Document mp23gXZv18611B5a94e0784v4

INTEROFFICE MEMORANDUM AUGUST 26, 1992 FROM MANAGER - ENVIRONMENTAL COMPLIANCE TO DISTRIBUTION LIST SUBJECT: ASBESTOS NOTIFICATION FEES EFFECTIVE SEPTEMBER 1, 1992 The Texas Air Control Board (TACB) adopted a new regulation concerning asbestos removal notification fees. The following information outlines the requirements and inpacts of the new regulation on DFMC. Effective Date September 1, 1992 Impact on DFMC There are two types of asbestos removal jobs at DFMC: 1. Project Asbestos Removal Jobs Project asbestos removal jobs are those that remove more than 260 linear feet, 160 square feet, or 35 cubic feet of asbestos containing material (ACM). A notification form must be submitted to TACB at least 10 working days prior to the start of the job. Notification procedures contained in existing DFMC Safety Order, S-125, will continue to be used to assure compliance with this requirement. The TACB will subsequently send a bill for this notification fee to the removal contractor, if one is identified on the notification form. If a removal contractor is not identified on the form, the bill will be sent to DFMC Environmental Compliance Department. The notification fee will be charged to the department conducting the project. 2. Incidental Asbestos Removal Jobs LAM 017547 Incidental asbestos removal jobs comprise all other asbestos removal jobs. The TACB is notified of these jobs annually. In November, the Environmental Compliance Department will ask each department to estimate the amount of ACM that is expected to be incidentally removed in the upcoming fiscal year. This amount will be included in the annual notification. The TACB will subsequently send a bill for the notification fee to the removal contractor, if MH92238 DPMC-11268 one is identified on the notification form. If a contractor is not identified on the notification form, the bill will be sent to DEMC Environmental compliance Department. The notification fee will be charged to the department conducting the project. If these costs were applicable in 1991, the estimated cost for the Complex would be $15,000. Requirements . The fee for asbestos removal jobs is based upon the notification forms sent to TACB and is $20 per Asbestos Reporting Unit (ARU). ARU is defined as: ARU = Amount of ACM in linear feet to be removed / 260 + Amount of ACM in square feet to be removed / 160 + Amount of ACM in cubic feet to be removed / 35 (round this total to the nearest tenth) The minimum fee is $50/notification and the maximum fee is $7,500/ notification. An example fee calculation is given below: Example: 1250 square feet of ACM is to be removed. ARU = 1250 / 160 = 7.8125 or 7.8 Fee for asbestos removal = $20 x 7.8 = $156 Revisions to notifications are outlined as follows: 1. If the actual amount removed is less than the amount originally specified in the notification, TACB will refund the overpayment minus a $25 administrative processing fee. 2. If the actual amount removed is more than the amount originally specified in the notification, a check covering the difference must accompany the revised notification. 3. If a revision to the notification is made but the amount of ACM removed is unchanged, no additional payment is required. If you have any questions on these new requirements, please contact M. L. Haller at 6-3228. J. W. Holden MH92238 lam 017548 DPMC-11269 CAS No. SUBSTANCE EFFECTS SCREENING LEVEL Pg/m3(ppb) 30-minute annual or 1-hour 17068-78-9 8052-42-4 1912-24-9 86-50-0 asbestos (fibers/cc) (Mg/m3) asphalt, vapors particulate Atrazine Azinphos-methyl fraction . 001 . 03 350 (135) 50 50 2 .0001 N .003 35 (13.5) 5 D T 5 N,T,0 .2 N,T,0,M BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 7440-39-3 7727-43-7 68359-37-5 17804-35-2 98-87-3 71-43-2 95-14-7 8032-32-4 205-99-2 100-47-0 50-32-8 95-14-7 98-88-4 94-36-0 140-11-4 100-51-6 100-44-7 98-87-3 7440-41-7 121-46-0 82657-04-3 92-52-4 111-44-4 542-88-1 1304-82-1 80-05-7 barium & compounds, as Ba 5 .5 N,T,0,M barium sulfate (PM) 50 (resp) 5 N, 0 Baythroid 50 (PM) 5 D (cyfluthrin, also see pyrethrum) Beech wood dust Benomyl (PM) benzal chloride 10 50 (resp) 20 (3) 1 5 2 (.3) N, T 0 D benzene 30 (10) 3 (1) 0 benzene azimide (benzotriazole) 100 (20) 10 (2) D benzine 3500 (875) 350 (88) N (light petroleum distillate; VM&P naphtha) benzo[b]fluoranthene .5 .05 E (see coal tar pitch volatiles) benzonitrile 505 (120) 51 (12) D benzo[a]pyrene .03 (PM) . 003 D benzotriazole (benzene azimide) 100 (20) 10 (2) D benzoyl chloride 60 (10) 6 (1) D benzoyl peroxide 50 5 N,T,0,M benzyl acetate 600 (100) 60 (10) D benzyl alcohol 500 (110) 50 (11) D benzyl chloride 50 (10) 5 (1) T, 0 benzyl dichloride 20 (3) 2 (.3) D (benzal chloride) beryllium and compounds see TACB Reg III bicycloheptadiene 2000 200 D Bifenthrin 25 2.5 D biphenyl 2.3 (o) 1.3 T bis(chloroethyl) ether 290 (50) 29 (5) N,T,0,M (dichloroethyl ether) bis(chloromethyl) ether .05 (,01) .005 (. 001) D bismuth telluride 100 (PM) 10 N, T resp. fraction 50 5 N selenium-doped 50 5 N, T, 0 bisphenol A 800 (vapor) 80 D 40 (PM) 4 D lam 017549 DPMC-11270 INTEROFFICE MEMORANDUM APRIL 25, 1991 FROM: J. M. SOWLE TO: W. G. C0IT J. A. GAND0LF0 D. G. JAEGER H. L. LEE G. A. PHILLIPS T. Q. QUEENER T. A. ROBERTS E. V. STIGALL SUBJECT: INTERPRETATION CHANGE ON ASBESTOS REPORTING REQUIREMENTS FOR RENOVATION WORK There has been an interpretation change in the reporting requirements for renovation work involving asbestos removal. Previously, DPMC was able to include in an annual report to the Texas Air Control Board (TACB) the amount of asbestos that would be removed due to renovation work. These projects included removal jobs where the amount of asbestos removed were both above and below the reportable quantity of 160 square feet or 260 linear feet. The change is now DPMC must report to the TACB all jobs above the reportable quantity of 160 square feet or 260 linear feet 10 days in advance. The annual report is only for estimating small jobs during the year that are less than the reportable quantity. This change is effective immediately. If you have any questions or difficulty meeting the above reporting requirement, please contact K. C. Glauner at 6-7515. Thank you for your cooperation, J. M. Sowle cc: G. C. Anderson W. B. Austin M. J. Boyle M. L. Corron A. DeMunburn - Brown & Root N. A. Gilbert K. C. Glauner A. F. Schmit ECB Satellite Envr. Chron. LAM 017550 DPMC-11271