Document mb9g4YMG4L37NxjZJKdGyBMv0
CONSTRUCTION PHODUCS DIVISION V. R. Grace & Co. 1970 LONG HANGS PLAN VOLUME I
Copy No.:
Cambridge, Haas. October, 19^9
CONSTRUCTION PRODUCTS DIVISION 1970 LONG RANGE PLAN
Index
PROFIT PLAN SUMMARY, 1970 - 1974: DIVISION
I. TEE INFORMATION BASE - PRODUCT LINE ANALYSIS
1. ZOSOLITE:
A. Description of Product Line B. Industry Characteristics and Trends C. Market Characteristics and Trends D. Technological Trends E. Coapetition F. Key Factors for Success G. Strengths and Weaknesses E. Product Line Profit Plan Sumary,1970 - 1974
2. DASEX, HORN, SERVICISZD:
A. Description of Product Line
B. Industry and Market Characteristics and Trends
C. Technological Trends
D. Coapetition
E. Key Factors for Success
F. Strengths and Weaknesses
.
G. Product Line Objectives
H. Product Line Profit Plan Suaaary,1970 - 1974
3. ROCK PROCESSING CHEMICALS:
A. Description of Product Line B. Industry Characteristics and Trends C. Market Characteristics and Trends D. Technological Trends E. Coapetition F. Key Factors for Success G. Strengths and Weaknesses H. Product Line Objectives I. Product Line Profit Plan Suaaary,1970 - 1974
II. PLANNING ASSUMPTIONS
A. Voluae of New Building and Construction
B. Other Planning Assumptions
i
Page
ill
1-1 I-l8 1-30 1-42 1-46 1-59 I-6l 1-65
1-66 I-?4 1-99 1-102 1-110 1-111 1-113 1-114
1-115 1-116 . 1-118 1-120 1-120 1-121 1-121 1-122 1-124
II-l
11-10
III. MAJOR PROBLEMS AND OPPORTUNITIES
Major Problems:
A. Division
B. Canada
C. Zonolite
D. Darex, Horn and Servicised
E. Rock Processing Chemicals Major Opportunities:
t
A. Division
B. Canada
C. Zonolite
D. Darex, Horn and Servicised
E. Rock Processing Chemicals
IV. LONG RANGE OBJECTIVES AND STRATEGY
A. Division
t B. Canada
C. Zonolite
D. Darex, Horn and Servicised E. Rock Processing Chemicals
V. ONE: YEAR OBJECTIVES AND ACTION PROGRAMS - WORK PLANS
1. ACCOMPLISHMENTS VERSUS 19^9 OBJECTIVES:
A. Zonolite B. Construction Materials Division
2. OBJECTIVES FOR 1970:
A. Division B. Canada C. Zonolite
D. Darex, Horn and Servicised E. Rock Processing Chemicals
3.. RESEARCH PROGRAM - 1970
r axe
III-l III-l HI-2 III-l* HI-5
III-6 IH-7 III-8 III-10 111*10
IV-1 TV-2 XV-3 TV-8 IV-10
V-l V-5
V-10 V-ll V-ll V-13 V-13 V-14
f
V. ONE YEAR OBJECTIVES AND ACTION PROGRAh5 - WORK PLAINS
1. ACCOl-gLISHKENTS VERSUS 1969 OBJECTIVES A. Zonolite: 1. SECURE CONTROL BY PURCHASING OR LEASING OF VERKICULITE DEPOSITS IN SOUTH CAROLINA. Target D&te: April Progress: Our evaluation indicated that the reserves vould support only a very saall mill operation, vhich vould not he capable of generating an adequate return on investaent. We are focusing our efforts on evaluating the deposits in Virginia.
2. DESIGN MILL FACILITY TO UTILIZE VERMICULITZ IN SOUTH CAROLINA. <: Targe' Date: March, dependent upon success of No. 1.
Prorre . Cancelled.
3. FURTHER EXPLORE VERKICULITZ OCCURRENCES IN NORTH CAROLINA AND VIRGINIA. Target Date: April Progress: Drilling conducted in Virginia during June through Septeaher has given prelininary indication that this
1970
V- 1
deposit nay warrant commercial developnent. Con siderable testing and analysis Bust be done before naking a final assessnent. Ve may have to conduct further exploratory drilling next summer before determining whether this area should be commercially developed or abandoned.
U. IMPROVE PROCESSING METHODS AT LIBBY. Target Date: September Progress: Ve have found a new reagent system which is much more selective than anything used to date for flotation separation of vermiculite from the gangue material. Ve are piloting new processing methods and circuits, which ve expect to have firmed up to be able to start to e* -ineer revisions to the plant by the end of 1969.
5. ATTEMPT TO MARKET A FIRE RESISTANT COMPOSITE CONTAINING A HIGH PERCENTAGE OF' VERMICULITE DEVELOPED TO THE PILOT STAGE BY VRC. Target Date: April Progress: Ve were unable to interest anyone in this project because comparable type materials can and are being made at lower cost using low density Perlite.
1970
V- 2
6. FURTHER DEVELOP PROGRAM FOR MARKETING DRI-PAC PERLITE-ASPHALT ROOF DECK SYSTEM. Target Date: December Progress: We are progressing on schedule. We have obtained nine applicators as of October.
7. EXTEND THE TEST MARKETING PROGRAM ON REDI-EARTH TO ADDITIONAL AREAS. Target Date: September' Progress: We had inconclusive results and plan a new approach using cooperative advertising in 1970.
wI
8. CLOSE THE SPOKANE, WASHINGTON AND THE PORTLAND, OREGON PLANTS AND REPLACE WITH ONE CENTRAL FACILITY. Targi ''ate: December Progress: Project delayed until 1971.
9. CONSTRUCT A NEW POLYSTYRENE PLANT AND KEN VZRMICULITE WAREHOUSE IN ATLANTA. Target Date: August. Progress: We extended the lease on the present polystyrene facility until August, 1970 and vill construct nev plant in 1970. This project vas delayed pending the development of a manufacturing plan for the Southeastern part of the U.S.
1970
V-3
.10 CONSTRUCT HEW PLANT IH ELLWOOD CITY, PENHSYLVAHIA.
Target Date: June Progress: This vas accomplished July 10, 19^9.
11. CLOSE MODESTO AHD CONSOLIDATE WITH SOUTH GATE, CALIFORNIA. Target Date: April Progress: The consolidation vas accomplished in February, 1969.
12. CONSOLIDATE TWO PLANTS IK BOCA RATOH AND ONE IN HIALEAH INTO ONE LOCATION IH SOUTH' FLORIDA. Target Date: December Progress: Rescheduled for 1970. This project vas delayed pending the development of a manufacturing plan for the Southeasi ' part of the U.S.
13. ORGANIZE AND STAFF A RESEARCH AND DEVELOPMENT PROGRAIL Target Date: June Progress: Tvo research professionals have been assigned to Zonolite at Cambridge. Further emphasis on Zonolite research vill be given by the former CKD research group, vhich now serves the entire Construction Products Division.
970 V - h
B. Construction Materials Division: 1. IllCREASE EMPHASIS ON DEALER SALES OF SERVICISED AND HORN PRODUCT LINES. Target Date: Continuing Progress: We nov have three hundred coshined dealers and distribute for our Horn and Servicised lines. 'This progras vill con tinue in 1970.
2. ACCELERATE THE SEALANTS PROGRAM. Target Date: Continuing Progress: Sealants sales through Septesber vere 20 percent ahead of the sase period of 1968. Hovever, prices have deteriorated causing a reduction in gross margins end ve 1 > vithdravn the acrylic type sealant because of product failures.
3. PLACE HEAVY EMPHASIS ON BITUTEB2 MOISTURE BARRIER. Target Date: 1st Quarter Progress: Current estimated sales of Bituthene in 1969 are 52 percent over budget and 380 percent over 1968. We have met^the 1969 objectives.
h. CONTINUE TO EMPHASIZE GROWTH IN DAREX ADMIXTURES. Target Date: December
1970
V- 5
Progress: We have purchased E. W. Zimmerman, one of the re maining Darex distributors. Ve plan to acquire J-V and.A. H. Harris before nid-1970 to complete this program.
Field tests of tvo nev Darex admixture formulations vere not successful. These products have been returned to the laboratory for further development work. Ve vill not sake our December target date on them.
5. INCREASE SPECIFICATIOH EFFORT IN SET CITIES AND WORK ON TARGET ACCOST LARGE JOB PROGRAM. Target Date: 1st Quarter
) Progress:
Ve h * added personnel in key cities but have been only rode*-, y successful in gaining increased specification effort. Ve have changed our marketing program from emphasis on direct sales to sales through dealers and distributors for the Horn and Servicised product lines.
6. IMPROVE THE MARKETING, ADVERTISING, PROMOTIONAL AIID PRODUCT MANAGEMENT EFFORTS. Target Date: Continuing Progress: Ve are continuing to phase out the low volume, marginally profitable products, especially in the Horn line, and
1970
V-6
have focused the attention of product managers on the key products. Our advertising and promotional effort has been concentrated on Bituthene.
7. INTRODUCE TWO NEW ROCK PROCESSING CHEMICALS PRODUCTS. Target Dates: 1st and 2nd Quarters Procress: We introduced DDA-7 in June. This vas three months after the target date because of difficulty in obtaining ASTM acceptance. We have not yet introduced Hydrophobe, the second nev product, because field tests to date have not yet confirmed the optimum formulation. We are continuing to vork on this and ej^ect that ve vill introduce a commercial product by the end of the year.
c
8.
HOLD MAXI"IK RPC MARKET SHARE. \
Tang ate: Continuing
Procress:
Following the introduction of DDA-7, ve have begun to
regain customers that had been lost to competition and
are holding other customers that were questionable.
9. BEGIN SELF-MANUFACTURE OF 3ITUTEZNE. Target Date: l<th Quarter Prorress: Ve deferred this project to resolve plant location, formulation and equipment design questions.
1970
V-7
10. I!*?R0VE CHICAGO PLANT OPERATION. Target Date: Continuing Progress: An experienced plant manager vas hired September 1. Two' college graduates were added to the supervisory
. group and regular training meetings have been conducted with the entire supervisory group. We have improved our ability to meet promised shipping dates, but have not yet resolved this problem entirely. We have focused almost 90 percent of the Chicago laboratory effort on quality efforts and have made good progress vith the outgoing quality level of sealants, FVC vaterstops end rubber products. Before the end of the year, ve vill have completed or started cost reduction projects in the PVC, rubber, cutting and varehouse fabrication depar nts.
