Power Engineer's Noletnok (Continued from pa/e 114)
ohout an hour and a half the pressure rose to 85 psig with 95 pslg at the
boiler*. Since the water level had risen con*
sldersbly the accumulator was then blown down. In later, normal operation the excess water was used (or boiler feed and the accumulator blown down only once o week.
It is important to keep the check valves in perfect working order. When boiler pressure drops below accumu* lator pressure the outlet-line cheek valve opens and the hot water Rashes into steam with the falling pressure. With boiler pressure rising above ac* cumulator pressure the outlet cheek
and cut to fit, should be carefully in* sorted between the eemicylindricsl sec* lions, as in sketch. Half sections and side blocks should be tightly butted to gether end firmly fastened in place with iron wire. All joints should be pointed up with asbestos cement, and the entire outer surface covered with a layer of the cement reinforced with hexagonal wire mesh and troweled to a smooth, hard finish. The two lines may be first wrapped with wire mesh be/ore applying the Insulation.
Steam*wrapped piping should first be covered with galvanized expanded metal loth, laced in place with iron wire before applying insulation.
steady up-scale reading, which should be in the same proportion to battery voltage as the resistance across which it is connected is to the total shunt-field . circiHt resistance.
Max Pafbnoach Dalton, Mass.
valve closes and the inlet check valve
opens, letting steam enter through the
Injection nozxle. Incoming steam con*
denses and gives up its beat to the
stored water.
Without the accumulator, boiler pres* sure would drop to 55 psig when start* ing a curing cycle. When the accumu*
Continuous Walkway 8avos Climbing
; J
lator operates, boiler pressure drops to only 75 psig. Another advantage of the accumulator was discovered acciden tally. While the vulcsniters were loaded and curing, one of the electrical controls on the boilers burned out, shutting them down for 20 min until a repair could be made. The curing cycle was carried on by the accumulator without interrup* tion, until the boilers came back into serviee.
Shell of the accumulator was lagged with two Inches of insulation, one inch of magnesia block and one inch of asbestos cement. All steam lines were also well lagged.
John D Truman BuQalo, N. Y.
Inductive Kick Checks Motor Compounding
Dc motor omvB i coming back be* cause of flexibility and accuracy of elec tronic control. Since these motors usu* ally have series fields the old question comes up of how to cheek the field con nections to be sure they ore cumulative. The old method of starting with the shunt field open end getting the same rotation proves too dangerous.
The sketch shows a method I de
Br joining adjacent ends of walk- j
ways provided with a battery of gas1 engines In a power plant, a continuous! walkway was developed that reduced!
the amount of climbing by-the oilers.',The short connection units, carried
on the ends of the usual walks, tlso^ served as -points for installation of the,; ladders or stairs giving access to the,' walk. This plan's saving in tho number- of ladders was realized without de-L creasing accessibility to any unit while^ always having reody ovenues of escape^
In cate of plant disaster. The ladder aeciions, together with'-
the short connecting bridge, are re-^
moved easily if tho overhead crane must}*, be used in an area normally occupied'-* hy a unit. In aucb cases the walks sre'j
blocked of! and the remaining ladders^ continue to give access to the platform/;
Elton Stsrrstt Houston, Texas 'v
veloped during (he war to use when the
controller U several decks below the motor. All that is needed is a low-
CONTRIBUTIONS INVITED
How to Insulate SteamTraced Piping Effectively
Hatf s&crtons of semlcylindrlcal molded pipe insulation, each half sited for its respective line, should be fitted around the process line and the steam pipe. At the two sides, blocks of the same thickness as the pipe insulation
reading voltmeter of the analyser type and two dry cells. Connect the volt meter across the shunt-field rheostat and the batteries across the armature and aeries field. The following action depends on the inductive coupling be tween the field windings.
With meter and battery polarities con nected to give up-scale readings, make and break the battery circuit. If the fields have the right polarities the volt meter will kick down below tero when the circuit is made and then show a
Powsa pays 120 far each item pub- ;;
lishad in "Power Engineers* Not* ]:
book." Here's your opportunity to
cash in on those professional tricks '
you Hava cuecetifolly used in the
past, and help yoor fallow power 4
engineers at tho aama time. Your
monuscript need only be in rongh
torm, giving all facta, with sketches J
in pencil. We will edit them for ,
publication. This deportment j
covers power problems in design, 1
operation and maintenance.
|
116 (4)3)
POWER July
In the American fllosoer Corporation*1 Type // Ueovy Duty Heating- Coil Anaconda 10% Cupro Nickel Tithes provide the necessary
strength, corrosion resistance end heel (ran*. jer qualities. Tube fins ere helically wound copper ribbon. Photos reveed ease 0/ remot'fng entire heating element, also the individual finned tube units.
ANACONDA 10% CUPRO NICKEL TUBES for heavy duty industrial service
HE AMERICAN BLOWER CORPORATION'S
TType H Healing Coil, designed for heavy
transfer qualities. Tubes of this composition are in service in large power stations where
duty industrial work in which steam pres* operating conditions arc particularly severe.
sures up to 350 pounds and temperatures as It is one of four standard Anaconda Copper-
high os 600* F. are used, is equipped with Nickel Alloys furnished for heat exchange
Anaconda 10% Cupro Nickel Alloy 754 Con applications.
denser Tubes.
* Or
This moderately-priced copper-nickel al
loy, containing 10% nickel and 0.75% iron All told, there are eleven standard and sev
provides good corrosion resistance and heat eral special Anaconda Condenser Tube Ah
loya --ranging from Deoxidized Copper and
Arsenical Admiralty to Super Nickel 702
AnaconpA
o4nacmu6x
CONDENSER TUBES & SHEETS
(30% nickel). The services of our Technical. Department are available at all times to assist engineers and fabricators in the selection of alloys for heat exchange use. Please feel free to consult us, ond write for a complimentary
THE AMERICAN BRASS COMPANY
copy of Anaconda Publication B-2.
General Offices: Wtterbury 88, Connecticut Subsidiary ofAnaconda Copper Mining Company
fa Ciwti: A.ttMui tniKi, Run In. firm Tnerm*. Ont.
'OWE* July 1440
117