* _ H. W. Hilgers To: 1111Vl Vllllli CommunkaHon From: Date: Subject: R. W. Seymour March 18, 1993 Auwamam MONTHLY PROGRESS REPORT FEBRUARY, 1993 There were one medical treatment: and three first aid injuries In February. The medical treatment Injury was a Yard Operator who received a laceration to his upper right leg with his knife when cutting a railcar seal. As of February 28, the plant's employees completed 144 days (180,077 employee hours) since last lost time injury. rb. TO FVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Compound Production, MM Lbs. Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M Ml* 34.3 85.7 96.3 1.0692 6.1 97.3 1.5 81.1 < 15.9> 100.5 < 137.3> 191.8 89.8 96.6 1.0444 31.4 97.4 8*1 < 13.4> 78.5 <222.7> February PVC resin production was 34.3MM pounds or 92.2% of bud get. Major downtime was experienced in February due to fluid bed dryer problems. Percent esset utilization for February was 77.0%. Orders for flexible compound continue to be strong. February production was at budget, but 500M pounds less than the previous month because of the short month. Variable costs were unfavorable mainly because of VCM efficiency. Fixed costs were favorable overall and favorable in all major categories except Miscellaneous. R. W. Seymour Plant Manager VAB.0001188677 DISTRIBUTION Houston Austin iffiliilaart lyyHKBBbdi Premiere Abtrdtan COVER LETTER G. G. Draper X H. R. Flammer H. W. Hllgers L. R. Kardos n J E Little X C. J. Matson V. E. Messlck X E. J. Mayer X C. R. Millar B. M. Myers M. J. Schneider X R. R. Smith H. G. Coleman H. D. Garrison J. V. Mare X J. Friend X P. J. Kober X P. E. Markey X J. Favao X P. L. Foote X J. B. Autrey J E. Beall X T . L. Cummings J. M. Edvards X S. C. Hillman C. M. Markerson D. A. Miller J. E. Nickerson J. D. Olson X R. W. Seymour (File Copy) 3wrm.mepprt X X X X X X X X X X X X X X X 9 * !' VAB.0001188678 SAFETY - C. H. Markerson/J. V. Uptain First Aid OSHA Recordable Total Injuries Muaber of Restricted Workday Casea Number of Lost Workday Cases Feb. 0 0 Fiscal Y.T.P. 1993 2 1 Fiscal -J 7 2 0 Race lving/Warehouse Office Totals d n Injuries bv Type Cuts and Abrasions Eye Injuries Burns Bruises S trains/Sprains Stings Other Totals 1 1 1 1 0 4 3 0 0 1 0 0 0 3 4 0 0 3 0 1 0 3 0 Lost Workday Cases Days Lost 0 25 0 39 37 First Aid Cases Medical Treatment Cases Lost Workday Cases 0 03 0 10 0 00 Last lost time injury Days since Employee hours since - 10/7/92 144 180,077 On February 28, 1993, the employees of the Aberdeen plant completed 144 days with no lost time injury. VAB.0001188679 fiAVKTY - Continued Topics for the plant safety meetings during the month included: Lead and Cadmium Health Training. Training participation was 90%+. tb All fire extinguishers and safety showers were inspected during February. The hands-on portion of the interim physicals was completed during February. Chris Markerson attended the Behavioral Science Technology seminar in Mew Orleans. Routine dosimetry results for the month were: Chemlcal VGM Lead Total Particulates ______1 Htmiher Percent PEL, u Formant 70 98.6 2 100.0 1 100.0 1 0 0 1.41 .0 0 The single VCM overexposure was with benefit of respiratory protection i FA MTO FA FA Compound Vinyl Lab Maintenance Description i Cut of middle finger, left hand. Laceration of right leg received when cutting a railcar seal. Laceration of left