Monsanto . PftOM <NAME ft LOCATION) E* G. Wright - Anniston Plant PAT t CCT :September 9, 1970 V .' \ : WATER REDUCTION IN AROCLOR DEPARTMENT \ fUftAtNCt :0.L.E. & M.J.W. memo dated August 31, 1970 TO : J. C. Landwehr CC: J * T. Bell . J. L. Corder 1 J. L. Etheredge L. Faulkner W. Miller B. O. Severson M. J. Williams This memo will bring you up to date on areas where water can be reduced in the Aroclor department. This subject has been discussed by Mark Williams, Johnnie Etheredge and B. O. Severson and they feel that there are certain water reductions which can be accomplished immediately. These areas are as follows: - Location Amount Ho0 (Reduced) Action 1. 5 Still jets 1 GPM/jet = 5 GPM Cut back on H2O to jets. 2. Sprinkler valve . ' 15 GPM Repair leak. 3. SSK jets @ blow tanks 5 GPM Use minimum H20. 4. Aroclor 1268 flaker 2 GPM Repair leak 5. Aroclor cooling tower blow-down 6. Sinks (East & West loading dock and acid plant) 30 GPM 15 GPM Blow-down tower @ PNP Turn H^O off when not in use. 7. Drowning jets at HC1 plant 30 GPM Use minimum of H O or s hat . down when not needed. 8. Leak at flange under south carbon tower 10 GPM Repair leak. 9. Surge tank pump seal leak 10 GPM Repair leak. 10. Hydrogen compressor cooling H2O tank 5 GPM Descale tank to eliminate waste water 11. HgO and steam in S.W. W-R plant 2 GPM Cut off if not needed Total 129 GPM Reducing or eliminating these flows to the process sewer would accomplish approximately an 18% reduction in the hydraulic loading to the neutralization pit. This will be reflected by an increased retention time in the temporary limestone pit and should certainly increase the neutralization efficiency. I would recommend that steps be taken immediately to reduce these flows, as well as any others which are evident, > DSW 552010.01 skd J E. G. Wright STLCOPCB4090427