the public health.
processed, packed, transported, or held in any such place, or otherwise bearing on violation of this Act. No inspection authorized for prescription drugs by the preceding sentence shall extend to (A) financial data, (3) sales data other than shipment data, (C) pricing data, (D) personnel data (other than data as to qualifications of technical and professional personnel performing functions subject to this Act), and (E) research data (other than data, relating to new drugs and antibiotic drugs, subject to reporting and inspection under regulations lawfully^issued pursuant to section 505 (i) or (j) or section 507 (d) or (g) of this Act, and data, relating to other drugs, which in the case''of a new drug would be subject to reporting or inspection under lawful regulations issued
(b) Upon completion ofanysuch inspection of a factory, warehouse, consulting laboratory, or other establishment, and prior to leaving the premises, the officer or employee making the inspection shall give to the owner, operator, oragent in charge a report in writing setting forth any conditions or practices observed by him which, in his judgment, indicate that any food, drug, device, or cosmetic in such establishment (1) consists in whole or in part of any filthy, putrid, or decomposed substance, or (2)has been prepared, packed, or held under insanitary conditions whereby it may have become contaminated with filth, or whereby it may have been rendered injurious to health. A copy of such report shall be sent promptly tothe Secretary.
pursuant to section 505 (j) of this Act). A separate notice shall be given for
(c) If the officer or employee making any such inspection of a factory, ware
each such inspection, but a notice shall not be required for each entry made
house, or other establishment has obtained any sample in the course of the
FORM FO-442 (3/66)
' . ..
DSW 443193
STLCOPCB4057733
inspection, upon completion of the inspection and prior to leaving the premises he shall give to the owner, operator, or agent in charge a receipt describing the samples obtained.
(d) Whenever in the course of anysuch inspection of a factory ot other establishment where food is manufactured, processed, or packed, the officer or employee making the inspection obtains a sample of any such food, and an analysis is made of such sample for the purpose of ascertaining whether such food consists in whole or in part of any filthy, putrid, or decomposed substance, or is otherwise unfit for food, a copy of the results of such analysis shall be furnished promptly to the owner, operator, or agent in charge.
Sections 511 (a), (b), (c), (d), and () of tho Federal Food, Drug, and Cosmetic Act as added by tho Drug Abuso Control Amendments of 1965 21 U.S.C. 360a J ora quoted bolow;
"Sec. 511. (a) No person shall manufacture, compound, or process any
depressant or stimulant drug, except that this prohibition shall not apply to
the following persons whose activities in connection with any such drug are
solely as specified in this subsection:
"(1) (A) Manufacturers, compounders, and processors registered under
section 510 who are regularly engaged, and are otherwise qualified, in
conformance with local laws, in preparing pharmaceutical chemicals or
prescription drugs for distribution through branch outlets, through whole
sale druggists, or by direct shipment, (i) to pharmacies ortohospitals, __
clinics, public health agencies, or physicians, for dispensing by registered
pharmacists upon prescriptions, or for use by or under the supervision of
practitioners licensed by law toadminister such drugs in the course of their
professional practice, or (ii)to laboratories or research or educational
institutions for their use in research, teaching, or chemicalanalysis..............
. "(B) Suppliers (otherwise qualified in conformance with local laws) of
_ manufacturers, compounders, and processors referred to in subparagraph (A).
`1 (2) Wholesale druggists registered under section 510 who maintain
establishments in conformance with local laws and are regularly engaged in
supplying prescription Jrugs (A) topharmacies, or to hospitals, clinics,
public health agencies, or physicians, for dispensing by registered
pharmacists upon prescriptions, orforuseby or under the supervision of
practitioners licensed by law toadminister such drugs in the course of
"^their professional practice, or (8) to laboratories or research or educational
- institutions for their use. in research, teaching, or clinical analysis.
"(3) Pharmacies, hospitals, clinics, and public health agencies, which
maintain establishments in conformance with any applicable local laws
regulating the practice of pharmacy and rredicine and which are regularly
engaged in dispensing prescription drugs upon prescriptions of
practitioners licensed to administer such drugs for patients underthe care
of such practitioners in thecourse of their professional practice.
"(4) Practitioners licensed by law to prescribe or administer depressant
or stimulant drugs, while acting in the course of their professional
practice.
v
"(5) Persons who use depressant or stimulant drugs in research,
teaching, or chemical analysis and not for sale.
.
___ "(6) Officers and employees of the United States, a State government, or
apolitical subdivision of a State, while acting in the course of their official
duties.