\
11. REDUCE INVENTORY LEVELS. Target Date: 1st Quarter and Continuing Progress: We reviewed the product line to eliminate slow moving items and were able to sell off seme of this obsolete inventory. However, there is still a considerable quantity of obsolete or slow moving inventory on hand. We did not accomplish other planned actions because management attention vas redirected to other problems which must be solved before an effective inventory policy can be specified.
1970
V- 8
.12 IMPROVE THE DIVISIONAL TOTAL DISTRIBUTION POLICY.
Target Date: ^th Quarter Prorress: Ve did not hire an outside consultant as planned last year because ve decided first to Bake changes in the product line and in the marketing organisation. These and other changes vill accomplish this objective vithout the need for an outside consultant.
13. FOCUS R&D EFFORT ON HIGHEST PROFIT PRODUCT LINES. Target Date: Continuing Procress: Ve devoted more RID effort to-Rock Products Chemicals and to Darex admixtures as scheduled.
Ik. FOCUS R&P EFFORT ON NZV PRODUCT 'DEVELOPMENT. Tr \Date: Continuing Prorress: Ve have begun to vork on several basic dev products , including products in the roofing, vail panel and concrete forming areas, as scheduled.
15. CONDUCT RfcD VORK ON THE BITUTKZNS PROGRAM. Target Date: Continuing Prorress: Ve have vorked on formulation modifications as scheduled.
1970
V- 9
2. OBJECTIVES FOR 1970 A. Division: 1. COMPLETE TECHIfICAL/ECONOKIC EVALUATIONS 0? THREE SPECIFIC HEW PRODUCT OPPORTUNITIES AND BEGIN PLANS TO ENTER FIELDS WITH GOOD INDICATED RETURN ON INVESTTIENT. (a) Foam forming system for poured concrete. Conduct market study and engineering design evaluation. If favorable, design molds and begin plant installation. Tercet Date: 3rd Quarter (b) Core materials for vail pends for housing. Conduct technical/economic evaluation of veraiculite molded vith binders, including the "French Board" and other binder systems. Vork vith HUD "Operation Breakthrough" con sortium to select most favorable for development and mar'" 'ting. \arret Date: 3rd Quarter
(c) Inverted insulated roofing. Conduct technical/econcmic evaluation of combinations of Bituthene and I^'foam, in cluding outdoor veathering tests during vinter, spring and susraer, 1969/70. Make preliminary determination of commercial feasibility. Target Date: 3rd Quarter
1970
2. IDENTIFY' AND APPROACH ACQUISITION CANDIDATES. Study segments of the building end construction market for profitability and fit vith CPD and to identify leading companies. Target Date: Continuing V - 10
B. Canada; 1. CONCENTRATE SALES EFFORTS ON PRODUCTS WITH BEST VOLUME AND PROFIT POTENTIAL. . Eliminate lover margin buyouts and increase specification and sales efforts on admixtures, Bituthene and rock . processing chemicals. Target Date; 2nd Quarter
C. Zonolite; 1. INCREASE VERMICULITE SUPPLY. (a) Continue exploration in Virginia and initiate prospecting in Southern Ontario and Quebec. (b) Install equipment at Libby to increase recovery rate. (c) Install six D-l8 furnaces in plants to inprove the yield in bags obtained per ton of ore expanded. Target Date; By end of year.
\
\ 2. CONSOL^. E MANUFACTURING AND DISTRIBUTION IN SOUTHEASTERN
UNITED STATES. Install a large-scale manufacturing plant vith rail-traile distribution terminals to serve a region now supplied by several obsolete local plants. Target Date; bth Quarter
3. I)TROVE AND EXPAND DYFOAM MANUFACTURING. (a) Add a varehouse and block molding equipment at Kev Castle. Target Date; 3rd Quarter
1970
V - 11
(b) Install equipment in a rental site in New England to serve the northeastern seaboard narket. Target Date: 3rd Quarter
(c) Install & block laminating line for Vent Board and Tufhide. Target Date: 3rd Quarter
(d) Improve output rates of plants by operating procedurechanges. Target Date: Continuing
1. IMPROVE THE BUILDING -PRODUCTS SALES ORGANIZATION. (a) Study territory coverage and district and regional coatro realign and consolidate vhere appropriate to achieve cere efficient sales coverage of the narket. Target Date; 3rd Quarter (b) Reorganize our technical services and product canager group to ico'f"'*'" their effectiveness and to replace the functions of -he Vemiculite Institute. Appoint a Merchandise Manager. Target Date; 2nd Quarter
5. IMPROVE THE CONCRETE PRODUCTS OPERATION. Kegotiate agreement vith Aserican Excelsior for lover cost supply at Brunsvick and revamp the facilities at Terry to reduce labor. Target Date; 3rd Quarter
1970
V - 12
D. Darex, Horn and Serviciscd: 1. REORGANIZE THE CAMBRIDGE AED FIELD ORGANIZATIONS TO FOCUS MANAGEMENT ATTENTION ON THE HIGH VOLUME," HIGH PROFIT MARGIN LINTS AND ON THE PROBLEM LINES. Eliminate the field regions and set up control at Cambridge separately over Darex admixtures, Bituthene waterproofing and Horn/Servicised building and engineer ing construction products. Target Date; 1st Quarter
2. IMPROVE THE CHICAGO OPERATION. Complete the reorganization of the manufacturing, order handling end inventory control operations. Target Date: 2nd Quarter
c E. Roch Processing Chemicals: 1. PEGAIN MARKET SEARE. Promote DDA-'f > regain customers lost to competition and to hold existing customers. Target Date: Continuing
2. BEGIN SALES TO NON-CEMENT MINERALS PROCESSING INDUSTRY. Devote sales effort to introducing products based on our existing dry dispersants technology to non-cenent companies processing minerals by the dry grinding process. Target Date: One significant nev customer by end of year.
1970
V - 13
5 3
3. RESEARCH PROGRAM - 1970 Both expansion/nev opportunity reseerch programs and selected sustaining research projects that are of najor importance ere de scribed in this portion of the Plan. Less significant sustaining research end technical service projects ere omitted, but an estimate of their cost is given in the summary of the 1970 reseerch depart ment budget.
A. REVIEW OF 1969 RESEARCH PROGRAM
Accomplishments:
1. Bituthene
During 19^9 a pilot line vas installed and used to produce
small quantities of Bituthene for field testing. The line
employs crumb natural rubber instead of the latex emulsion
currently being used in England. The former has performance
advantages over the latter and manufacturing equipment to
mEke it is simpler. A third method for rubberizing the
bitumen vas dev
in the laboratory, vhich has possible
patent protection.' It vill provide savings in manufacturing,
and has performance advantages over both the latex and crumb
rubber products. Manufacturing feasibility vill be evaluated
on the pilot line for field testing late in 19^9 and early
1970. The R8cD costs of this program vere approximately t3^,000.
2. PDA-7 Development vork vas completed and the product presented to the market at mid-year. This nev interground addition should
1970
v - ik
aid CPD both to recover lost business and to penetrate the Type I cement narket. The RAD costs of this program during 1969 vere approximately $21,000. A program aired at de velopment of DDA-8 vas started at mid-year and vill be cerried over into 19T0.
3. Hydrophobe This is a new interground air entraining agent/vater repellent for masonry cenent vhich is nov being field tested, .Total BAD costs, including 1968, vere approxinately $16,000. Annual sales potential is estimated at $200,000.
I4. Zonolite Products Asbestos fiber is a health hazard during the application of Hono-Kote. Work done late in 19&9 to eliminate esbestos from the product indicates that a substitute has been found vhich does not deter from'the properties of the original Kono-Kote. Fire tests are be g conducted to confirm our findings and obtain product approval.
Serious air pollution at CPD plants vhere Zonolite masonry fill is produced is also hazardous to health. A new coating for the expanded vemiculite vas developed vhich both lovers the cost of the final product and eliminates the pollution problem.. The use of the nev coating vill require changes in manufacturing equipment vhich vill carry over into 1970.
A V - 15
A portion of the mined verciculite, Type III, cannot be used in the current product line because of its extreme friability and has, therefore, been stockpiled at both of Zonolite's mining operations. During 19&9 several potential nev uses vere uncovered for Type III vermiculite vhich vill be further investigated in 1970.
Disappointments; 1. VRC Liouid Curable Polymer - Sealant and Floor Coating
Because of lack of long-term stability plus batch-to-batch inconsistency, none of the experimental polymers supplied by WRC during 1968 and 1969 could be compounded into a useful structural sealant and/or a floor coating. The R&D ex penditure on this program during 19^9 vas approximately
$10,000.
2. Room Temperature Acrylic Sealant
Efforts to ovei
srtain of this product's undesirable
performance characteristics vere not successful and the
product vas vithdravn from the market at mid-year. The total
R&D costs in this effort during 19^8 and 19^9 vere ap
proximately $35,000.
3. Concrete Admixtures In March, a patent vas granted to Master Builders (MartinMarietta) covering the use of compositions similar to those developed by CPC late in 1968. The priority given to con-
1970
V - 16
tinuation of our program resulted in a delay in the plans for developing:
(1) Admixture for specialty concretes, (2) Polymer treated concretes, (3) Concrete surface sealer. The'cost of this prograa in 19^9 vas approximately $26,000.
lj. Surface Retarders Problems in manufacture and field application forced us to vithdrav the nevly developed (1968 to 19^9) line of concrete surface retarders from the market. Total research costs for this project were $10,000.
B 1970 RESEARCH PROGRAM Research effort in the exp.ansion/nev opportunity area during 1970
c will be focused on four major projects.
1. Bituthene Attempts to improve its properties, simplify its manufacture and provide patent coverage vill be continued in 1970* In addition, possible modifications of Bituthene for use in roofing, pipe vrapping, and low cost damp-proofing vill be examined. The estimated research and development expenditure on this project during 1970 is $50,000.
1970
V - 17
2. Roofing Systems During the second half of 196?, experimental roofing systems using Permadeck, Bituthene, Ityfoam and vermiculite concrete vere erected for performance studies in 1970 and 1971. All of the systems are designed to provide both vaterproofing and insulation. An expenditure of $15000 is planned in 1970 in the system evaluation.
