Document mpRgDzzZwLg62oVqyM3rMXXnO
INTEROFFICE CORRESPONDENCE
GEN-80-17
Object:
DATE:
REMOVING, DISPOSING OF AND REPLACING ALL ASBESTOS
INSULATION - ESTIMATE April 1, 1980
office:
Corpus Christi Refinery Engineering
from:
E.;Ratchford, Jr.
__
to: W. C. Mil burn
As requested by Mr. J. M. Connor, Corporate Safety Director, an estimate has been made of subject project.
Accomplishing this project in the Corpus Christi Refinery would cost $15,200,000.00 and would require the controlled disposalof approx imately 1,526,000 pounds of asbestos insulation (see attached detail sheet).
The following listed process units/areas are known to be asbestos-free and are not included in this estimate:
a. All Storage Tanks b. Parex Unit c. Waste Water Treatment Plant and Sand Filtration V-V- t d. New FCCU Reactor (DC-102) and Its Overhead Vapor Line e. New Hot Process (Water Treatment) and Filters f. New Vacuum Tower in Crude Unit (DA-4)' g. New FCCU VRU Section and Alkylation Unit Revamp h. New Power Generation (Gas Turbine Generators) i. New Ultraformer StabilizerSection
It Is assumed that the accomplishment of this project would require approximately two years; it is further assumed that no unscheduled shut down of process units would be required.
*
This estimate Is based on current estimating standards and contractor's furnished data.
E. RatclVfor(i,>or. Project Engineer/Estimator
JER/grt Attachment
cc: JHA, EBD, REF, TRH, JDJ, JRK, PWK, RCR
i
SUN-7SOO.O
Does this correspondence reolly hare to be filed?
K018514