Document mp5G90RQ77VjVX8nnyEqg5ZKk

OF COUNSEL: W ILUAM N, WOODSON. Ill MICHAEL J. ACKERMAN T h o m a s K. Iy o t \>s k e A PRO FESStO N A L LAW COFTPORATVON 540 U N IV E R S IT Y AVEN U E THIRD FLOOR PALO ALTO. CALIFORNIA 94301 TELEPHONE C415) 326-5575 May 10, 1989 C.B ^E"CE7VtD M.AY ii a/ j // --7 fir* f. Mr. John McCarthy Vice-President Nevada Power Company 6226 West Sahara Ave. P .0. Box 230 Las Vegas, Nevada 89151 R e : PCB Change Out Dear John: Thank you for supplying the labor costs associated with the capacitor change out. Enclosed, please find a damage summary that I was able to reconstruct from the data you have provided us. Would you look it over to verify that it is correct. General Electric has asked me to make a damage demand on them for your change out costs and I would like to be sure that my numbers are basically correct. Am I correct in assuming that labor costs associated with transformers (not capacitors) are already plugged into disposal and/or replacement costs? Would you please call me as soon as time permits to discuss this damage summary. The sooner we get the numbers to GE, the sooner we can start serious negotiations on this matter. Sincerely f. W\zAL-- THOMAS E. K0T0SKE TEK:rry Enclosure cc: Charles H. McCrea Sr. David S. McCrea NEVADA POWER COMPANY: PCB REMOVAL AND REPLACEMENT D A M A G E SUMMARY _______ 1. Replacement Costs a) Transformers: 1,876,471. b) Capacitors : 1,472,681 2. Disposal Costs 3. Analytical Costs 4. Construction Costs 5. Disposal Containers 6. Labor Costs (capacitors, only) 7. Future PCB Removal Costs $3,325,160. 1,114,092. 33,622. 17,231. 12,805. 163,183. 200,000. $4,866,093.