hand. Contusion of middle finger, right hand. VAB.0001188680 5 March 1993 I ABERDEEN CHEMICAL PLANT INJURIES co ii i o ff* TOTAL INJURIES -+- OSHA RECORDABLE VAB.0001188681 OTIAT.TTY MAMACEMKHT MtOCggfi - K. K. Smith Armor Bond personnel visited the Aberdeen Plant on February 9. They toured the vinyl plant and the Q.C. lab. , They discussed product specifications and problems that they are having. A Joint visit with R&D was planned. Variform personnel visited the toured the vinyl plant and the Q .C. specifications. on February 25. They discussed product team projects. They parts and adding new $65,000. personnel skill tests The instrument Technicians Team recommended upgrading the controls used in the plasticiser unit. The Teem recommended the use fixtures in the V-10 end V-ll test using shaker The Quality Management Coordinator attended a Ford Value Analysis/ Value Snglneering introduction1 VAB.0001188682 1 nngT TAtTAWfltfi - R. V. Sejwwr Variable Costs PVC Flexible Compound Total <151.9> < 17.8> <137.3> <648.2^ 95.6 <553.6> <803.1> 77.8 34.4 * The negative efficiency variance for FVC Is primarily due to an unfavorable VCM efficiency <$194ii>. Investigation of the V(3I Inbound accounting system for February has not revealed any problems. We are continuing to Investigate potential causes for efficiency losses in our in*process and end product accounting systems. VCM V*-r<*nge - $M <$689.4> Payroll and Benefits MM6tC Miscellaneous Tl&D Clearances Vgrtonvo - . $M $35.1 74.5 < 37.2> 3.1 Total $100.5 Operating and Maintenance payrolls were under budget because of the short month and no holidays. Benefits were $11.5M of the variance. MM&C a Both materials and contracts were under budget as planned. Miscellaneous This category is over budget mainly because of unbudgeted moving and home assistance expense and hands-on physical exams in February. VAB.0001188683 * * fiOBT vastamcks - Continued Taxes and Insurance This category was essentially at budget. This category continues to be unfavorable because of minimal activity on the Pond #2 cleanout project. Work on this has essentially stopped waiting for Conoco to remove the excavated dirt from the plant for disposal. rJ' . 1 I VAB.0001188684 1d u VIHYL - J. D. Olson, V. S. Carroll Safety The Vinyl Department had one injury in February. The injury required medical treatment to a Yard Operator when he cut his leg with a knife while removing a railcar seal. The cut required stitches. The monthly safety meetings were held on shift. 1. February production was 34.3 MM pounds of which 33. OM pounds was prime grade resin. Percent asset utilization for February was 77%. 2S& - Production, MH lbs, Rate, M Lbs./C.D. Capacity Utilization Factor, % Total Reactor Charges es/C.D. * Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), % Bed Dryer Stream .factor,. % - Resin Quality, % Prime 34.3 1223.2 92.1 82.6 29.5 85.7 94.8 86.5 96.3 191.8 1270.2 95.6 4499*0 29.8 89.8 92.8 91.0 96.8 2. New agitator blades were installed in 0-700. These blades will improve quality (reduced hard particles) and allow production of Type I in D- 700. Production of 5385 in D-700 provides more flexibility of operation during projduct changes which will result in reduced downtime. Estimated production increase with new blades is 700M lbs./year. 3. The relief valves were chafed an 0in D-600. We are working with PSD :o allew production of low mole determine if a set of relief in D-600. be attained to allow production of the full range of products I %> .M .. .dL =J Bangs Operational downtime (limited blend tank space, new D-700 agitator blades, D-600 relief valves, low empty hopper cars, holding charges due to bad weather, and recovery scheduling conflicts). 