3. Vail Panels During 1969, CPD Joined a consortium vhich submitted a proposal to HUD for participation in "Operation Breakthrough". Part of CPD's participation in the consortium involves de veloping vail panels for use in systems built housing. The principal goal in 1970 vill be to attempt to develop a board using versiculite that vould have sufficient strength to serve as the core of the vail panel. Indoor/outdoor coatings, methods of fastening and sealing of Joints betveen the panels vill also be investigated. A small expenditure ($7,000) is tentatively planned for 1970, pending determination of the acceptance by HUD of the proposal submitted by our consortium.
1970
k. Shrinkage Control - Mortar and Concrete Basic vork at WRC in I96U to 1967 identified the causes of shrinkage of portland cement-based mortar and concrete and established several possible avenues of approach to control shrinkage through additives. A research expenditure of $20,000 is planned for 1970 to investigate these and other approaches. V - 18
Four major research projects in the Sustaining Research category vill he conducted in 1970.
1. Concrete Admixtures The setback in early 1969 caused by the issuance of Master Builders' patent vas partially overcone by a strong research effort during the remainder of the year. This program vill continue to have top priority during 1970, for vhich an R&D expend!ture of approxinately $50,000 is planned.
2. Type III Vemiculite The program initiated in 1969 aimed at finding a use for Type III vemiculite vill be continued in 1970 at an ex penditure level of $25,000. One use that vill be evaluated end that ties in vith the vail panel project involves fabrication through the use of a suitable binder into in sulating fireproofing cores for vail panels.
3. Admixtures for Specialty Concretes During 1969 concrete made from specialty cements such as Cbem Comp, PCA Jet Set Cement and Alpha Regulated Set Cement gained considerable attention. CPD must have admixtures that are compatible vith these cements in order to maintain its position in the concrete industry. The planned RtD expenditure for 1970 on this project is approximately $37,000.
1970
V - 19
1*. Grinding Aid and Pack Set Inhibitor for Portland Cerent During the second half of 1969, work vas started towards developing DDA-8, the next generation of grinding aids for Portland ceaent. The objective is to achieve equivalent performance at reduced cost. This work will be continued in 1970 on an expenditure level of about $30,000.
C. MAJOR RESEARCH DEPART! S?T PROBLEMS 1. Research Effort Balance Because a good part of CPD's sales is predicated on efficient technical service, a considerable portion of the research department effort is in maintenance type research projects. In the past, this has distracted from the emphasis on new opportunity research projects. Although the magnitude of this problea vas reduced in 19^9, measures to control it further will be taken during 1970.
D. SUl-CiARY OF 1970 RESEARCH BUDGET During 1970, the Construction Products Division will spend $863,000 in its research and development program. Research and developaent in the Construction Products Division includes technical service and sustaining research as veil as nev opportunities research, and in 1970 vill also include process engineering work on nev products. A breakdown of planned expenditures for 1970 compared with current estimate for 19^9 is shown in the following table.
1970
V - 20
RAD EXPENDITURES
Expansion/IIev Opportunity Research Maintenance/Sustaining Research:
Sustaining Research Technical Service
Sub-Total RAD/Process Engineering
TOTAL PZSEARCH
Planned 1970 ($000)
$162
cz 1969 ($000)
$ 95
256 375 _ 631
70 $863
262 37U 636 -" $731
All of the planned increase in the total expendiutre is in the expansion/nev opportunity research projects and the assignment of process engineering tiae to the product developnent prograa. The nev opportunities projects have been described earlier in the research plan and all have considerable nev sales potential for C?D. The vorh by process engineering vill fill a gap in the prograa to take nev products from the initial- research stage through pilot manufacturing to ultimate ccmercialisation. The expenditure in sustaining research and technical service vill not change over that of 19^9
1970
V - 21
The principal factors accounting for these variances are as follows:
1. Net Sales
CPD net sales in 1969 of $5^,552,000 are expected to be $1,01*0,000
(1.9?) favorable to Budget. Zonolite net sales are estimated to be $1,782,000
(6.5?) over budget; but this overrun is expected to be substantially offset
by underruns in Darex/Hom/Servicised ($671,000 or 3.3?), with the U.S. and
Canada sharing about equally in the underrun), and Bock Processing Chemicals
($11*1,000 or 5.7?). The underrun in U.S. Darex/Hora/Servicised reflects an
unrealistic Budget, while the Canadian underrun is due to 1) the loss of our
Ontario admixture distributor in December, 1968, and 2) the failure of con
struction activity in Quebec to rebound from the post-"Expo" doldrums.
Compared to 1968, both Bock Processing Chemicals and Concrete Products
are expected to have lover sales in 1969 (3.6? and 1.1*? respectively), whereas
Zonolite and Darex/Hom/Servicised sales are estimated to overrun 1968 (7.0?
and 1*,1*? respectively).
2. Gross Profit Percent
Gross profit percent is 1.9? unfavorable to the 1969 Budget due to
the following factors:
Factors Accounting for Unfavorable Gross Profit Percent
1969 Current Estimate Vs. 1969 Budget ($000)
Manufacturing Variances in Vermiculite Mining Manufacturing Variances at Chicago Manufacturing Variances at Expanding Plants Unrealistic Margin Budget for Darex/Hom/Servicised Competition in Bock Processing Chemicals i prable Product Mix at BPD (primarily high sales of
margin glass fiber) Higi. .r Manufacturing Costs at Concrete Products, partially
offset by a higher selling price
$ 250 175 110 120 75
90
180 $1,000
-2-
noio c. o
Manufacturing variances are expected to add $350,000 to cost of sales at Libby, offset by $100,000 of favorable variances at South Carolina. The Libby variance primarily reflects the lower vemiculite content in the mill feed than contemplated in the Budget.
The manufacturing variances at Chicago are primarily due to contin ued production problems with PVC vaterstops and bridge pads and to a lesser extent to unrealistic DMC's on paraplastics and sealants.
The variances at the expanding plants are primarily due to the age and poor condition of some of the older Model A expanding furnaces, six of which are budgeted for replacement in 1970.
Competition from Westvaco's REAX, Union Carbide's acetic acid, end the introduction of our new higher-cost grinding aid DDA-7 account for the \ drop in Rock Processing Chemicals gross profit percent,
3. Ooeratinr Expenses Total operating expenses of $1^,950,000 are $137,000 (,9?) favor
able to Budget due to a $190,000 (1.62) underrun in selling expenses more than offsetting a $69,000 (2.62) overrun in G4A expenses.
1*, Extraordinary Items - Other The 1969 estimated results reflect the gains on the sales of Perl-Tile
and the Elivood City plant (totalling $13^,000 after tax) partially offset by continued costs in early 1969 associated with Zonolite's move from Chicago ($ll*,000 after tax). These moving expenses are $36,000 favorable to the 1969 Budget ($50,000 after tax).
C. 1970 BUDGET * We expect only a minor increase ($22,000 or 1.12) in the Grace share of
- 3-
o<MPsn
after-tax profit from 1969 to 1970 although net sales are projected to increase
substantially ($3,1*1*1,000 or 6.3?). The major reason for the low profit improve
ment is the necessity to spend heavily in 1970 on Zonolite prograas to benefit
future years. There is no question that the Zonolite business has been "milked"
over the past several years. Research and process engineering have been
neglected, and little has been done to upgrade aanufacturing facilities. The
1970 Zonolite Budget includes $11*0,000 for non-standard and start-up expenses
associated with upgrading these manufacturing facilities.
1. Bet Sales
CPD net sales in 1970 of $57,993,000 are expected to be $3,1*1*1,000
(6.3?) over the 1969 Current Estimate as follows:
Elements of 1970 Net Sales Increase l$0Q0)
1970 Budget 3
Variance to 1969 Estir.a 5>
Derex/Kom/Servicised Rock Processing Chemicals Zonolite Concrete Products Total
$20,1*21*
2,51*9 31,120
3.900
$57,993
$1,027
199 2,085
130 *3.^1
5.3?
8.5 7.2
3.1* or
Increased sales of Bituthene and admixtures account for the bulk of the Darex/Horn/Servicised increase. Bituthene gross sales are expected to increase $6ll*,000 (110?) from $558,000 in 1969 to $1,172,000 in 1970. Gross sales of admixtures are expected to increase $1*27,000 (7,9?) from $5,1*07,000 in 1969 to $5,83^,000 in 1970.
The Zonolite sales increase includes $650,000 of price increases on products sold by the Building Products group. Our ability to realize these increases is one of the greatest risks in this Budget. In addition, sales
- 1* -
volume of all expended veniculite, perlite, glass and polystyrene products are expected to increase approximately 5.5!*.
The 1970 Zonolite Budget also reflects $90,000 of price increases on ore concentrate to customers and licensees. However, the total tonnage sold to custorers and licensees is expected to remain at the 19o9 level of 105,000 tons.
Total ore tonnage to customers, licensees and expanding plants from South Carolina and Libby increases only 2,000 tons frcm 288,000 in 19C9 to 290,000 in 1970. Tne small ore requirements increase in spite of a much greater demand for expanded veraiculite is due to savings of 10,000 tons re flecting yield improvements due to the installation of D-l8 furnaces at our expanding plants and the installation of Eiaco extractors at Libby and South Carolina.
Concrete Products' net sales are expected to increase $130,000 (3. ' in 1970. Price increases account for $60,000 of this increase and is the major risk in this Budget.
