Document mq6MnGjqjVQ2zDyLMw5LqDvNk

SUBJECT: ASBESTOS PAGE: 3 OF 3 LAST REVISED: 11/09/87 UNION CARBIDE CORPORATION TEXAS CITY PLANT Plant Procedure SH-5.6 Attachment #1 INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR FACILITY CONTAINING ASBESTOS MATERIAL 1. Description of the facility: 1) /S b 7/c^-k ?;n/' 2. Estimate of approximate amount of friable asbestos materials present: (Area in sq. ft. or linear ft.) _________ /S -fl______________ Estimation technique used: ____________e k> f__________________________________ 3. Estimated age of asbestos material: __ <Pd> 4. Location of facility: _________ <3 / oLp H JAf/5. Scheduled starting day: ____ Ob Scheduled completion day: / b//9< 6. Nature of planned demolition or renovation: Rt.s/ a J /Viy /*-> > 0 /? /jc. cr*\ >e>o ----- A Method to be used (negative pressure enclosure, glove bag, etc.): / 7. Name of person that prepared the form: R a <->J Lk Location and telephone number: si/<d< '=->''9 ^ S'2 Date: ? fi//fo_______________ NOTE: This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation. April 1985/Revised November 1987 #0184s UCTC 18522