463.0 Maintenance downtime (f motor, fluid bed dryer D-600 agitator gearbox and D-745 condenser). bed dryer blower 497.0 VAB.0001188685 UBBe - Continued Total % of m Operational downtine (centrifuge plugs, dryer cleaning, flameouts). m Maintenance downtime (activator problems, centrifuge repair). m Reactor limited production. 37.4 10.1 52.5 - J. B. Autrey/S. A. Truitt Large reactor seal 700 failed due to lubrication problems, changed and rebuilt for a spare, and lubrication was same as Raw Unit on all 014 Unit seals. The seal was to be the Reactor TOO was blades on the in an effort to control contamination were also changed out. The The north fluid bed dryer Mrd centrifuge was hldh vibration. The centrifuge was sent out The deads ter pads were also changed out. service due to v's shop. The "B" recovery compressor was taken out of service and rebuilt for a . It was due to wear. Reactor 743 seal failed due to normal wear after forty months service. Reester gearbox cm 600 was replaced due to bearing failure on the input The fluid coupling was also Reactor 600 relief mole conversion. and Safety discs were out the low The Hew Unit cooling tower pump was taken out of service. was due i to normal wear after 104* years, of service, A new split mechanical seal replaced the old seal to on seal leaks. The motor on #9 air compressor was replaced The The motor on the backmix section Of the fluid bed was removed twice service The cause was The #5 boiler feedwater 'l VAB.0001188686 COMPOUND - S. C. Hillman, J. B. Hegvood SsfdtY The Compound Department had two first aid cases during the month. A Compounder received a laceration to his third finger on his left hand while turning a mill knife and a Utility employee complained of something in his right aye while boxing on Line III. Orders for Line I, Line III, and Line V were strong during the month. Production was down 500M pounds from last month. This was due to February being a short production month. Orders should continue to be strong for the remainder of this quarter. Operating Avg./Dav Line I 28 Line HI 28 Line V 24 Total % Prime m Capacity Utilization Factor 1730 3472 925 6127 97.26 78.10 62 124 39 225 8195 18051 5203 31449 97.42 82.70 Downtime Line I Hours - Product Changes m * Miscellaneous Maintenance - Quality 69 53 11 Product Changes - Miscellaneous Maintenance - Quality Line V - Product Changes Miscellaneous Maintenance - Quality 74 24 8 39 23 12 Operating Uavs Plasticizer 28 % Prime Capacity Utilization Factor Production Q& Lbs. 1 Month Fiscal YT.D. 1527 79.23 81.12 8127 82.10 85.08 VAB.0001188687 CQMPfinro - Corn:limed i - J* B. Autrey/S. A. Truitt m The agitator seal on R-l reactor in plasticizer was repaired. m Line V Orbitran failed. The problem was traced to defective boards which were sent out for repair. i L VAB.0001188688 I gncmmOG - j. E. Nickerson, T. R. Mackey, ft. H. Sneed PROJECTS IN PETOjOIMKHT cmnEBAT. Evaluation of alternatives is nearly complete on the technology of choice for the EXPRESS dryer, the UDHE