Document mpwaZ56vkod96M555y8n9dMyZ
Carbon Adsorption Studies (IRansaw, Anniston)
The pilot study was terminated 1/6/71 without the Indication of a breakthrough at average flow rate of 6 gprn/ft .
Presently, the data la being compiled for evaluation by the Calgon
Division of Pittsburgh Carbon. Calgon will utilize the data to give
the following information: a. design parameters, b. operational
costs, c. capital investment.
.
Filtration Studies (IRansaw, Anniston)
The Issuance of the R&D report covering this study was delayed. This report will now be issued 1/15/71.
Solid-Aroclor Removal by Flocculation (IRansaw, Anniston)
The Installation of the clarification unit is progressing according to schedule. Start-up is targeted for 2/2/71.
The flocculation jar tests conducted on the plant effluent (by Betz Laboratories) indicate that the best settling floe is obtained with 15 ppm of bentonite clay and 1.5 ppm of their polyelectrolyte 1170 additives. These results were demonstrated at the Anniston site by a Betz representative. Plana are now to use the flocculating agents recommended by Betz in the pilot tests.
The Issuance of the work plan covering the flocculation study and the semicontinuous adsorption study will be Issued 1/15/71.
Pollution Abatement, PR&D-Annlston (iRansaw/jLBrown)
BACKGROUND: ,-
The filtration and column adsorption phases of the work plan issued 9/9/70 have been completed. A report on the filtration study will be issued by 1/15/71. The data generated in the column study is being compiled for a cost estimate.
The following conclusions were drawn from the filtration
study:
a. Aroclor levels of the plant effluent were reduced to 10 ppb by filtration of the neutralization pit aollda on which Aroclor was adsorbed and by adsorption on the filtering media.
b. The removal of 200-1000 ppm of solids in the plant effluent is a primary concern in any final clean up system.
MONS 033*62
\ SAFETY:
- 104
The line of research proposed In this vork plan Is based primarily on these conclusions. In the flocculation Jar test run on the plant effluent, 15 ppm of SPV bentonite clay'l'and 1.5 ppm of Betz's 1170 polyelectrolyte gave the iest settling floe.
Experimental: I. Define the following parameters in a flocculation study on the plant effluent.
, v
a* Flow rate b. Height of sludge blanket c. Bentonite clay feed
Object: .
To determine the operational parameters at which the solid and Aroclor concentrations are reduced to a minimum (i.e. 0*20 ppm solids & 10 ppb Aroclors). Since the bentonite clay is only a weighting agent for the floe, its concentration will be Increased to some practical limit if necessary, in order to. provide more surface area for adsorption.
Estimated Beginning Date: Mandays Target Completion Date:
2/1/71 40 4/1/71
Experimental II. .
Demonstrate Arcelor removal in a semi-continuous adsorption study. Define optimum conditions:
a. Retention time b. Adsorbent loading capacity c. Recycle
Object:
To utilize some less expensive adsorbents than carbon and provide an alternate design. The same reactor clarifier (Part I) will be used in this study. Provision will be made to recycle the settled adsorbent to premix area.
Mandays ' Target Completion Date:
40 5/28/71
The HC1 and H3PO4 in the plant effluent are normally neutralized in the limestone pit. Occasionally, there is some residual acidity which should be guarded against. Any area exposed to the waste water should be washed thoroughly with copious amounts of water. This will also remove any Aroclor present.
* The flocculating agents (Betz polymer 1170 and American Colloid's SPV bentonite clay) ore neither flammable, corrosive, or toxic. Hence, their handling requires no particular precautionary measures.
An operation manual containing all safety procedures will be issued to personnel operating the clarification unit.
(1) Product of American Colloid Company
MQNS 033863
105
RESEARCH AND DEVELOPMENT REPORT ANNISTON PLANT
OTHER LOCATIONS
GENERAL OFFICE
jra 1
P. B. Hodge* F. J. Holzapfel W. B. Papageorge o W. R. Richard
J. R. Savage
Report No._______ 1__________ Job N.. 446-514__________
ANNISTON PLANT
J. T. Bell J. L. Etheredge V. R. Haupc J. C. Landvehr G. W. Miller V. F. Taffee E. G. Wright
Hlei Potiomoli Fieblemi
Aroclor Pollution Study I. Ranoaw & A. Nelson (J. L. Brown) Removal of Aroclor from the waste water by filtration-adsorption.
Justification!
Pollution Control
Summary!