2. Gross Profit Percent Gross profit percent is expected to drop .2% from 33.6? in the l?o9
Current Estimate to 33.W in the 1970 Budget in spite of the price increases noted above. The major factors affecting gross profit as e percent of net sales are shown in the following table:
-5-
0*93962
FACTORS AFFECTINS GROSS PROFIT P5P.CZTTT
1970 Budget Vs 1969 Current Estimate U000)
UNFAVORABLE FACTORS
Darex/Hora/Servicised
Reduction in gross margin in the U.S. primarily due to
increased sales of lover nargin Bituther.e and price erosion
on admixtures
$ (80)
Wage rate increases at Chicago
(Uo)
Rock Processing Chemicals
Reduction in gross margin primarily due to replacing
HEA2 with higher cost DDA-7
(1*0)
Concrete Products
Cement and excelsior cost increases and vege rate
increases
(100)
Zonolite Expanding and Polystyrene Plants
Wage rate increases
(200)
Increased direct laborheadcount
(100)
Increased maintenance cost
(100)
Increased depreciation
(50)
Raw material (ex veraiculite) cost increases
(100)
Non-standard and start-up expenses
(100)
Zonolite Mines
j
Increased Depreciation
(150)
Non-standard and start-up expenses
(30)
Wage rate increases
____(150)
Total Unfavorable Factors
$(1,2^0)
FAVORABLE FACTORS
D?-rex/Horn/Servicised Direct labor headcount and overtime reduction at Chicago Increase in gross margin in Canada due to improved vaterstop manufacture end to self-saturation of fiberboard
Concrete Products Price increases on Permadeck Manufacturing cost reduction due to elimination of special trimming, reduction in direct labor headcount and rejects
Zonolite Price increases on expanded vemiculite and ore concen trate to customers andlicensees Other - net
110
30 60
110
JliO 50
Total Favorable Factors
1.100
Net - Unfavorable
$(ll0)
093963
3. Operating; Expenses Operating expenses are forecast to increase $911,000 (6.1?) froa
$11,950,000 in 1969 to $15,861,000 in 1970. As a percent of sales, operating expenses decrease slightly froa 27.1? to 27.3?.
The increase in selling expenses of $135,000 (3.7?) reflects normal inflationary increases.
The increase in G&A expenses of $365,000 (13.5?) is due to l) noraal inflationary increases of $135,000 (5?), 2) the expenditure of $130,000 in 1970 on process development projects for polystyrene, venniculite and Bituthene, and 3) market development effort ($100,000) on new products, including French Board and Foes Fora.
The increases in R&D expenses of $108,000 (22.1?) include 1) a $61',000 increase for veraicuiite ore prospecting on the east coast, 2) a $67,000 increase in admixtures to develop a new product in order to protect our future in this market, 3) a $30,000 increase to develop new cement grinding aids, 1) a $15,000 increase for additional research on veraicuiite, 5) partially offset by a $68,000 decrease in research on Horn and Servicised products.
1. Other Income/(Expense) Other income/(expense) is unfavorable $80,000 in 1970 over 1969 mainly
due to increased absorption of Cambridge expenses ($57,000) resulting from the move of the Polyfibron Division froa the Cambridge offices.
5. Extraordinary Items - After Tax The absence of favorable extraordinary items after tax in 1970 results
in $170,000 less after-tax profit in 1970 than 1969. This is due to the
093964
elimination of depletion and the gain on the sale of Ellvood City and Perl-Tile
in 1969.
6. Management's Opinion of the 1970 Budget
The 1970 Budget is a tough target for our people to make and was
purposely so set. We believe it is realistic but an important element to our
success vill be the level of construction activity in our areas of the market.
We expect to experience a dovntum in general construction activity
in 1970 from the level experienced in 1969. The curtailment of government
construction spending vill have an unfavorable effect on non-housing construction.
The current high interest rates vill also have some impact, although this, factor
is more severe in the nev housing construction market, and only a small percent
age of our total sales are tied to this market.
Hovever, the price increases, increased sales of products with a low
market penetration, such as Bituthene and polystyrene, and a more aggressive
marketing program vith vermicuiite products are expected to more than offset
the decline in construction activity.
Although ve believe the 1970 Budget represents a realistic appraisal
of the key factors which can affect our 1970 performance, there are certain un
predictable elements on the downside which could result in underrunning the 1970
profit 3udget. These include l) a severe downturn in non-housing construction
activity, 2) strikes in the construction industry, 3) failure to make our price
increases stick in 3uilding Products ($650,000), 1j) feilure to make our Permadeck
price increases stick due to increased competition from Elberton ($60,000), 5)
failure of our new grinding aid, DDA-7, to perform as we expect relative to West-
vaco's RE/", and 6) failure to get the improvement in ore concentrate recovery at 1
Libby '
ions per day to 575 tons per day).
-8-
oq-*q*,s
D. F0UR-Y5AB FORECAST 1. Ket Sales CPD's net sales are projected to increase $19,729*000 from $57,993,000
in 1970 to $77,722,000 in 1972*, an average annual grcvth rate of 7.6?. During this period, Grace share in after-tax profit is projected to increase frcn $2,051,000 in 1970 to $1*, 109,000 in 197**, or at a rate of 19.0? per year.
Zonolite sales of $145,517,000 in 1972* are expected to be $ll*,397,000 (10.0? per year) higher than 1970. Approximately $1*,000,000 of the sales increas is due to price increases on expanded vermiculite and perlite averaging approxi mately 3? per year. The balance of the Zonolite sales increase is due to 1) increasing the penetration of concrete aggregate (from approximately 2? to 1*?) in the northern United States ($1,900,000), 2) sales of French Board, a nev fireproofing product using vermiculite ($1,900,000), 3) sales of vermicuiitc"peat" pots, cattle feed roughage, and seed enscapulation products ($1*00,000), 1*) normal grovth of existing vermiculite, polystyrene and perlite products ($5,100,000), and 5) an increase in ore sales to customers and licensees ($1,100, of vhich $600,000 represents price increases.
Darex/Horn/Servicised sales are expected to increase $1*,216,000 (1.55 per year) from $20,1*2J*,000 in 1970 to $2l* ,61*0,000 in 1971*. This increase is pri marily due to Bituthene, admixtures, and to a lesser degree, Servicised produces.
Rock Processing Chemicals sales are projected to increase $916,000 (tr. average annual increase of 0.0?) to $3,1*65,000 in 197**. Approximately tvo-thirds of this increase is expected to be sales of nev products resulting from research efforts in the early 1970's.
-9)
093966
2. Gross Profit Percent Gross profit as a percent of sales is projected to increase from 33.^2
to 3^.1*, contributing $5^,000 to pre-tax profits in 197^. Gross profit percent improves in all four profit centers as nev, higher margin products, price increases and changing product mix more than offset higher depreciation from the capital spending program and other manufacturing cost increases.
3. One ratine j-'xoenses Total operating expenses, although increasing $3,9^9,000 (average
annual increase of 5.7? per year) decline as a percent of net sales from 27.3? in 1970 to 25.k? in 197^. The drop in selling and G&A expenses as a percent of net sales more than offset a small increase in research (from 1.0? to 1.12), the latter being necessary to an aggressive nev product development program, principally in finding new uses for vermiculite and prospecting.
V** r*L'iTu>^srr*>' *
*1 u -- .'_(!/
Total capital spending over the five-year period is estimated at
$19,500,000 more than half of which ($12,100,000) will be spent in 1970 end
1971.
Spending on Zcr.olite maintenance, expansion and cost reduction projects
amounts to $16,000,000, or 82? of the total over the five-year period. Of this,
$3,200,000 is slated for the Libby (37,000,000) and South Carolina ($1,200,00 0.'
mines and mills. Most of the South Carolina capital is for equipment replace
ment projects.
The situation at Libby has reached critical proportions. Prior to 196?,
capital spending was mostly for replacement of equipment. For the past several
ye rs, the percentage of vermiculite in the mill feed has been declining, and
i - 10 -
093967
mining and milling costs (particularly labor), have been increasing as has the demand for ore. Jelling facilities vere operating at capacity in 1969, and ve still had to purchase 6,000 tons of ore fron Africa and reduce our ore inventorie at the nines.
We are now at the point where ve aust introduce labor saving projects increase the recover:/' of ore concentrate, reduce the rock content, ar.d increase ore output to keep up with expected demand. We expect that projects currently underway (tranfer point, scrubbing and desliaing, and extractor) will allow us to barely meet ore deaand in lO^O. We must aal:e the investaent at Libby in order to aaintain and iaprove profitability.
The facilities situation is also critical at the veraiculite expanding and polystyrene plants. In the past, capital expenditures have been far below tiie level required Just to maintain these facilities in current condition. Also, many of these plants do not have room for expansion, As a result, the capital budget and forecast contemplates $7,800,000 of spending for relocating and modern izing to eliminate safety hazards, introduce cost reductions, and increase capacity.
Other then Zonolite, the largest spending project is for a Bituthene facility The capital budget and forecast includes $605,000 to be spent in 1970 and 1971 for the project, which includes the acquisition of a site near Chicago, This site will also be used to consolidate the present Chicago and Milwaukee Zonolite plants in 1971 (at an additional capital cost of $1*50,000).
T. P-ET'JPJi C" GRACE CAPITAL EMPLOYED The following table summarizes the returns on Grace Capital Employed for
the period 1970 through 1971*:
\
- 11 -
093968
Return on Grace Capital Employed
1970 - 197^
Darex/Horn/ Servicised
Rock Processing Chemicals
Zonolite
Concrete Products
Total
1970
1971 1912 1973 197'
3.62 1*.0
5.1 5.6
6.5
21.9? 22.3 23.1 26.9 30.9
9.1*? 7.7 9.0
10.7 12.3
7.2? 9.8
11.3 11.3 11.3
7.3?
6.9 8.1
9.1* 10.8
The returns for each of the four profit centers are calculated based on
operating profit taxed at 1*9.2? in 1970 and 1*8.0? in 1971-1971*. In the case
of Zcnoiite, hovever, the tax rate vas adjusted for depletion. Items belov
the operating profit lice were considered only in the consolidated Construction
Products Division,
i
As mentioned in the 3AC\GR0UND section, the budget and forecast assumes the
status cuo for the Darex/Hcrn/Servicised business.
The incrc-ase in returns on GCE from 21.9? to 30.9? in 1971* for Rock
Processing Chemicals is primarily due to the introduction of new products in
1971 and 1972 resulting froa our increased research effort.
The Zcnoiite return on GCE drops to 7.7? in 1971 increasing to 12.3% in
1971*. This reflects the capital spending program and the consequent increase
in depreciation, with the benefits of this progran appearing in the latter part
of the five-year period.
Tne Concrete Products improvement reflects l) lover excelsior costs
(principal rav material) from an agreement ve expect to enter into with American
Excelsior Co. and 2) improved manufacturing situation at the Terry, Mississippi,
plant (elimination of unfavorable manufacturing variances end increased product!
capacity).