` * (7) An employee or agent of any person described in paragraph (1)
through paragraph (5), and a nurse or other medical technician under the
supervision ofa practitioner licensed by law to administer depressant or
stimulant drugs, while such employee, nurse, or rredical technician is
acting in the course of his employment or occupation and not on his own
account.
"(b) No person, other than--
" (1) a person described in subsection (a), while such person is acting
in the ordinary and authorized course of his business, profession,
occupation, or employment, or
' ` `(2) a common or contract carrier or warehouseman, or an employee
thereof, whose possession of any depressant or stimulant drug is in the
usual course of his business or employment as such, shall sell, deliver,
or otherwise dispose of any depressant or stimulant drug to any other
person.. '
*
"(c) No person, other than a person described in subsection (a) or
subsection (b) (2). shall possess any depressant or stimulant drug otherwise
than (1) for the personal use of himself or a member of his household, or (2)
for administration to an animal owned oy him or a member of his household.
In any criminal prosecution for possession of a depressant or stimulantdrug
in violation of this subsection (which is made a prohibited act by section
301(q) (3. the United States shall have the burden of proof that the
possession involved does not come within the exceptions contained ir. clauses
(1) anJ (2) of the preceding sentence
"(d)(1) Every person engaged m manufactuimg, compounding, processing,
selling, delivering, or otherwise disposing of any depressant or stimulant
drug shall, upon the effective date of this section, prepare a complete and
accurate record of all stocks of each such drug on hand and shall keep such
record for three years. On and after the effective date of this section, every
person manufacturing, compounding, or processing any depressant or stimulant
drug shall prepare and keep, for not less than three years, a complete and
accurate record of the kind and quantity of each such drug manufactured.
compounded, or processed and the date of such manufacture, compounding, or
processing; and every person selling, delivering, or otherwise disposing of
any depressant or stimulant drug shall prepare or obtain, and keep for not less
than three years, a complete and accurate record of the kind and quantity of
each auch drug received, sold, delivered, or otherwise disposed of, the name and
address of the person, and the registration number, if any, assigned to such
person by the Secretary pursuant to section 51(Xe), from whom it was received
and to whom it was sold, delivered, or otherwise disposed of, and the date of
auch transaction: No separate records, nor set form or forms for any of the
foregoing records, shall be required as long as records containing the required
information are available.- --
------------------------- -----------
-
1 * (2) (A) Every person required by paragraph (1) of this subsection to prepate
or obtain, and keep, records, and any carrier maintaining records with respect
to any shipment containing any depressant or stimulant drug, and every person
in charge, or having custody, of such records, shall, upon request of an officer
or employee designated by the Secretary permit such officer or emplo>ee at
reasonable times to have access to and copy such records. For the purposes .
of verification of such records and of enforcement of this section, officers or
employees designated by the Secretary are authorized, upon presenting appro
priate credentials and a written notice to the owner, operator, or agent in
charge, to enter, at reasonable times, any factory, warehouse, establishment,
or vehicle in which any depressant or ctimulanf dmg
"a*jfacturod, _
compounded, processed, sold, delivered, or otherwise disposed of and to
inspect, within reasonable limits and in a reasonable manner, such factory, .
warehouse, establishment, or vehicle, and all pertinent equipment, finished
and unfinished material, containers and labeling therein, and all things therein
fincludiiig records, fries, papgtb, processes, CMttolS.'ancf r^fiTitie^)'bearm'g,""
on violation of this section or section 301(q); and to inventory any stock of
any such drug therein and obtain samples of any such drug. If a sample is thus obtained, the officer or employee making the inspection shall, upon
completion of the inspection and before leaving the premises, give to the
owner, operator, or agent in charge a receipt describing the sample obtained.
*4 (B) No inspection authorized by subpaxagTaph (A) shall extend to (i)
financial data, (ii) sales data other than shipment data, (iii) pricing data,
(iv) personnel data, or (v) research data, which are exempted from inspection under the third sentence of section 704(a) of this Act.
1 * (3) The provisions of paragraphs (1) and (2) of this subsection shall not
apply to a licensed practitioner described in subsection (a) (4) with respect
to any depressant or stimulant drug received, prepared, processed, administer
ed, or dispensed oy him in the course of his professional practice, unless
such practitioner regularly engages in dispensing any such drug or drugs to
his patients for which they are charged, either separately or together with
charges for other professional services.
