PROJECT
Monitoring insulators for asbestos exposure.
DATE OF SURVEY
December 12 and 13, 1978
DISCUSSION
Messrs. Brad Nester and Charlie Miller, Construction
. insulators, were monitored for asbestos exposure on
December 12 and 13, while removing insulation from piping on the
third level of Building 773, Both men wore respirators during the
operations. On the first day only a small amount of water was
applied to the insulation before removal to minimize the emission
of airborne asbestos fibers. Personnel exposures were 2.8 and 1.3
fibers per cubic centimeters of air (f/cc) respectively. On the
second day of monitoring, December 13, the insulation was thoroughly
wetted with water before, during, and after removal. As a result,
the air concentrations in the breathing zones of the insulators
were reduced to 0.3 and 0.4 f/cc. The OSHA standard for an eight-
hour exposure is 2.0 f/cc.
RECOMMENDATIONS As evidenced by this monitoring, it is essential that extra time be taken to thoroughly wet asbestos-
containing insulation before, during, and after removal. For small stripping operations a portable garden water sprayer can be used.
REFERENCES
UCC C/P Industrial Hygiene Method 38C-29X4-Rla 29CFR 1910.1001
UCC 024276
DATA
Location: Building 773, third level
Date 12/12/78 12/12/78 12/13/78 12/13/78
Employee Brad Nester Charlie Miller Brad Nester Charlie Miller
Sampling Time 0950-1038 0950-1038
1335-1350 1335-1350
Air Cone. Fibers/cc 2.8
1.3
0.4
0.3
REPORT PREPARED BY
W. F. Blythe, Jr. Technical Center Industrial Hygiene Group
WFBJr/sc
W. F."Blythe, Jr.
''
UCC 024277