Document mmLnORgdEBzeQrZvkya4GOev0

Anniston J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffpp General Offices COMPANY CONFTDPNTIAL Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Summary H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard W. K. Johnson C. F. Luecke W. R. Richard w. R. Robirds c. W. Roos J. R. Savage J. E. Smith J. A. Stephens South Second St. ,p. 0. DeGarmo Other Locat ions A. H. Forsten Alvin, Texas D. W. Jackson W.G.K. JANUARY 1971 Specialty Products Liquid Hydrogen supply was installed to enable HB-40 to operate when the biphenyl tubular units are down due to natural gas curtailment. Cost is $0.75 per lb. of hydro gen or $4.00 per cwt of HB-40 made from this hydrogen. The third generation Polyphenyl experimental reactor designed for three point promoter injection is complete and starting date of 3-point injection experiment is 2-4-71. This work is directed toward measuring the accu mulative effect of cumene on biphenyl conversion. Plant distilled Santowax Q and hydrogenated it to HQ-40 for market product testing. Hydrogenation cycle time is double that of HB-40. Held up design work on low color Solid Aroclor 5460 after problems in plant during third batch. Laboratory work to prevent smoke evolution that occurred in the still has led to a revised procedure which will be used in another low color run scheduled for February 17. Produced one batch of Solid Aroclor 5068 in plant without anticipated problems from free chlorine in the off-gas. Low chlorine feed rate and addition of extra catalyst (four times normal) were probably responsible for the reduced free chlorine. Statistical correlations on Aroclor 5060 qhlorinations have established that density is an adequate substitute for softening point as a finishing control. Evidence of a con tinuing drift in density gauges was found. Study will be continued on a control system for Aroclor 5460 based on -- density chlorination control. DSW551621 n - 306 CONFIDENTIAL INFORMATION . "This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be excerpted for him. The report must not be sent outside the Company without written approval and the authorized recipient is accountable for its safe keeping, excerpting or otherwise disclosing of its contents and for its proper disposal. The docu ment remains the property of Monsanto Company and shall be returned within two months to its author, except upon special authorization to hold for a lonaer period." STLCOPCB4090038 2. HB-40 Expansion completion was taken over by plant forces. All outside steel was installed with inside work remaining. Final wrapup of job will be accomplished in the first quarter. Oval gear motor for Santowax charging problem appears to be due to high operating temperature. A PR&D report detailing PCB removal by sand and carbon filtration was issued on 1-15-71. The carbon adsorption studies of the Aroclor sump effluent have been completed after three months of continuous operation. PCB effluent level continued to be less than 10 ppb at the end of the first of four 5-ft. columns when the work was terminated. The experi mental data has been forwarded to the Monsanto vendor (Calgon Corporation) for development of scale-up factors. Installation of the reactorclarifier facilities is complete and start of studies to evaluate PCB removal by powdered adsorbant addition followed by flocculationclarification removal of solids is underway. Completed asphalt liner for revised No. 1 limestone pit. Return to service is targeted for 2/22 unless weather delays final acid proofing. Agricultural Division Group plans were revised to reflect two Process Engineers' work load. Program developed for Ethyl PCT quality improvement to meet Geigy require ments and increase sales potential. Parathion plant started up week of January 18. PR&D studies on the recycle of filtered organic residue from 96% chlorina ted Methyl Intermediate into the next thio acid charge were begun again after approximately 6 weeks delay. Work is directed toward full evalua tion of this possible process. Quality Control The Plant Quality Score was 89.8, up 3.3 from December, with a YTD score of 89.8 against a target of 95.0. Pollution Control The remainder of the samples for the carbon treatment and sand filtration studies were completed in January. Approximately 50% of the fish samples collected in December have been started. Monsanto was mentioned in a newspaper article in January (Oxford Sun - January 20, 1971). This article was complimentary of Monsanto as being an area industry which was active in its anti-pollution efforts. :kd 55A 6# OSNN STLCOPCB4090039 3. PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O. Kemp Complaint Report Quality Number NY 1-P (197) Material Aroclor 5460 Customer Reason American Mineral Spirits (see below) (50 lb. bags weighing 52 to 53 lbs. is contrary to their precise formulation). YTD Quality Complaints/100 Shipments 0.35 Target 0.20 OS\N 551623 STLCOPCB4090040 4. COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT Community Relations 1. J. C. Landwehr attended the AIA meeting in Birmingham, Alabama on January 15. (Air & Water Sub Committee) Personnel Development 1. Dave Dixon, Co-op from Georgia Tech, reported January 4 for the winter working quarter. He will be working under the direction of W. B. Dunlap. 2. J. T. Bell visited St. Louis for a meeting concerning "Division Analytical Operations" on January 18-19. 3. Plant Safety Meeting was conducted on January 21-22 & 28. The ' subject of the meeting was USE OF PROPER TOOLS AND EQUIPMENT. The program was planned and conducted by the January 1971 Safety Committee: Jerre Ford, Tom Lackey, Nolan Sims and Vince Haupt, Chairman. 4. W. E. Voss transferred into TSD from Production as a Supervising Engineer for PNP, P2S5 an^ Parathion. 5. L. L. Faulkner also transferred from Production as a Senior Engineer working in Biphenyl-Santowax product area. Visitors li J. R. Savage visited the plant January 18th for review of Technical Program. 2. Messrs. R. M. Kountz and R. L. Neary visited plant on January 27, concerning "Santowax Expansion." DSW 551624 STLCOPCB4090041 1971 DISTRIBUTION OF TIME BY TECHNICAL SERVICE EXISTING PRODUCT 70 TECHNOLOGY IMPROVEMENT NEW PRODUCT EVALUATIONS 60 C.QM (d 0) ^>iCrHDiDi4J>U 3 3 3 0) oOOz 0a) MAJOR PROJECT SUPPORT 50 PROCESS CONTROL IMPROVEMENT 40 PROJECT DESIGN PROCESS MAINTENANCE 30 20 10 10 0 TECHNOLOGY AND TECHNICAL "SUPPORT 15 5 TECHNICAL MANPOWER 15 5 PLANT IMPROVEMENT. PROGRAM REAL ESTATE MANAGEMENT 10 DSW 551625 STLCOPCB4090042