Minutes of Meeting - 11/7/72 Drums - Electrical Grade Fluids
cc N. L. Davis - 1760
C. H. Downs - G4NE
R. H. Dunlop - G4NA
A. E. Leisy - 1740
C. Paton
- B2SC
E. M. Potter - B2NK
W. R. Richard - T3A
G. R. Sido
- G5EC
i
Present: Messrs: P. B. Benignus R. M. McCutchan
% R. D. Minteer O. N. Mueth R. H. Munch
J. R. Savage fi&SL
R. A. Sipes
Objective
.
To take action on the findings of recent Aroclor drum testing conducted by Dr. R. Munch.
Summary
Dr. R. Munch reviewed data on tests conducted with Aroclor 1242.
It was concluded that drums specially made by Inland Steel Com
pany were clearly superior to standard lined drums (Code #93320)
with respect to degradation of electrical properties during stor
age.
.
After discussion regarding the need for precise duplication of these -special drums, it was decided that initial orders should go to Inland and -that^qualification of our current supplier (Nesco) should be initiated.
Timing for the switch over to the special drums was set for Janu ary 1, 1973 and duration of period of use to confirm superior drum performance was estimated to be three months.
DSW 329334
/
STLCOPCB4076042
-2-
A decision was also made to confine drum specification change to 55 gallon units only - 30 gallon and 5 gallon units to retain pres ent specifications. It was also decided that proposed drum decora tion changes (yellow color plus 6 language logo) would be initiated later. (NOTE: Subsequent to the meeting, J. R. Savage advised that a decision was made by Cumming Paton to effect this change concur rently.)
Program and Commitments
In order to effect the decisions noted above, the following program
and commitments were established^
-
.. ...............
1. Set up new drum specifications (F. J. Kusiak and 0. N. Mueth).
NOTE: Special features for the new drum specifications are
attached.
' '. ' -
2. Arrange for present drum phase out and new drum procurement with Inland (O. N. Mueth).
3. Initiate drum decoration and logo change with Inland (0. N. Mueth and G. R. Sido).
4. Procure 16 gauge cold rolled steel -sections phosphatized by Nesco (Iron Phosphate treatment) and run Aroclor compatibility tests (R. D. Minteer and R. Munch).
5. Assuming NescoVs phosphate treatment is satisfactory, procure 30 test drums for evaluation of electrical properties degra dation during storage (R. D. Minteer and R. Munch).
FJK/rlg Ends.
\ DSW 329335
STLCOPCB4076043
o
o
SPECIAL FEATURES FOR NEW AROCLOR DRUM SPECIFICATIONS
1. Steel to be 16 gauge, cold rolled, free of rust and contami-
- nants.
:`
2. Steel ends and shell after forming to be washed and zinc
phosphatized.
3. American flanges and plugs specified as follows:
Zinc plated flanges - 2"
-- Part #133000225
Zinc plated flanges - 3/4" - Part #113000225
Zinc plated plugs - 2"
- Part #232001625
. -v Zinc plated plugs - 3/4" - Part #212001625
4. Silicone gaskets in flanges and plugs.
.
5. Seaming Compound to be Dow Corning RTV 734.
6. Interior of drums after fabrication must be absolutely dry and plugs tightened securely.
7. Extra care to be exercised in manufacturing to insure optimum
cleanliness. In this connection 100% inspection of shells
and ends is necessary to guard against contaminants such as
% y:-
oil and grease.
8. All other details incorporated in the DOT 5B specification.