093969
1969 Estimate
Percent of Set Sales
1970
1971
3ucU?et
Forecast
1972 Forecast
1973 Forecast
1971* Forecast
100.OS 33.6
100.OS 33.1*
loo.oS 32.9
100.OS 33.3
100.OS 33.9
ioo.oS 31*.1
21.1* 5.0 0.9 0.1
27.1* 6.2
0.1
6.3 2.8 3.1*
3.1*
0.7 0.2 3.7
20.9 5.3 1.0 0.1
27.3 ' 6.1
(0.1)
6.0
2.3 3.6
3.5
20.1* 5.0 1.1 0.1
26.6
6.3
-
6.3
2.5 3.8
3.7
3.5 3.7
20.0 k.9 1.2 0.1
26.2 7.1
7.1 2.6 *.5 l.l*
l*.l*
19.7 1*.8 1.3 0.1
25.9 8.0
8.0 3.0 5.0 1*.9
1*.9
19.2 1*.7 1.1* 0.1
25.1* 8.7
8.7 3.3 5.1* 5.3
m 5.3
093970
se___________ . '69 Budget favorable)
1.9? (3.5)
1970 Budget
__________ Variance
'70 Budget Va. '69 Estimate
Favorable/(Unfavorable)
Amount
%
/rji-
$57,993
$3|ui
6.3?
19,361
1,021
5.6
1971 Forecast
1972 Forecast
1973 Forecast
$61,995 20,125
$66,931 22,327
$71,36** 21,353
1.6 (2.6) 0.6 16.7 nV<7a (13.3)
(12.0) 9.9
(13.7) (11.2)
12,125
3,071
597 68
(135) (365) (108)
____ HJ
15.861
(911)
3,500
(2) ____ Hi)
(V (w
no
3 (60)
3,113 3;^ 33
1,317
186
2.096
219
2,051
212
(3.7) (13.5) (22.1)
(1*) (6.1)
3.2 m
1.0 12.1
n.7
n.5
12,630 3.U9 720 71
16.510
3,885
* / * 'r"'
(2) 2
3,835
... .U36
2.~319
: 2,300
13,106 3,280 791 75
17.555
1,772
(2) 2
1,772
1.761
3.on
2,958
11,111 3,187 919
_____ 18
18.625 i 5,726
(2) _____ 2
5,728
-2*110
3,531
(50.0)
(9.2)
.1
.3
m
2_,95i
28,206 7.3?
15,872 7.6?
(70) (120)
22
(1,603)
(5,886)
1.1
(19.5) (11.7)
-
_ 2.300
33,1U 6.9?
53,013 7.3?
-
2.958
36,112 8.1?
58,360 8.2?
3,531
37,HI 9. IS
61,966 9.2?
093971
SUWABY or PROFIT PLAN I
~
($000)
"
REPORTING UNIT - CONSTRUCTION PRO:
Net Seles
Gross Profit on Sales
Operating Expenses Selling General fc Administrative Research & Development Depreciation Sot Charged to Production
Total Operating Expenses
Set Operating Profit
Interest Income/(Expense) Other Income/(Expense)
Bet Income Before Taxes
Taxes On Income
Net Incase After Taxes
Grace Share in Net Incase After Taxes
Extraordinary Items (Grace Share) Investment Tax Credit Other - After Tax
Grace Share in Total Bet Income
Grace Capital Employed (Average) Percent Return Gross Assets (Average) Percent Return
1968 Actual
1969 Budget
1969 Estimate
7Z9~ Fe
$51,961*. $53,512 17,963 18,998
$51* ,552 18,31*0
11,1*52 2,1*23 1*1*3
73
11,880 2,637 1*92
______18
1U.393 15.087
3,570
3,911
3 (20) (211) _____ U5)
3,362
3,876
1,1*76
1.702
1.866
2.171*
1,81*9
2,11*1*
11,690 2,706 1*89 5
ll*.950
3,390
(5) 25
3,1*10
1.533
1.877
1,839
83 :_____
1.863
21,761* 8.65
37,373 9.65
1U0 12 >
2.231*
23,703 9.1*5
1*0,097 9.85
70 120
2.029
23,603 8.65
39,986 8.5S
-
093972
ONO P IN
Percent of Net Sales
J.*oy
1970--------- 1971--------------1972-------------- 1973-------------- 1975
et Estimate Budget Forecast Forecast Forecast Forecast
OS 100.OS 100.OS 100.OS 0 37.1 37.9 37.5
100.0* 38.1
100.OS 38. k
100.OS 38.6
28.9 fc.l 1.2 0.1
k 3^.3
6 2.8
** j.
1.5
9 1.3
28.9 It.2 1.2 0.1
3U.1*
3.5
1.7
1.8
28.2 U.l l.fc 0.1
33.8
3.7
1.8
1.9
27.8 U.l l.fc 0.1
33. k
M
2.3
2. it
27.8 lt.1 1.5 0.1
33.5
V.9
2.k
2.5
27.3 k.l 1.6 0.1
33.1
5.5
2.6
2.9
093973
1971 Foreetit
1972 Forecast
1973 Forecast
. 197k Forecast
$21,255 7,980
$22,360 8,525
$23,3^5 8,965
$2k,6kO 9,520
5.985
880
29 ___ 21
7.180
BOO
-JfiL
kl6
6,222 912 323 21
7.k80
l,0k5
502
6,k77 955 358 25
7.815
1,150
_____
???.
6,7k2 1,000
k03 25
8.170
1,350
6k8
702
10,39k OS
lk,919 5.k$
10,669
5.J 15,611
6.7$
10,699 5.6$
16,059 7.2$
10,797
6.5$ 16,589
6.1$
iyeo Actual
xyoy Budget
PerC' 1969 ------ 17 Estimate Bud;
100.0$ 37.5
100.0$ 39.0
100.0$ 37.1
100. 37.
29.1 k.6 1.6 0.2_
35.5
27.9 k.O 1.3 0.2
33.k
2.0 5.6
1.1 2.7
.9 ____ hL
CO.
CM
28.9 k.l 1.2 0.1
3k.3
1.5
1.3
28. k. 1. 0.
3k.
3.
1.
093974
'ROTIT PLAH DATA iOOO)
VORN/SEHVICISED
69 =at
Variance
'69 Estimate Va. *69 Budget
Favorable /(Unfavorable)
Amount
$
1970 Budget
Variance
'70 Budget Va. '(>9 Eatlmate
Favorable/(Unfavorable)
Amount
%
397
$(671)
(3.3)%
$20,k2k
$1,027
5.3$
189
(63k)
(8.1)
7,735
5k6 7.6
598 1
5.907
(309)
(5.5)
789 19 2.k
8k8
(59)
(7.5)
239 20 7.7
20 11
-
253
(lk)
(5.9)
21 il) (0)
6U6
51 0.8
7.029
<3>
(5.8)
5k3
(583)
(51.8)
706 163 30.0
288 265 k7.9
3k7
(59)
(20.5)
2>,
(318)
(55.5)
359 10k k0.8
li50
(6k)
(.7)
9.852
(k02)
(k.3)
7$ 3.6$
uOk
(337)
(2.6)
13,988
(58k)
(k.k)
1$ 5.0$
093975
SUMMARY 07 PROFIT PLAN : (SOOO)
REPORTING UNIT - DARSX/HORN/
Net Seles
Gross Profit on Sales
Operating Expenses Selling General k Administrative Research k Development Depreciation Rot Charged to Production
Total Operating Expenses
Net Operating Profit
Taxes on Incase
Net Incose After Taxes
Grace Capital Employed (Average) Percent Return Gross Assets (Average) Percent Return
1968 Actual
1969 Budget
1969 Estimate
pst Fa
$18,578 $20,068
6,970
7,823
$19,397 7,189
858 292
26
6.590
380
205
175
5,599 808 259 31
6.697
1,126
553
573
5,598 789 239 20
6.61*6
5l3
288
255
_
....
9,069 1.9* 12,781
3.0*
9,386 6.1* 13,067 8.6*
9,1*50 2.7* 13,1*01*
*.l*
1969 tiaate
Percent of Het Sales
1970 Budget
1971 Forecast
1972 Foreeast
1973 Forecast
197b Forecast
30.0' 39.3
100.0% 37.7
100.0% 38.2
100.0% 38.0
100.0% 37.9
100.0% 38.2
lb.9 b.3 3.3 0.1
22.6
If ~
8.8
7.9
lb.b b.3 1*.3 0.1
23.1
lb,6
7.1
7.5
lb.b b.3 b.7 0.2
23.6
lb.6
7.0
7.6
lb.8 b.2 b.5 0.2
23.7
lb.3
6.9
7.b
lb.2 b.l b.3 0.1
22.7
15.2
7.3
7.9
13.7 b.O b.2 0.1
22.0
16.2
7.8
8.b
A^
971 ?cast
1972 Forecast
1973 Forecast
1971* Forecast
,675 ,020
$2,870 1,090
$3,165 1,200
$3,1*65 1,325
385 1*25 1*50 1*75 115 120 130 11*0 125 130 135 11*5
5555
630 680 720 765
Uo 1*80 560
137 197 230 269
203 213 250 291
910 .3* ,586
-.6?
