Document mbzbjqzd6910Q9r7Zr8mkVyyZ
QUOTATION
Ac 0 P^NT
SOUTHWESTERN
-
1
INDUSTRIAL CONTRACTORS AND RIGGERS, INC
7155 Industrial Ava. P. O. Box 1611 El Paso, Texas 79948 .
(9151 779-3931
Contractors' License Nos.
Aritona-31280, 38194, 3819S Naw Maxico-2358 Navada--11306 Washington-223 0115526
ASARCO Incorporated__________________________ pflTc August 5. 1977
P. 0. Box 1111
ppmprr Reroute 20" 0D
El Paso. Texas 79999_________________________ *
Quench Airline to Acid Converter iocATioN El Paso, Texas
We propose to furnish labor and equipment to reroute the 20" 0D Quench Airline to the Acid Converter as indicated on your drawing E 23853 for $7,490.00 (Straight Time Hours).
This quotation is based on the following conditions:
1. All material other than welding rod to be furnished by others.
2. Insulation work is excluded.
3. Existing scaffold to remain for our use.
4. Brick work at new opening in converter to be performed by others.
NORMAL CONDITIONS OF ACCEPTANCE, SALE AND PAYMENT ARE STATED ON REVERSE SIDE OF THIS QUOTATION.
TERMS AND CONDITIONS
1. All quotations arc subject to prompt acceptance and transmittal of order and to confirmation at time of order.
2. This proposal is based on a forty-hour vve*k- Monday through Friday. The premium will be charged at our costs plus insurance and taxes for any work authorized by you, to be performed before 8:00 A.M. and after 4:30 P.M. or on Saturdays, Sundays or holidays.
3. Unless otherwise noted, this price is based on the present hourly wage rates of Building and Construction Trades in the locality where the work is to be performed. In the event that an undue delay of the acceptance of this quotation or in the start of the job causes a wage increase to be effective, this quotation will be re-figured to include the increase.
4. The Company reserves the right to correct all typographical or clerical errors.
5- Should the Customer order any change in the work to be performed as outlined in the proposal, the Contractor reserves the right to adjust this quotation price accordingly.
6. Unless otherwise specifically stipulated, the Customer h to maintain job site free and clear of any equipment or material that may. in any way, interfere with, the work to be performed under this proposal. This shall be done without cost to us.
7. All agreements ate contingent upon strikes, accidents, and other delays beyond our control.
8. We shall not be liable for ar.y losses the Customei incurs, that may be caused by delay in the completion of work to be pe:formed under this quotation, when such delay is caused by conditions beyond our control.
9. The terms of payment for any work covered by this quotation shall be net cash upon completion of work, except as may be provided by job specifications.
10. All structural steel will be erected in accordance with AJ.S.C. Manual of Steel Construction, latest e'dirion.