` ` (e) No prescription (issued before or after the effective date of this
section) for any depressant or stimulant drug may be filled or refilled more
than six months after the date on which such prescription was issued and no
such prescription which is authorized to be refilled may be refilled more than
five times, except that any prescription for such a drug after six months after
the date of issue or after being refilled five times may be renewed by the
practitioner issuing it either in writing, or orally (if promptly reduced to writing
and filed by the pharmacist filling it).
Section 301 of tho Federal Food, Drug, and Cosmotic Act 21 U.S.C. 331^it quoted in port bolow:
" Sec. 301. The following acts and the causing thereof are prohibited: ***
* * (<j) (1) The manufacture, compounding, or processing of a drug in violation
of section 511(a); (2) the sale, delivery, or other disposition of a drug in
violation of section 511(b); (3) the possession of a drug in violation of section
511(c); (4) the failure to prepare or obtain, or the failure to keep, a complete
and accurate record with respect to any drug as required by_section-Sll(d); (5) the refusal to permit access to or copying of any record as required by section 511(d); (6) the refusal to permit entry or inspection as authorized by section 511(d); or (7) the filling or refilling of any prescription in violation
-
of section 511(e)."
_______
Section 11 (b) of tho Fedora I Hazardous Substances Labeling Act OS U.S.C. 1270 (b),/ is quoted below;
"For purposes of enforcement of this Act, officers or employees duly designated by the Secretary, upon presenting appropriate credentials and a written notice to the owner, operator, or agent in charge, are authorized (1)
to enter, at reasonable times, any factory, warehouse, or establishment in which hazardous substances are manufactured, processed, packed, or held for introduction into interstate commerce or are held after such introduction or to enter any vehicle being used to transport or hold such r.nznrrioua substances in interstate commerce; (2) to inspect, at reasonable tines and within reasonable limits and ui a reasonable manner, such factory, warehouse,
establishment, or vehicle, and all pertinent equipment, finished and unfinished materials, and labeling therein, and (3) ta.obtain samples of such materials or packages thereof, or such labeling. A separate notice shall be given for each such inspection, but a notice shall not be required for each entry made during the period covered by the inspection. Each such inspection shall be commenced and completed with reatf^^ble promptness."
DSW 443194
STLCOPCB4057734
JOHN O. MOOMAW
ATTORNEY AT 1--AW
TELEPHONES:
OTFICI 384*4702 Home 384*4049 Area Cooc 812
EAST MAIN STREET BLOOMFIELD, INDIANA 47424
April 17, 1972
Mr. Karl F. Meyer, Supervisor The Travelers Insurance Company 522 Olive Street St. Louis, Missouri 63101
Dear Mr. Meyer:'
Bloomfield Silo Company has consulted me with respect to damages suffered by them as the result of using Monsanto's product known as "Aroclor".
To date they have expended the sum of $5,639.60 in
labor and materials directly, connected with the use of
the product sold by Monsanto. Many other claims are
presently being made against this Company for the same
reason and it is the feeling of my client that they should
be reimbursed for any loss sustained by them in this
respect.
-
Please let us know your intention in this matter as soon as possible.
JOM/fc
0siv-<,95
STLCOPCB4057735
our discussion I have not callec Autery. Assume St. L. will
Raleigh To--C>O
CO
V <0 Q
STLCOPCB4057736
CiicniisirihutGzs'
Qen&uzl B'Ui^tcA
P. O. BOX 22217 1S50 LUETT ST. Phone 638-1361
INDIANAPOLIS, IND. 4622?
P.O. BOX 2G3 7415 NELSON RD., EAST Phone 749-5153 NEW HAVEN, IND. 46774
September 8, 1971
Mr. Rollie Garcia Monsanto Company P.O. Box 5444-Springside Drive Akron, Ohio 44313
Dear Mr. Garcia:
-
This is to confirm our phone conversation of September 7th, 1971, where in we reported a possible contamination problem of a paint formulation containing Aroclors..
As I related in our conversation, a Mr. Rex Autery of the Bloom field Silo Company located in Bloomfield, Indiana called our Office Manager, Mr. Larry Ryan, and reported that their silo paint which contains Aroclors have caused some milk contamination in the State of Kentucky.
According to Mr. Rex Autery the Kentucky Board of Health took samples
of their paint on the wall of a silo and has indicated that this
paint has caused contamination in milk which they blame on the Aroclor
II
content of the paint.
,
i Mr. Autery has requested that we contact you and request some tech i nical assistance for him to disprove this claim. I contacted Mr.