922 23.1$
1,653 21*. 8$
928 26.9$
1.715 28.0$
91*1 30.9$
1,782
31.1*$
1968 Actual
1969 Budget
1969 Estimate
Percent of Het
1970
1:
Budget Fort
100.0$ U.2
100.0$ 1*2.7
100.0$ 39.3
100.0$ 37.7
10: ' 31
11.3 3.1* 2.7 0.1
17.5
26.7
11*.1
12.6
13.2 l.l 3.5 0.1
20.9
21.8
11.5
10.3
lfc.9 1*.3 3.3 0.1
22.6
16.7
8.8
7.9
llt.l* 1*.3 **.3 0.1
23,1 1
lk.6
7.1
7.5
11 J 1 (
2J
11
007074
PLAH DATA rESSIBG CHEMICALS
Variance
'69 Estimate Vs 169 Budget
Parorable/(Unfavorable)
Amount
%
1970 Budget
Variance
'70 Budget Vs. '69 Estimate
Favorable/(Unfarorable)
Amount
*
$(lhl) (139)
(5.1%) (13.1)
$2,51*9 962
$ 199 38
8.5* l*.l
(21)
m
8
(152) 80
(72)
(6.1*) 9.3
(2.5) (27.9)
27.9 (28.0)
366
(16)
(U.6)
no (9) (8.9)
109
(31)
(39.7)
3
588
(?6)
(10.5)
371*
(18)
(1*.6)
18U 23 11.1
190 5 2.7
32 (58)
3.8 (k.2)
866 21.9%
1,1*95
25.0*
(61*) (51)
(8.0) (3.5)
I t
t
j
1971 Forecast
1972 Jortujj
$2,675 1,020
1,095
385 115 125 _____ 5
630
390
187
203
A25 IX ___ 68C
___19' 212
910 22.3*
1,586
21*. 6*
922
23.1* 1,653
2 4. 3
093979
SPMMARY OF PROFIT PLAN ($ooo)
REPORTING UNIT - ROCK PROCESS T
Net Sales
Grose Profit on Bales
Operating Expenses Selling General k Administrative Research fc Development Depreciation Not Charged to Reduction
Total Operating Expenses
Net Operating Profit
Taxes on Income
Net Income After Taxes
Oraee Capital Employed (Average) Percent Return Gross Assets (Average) Percent Return
1968 Actual
1969 Budget
1969 Estimate
$2,1*37 1,078
$2,1*91 1,063
$2,350 921*
275 329 81* 101
66 86
33
350 101
78 3
1*28 519 _2K i
650 51*1*
392
31*3 287
207
307 257
185
693 1*1*. 3$ 1,383
**7.0$
631* 30.8$
1,386
39.2$
602 23.1$
1,1*1*1*
27.1$
093980
I960 Actual
1969 Budget
1969 Estimate
Percent of Set Sales
1970
*
Budget For.
1972 Forecast
1973 Forecast
197** Forecast
100.0? 33.1
100.0? 33.6
100.0? 32.5
100.0? 31.1*
100.0? 30.6
100.0? 31.0
100.0? 31.9
100.0? 32.2
19.7 *.7 0.3 0.2
2l*.9
8.2
5.0
20.2 5.6 0.5 0.2
26.5
7.1
2.5
k.6
18. k 5.5 0.6 0.1
2 k.6
7.9
3.2
k.7
17.5 5.8 0.8 0.1
21*.2
7.2
2.5
1*.7
17.2 5.5 0.9 0.1
23.7
6.9
2.3
k.6
16.8 5.1* 0.9 0.1
23.2
7.8
2.3
5.5
16.5 5.3 1.0 0.1
22.9
9.0
2.8
6.2
16.1 5.1 1.2 0.1
22.5
9.7
3.1
6.6
o<n<>8i
1971 rrecast
1972 Forecast
1973 Forecast
1971* Forecast
:i*,065 -3,1*35
$37,601 11,672
$1*1,251* 13,11*8
$1*5,517 11*,656
5,858 1,895
301 36
3,0gP 2,31*5
1.56V
6,357 2,019
31*1 38
8.755
2,917
852
2.065
6,812 2,173
1*26 22
__9ii0
3,698
1,11*1*
2.551*
7,332 2,322
51*1 1*0
-10.235 1,1*21
2,??0
0,291 7.7$ 3,615 7.0$
22,977 9.0$
38,073 7.7%
23,91*6 10.7$ 1*1,069
9.0$
21*,383 12.3$ 1*3,61*5 10.1$
1963 Actual
1969 Budeet
1969 Estimate
.^erc-ct cr :e 1970
3 Fo:
100.0$ 33.1
100.0$ 33.6
100.0$ 32.5
1 nw n > H 31.1*
2;
19.7 1*.7 0.3 0.2
21*.9
8.2
3.2
_5.o
20.2 5.6 0.5 0.2
26.5
7.1
2.5
1*.6
18. k 5.5 0.6 0.1
21*.6
7.9
3.2
1*.7
17.5 5.8 0.8 0.1
2i*. 2 ;
7.2
2.5
1.T
1
2
093982
:FIT PLAIT DATA >r
: (EX CONCRETE PRODUCTS)
Variance
Variance
'69 Estimate Vs. '69 Budget
'70 Budget Vs. *69 Estimate
Favorable/(Unfavorable)
1970
Favorable/(Unfavorable)
te
Amount
-----
Budget
Amount
%
35
$1,782
6.5*
X $31,120
$2,085
1,2%
28 277 3.0
9,764
336 3.6
42 168 3.0
5,450
(108)
(2.0)
96
(82)
(5.4)
1,804
(208)
(13.0)
T2
(25)
(17.0)
235
(63)
(36.6)
33 8 19.5
35 (2) (6.1)
43
69 1.0
T.W1*
-12SD
(5.3)
95 346 17.8
2,240
(45)
(2.0)
i.
(237)
(35.0)
___ 169
16.0
12 109 8.6
l.Tl
_i2i
7.4
02
142 1.2
15,645
(4,143)
(36.0)
1 9.4*
64 0m
553 2.4
27,573 8.1*
(5,209)
(23.3)
093983
SUMMARY Of PROFIT PLAB
(*000)
REPORTING UNIT - ZONOLITE (EX CON:
Net Sales
Gross Profit on Sales
Operating Expenses Selling General A Administrative Research A Development Depreciation lot Charged to Production
Total Operating Expenses
Set Operating Profit
Taxes on Income
Set Income After Taxes
Grace Capital Employed (Average) Percent Return Gross Assets (Average) Percent Return
1968 Actual
1969 Budget
1969 Estimate
$27,127 8,975
$27,253 9,151
$29,035 9,428
5,351 1,284
87 41
6.763
2,212
848
1.364
5,510 1,514
147 41
7.212
1,939
____ 6l5
1.261
5,342 1,596
172 33
7.143;
2,285
____ 215
1.370
10,503 13.0*
20,772 ie.6*
11,644 10.8* 22,917
8.5*
11,502
11.9* 22,364
10.2*
*
. -
093984
>66 m&i
1969
Budset
1969
Estimate
Percent of Wet Sales
1970
1971
Budget forecast
1972 forecast
1973 forecast
1974 forecast
3.0$ 100.OS 4.6 26.0
loo.&S
21.2
100.OS 23.1
100.OS 24.8
100.OS 25.4
100.OS 25.4
100.0S 25.4
).8 i.2
"
ufi_ J.*
4.1
12.0 5.8 -- -
IT. 8
8.2
--fr3
3.9
10.6 5.9 -- 0.2
4.5 g*4 2.1
10.3 5.9 -- 0*2
16. *
6.T
,, 3.1
3.4
10.1 5.7
^2_
4$.
8.8
*.2
4.5
9.8 5.6
15.6 9.8
-it! 5.1
9.8 5.6 0.2 15.6 9.8 _4fcL
5.1
9.8 5.6 0.2
15.6
9.8
JuL
5.1
093985
1970 Budget
Variance
'70 Budget V*. *o9 Estimate
Favorable/(Unfavorable)
Amount
"~r"-
$3,900 900
$ 130 101
3.45 12.6
1*02 229
9
64 0
260
128
1?2
I.8U3 7,2% 2.816 9.2%
(2) (9) (11) 90 (38) SI
6 (1*2)
(0.5) (4.1) __ (1.7) 52.9 (1*2.2) 65.0
.3 (1.5)
1971 Forecast
1972 Forecast
1973 Forecast
197Forec.
$4,000 990
$4,100 1,01*0
$4,100 1,01*0
$4,1: 1,01
1*02 229
;1 ______2 i ____ ! 350
i ____l8 1
182
1*02 229 _____L
-
400
___ 122 208
1(02 229
9
___ i*2 1*00
____122 208
4c 22
64
ko.
____ 12. 20
1,81*9 9.85
2.923 12.01
1,81*1* 11.35
3,023 13.25
1,841
11.35 3,123
12.85
1,83* 11.35
3,22! 12.45
093986
SUMMARY 07 PROFIT PLAB (woo;
RKPORTHO UHIT - CONCRETE
Bet Sales
Gross Profit on Ssl.es
Operating Expenses Selling General & Administrative Research k Development Depreciation Sot Charged to Production
Total Operating Expenses
Bet Operating Profit
Taxes On Income
Set Income After Taxes
Grace Capital Employed (Average) Percent Return Oross Assets (Average) Percent Return
1968 Actual
1969 Budget
1969 Estimat
S31822 9l*0
13,700 961
*3,772 799
1*12 197
3
612
328
____ ill
- 155
1*1*2 21k
3
___ 652
302
___ 152
1*3
1*00 220
9
629
170
_____ 20
80
1,*99 10.3*
2,1*37 13.5*
1,839 7.8*
2,727 11.1*
1,81*9 i.3* 2,771* 6.1*
093987
) (38) (3)
Grace Canitai annloyed
ronstr.Goodwill Includ. Constr.Goodwill
'* After-
* After
tax Returns
iOOO
Tax Returns
33-1** 26.5 20.3
i.l* Q.3
10.1* *4- &.7
9.7
12.U 13.8 13.9 13.9
A-
2,370
2.510
2,599
2,939 2,<?l*o 2,91*3
2,01*9
2,ol*l* 2,9l*l 2,936
_% 10.9 2.5 5.3
6.5 1* .2 6.0
7.8 8.7 8.7 8.7
(1*0)
After-Tax Cambridge Allocation
($000)
8-
pli
^ 26 '
38 *9 1*2 t/ 1*6
1*7 1*7 1*7 1*7
(1*1)
Net Income After Cambridge
Allocation (5000)
i 296 262 258
?
113
151* -
or ei 132
182 208 208 208
- (.1)
NS 2.3*
(22.8)* 20.7
(-3) .2 ?
