Vista Polymers Inc. A Subsidiary of Vista Chemical Company
Highway 25 Post Office Box 91
Aberdeen, Mississippi 39730 Phone {601} 369-8111
A
September 11, 1984
Mr. Jerry B. Banks Mississippi Department of
Natural Resources Bureau of Pollution Control P. 0. Box 10385 Jackson, MS 39204
Dear Mr. Banks:
This letter will confirm our conversation of September 10, 1984 at 10:45 a.m. I informed you of a leak that occurred at 11:10 a.m. on September 9, 1984. Prior to reactor D-300 being charged, the reactor was pressured up to about 10 - 15 PSIG with VCM gas in accordance with plant operating procedures. The outside operator checked the reactor and since everything looked normal, he instructed the panel operator to proceed with the charge. The out side operator then walked across the recovery structure and heard a noise that sounded like an air leak. As he walked back to the reac tor, he thought there might be a problem and radioed to the panel operator to stop charge. The panel operator immediately stopped charging on the reactor, noting that no additional VCM was added to the reactor since the initial amount. The outside operator and chief lead operator immediately discovered that the cause of the noise was from the reactor atmospheric vent valve. The valve was immediately closed and the leak stopped. The connector between the actuator and the valve had worn and the valve was slightly cracked open, even though the indicator light on the panel indicated closed. The valve connector was then repaired before the reactor was returned to service.
If you have any questions, please call me at 601-369-8111.
Veldon E. Messick Senior Process Engineer
bis
VAB.0001215209
i.. [...
Kh -4
To: File
Interoffice Communication
From: Date:
Subject:
V. E. Messick
September 11, 1984
LEAK REPORT TO STATE
VKIA
On September 10, 1984 at 10:45 a.m. , I called Jerry Banks to
inform him of a leak that occurred at the plant at about 11:10
cl mm.m on September 9, 1984. I told him that prior to reactor D-300
being charged, the reactor was pressured up to about 10-15 PSIG
with VCM
as is the plant operating procedure. The outside
operator checked the reactor and since everything looked normal,
he instructed the panel operator to proceed with the charge. The
outside operator then walked across the recovery structure and
heard a noise that sounded like an air line leak. As he walked
back to the reactor, he thought there might be a problem and
radioed to the panel operator to stop charge. The panel operator
immediately stopped charging and began recovery on the reactor,
noting that no additional VCM was added to the reactor since the
small initial amount. The outside operator and chief lead
operator immediately discovered that the cause of the noise was
from the reactor atmospheric vent valve stack. The valve was
immediately closed and the leak stopped. The connector between
the actuator and the valve had worn and the valve was slightly
cracked open even though the indicator light on the panel
indicated closed. The valve connector was then repaired before
the reactor was returned to service. Jerry told me thanks and
asked no questions.
Veldon E. Messick Senior Process Engineer