Aroclor was removed from the plant effluent by filtration of the neutralisa tion pit solids on which Aroclor was adsorbed and by adsorption on the filtration media. Aroclor concentrations (100-6,000) In the plant effluane were consistently reduced to 10 ppb upon passing through a four (4) Inch dlamater tube (packed to a bed depth of 5.5 Inch with activated carbon) at flow rates up to 350 cc/mln. In the sand filtration study conducted under similar operating conditions, the Aroclor levels In the effluent were not consistently reduced to the target level (< 10 ppb).
The presence of 200-1000 ppm of solid particles (slse range 1.5-25QW) tended to blind the filter, thus setting a maximum limit on the pressure and flow at which the unit had to be operated.
Ish Ransaw PR&D Chemist
HONS 033864
- 106 -
Aroclor Pollution Study FRU) Report
ptg( 2
BACKGROUND;
Initial Research efforts for removing Aroclor from the vaete cream were cantered primarily around three conventional approachea: multiple dlatlllatlon, adsorption and extraction. After considering the economic and technical factore involved In each approach, it wee felt the approachea should be evaluated In sequence listed above. The following paragraphs are presented to up-date previously research efforts and to show the basis for the work being reported.
Coat evaluations were made by Dr. Vise, CED, for both a distillation and extraction system for removing Aroclor from the waste water. Dr. Vise concluded that the cost for either of these systems was likely to be considerable greater than that for an adsorption system. A decision was made at this point to abandon these approaches and pursue the adsorption approach in depch.
Initial screening of various adsorbents (l.a, carbon types, porocal, attapulgus clay, powdered polyethylene) by adsorption isotherm tests was very Inconclusive. The Aroclor levels were reduced to < 10 ppb In all the Isotherm testa regardless of ths adsorbent or the amount of adsorbent used. The reason for tha erroneous results was later found to lie In the fact that Aroclor was being adsorbed on the reactor walls, particulates In the solution, as well as tha adsorbent being teeted. From the Isotherm studies, the following conclusions were drewn: A) Aroclor levels In plant effluent can be reduced to an acceptable level (< 10 ppb) by adsorption, b) Further evaluation should be done on an adsorption column utilising a feed of constant Aroclor concentration.
The studies reported herein were conducted at the original neutralisation pit
(hereafter designated as pit 01) and newly constructed neutralization (hereafter
designated pit 12). Fit 01 was distinguished from pit 02, during the course of
study, by both its consistently higher suspended solids and Aroclor concentrations.
Pit 01 has been operational since 1961 while pit 02 has been operational since
October, 1970.
;
In a 13 day pilot run at pit 01, Initial concentrations of 1,000-8,000 ppb Aroclor In ths waste wera reduced to a range of 0-15 ppb upon passing through a series of packed carbon beds at a average flow of 25 cc/mln. Over 991 of Aroclor removal occurred in the prefilter. This unusual reduction was found to be due, In part, to the filtration of solids on which Aroclor was adsorbed. Since the average flow per square foot was quite low for this particular study, It was felt that the prefilter observation should be evaluated at higher flow rates. This report contains the result of the studies carried out using both carbon and sand filtering media for treating waste water from pit 01 and 02.
1. The adsorber consisted of a prefilter (3.5 Inch diameter packed te a 5.5 Inch bed depth and a series of one (1) inch diameter columns packed to a total bed depth of 13.5 ft.
HONS 033865
Aroclor Pollution Study PRAD Report
EXPERIMENTAL
- 107
P*S* 3
Pit.
'
2. Sampling
A 24 hour composite sample (300 ml) vas taken by catching a 100 ml. sample every .8 hours. : Occasionally, smaller samples were caught at shorter Intervals and composited.
3. Plow Rate
Plow to the filter was controlled by adjusting two needle valves (diagram above). A calibrated rotameter was used to measure flow. A given flow rata was difficult to maintain due to the back pressure crested by the 'build up of fine solids In the filter. The unit was back washed when hecessery to maintain a relative constant flow. In the studies conducted at pit 41, flows were started at the lowest rate (100 cc/mln.) and then Increased to maximum 350 cc/mln. This approach was reversed In the sand study at the pit 42. The maximum flow (350 cc/mln.) could not be maintained over an eight (8) hour period due to the high back pressure.