(10.5*) ( 9.5 )
(1*7.1*)* 63.0
093989
(33)
Net Income After Taxes
(sooo)
S 296 262 258 63 139
192 123 178
1961* 1965 1966 1967 1968
1969 b 1969 E 1970 B
229 1971 F 255 1972 F 255 .1973 F 255 1971* F
(31*)
(35)
Gross Assets__________
3000
% Pre-Tax Returns
(36)
(37)
______
Grace Cap it
Exclud. Constr.Goodwill
5 After-
3000 Tax Returns
$ 1,650 1,930 2,260 2.237 2,1*37
2,727 2,771* 2,8l6
2,923 3,023 3,123 3,223
30.1*? 25.3 20.7
5.0 10.5
13.7 9.0
12.1*
15.1 16.2 15.7 15.2
3 8*6 988
1,270 1,1*19 1,1*99
' 1,839 1,81*9 1,81*3
1,81*9 1,81*1* 1,81*1 1,836
33.1*5 26.5 20.3
l*.l* 9.3
10.1* W 6-.7
9.7
12.1* 13.8 13.9 13.9 ,
(l6.o)S 19^6-1969 I 15.7 1969 E-1971* F
8.5* 3.0
15.85 (.1)
(35.9)5 1969 E vs. 1969 B 1*1*.7 1970 B vs. 1969 E
% of Net Sales
7.75 6.5 5.6 1.6 3.6
5.2 3.3 l*.l*
5.7 6.2 6.2 6.2
(1.75) (1.5 )
Turnover
2.1 2.1 2.0 1.6 1.6
1.1* 1.1* 1.1*
1.1* l.l* 1-3 1.3
(5) .3
Turnover
1*. 3 l.l 3.6 2.5 2.5
?.? 2'.0 2-1
2.2 2.2 2.2 2.2
093990
(2?)
(30)
(31)
(32)
Other ne(Exr>ense) 5000)
S (6) 11* 7 12
vl2C i
r-
-
~
net Profit Before Taxes
(SO00)
$ 562 1*89 1*68 111 257
371 24. v 250
350
1*1*0 1*90 1*90 1*90
Federal Incone Taxes
fSoooT
$ 270 235 225 53 13c
197 13? 132
172
211 235 235 235
Bet Profit After Taxes
($000)
$ 292 251* 21*3 58 121
177 /?r-li8'
178
229 255 255 255
Investsient Tax Credit
($000)
$ 1* 8
15 5
10
15 5
-
V
(lM)*
(13.3)?
(16.5)?
1*.6?
11*.1*
12.2
16.6
HS
-
<"et Sales
(.1)? .? .1 .3
3.2)
-
(33.2)? 1*0.0
11*.7? 12.2 10.2
3.1 6.7
l".l 6.6 o.O
11.0 12.0 7 2 mn 12.0
33.0 i (30.3)
Effective Tax Pate
1*8.0? 1*8.0 1*8.0 1*8.0 52.6
*2.3 52.8 l*o.2
1*8.0 L. n IS
Includes T err:-' riant Startur cf ?r.00C
(33.3)? 50.8
? of Net Sales
7.6? 6.3 5.3 1.6 3.2
l*.p 3.1 U.l*
5.7 6.2 6.2 **
(66.7)?
1961* 1965 1966 1967 i960
1969 3 1969 E 1970 B
1971 7 1972 F 1973 F 1971* F
(210
(25)
(26)
Operating Expenses ($000)
(IT
Selling
0 t A 'Total
$ HA NA NA HA 1*1**
1*1*1*
-r1'i 1*02 1*01*
liOl* 1*01* 1*01* 1*01*
4 NA HA NA HA 1**9
$ 551 583 6*7 617 5c3
ll*3 l".i 11*7
11*6
587 f v~5l*9
550
11*6 11*6 11*6 11*6
550 550
550 550
1961*-1969 E ?69 E-1971* F
HS5 .1
NS? (.1)
(.1)5
-
1969 E TS. 1969 3 9.5 5 1970 B ys. 1969 E (.5)
(2.8?) .7
6.5 5 (.2 )
1061* 1065 1066 167 1068
loc r 196? I 10" 0 3
1=71 ? -072 F 1077 T 1=7-
? of Total Net Sales
HA? HA HA NA 10.s
12.0 10.7 10.1*
10.1 9.9 0.8 9.9
NA? RA HA HA 3.9
7.0 3.c 3.7
w*3 av 3.6 r.f 3.6
lU.li? 11*.5 15.0 17.2 11*.7
1 a. 0 11*.6 11*.1
13.7 13.1* 12.1* 12.1.
f2'. 3reaV.dovn not available ir. 1061-.;^ on a eenoarabl* basis.
(27)
(28)
Operating Profit (SOOO)
$ 568
1*75 l*fi
99
377
-1,
371*-*: 250
350
1*1*0 1*90 1*90 1*90
Other Incoae(Expense'
(SOOO)
* (6) 11*
12 us:; -
r_ -
(15.1)5 ll*.l*
NS NS
(33.2)? 1*0.0
-
11*.8 11.9
10.1 2.8
0.0
I'M 6.6 9.0
11.0 12.0 12.0 19 n
.
5 of Net Sales (.1)' B *3 .1
/2.2)
-
_ -
(?) :
093992
M (15>
-oduct I ine
:rete
Installation
. Slats
Materials
-37 S 271 :L9 253 :6o 331 r'23 2U7 '2Z 235
.77 177 :30 /?i 165 -30 165
?30 170 ?S0 170 ?80 170 ?80 170
-9S>
(9.MS 0.6
6.8S
(16)
(17)
(18)
(19)
(20)
Erection Total
$ 293 3U9 526 UUU
1r
$ 2,713 2,9tt 3,t28 2,870 2,882
230 2,739 IK 230 Jr 'r2,971
230 3,000
220 3,010 250 3,060 250 3,060 250 3,060
(1*.8)S 1.7
1.8S 0.6
Gross Profit by Product Line
Concrete
Inste
Permadeck
Channel Slabs
Mat
($000)
(*/So. Pt .)
$ 1,009 912 968
68t
rsn c
8.7*
8.9 7.7 6.U 6.6
$ 38 iei
13t 18 17
w
SflU
6.3
, > 35
5.6 (f 7J ftO)
885 6.1
-
2^
980 1,010 1,010 1,010
6.5 6.7 6.7 6.7
20 20 20
1
Arera*
(t.5)S t.9
(8.M4 3.7
(17.MS 2t.8
(15 (3
-
(8.5)4
(10,2)*
(11.1)4
(1.0)
11.5
8.9
4 Vari:
(16 -
Product Line
-0? 77.OS .1* 81.1 .3 10.6 .7 70.1* .8 81.6
.5 w A^ ^w .5 82.5
82.5
85.0 .3 85.0 3 ?5.C 3 85.0
103.2? 10t. 2 108.0 112.7 lit. 3
ICG. 0 109.5 109.5
110.0 108.7 103.7 108.7
70.8S 73.6 7*.9 80.0 75. t
( ** W
78.8 76.9
75.3 7M6 7t.6 7U.6
37.1? 37.9 33.7 20.2 29.6
cr 1 2^.3 27.1
20.1 30.0 30.C 30.0
4 of Het Sales by Product
8.0? 10.6 16.7
3.3 7.2
16.5 (t.5)
23 16 20 20 18
*r
17 17
. 15 6.7 15 6.7 15. 6.7 15.
093993
(12)
(13)
(Ik)
(15>
Cost of Sales bv Product Line
Concrete
Installation
Penaadeek
($000)
(tf/Sq. Ft .)
Channel Slabs
Materials
$ 1,712 1,1*93 1,902 1,656 2,i**c
2,155 V 2,3^6
2,375
iu.ee
1*.6
15.2
Cr V'
15.1*
I?. 6 ts
15.1* !'*,<> 16.5
16.1*
t>9
3 1*37 SU9 660 523 22C
177 230 230
$ 271 253 331 2l*7 233
177 IT| 165
165
2,390
15.9
230
170
2,360
15.7
280
170
2,360
15.7
280
170
2,360
15.7
280
170
(16)
(17)
Erection Total
$ 293
31*9 526 hhh
t- 1 r
1 2,713 2,91*1* 3>28 2,870 2,582
230 230 ' 230
2,730 1 f 2,971
3,000
220 3,010 250 3,060 250 3,060 250 3,060
(15)
p, ($000)
$ 1,00;. cv 06; 68-
rsr- :
flo;
88?
08c 1,01c 1.01C 1,01C
6.55 .1
2.2* (1.0)
(12.0)? u. 0
(9.M? 0.6
<.?>* (1.S)
62.9? 62.1 66.3 70.8 70.1*
70.9 71*.7 72.9
70.9 70.0 70.0 70.0
(7.1)* .6
(29.9?) -
6.8* -
? of Net Sales by Product Line
92.0? 89.1* 83.3 96.7 92.8
83.5 10U .5
-
93-3 3.3 3.3
77.0? 81.1 79.6 79.1* 81.6
cA OA .oA 82.5 82.5
85.0 85.0 85.0 85.0
(1*.8)? 1.7
1.8* 0.6
(u. 5) 1* .9
(8.5)*
(10,2)
-
(1.0)
11.5
103.2? 10L.2 108.0 112.7 111*.3
1CC.0 109.5 109.5
no.o 108.7 108.7 108.7
70.8? 73.6 71*.9 80.0 75.1*'
* \ A
78.8 76.?
75.3 71*.6 71*.6 71*.6
37.1? 37.9 33.7 20.2 29.6
AM *
2*.3 27.1
20.1 30.0 30.C 30.0
093994
(6)
(9)
(10)
(11)
"et Sales bv Product Line
Concrete
Installation
Charnel Slabs
Materials
Erection Total Year
J 1*75 950 603 51*1 237
212 2-20 230
230 300 300 300
(11*. 2)? 6.1*
3.82 *.5
$ 352 312 1*16 311 25
210 ii? 200
200
200 200 200 200
$ 281*
335 1*97 301* 2**i*
S3.832 1* ,002 1* ,576 3,586 3,622
230 3,700 -210 s*?3,770 210 3,900
200 It ,000 230 1*,100 230 1*,100 230 1*,100
1961* 1965 1966 1967 1968
i 196 b 1969 z 1970 B
1971 F 1972 P 1973 F 1971* F
Averaee Annual 2 Increase/(Decrease)
(10.7)f
-
(5.8)2 1.8
(.3)2 1961*-1969 E 1.7 1969 E-1971* F
* Variance Favorable/(Unfav.)
(8.7)*
-
(8.7)2
-
1.92 3.1*
I960 E vs. 1969 1970 B vs. 1969
Total Set Sales
12.1*2 23.7 17.6 15.1
6.2
5.7 5.8 5.o
5.7 7.3 7.3 ".3
0.22 7.8 0.1 8.7 7.5
5.o 5.3 5.1
5.0 l*.o 1* .9 1*.0
7.1*2 8.1* 10.6 11.0 6.1*
100.02 100.0 100.0 100.c 100.0
6.2 100.0 5.6 100.0 5.1* 100.0
5.0 100.0
cC
/
100.0
*(
S'
100.0
c
s *
1C0.0
1061* 1965 1966 1967 1968
1969 B I960 E 1970 B
1971 F 1072 F 1Q73 F 1971* F
093995
ficn 1C?C 3/F
(2)
rr. U,S, Poof Deck Market roof'^ Mineralized Wood
ket Fiber Sales
rt.)