cyclone dryer is preferred due to , energy ease11 of An economic evaluation will be completed after dryer costs have been better defined. The water to monomer ratio on all reactors is bet more resin. All low mole recipe eater to to 1.1 on 4 pounds basis t with' mole resins changed to 1.2 water to monomer. The New mole resins are at 1.25 with testing continuing at 1.2 on reactor D- 743. The batch sire has also bean increased in the Old Module small reactors increasing thae charrgre level byv a toOttaall^mof 1 inch. The batch slsa increase has not caused foaming problems. This firs t phase of Increased batch sizOS1 and improved water to monomer retlo will Increase capacity of the reactors by 14MM pounds per year. . i'1' j . ^ *! new blades were installed in reactor D- The reactor started up with no . The are identical to those installed in B-745 and will improve hard in 5385 resin i HCi I. added flexibility will result in approximately 700M pounds additional A - initial layouts and process flow drawings are complete for the VGM storage and unloading facility and are 30% complete fbt the Old Module. PAI (the drafting contractor) will drawings of the Old Module,:';|liw' Module end SA Progress is steady and we are on terget (July 1, 1993) for coqple- CAD and P&IDs for the Old1 Module and VCM storage and unload ing facility. Operating procedure writing is progressing on schedule. Procedures for the Old Module and VCM storage and unloading facilities will be complete by July 1. Process Safety Information Work has begun on compiling equipment specification sheets for com pliance with OSHA Process Safety information. Work on equipment specifications includes documenting safe operating limits and documenting valves. all relief systems including calculations for all relief VAB.0001188689 EMGIHEKRING - Continued Wow HcMLihc Equipment and piping modifications of the chemical system . Boiler approval drawings from Nebraska are scheduled to T i arrive in March . A design for boiler will be isaued in March. Work has on operating the ahmtcal fe4 men. Water samples after installation of new equipment showed no cant' this - is .due tax* . moA the pond, sludge -. will bio - levels in then increase. i i:- Pleat review of the project Is The Process Hazards Analysis Study and the written are ; Materials gre on site and the project end field construction. on DCS A project scope meeting was held end several options were The immediate plea is to remove the restriction Install larger impellers In both existing pumps, if feasible term solution involves upgrading existing pumps to speed up A preliminary The is just proj ect will replace the seal oil system in the Old similar to the New Module. An oil reconditioning unit sidered to help.maintain clean, dry oil in the system. This one con- i< ,rs VAB.0001188690 MONTHLY PROGRESS REPORT k I M.L. CARTER FEBRUARY REPORT Month 2nd Qtr. YTD ACTUAL 141.3 i 321.3 875.8 BUDGET 254.0 T 775.0 3435.0 I MS - 112.7 r* #.i *i - 453.7 -2559.2 %" 14.31 i -58.5% -74.5% .7 M lower Second Quarter Budget submitted in December FY93. Delays encountered on two projects account for 70% of the underrun. It should be noted that the above data is based on a 4 Quarter fiscal year as approved in the 2nd Quarter FY 93 Capital Budget. and - Current Quarter Expenditure Forecast as submitted for the current quarter capital