Document mpNgjOGEwKD3wKXrBpeDoZXb0

jjas.te Xreatjnent, Unit Spills and Release? Report Items 1-14 to be compl ted by the lead operator 1. PattJ _____________ 2. Tjjng oi Day: 3. Unit: (Check all that apply) ____ WTU STRIPPERS ___ BOTTOMS PLANT ___ SLUDGE KETTLE ____ P/T STRIPPERS ____ CSS ___ TETRA ____ CPC ___ BAT ____ FORMATE ____ INCINERATORS ____ WASTE CLASSIFIERS ____ OTHER (Describe below 4. Description at Event: (Describe etails of where and why the leak occurred) 5. MfrLtfial Spilled: (Describe the stream and composition of spill) 6. Physical State: (Check all that apply) _____ Solid Liquid Vapor _ Boiling Liquid 7. Amount Spilled: (Estimate or calculate the quantity to the best o your knowledge; ex. 1/4 gallon, 1 pint, etc.) 8. Whfirt did spill S to?: (Check all that apply) --in Ground Air Roadway Ditch ------- Process Sewer _____ Storm Sewer Concrete Containment Other (Describe) 9* Classification Release: (Check the yellow book to find this out and check the appropriate classif.) ------- Unit Release _____ IRQ _____ irqc _____ Agency Reportable 10. N_q.tiiication: (Based on the classification of the release, is it necessary to notify supervision?) _____ Yes No (Unit release) If No, your completion of this report is sufficient If Yes, who was notified? _ Time_ .11 Irngdiala SPJLrqg.tiyq Action Taken: (Describe below) .12 Shift Discussion Yes No If no, explain why. 13. Re.cgmm pdatigng fxpm aeejratprg t prevent reoccurance hi fc.C! MJ * S' 14. Lead Operator''* Nsmo- SL 002058 ftw O It ms 15 - 18 are th responsibility of th unit sup rvisors to compl te. 15. %gs;p,oagibi$ supervisor's name 16. Determine Root Cause of Spill: (Check one that best applies) Mechanical Seal Leak _____ Mechanical Problem ________ Internal Corrosion ___ External Corrosion Instrument Problem _____ Design Problem People Errors (see list below) Circle one that best applies, for people errors only 1. Failure to follow procedures. 2. Design Problems 3. Lack of Training for routine operations 4. Inadequate crisis response. 5. Lack of experience or planning. 6. Failure to communicate properly. 7. Complexity of instrument systems. 8. Others (give details) Others (give details below) 17. List corrective measures_to prevent this f_rom haBBSfllflfl Sflaia and IftEflgt sflmBl-a&ian dalag-u 18. Note data whsa all qgrxostiy? msagarag aca carnal ad and Ihia. i&lsags Is. sloaad out. date initials SL 002059 CONFIDENTIAL* Subject to Protective Order of 14f .Indicia 1 District Cotift No. 91-1145 R lease No: Wi'l ^ ^ 4ir * * / n/ OT.TD