4. Analytical Analysis
The Aroclor vas extracted from the aqueous sample Into a hexane solvent. The hexane solution was then dried and analyzed on a EC/CC. The concentration ' of Aroclor 1221, 1242, 1254 was determined by comparing the main peak height of the unknown with height of the same peak in the chromatograms of known Aroclor solutions of 1221, 1242, and 1254.
MONS 033866
- 108 -
Aroclor Pollution Study PRAD Report
Pago 4
DISCUSS10H OP RESULTS
.
For clarity of the following dlacusslon. It 1* neceasary her* to explain the ' difference In the quality of the effluent from pita PI and f2.
During the couree of this atudy, the effluent from pit #1 generally contained about 1,000 ppm of sollde and Aroclor concentratlone In the range (1000-80000 ppb) Table 1 & 2. A prolonged study of the effluent quality (l.e. eollds and Aroclor levels) Indicates that high Aroclor concentrations generally correspond to high solids. Presently, the solids level In pit 02 Is kept at minimum. The effluent from pit 02 normally contains about 200 ppb of solids and 50-100 ppb Aroclor except during periods In which large quanltles of acid (HC1) are being sewered. This accounts for the higher values seen In Tables 3 A 4.
Carbon consistently reduced the solid and Aroclor concentrations In the effluents from pits 01 A 2 to an acceptable level (< 10 ppb) at flow rates up to 330 cc/mln. (Table 1 A 3). The mechanism by which Aroclor Is being removed cannot totally be explained. Existing evidence indicates adsorption on the pit sollde. However, attempts to determine the adsorptive capacity of the solids were uneucceeeful. The lower quantity of solids (200 ppm) In the effluent from the pit 02 had seemingly little effect on the quality of effluent produced.
As It can be seen from Tables 2 A 4, the quality of effluent realized in the sand filtration was not as dramatic as In the carbon study. Aroclor levels In pit 01 effluent (Table 2) were significantly and rather consistently reduced without producing an acceptable effluent (< 10 ppb) quality. Comparatively, the effluent quality produced at the pit 02 was very Inconsistent (Table 4). The affluent quality varied between high and low values without drastic changes In
Influent Aroclor levels or operating conditions.
The following factors may explain the results obtained:
.
a. The solids level of Influent varied considerably during the test period. b. Silica type adsorbent requires a considerably longer contact time to
adsorb Aroclor than carbon.
The test data for both the sand and carbon studies suggest that the Aroclor removsl Is taking place by filtration of pit solids on which Aroclor has been adsorbed and by adsorption on the filtering media Itself. Further, It slso suggests that the adsorption zone with carbon Is quite short end quite long
with sand. '
The sollde In the waste stream caused considerable operational difficulties.
These solIds, of which 42Z of Its pertlcles were In the 1.5 - 2.3Jk size, tended
to blend the filter, especially at flow rates > 200 cc/mln. Backwashing the
filter did not adequately remove the finer particles. Hence, these Aroclor con taining particles were eventually washed through the filter. This point was
considered a breakthrough.
HONS 033867
Aroclor Pollution Study PK&D Report
- 109 -
Page 5
CONCLUSION
1. Aroclor Is removed from the plant effluent by the filtration of the eollde on vhlch Aroclor was adsorbed.
2. Aroclor Is adsorbed on activated carbon within a very short adsorption sons.
3. The effectiveness of sand In removing Aroclor Is not sufficient at the experimental bed depth.
A. Solids removal Is a primary concern In any final clean up method.
FUTURE WORK
1. A pilot adsorption study has been conducted In a series of 3 Inch diameter columns. These result are being compiled for an evaluation and recommendation. A report will be Issued by 1/28/71.
2. A pilot clarification (flocculation) unit la scheduled to be put In operation by 1/29/71. This unit will also be used to carry out semi* continuous adsorption studies with other finely divided solids.
Jw Attachments
MONS 033868
- 110 -
CARBON FILTRATION STUDY AT OLD PIT TABLE 1
Fag* i
Volun* Treated (Cal.)
38 99 160 *175 198 836
Aroclor Con centratlon
of Znfluent
(pp b) 1221 1242 1254
84 106 NDA
1750 188 NDA
NDA 618 NDA
6051 2638 NDA
559 147 NDA
2106 441 NDA .
Average
Dally Flow (GFM)
Aroc .or Concen tratlon
o Effluent
(ppb)
1221
1242
1254
0.0263 0.042 0.042 0.0263 0.0263 0.0263
NDA NDA NDA 21 14 NDA NDA NDA NDA
7 5 NDA NDA NDA NDA 4.0 1.2 NDA
Unit plugged. SolIda were oreed thr lugh f the preeeu :a on filter 1 creased.
