Document mmKYwDGRR4JG3xDJEbLJpykyQ
UC 14>2
yxipm-j .f T i IMTSSNAL CORRESPONDENCE
' Cc` (J^ '
METALS DIVISION ' W**'
RECEIVED
// DEC 24 1975
///
4525 ROYAL AVE., P. 0. BOX 579, NIAGARA FALLS *JE YORK I i3U2
To (Name) Division Location
Mr. F. H. Larrison
UCC Metals Division
Box K
-
King City, CA 93930
Copy to
Mrs. L. J. Grogan Messrs. G. L. Dickson
E. J. Kleber
J. L. Myers T. P. Norris R. L. Schult . W. C. Thurber^ J. E. Walsh File
D.^te Originating Dept.
December 19, 1975 "Calidria" Asbestos
Answering letter date
Subject
January Production ; Shipping Schedules
s
Attached are copies of production and shipping schedules of major
order for the month.
I
Eight bulk cars of SG-104 are included and should be scheduled to maximize plant output. Once again, 60 tons of T-135-0 are scheduled in the last week and we will postpone them if possible.
Although our backlog has dropped dramatically, we still need every
pound of product we can get for January. As you know, the backlog consists of orders we could sell if we had product.
The critical shortage of RG-244 and SX-24 which meets specification also requires the maximum production of those products. Since they are both in such short supply, we suggest producing each for two or three days at a time.
REBrcjb Attachments
UCC 025450
DR-bEft*>
O0Ti>TfttJ '
C-n - MT &.*D0LG-6 tod.
T*
UCC 025453