budget. budgets. Total of current and previous quarter approved Total Expenditures for the Second Quarter FY93 are forecasted at $775 M while March expenditures are forecasted at $363 M. VAB.0001188691 f A */ ft- wwnryfliUKflTAT. - K. G. Akins Water One NPDES permit violation occurred during the month. The monthly average for the amount of ammonia discharged per day was 14.2 lbs./day. The permit limit Is 12.3 lbs./day. Our NPDES permit modification was approved at the permit board meeting on February 23. The permit modification will allow higher J -I-- -- -- -- ui- ^irieua ^ The new limits were based on past performance. I YlCM flit Samples were taken to vertically delineate the groundwater contamin early Kerch. A complete presentation to the State on the findings should be ready by late Kerch or early April. ./ 4 J ! I I rj * VAB.0001188692 * ENERGY CONSERVATION - J. A. Bodron I. Energy Conservation Data A. Unadjusted EUI B. Adjusted EUI C. Btu/Lb. Product D. Total Energy Consumption MMM Btu Boiler No. 1 No. 2 No. 3 February 1993 (15.9%) (16.0%) 3049.8 132.0 Fiscal Y.T.D. (13.4%) 2997.0 703.8 Combuatton 88.7% 82.3% 82.0% c1 Y.T.D 88.0% 82.8% 82.5% ABERDEEN ENERGY 3409 3499 3309 1009 3099 3999 3499 3309 3900 XAH97 tttt.97 JAM 99 JUl*9t IAN 99 JVL9* JAH90 19190 MONTH JAM 91 19L9t JAM 92 39193 JAM 9% VAB.0001188693 I A sbeqbs /''"N JRHQM90HREE None. J. E. Beall ffucvm Process Assigned to Operations in the Vinyl Department. Deug Knittig Assigned to Process Engineering position in the Engineering Department. Doug Skokna - Plant Mims as Chief Division. - Transferred to Houston, Engineer, 01ins & Vinyl Willie White - Compound Operator operator to compounder. Progressed from Compound Reginald Evans Operator - Progressed from Compound Operator to Compounder Charles Reed - Compounder Operator from Compounder Willie - Compounder - Bid from Compounder to Painter/ Insulator Carpenter M B*. Plasticizer to Warehouse i Mitchell Bishop to Compound Bid from Plasticizer "B". Promoted from Compound Joe Trimble ,r Warehouse Worker Early Retirement None. TO/FROM T.EAVE OP ABSENCE R. Danny Flippo Vinyl Department - Union Leave of Absence. VAB.0001188694 I WAREHOUSE GENERAL PLANT 1 MAINTENANCE LABORATORY 1 COMPOUND VINYL PLASTICIZER SUB TOTAL I SALARIED 13 6 0 1 46.2% 0 j 9: 9 10 $ I 0 ( S.O* ! 0 f I 35 I0 25.M 01 1 318 1 * * 16.7% fl 5.6% 31 22 I j 71.0% 3.2% I 1 ^ Ift ' iLb" 30 10 33.3% 6.6% I5 3 0 60.0% 0 Hf V 1 ^143 57 | 39.9% I 2.8% 077 18 1 7.6% 23.4% VAB.0001188695 vm Printed 3/02/93 Department Overtime YARD MM# GENERAL HELPERS UTILTIY MAINTEMANCE OC LAB JAN1 TORS WAREHOUSE STORES DEVELOPMENT LAB mmv* COMPOUND mmm* VINYL mmk PLASTICIZER Total Plant **** Pay Period ending February 28, 1993 Ijos/fs - \ I DEPARTMENTAL SUMMARY HOURS REPORT ................ YEAR TO DATE ................... Non PaidfAbeence Jury Retire IX of $/T Paid Absences National{Death fn Lang-term nerd I Family Disability Total Aba X of S/T 5.50 8.00 4 8.08 49.50 24.00 0.00 1.50 0.00 .50 136.25 66.00 39.08 4 ,ri .21 0.80 8.80 .55 .61 0.00 .18 o 8o ! .83 ' 1 *31 j #05 | 2.45 0.80 0.08 0.00 18*80 0.08 8.00 0.00 8.00 0.00 8.00 0.80 0.00 0.00 8.00 8.00 8.00 60.08 0.00 12.00 12.00 256.00 I"* 0.00 228.00 0.00 0.00 0.00 2.17 Vacation 606 > I MNRR8 mmmm VAB.0001188696 atH Printed 3/02/93 DEPARTMENTAL SUMMARY HOURS REPORT ............ MONTHLY .............. Deptartment YARD GENERAL HELPERS UTILT1Y Total S/T Hr 1248.00 152.00 724.00 overturn Total X Hour of S/T 129.25 10.36 26.25 66.00 17.27 9.12 Holiday 1Holiday hr Worked Hr INot worked 0.00 I 0.00 I 0.00 | 0.00 0.00 0.00 Nan Paid' Absence (tours % of S/T . 0.00 0.00 0.00 0.00 0.00 0.00 Jury Duty ------ paid Absences n National 1Death In Long-term 6um6 I Family disability 0.00 0.00 0.00 0.00 0 00 0.00 0.00 0.00 0.00 12.00 0.00 0.00 Total Abe \ X of S/T !? .96 0.00 0.00 MAINTENANCE QC LAB JAN!TORS WAREHOUSE 4435.00 1836.00 160.00 751.75 456.50 242.50 5.50 70.50 10.29 13.21 3.44 9.38 0.00 I 0.00 I 0.00 I 0.00 I 0.00 0.00 0.00 0.00 29.00 24.00 0.00 .25 .65 1.31 0.00 .03 0.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 88.00 ; 0.00 .... . - 'll 0.00 040 2.64 1.96 0.00 .03 STORES DEVELOPMENT LAB COMPOUND 344.00 [ 783.50 5125.25 4.25 44.25 689.00 1.24 5.65 13.44 0.00 0.00 0.00 I 1 I 0.00 I| 0.00 0.00 0*00 .50 63.75 0.00 .06 1.24 0.00 0.00 0.00 0.00 OellO 0.00 0.00 0.00 24.00 0.00 0.00 0.00 0.00 .06 .1 1.71 VINYL 5200.75 PLASTICIZER MM 811.00 Total Plant **** 21571.25 523.75 77.75 10.07 9.59 0.00 I 0.00 I 0.00 0.00 0.00 |1 51.25 5.00 b .99 .62 0.00 0.00 1 0.00 0.00 0.00 0.00 -v.1. . bU 0.00 .99 0.00 __________________________________ l1, l . ' . --;it'L- J 1 .62 1.44 r*.1 Pay Period ending February 28, 1995 Vacation 72 0 108 328 144 0 8 56 16 492 396 84 1704 VAB.0001188697 MWmttM - T. L. Cummings n SftfaSl There were no reportiafcle safety instances this month. The Accounting Natural Team net threetines In February. TheJearn updated its mlssioastateaent, customers and naplUri. Frederick held a safaty meeting on tornadoes. Statistics 07-005 AFE/MRO LTL $310 i; 9993 $15*557 $3122 $3466 1 $55,591 19 VAB.0001188698 M. A. Svlerc There were no reportable safety instances this month. All teens net in February to review progress Oh their projects* Processed tfssish FY93 $2,767.86 192 187 $35,714.71 898 890 (Decreese) Feb. * . *93 Increase Spere Parts Ending Inventory $2,013,713 Hew Materials Ending Inventory $2,529,091 $2,016,458 $ 2*745 $2,268,757 <$260,334> Compound "A" Grade PLENEX "A" Grade Vynaprsne Coimpound Off-Grade (BG) Compound Off-Grade (H) Millscrap Dry Blend "A" Grade Dry Blend Offgrede Resin Type 1 Resin Type *BC" Vacuum Dust Total Packaged W/house 5,082,832 197,381 51,532 591,096 130,682 104,508 253,598 12,000 1,844,900 100 8,415,031 (Decrease) I fhfffflftt 5,051,857 242,379 47,535 648,317* 108,425** 96,115 197,698 0 1,623,650 100 < 3Q,975> 44,998 < 3,997> 57,221 < 22,257> < 8,393> < 55,900> < 12,000> <221,250> 0 < 0.61> 22 *80 < 7.76> 9; < 17. < 8.03> < 22.04> I -- Ah ' iijeWi i- < 11. 0 8,169,392 <245,639> Compound MAM Grade Rigid "A" Grade Resin Type 1 Resin Offgrade Total 3,228,521 172,700 16,174,446 20,489,916 (Decrease) 1 Chance 1,407,277 172,700 20,128,904 <1,821,244> 0 3,954,458 <56.41> 0.00 24.45 23,125,180 2,635,264 12.86 * Includes PLENEX (BC) ** Includes PLENEX (H) VAB.0001188699 ABERDEEN CHEMICAL PLANT SHIPPING ANALYSIS FEBRUARY 1993 -SHIPMENTS BY PRODUCTS- RESIN-BULK RESIN-PACKAGED FLEXIBLE COMPOUND-SULK FLEXIBLE COMPOUND-PACKAGED NEU BUSINESS VYNAPRENE RIGID COMPOUND-BULK RIGID COMPOUND-PACKAGED RIGID OOMPOUMD-PEUETS AUTOMOTIVE * BULK AUTOMOTIVE * PACKAGED PLASTICIZER TOTAL SHIPMENTS ST NODE BULK: FEBRUARY* RESIN FLEXIBLE COMPOUND 8ISIS COMPOUND PLASTICIZER TOTAL FEBRUARY *YTO* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER TOTAL YTD PACKAOBM ******* *PBBAU(UkY* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER TOTAL FEBRUARY YTD* RESIN FLEXIBLE CONPOUNO RIGID COMPOUND PLASTICIZER TOTAL YTD TOTAL MONTH SHIPMENTS 26,424,430 528,280 3,577,690 3,538,270 5,247 3,982 0 55,900 0 719,850 135,445 519,650 35,508,744 RAILCAR 143 22 0 3 168 CUSTOMER PICKUP 17 0 0 0 17 877 60 76 0 10 17 0 CUSTOMER PICKUP 1 14 0 0 15 COMMON CAPRRIER 17 113 1 0 131 13 119 65 477 7 12 03 85 611 03:11 PM 11-Mar-93 YTD SHIPMENTS 162,768,020 3,677,221 12,841,156 15,122,181 48,566 19,432 491,230 604,734 0 2,940,870 492,848 2,974,652 201,580,910 27 8 0 0 35 1Z3 43 8 4 TOFC AIR/DPS 00 00 06 00 00 AIR/UPS 0 1 0 0 1 00 00 00 00 00 4 8 0 0 12 TOTAL 187 30 0 3 220 1,060 119 9 21 1*209 TOTAL 18 128 1 0 147 __________ ^ 136 550 19 3 ^ ^ _____ . 708 CC: TLC,MA$,AEV,JRF VAB.0001188700 I 5A * * mm 01/93 VAB.0001188701 TABOBATOBT - J. M. Edwards, J. R. Williams 1 A. ' Sifetr ' Rpr8entatiV6i iron Armor Bond Corporation vialtad the with Nick Forsa to tour and discuss issues. John Derossi and Thomas Saloon with for a tour*. . It has Boon supplied out of the Oklahoma visited the plant be C. U warn i fc- non differences m our The customer complained of flakes and dark, small particles on top of a railcar compartment of 5385 resin* The customer complained of color problems with six boxes of 36525 Clay 20 made at the Mansfield Plant. =i m VAB.0001188702 UMiAIMttT - Continued oBS^UUBUI1UUI14iSmBbK D. Product Waivers Issued CuitOMr Product Times Fiber 38525 BLK Dicing 1 R/C The following is a summary of residual VCM results on inprocess samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of February, 1093. Reactor 5305 Number of Samples Average RVGM, ppm 829 64 33 0.290 65 0.421 The following is a summary of the residual VCM analysis of shipment samples for the month of February, 1993. Product 5225 5265 5305 5325 5385 5395 5415 5416 5465 Debox Pond 1 65 119 16 50 9 77 11 0 20 4 0.022 0.140 0.186 0.666 0.200 0.012 0.040 0.016 0 0.298 0.753 A II Lbs. 1 Hardness Color Hard Particles Heat Stability Cross Contamination Totals 143.5 144.0 -- -*-- 287.5 <2.31> <2.32> -----<4.63> 9.0 64.7 18.3 7.5 6.4 105.9 <0.14> <1.04> <0.29> <0.12> <0.10> <1.71> 4- y r VAB.0001188703 Resin Process Capabilities(based on dryer regulars') 5225 5265 Bulk Density 1.36 1.42 Inherent Viecosily (vs. 0.64 -0.67) (vs. 0.715-0.744) 0.04 0.83 0.24 - "L* Color 0.81 7.33 a" Color 1.33 7.67 "b* Color 2.17 2.83 % on Pan (vs. 2% max.) 3.08 3.08 %thru 140 1.15 0.74 Hard Particles, Average 5 minutes 7 minutes jr METS IR (vs. 95% of Corttrol) i` i Average Particle Size, Microns . 147 139 5305 1.72 0.90 0.90 2.42 4.11 23.67 4.17 11.9 6.00 6.33 2.47 14.33 j 0.46 i NA 137 143 February 1993 5385 1.69 1.47 h 1 5.67 5395 0.35 0.43 2.92 5415 0.78 0.71 3.08 5416 0.33 0.4 6.33 4.00 3.89 1 1.41 18 4 2.17 1.07 !|. 0.45 i i \. 'i*i 15 5 i 2.67 4.00 0.67 3.64 5 2 3.78 2.07 5 3.78 0.54 4 2 1.48 0.61 168 145 171 133 i VAB.0001188704 m mmmmmmmmrnm (/"N. FEBRUARY, 1993 - RESIN SHIP 1 DATE 1 2/5I PRODUCT "i^ 5415 * rf 2/9 I 5395 2/10 | 5305 2/10 1 5325 LOT NO. I LBS. V | 04614 I 50 1 04925 10 I 04744 11 04668 50 1 1 p 1 1 50 ] 2/10 ] 5395 1 2/15 I 5385 2/15 1 5395 1 04925 v1 1 04995 1 04925 1 50 1 50 I 1 50 2/16 2/16 5415 5325 04698 04668 50 1 50 ! A VAB.0001188705 A FEBRUARY, 1993 - COMPOUND M' VAB.0001188706