t American Society of Heating and Ventilating Engineers Guide, Chapter 9--Central Air Conditioning Systems
Hi controls, must be added. With few exceptions, systems designed to r^J bring the refrigeration effect to the coils. Many localities have refrigera
summer capacity requirements will have ample capacity for winter *
tion codes which restrict the use, in comfort conditioning applications of
intermediate season conditioning.
refrigerants acting by direct expansion in coils exposed to the air stream
A common arrangement of a central station spray type system C Therefore, local codes should be consulted by the designer before he plans
cooling and dehumidifying is illustrated in Fig. 1. The plant mav2 a system employing direct-expansion methods. Close humidity control
designed to condition 100 per cent outside air, 100 per cent return'air, 0r- cannot be maintained during the cooling season by the surface cooling
mixture of outside and return air. Further, part of the air returned fr<' type of equipment. Winter humidification may be accomplished by use
the conditioned space may be by-passed1 around the conditioner
of evaporating pans or spray nozzles. The cooling coils serve no purpose
illustrated in Fig. 2. The reheater may be installed in the fan jn during the intermediate or heating seasons, so in this respect the spray
chamber as shown, in the by-pass air duct, or in the fan discharge duo type equipmentis; ofternpreferred, in that during certain seasons evapora
depending upon apparatus space and other design conditions, sjjj tive cooling will be sufficient to produce the cooling desired Effective
another arrangement of equipment will result if the dehumidified air fa] cooling and dehumidification accomplished by surface units are dependent
delivers the conditioned air to several other fans rather than to the coi upon many variable factors. The air velocity through the unit air
Fig. 1. Spray Type Air Conditioning Apparatus
Fig. 2. Spray Type Air Conditioning Apparatus with By-Pass
ditioned space directly. These booster fan equipments may use part bf temperature, moisture content of the air, water or refrigerant tempera
pass air as illustrated in Fig. 3 or. 100 per cent dehumidified air art ture, and velocity of the water or refrigerant through the tubes must be
reheaters. The main apparatus, in either case, may or may not have] considered in selecting the proper unit for a given design load. If any of
by-pass connection, depending on load conditions and other design factoS these factors vary without a corresponding variation of the other, factors,
The systems illustrated in Figs. 1 and 2 may be converted into d* the effective work of the coil will increase or decrease, as the case may be.
surface cooling type by merely replacing the dehumidifiers with surfasB|
cooling coils which use cold water or direct expansion of refrigerant!^
DESIGNING THE SYSTEM
accomplish the required cooling and dehumidifying. The coils may alii
be installed within the spray chamber, either in series with the sprajjj The general procedure for the design of a central cooling and de
or below them.
humidifying system is as follows:
DEHUMIDIFIERS
1. Calculate the heat gain for each room or space to be conditioned. (See Chapters 5 and 8.)
Information on spray type dehumidifiers is given in Chapter 11.
. 2. Determine the volume of outside air to be introduced. (See Chapter 2.)
Surface cooling type dehumidifiers generally consist of extended-surfaSj coils within which the water or refrigerant is circulated or the refrigeraB
is expanded. The air to be cooled and dehumidified is drawn or blo|B over the coils. This system is generally comparatively low in initial (B|f
and has low operating costs. For comfort cooling, water is usually usedJjpE
r
3. Assume or calculate the temperature of air leaving the supply outlets. 4. Calculate the quantity of air to be circulated. 5. Estimate the temperature loss in the duct system. 6- Calculate the heat to be removed by the cooling and dehumidifying apparatus. ". Calculate the size of the reheating equipment.
.Select cooling equipment and heating equipment from manufacturers' data and
pcnqrinance curves.
`Patents exist covering the use of the by-pass for cooling and dehumidifying systems.
9. -.Calculate total tonnage.