Volune Treated
38 76 114 152 190 228
SAND FILTRATION STUDY AT OLD NEUTRALIZATION PIT
TABLE 2
Aroclor Concentration
of Influent
(ppb) 1221 ^242 1254
4100 4000 NDA
Average Dally Flow (GFM)
0.0263
Aroclor Concentration
of Effluent
1221
1242
1254
---
8000 2750 NDA
0.0263
138 5
NDA
48000 3650C NDA 2594 844 NDA 1800 400 NDA
,0.0263 0.0263 0.0263
-
-'
-
157 12
NDA
178 12
NDA
HONS 033869
VolUM Treated (Cal.)
38 76 114 1S2
Ill CARBON FILTRATION STUDY AT NEW PIT
Page 7
TABLE 3
Aroclor Concentration
of Influent
(pi>b) 1221 1242 1254
Average Dally Flow (GPM)
Aroclor Concentration
of Effluent
(PPb)
1221
1242
1254
31 109 NDA . 4 40 NDA
210 32 NDA
0.0263 0.0263 0.0263
NDA 2 NDA NDA NDA NDA NDA NDA MCA
340 4 NDA
0.0263
NDA 4 NDA
Volune Treated (Gal.)
36 76 163 277 364 446 516
SAND FILTRATION STUDY AT NEW PIT
TABLE 4
Aroclor
Concentration
of
Influent
(ppb)
CM
CM e-l
1221
1254
.
110 72 NDA
1200 260
820 NDA 60 NDA
Average Dally Flow (GPM)
0.0263
0.0263
0.0605
0.079
Aroclor Concentration
of Effluent
1221
1242
1254
48 3 NDA - -'NDA NDA NDA NDA NDA NDA
840 150 NDA 610 180 NDA NDA 560 NDA
0.0605 0.057 0.0482
7 NDA NDA 60 NDA NDA 55 NDA NDA
HONS 033870
- 112
TSD - Anniston (JCLandwehr)
PR6D work on PCB removal from waste water is continuing. The final report on PCB removal by sand filtration will be issued 1-8-71. The carbon adsorption studies of the Aroclor sump effluent have continued for three months with removal to less than 10 ppb in the first of 4 five-foot long columns. The experimental work will be terminated and reported as soon as the Monsanto-vendor (Calgon Corporation) development of scaleup factors is complete. The reactor-clarifier studies to evaluate PCB removal by addition of a cheap solid adsorbent (such as clay, limestone, etc.) followed by solids removal by flocculation-clarification ore targeted to begin by 2-1-71.
Environmental Studies-Monsanto Europe
During a visit to B.I.C.C* at Helsby we introduced MCS*10l6 as a potential replacement product for Aroclor 12*42. In a general discussion on pollution problems, with the Technical Manager, it was clear that B1CC are anxious to co-operate. They will also look for any technical improvements which MCS*10l6 might provide and report to on the results of the trials*
There has been some 0*K* press reaction to the publication in 'Nature' of the report by A*V* Holden, at Pitlochry, that PCBs are present in sewage sludge which is being dumped in the Clyde and Thames estuaries. This is the report on the work which Holden described to us last May. The 'Guardian' report links this with the bird-kill in the Irish Sea in late 19^9* We are still awaiting the draft of the NERC report on that incident* The PCB atory has now been superseded, at least temporarily, in the U.K* press by the "mercury in tuna fish"scare.
Blodegradatlon-Monsanto Europe
We have still failed to degrade the 2,},3'4,5-pentachloro biphenyl using the C2 organism, using a technique similar to that used successfully with the 2,2'3,3','t\5'-hexachlor biphenyl. Work is still continuing with this and with 4,4'-dichlor biphenyl.
A new soil culture (Cj), claimed by workers at University College, Bangor, to degrade biphenyl by a different mechanism from C, has been used to degrade Aroclor 1242 and MCS.1016. Preliminary results confirm that degradation occurs, but we do not yet have information on the pattern of degradation.
Work ia progressing on the analytical procedures for quantification and identification of residues! We are now able to identify a number of peaka and by a process of elimination suggest probable identification of other components. We hope to give figures for quantifying total residues in degraded Aroclor 1242 and MCS.1016 during the next few weeks. This information will be extremely useful in "selling" MCS.1016 against competitive products.
HONS 0338?1