MANUFACTURING t ENGINEERING MONTHLY REVIEW MEETING January 28, 1974
Page 2
RH 53IX
Pilot plant - one blender producing 4 or 5 batches first shift, 800 lbs. of APC. M. Wood still requires recipe for new EP 4693 using new RH 53IX. Lab is still testing. Could be substantial RH cost decrease with new process for RH 53IX.
Capital Appropriation for 512,000 for Stage II for structural work to two blenders still not approved.
We have stocks of old EP 4693. Fifty (50) tons of APC on order; only 10 tons made. R. Phoenix reported Don Marino is getting figures together of APC required to make RA0EX.
R. Phoenix directed Manufacturing to go ahead with RM 531X and APC as we know it.
ASBESTOS-FREE
W. Fletcher reported board program going well. Received favorable feedback from the field. V/ol lastoni te holding up program. Making all we can with RM avaitable.
L 10.11 ID RESIN TRIALS
One run made on 07 side only. Considerable variance in density with EP 5465A non asbestos recipe. It is decided to stay in 07 area for another week to see if problems persist. P. Partington would like evaluation of EP 5465 recipe with a report to him this week. Boards are coming out heavier than standard density of .85.
Ht. Braddock running liquid resin in starch recipes this week.
Chicago using powdered UF resin. V. Fletcher has given instructions for new recipe to T. Bernardi.
Estimated savings of $50,000 if liquid resin obtained in truckload quantities.
SEAL-ON GASKET PRODUCTION
S. Cinke is working on conversion of 0 & A Corrugated Machines and will have
numbers put together and feasibility of converting machine and oven capacity
worked out by end of this week. Meeting will be held on Monday, February 4
2:00 p.m. with M. Wood, P. Partington, R. Porter, S. Cinke to discuss where
we stand on gasket forming capacity.
^
GARNEX
R. Phoenix wants GARNEX put where we can only prove an economical value;
better to make fewer cycles and more money. Oo not have capacity and waiting
justification.
-