Autery and indicated that I had talked to you and that you in turn would be in touch with him to discuss the problem with him. You can contact Mr. Autery by phoning 812-384-4154 or if you desire to send a representative to Bloomfield, Indiana, please call him for an appointment. ' Your earliest assistance on this complaint will be greatly appreciated by Mr. Autery and if we can lend an additional assistance in any way please do not hesitate to call upon us.
If you need additional information or help in any way please let us know.
Yours truly, HOOS&R SOLVENTS/&yQKE&fICALS CORPORATION
'G. W.^K/eil Sj Sales 'Representative
DSW 443197
GWK:kb cc: E. C. Wilde
tf&MvcialecffloY SStedleb SPelvfce lo
BUFFALO CARNEGIE, PA. CHICAGO CINCINNATI CIEVEIAND DAUAS DETROIT ERIE, PA. FORT WAYNE GRAND RAPIDS HOUSTON INDIANAPOIIS KANSAS CITY, MO. LOUISVILLE MILWAUKEE NEW ORLEANS POR1LAND ROCHESTER, N.Y. ST. LOUIS SALT LAKE CITY SAN FRANCISCO SANTA FE SPRINGS. CALIF. SEATTLE SPOKANE *JOLEDO CANADA, TORONTO WINDSOR MEXICO, GUADALAJARA MEXICO CITY MONTERREY
STLCOPCB4057737
SEP 3 0 1971
"
Hoosier Etof'/eni's? &-[ h&mIczki [brnnrsvf rt
I I i mi i i m i rinmt
gi- iTi-TiTTn-rr -r--i'-t* w ww* >t
^eo iumcca * txaira.-.ifcmh^jirjg.g'g^i^iwi
Qc-;-i&ml
* p. o. pox 22217 * 1K-0 LUL'TT SI. '
Phono C3G-15G1
INDIANAPOLIS. IND. <6227
B'Mttcb Ojljics
P.O.BOX 283 ?<T5 NELSON PD., PAST * rhone 749-51S3 c NEW HAVEN. IND. 46774
September 8, 1971
a
Mr. Rollie Garcia Monsanto Company P.0. Box 5444-Springside Drive Akron, Ohio 4433.3
OVjX" r\J^` X d c,.-
O'
Dear Mr. Garcia:
This is to confirm our phone conversation of September 7th, ly71, where in V7e reported a possible contamination problem of a paint formulation containing Aroclors..
As I related in our conversation, a Mr. Rex Autery of the Bloom field Silo Company located in Bloomfield, Indiana called our Office Manager, Mr. Larry Ryan, and reported that their silo point which contains Aroclors have caused some milk contamination in- the State of Kentucky.
According to Mr. Rex Autery the Kentucky Board of Health took samples
of their paint on the wall of a silo and has indicated that this
paint has caused contamination in milk which they blame on the Aroclor
content of the paint.
,
Mr. Autery has requested that we contact you and request some tech nical assistance for him to disprove this claim. I contacted Mr. Autery and indicated that I had talked to you and that you in turn would be in touch with him to discuss the problem with him. You ' can contact Mr. Autery by phoning 812-324-4154 or if you desire to . send a representative to Bloomfield, Indiana, please call him for an appointment. Your earliest assistance on this complaint will be'greatly appreciated by Mr. Autery and if we can lend an additional assistance in any way please do not hesitate to call upon us.
If you need additional information or help in any way please let us know.
Yours truly,
hHoOoOsS/.TeER SOLVENTS/.^HE^ICALS CORPORATION Jy/J<' ^7 *" bed lJL-
"G. U.^K^eil SJ Sales"Representa tive
DSW 443198
GWK:kb cc: E. C. Wilde
fot ZBe/Sci lattice io S/itc&sXitt
BUFFALO CAPNEGIt. PA. CHICAGO CINCINNATI CltVilANO CALLS CmLDIT EGE, PA. FCU WATNl GRAND LAUDS - HOUSTON INDIANAPOIIS KANSAS CITY, MO. tOUISVIUE MILWAUKEE NEW OWEANS POST'AND ' tCLIItSTI.C. N.Y. ST. ICUIS SAIT LAKE CITY SAN F2ANCISCO SANTA FE SPRINGS, CAIIF. SEATTIE SPOKANE TOIEOO CANADA; TORONTO WINDSOR Ml'xiCOi GUADALAJARA MEXICO CITY MCNHEHY
STLCOPCB4057738