(000 So. Ft.)
55,000 60,000 *0,000 60,000
ft^CCO 55,000 55,000
55,000 55,000 55,000 5 5., 000
Decrease)
-- -
(3) (M (5)
Wood
Peraadeek (Cone.Prod. Min. Fiber-M.W.F.)
Unit
Gross
Sales
Sales
Sales
Deductions
(COOSa. rO (*000)
(scoo)
11,581 10.231 12,516 10.720
13.763
S 2,71*0 2,1*22 2,5ft 1* 2,360 3,0oi
* 19 17 ll* 20
38
lli ,000 l1*y200 lit,500
3.053^^3,170
3.200
15 it 30
30
15,000 15,000 15,00c 15,000
3,1*00 3,1*00 3,1*00 3,1*00
30
30 30 30
1*.2? 1.1
3.0? 1.1*
9.67 -
(3.5*)) -
1.1*? 2.1
j P* 3.8
7 Of ?OOf Deck "arket
7 So.last U.S.
d Per
V.V.F. Sales Scuare Foot
3l*.C5 35.7 3. 36.1* 32.1*
21.1< 17.1 17.o 17.o
25.1
23.7d` 23.7 23.0 22.0 22.1*
31.7 30.6 30.6
2o.k
?*.? ?*.2
21*.6 25.5 26.1*
27.3
O'*. 3
21.5 22.3 22.7
^2 ** 2? ,7
T
ruildir.rr 'tvrs suitable for ::radeck) i by Concrete Products.
(100.0)J -
7 of Gross Sales
.7? .7 C .8 1.2
.5 .0 .c
.0 w*
093996
Construction Products Division 1970 B/F Concrete Products_________________
(1) (2)
Year
196^ 19c5 10 66 ll Ircc
16q b i960 z 1970 B
1971 F 1972 F 1973 T> I07I r
Southeastern U.S, Poof Deck Market
Available Roof'^; Mineralized Wood
Deck Market
Fiber Sales
(000 Sq. Ft.)
<000 Sq. Ft.) "
162,000 i6e,ooo 150,000 165,000 170,000
55,000 60,000 70,000 60,000 55,000
ieo,ccc 180,000 150,000
57,000 55,000 55,000
157,000 lQl.OCO 202,000 210,000
55,000 55,000 55,000 55..0CO
(3)
Perr.adeck (Con Unit
Sales (000 Sq. Ft J
11.551
10.231 12,516 1C.7?0 13.7r3
il.OCC i^.T^i^cr
11,500
2;
15,000 15,000 15,000 15,000
.
Average Annual ? Increase/(Decrease)
I96I-1969 E i960 E-197J* F
2.1? 3.1
-
1.2? 1.1
t Variance Favorable/(Unfav.)
i960 E vs. 1069 E 1970 B vs. loAo y
(3.5?) -
1.1? 2.1
Year
lo6i 1965 1966 1967 106?
I060 E I060 E 1O70 E
1071 T
lz"2 F I0-3 r in-i. r
? of Roof Deck Market
31*. 0? 35.7 3P .0 p6.1 32.1
31.7 30.6 30.6
20.ii 2a.l 2'T. 2 ?6.2
? So.Fast U.S. W.W.F. Pales
21.1* 17.1 17. c
17.9
25.1
21.6 2^.5 ?f.l
2'T _ -3 O'T ^ ^ 77 . *
"7 . 'J
7
'1} Selected ner.--eider.t: il buildi.r.rr 'tYT* suitable fcr -erradec'! ir. the market irea served by Concrete Products.
093997
CALCULATION OF INCOME TAXES (WOO)
REPORTING UNIT - CONSTRUCTION PRODUCTS DIVISION
Reconciliation of Book Income to Taxable Income
1969 Estimate
Book Income Before Extraordinary Items - Pretax Extraordinary Items - Pretax
$3,110 170
Total Book Income
3,580
Less: Depletion Not Booked Excess of Tax Depreciation Over Book Gain on Disposition of Fixed Assets Reduction/(Increase) in Reserve for Bad Debts State Income Taxes Other
552 60
220 (50)
20
Subtotal
2,778
Add: Amortization of Goodwill Domestic Dividends at 15? Other
Taxable Income
20 2 -
2,800
Commutation of Total Incone Taxes
Less: Income of Foreign Subsidiaries
210
Taxable Income U.S. Co's
2,590
Tax at 1*8?
1,21*3
Less: Surtax Exemption on Non-Consolidated U.S. Subsidiaries
(13)
Tax on Gain on Disposal of Fixed Assets Depreciation Recapture (50,000 x 1*8?) Balance at 25? (170,000 x 25%)
21* 1*2
Total U.S. Tax Before Surcharge and Investment Credit
Add: Surcharge -.1969 at 10?; 1970 at 2.5?
1,296 130
Less: Investment Credit
(70)
Total U.S. Federal Tax
1,356
Deferred Income Tax on Excess Tax Depreciation Over Book - 1969 at 52.8?; 1970 at 1*9.2?; 1971 at L8?
Foreign Income Tax State Income Tax
32
105 20
Total Income Taxes
$1.513
1970 Budcet *3,U1*3
~ 3,1*1*3
677 1*0
50 20
2,656
23 2 -
2,681
220 2,1*61 1,181
(13)
--------- --
1,168 29
1,197
20 110
20 $1.31*7
CAPITAL BUDGET AND FOREC.
'
ttooo)
=
REPORTING UNIT: CONSTRUCTIONPROtt
TITLE OF PROJECT
Total Reqd for Project
Working Authorization Ac
Capital Total Per Unexp
Required
RCA
Aac
A. UNEXPENDED AMOUNTS OF RCA'S IAS OF I/1/70)
ORE SCRUBBING AND DESLIMING EQUIPMENT LIBBY, MONTANA, MILL - GRACE RCA k
% 153
$
NEW TRANSFER POINT FOR THE LIBBY, MONTANA, MINE - GRACE RCA #2
375 1
IMPROVE DDA-7 MANUFACTURING PROCESS - CHICAGO
30
HEW ACETIC ACID TANK AND HYDROPHOBE R-l* STORAGE - CHICAGO
RAILROAD TRACK SPUR - CHICAGO
35 . lo 1
l
TOTAL UNEXPENDED AMOUNTS OF RCA'S
_________________________________________ 2t
B. 1970 CAPITAL BUDGET
LIBBY MILL
STORAGE AND BLEND FEED SYSTEM
TOO
' FINES CIRCUIT
l
DUST COLLECTION
33 1*00
DRYER AND BUILDING
150
WASTE BELT
/
DRY MILL ADDITION
H5 100
COST REDUCTION
/
DUST COLLECTION - LOADING
CAPACITY EXPANSION OF EXISTING BUSINESS
90 75 65
CONCENTRATE HAUL TRUCK REPLACEMENT AND MAINTENANCE
55 20
093999
\L BUDGET AND FORECAST ($000)
AUCTION PRODUCTS DIVISION
Author!zat ion Amount
Total Per Unexpended
i RCA
Amount
Schedule of Expenditures
1970
1971
1972
1973
197**
Page 1 of 5
% Return On GCE
PayOut Time
$ 153 375 30 35 1*0
$ 70
125 12
35 1*0 232
$ 70
125 12
35 1*0 282
oO
700 rioo
j330 330
1*00 300 $ 100
<* (
150 150
\
11*5 11*5
100
90 90*) 75 75 S' '/
65 65 \ \
55 55 ) 20 20^
094000
Construction Products Division 170 B(T Concrete Products'
(1*2)
Earnings (Including Cambridge Allocation)
Per Aca. Share (60,000 Shares)
SI*. 93
1* .37 1* .30
Ce l!8B
1061* 1965 1966
1968
2.57
1.35 2.20
i960 B
1969 E 1970 B
3.03 3.1*7 3.1*7 3.1*7
1971 F 1972 F 1973 F 1971* F
Average Annual * Increase/(Decrease)
(22.8)? 20.8
196U-1969 E 1969 E-1971* F
5 Variance Favorable/(Unfav.)___________
(1*7.5)5 63.0
1969 E vs. 1969 B 1970 B vs. 1969 E
1961* 1965 1066 1067 1968
l6o E 1 -Cr Z 1970 B
10-ri r 1072 r 173 F 10*ri; r
093988
CAPITAL BUDGET AND FOREC.
tlooo)
r
REPORTING UNIT: CONSTRUCTION PROD!
TITLE OF PROJECT
Total Reqd for Project
Working Capital Required
Authorization Ag Total Per Unexp
RCA Aac
LIBBY MINE POWER SHOVEL TWO ORE HAUL TRUCKS
t 180
150
ROTARY DRILL REPLACEMENT AND MAINTENANCE
95 30
COST REDUCTION
12
ENOREE MILL OFFICE BUILDING
;
COST REDUCTION
62
ENOREE MINS REPLACEMENT AND MAINTENANCE
132
CAPACITY EXPANSION OF EXISTING BUSINESS
50
CONCRETE PRODUCTS - TERRY
EXCELSIOR ROOM REVISIONS COST REDUCTION
75 37
REPLACEMENT AND MAINTENANCE POLLUTION CONTROL
15 15
CONCRETE PRODUCTS - BRUNSWICK
POLLUTION CONTROL DAREX/HORN/SERVICISED/RPC
15
BITUTHENE MANUFACTURING FACILITIES
805
DAREX MFG. FACILITY - ATLANTA
155
REPLACEMENT AND MAINTENANCE
106
094001
-.3SZ? AND FORECAST ($000)
JIOW PRODUCTS DIVISION
Authorization Anount Total Per Unexpended
PCA Aaount
Schedule of Expenditures
1970
1971
1972
1973
197U
Page 2 of 5
J Return On GCE
PayOut Tine
CDo
$ 180 150 150
95 95 30 30 12 12
51* 51* 62 37 $ 25
132 132 50 50
75 75"'-. 37 37 ! 15 15 : 15 15
15 15 /' /
605 r505 $ 300
. :5 155
106
106
noton?
CAPITAL BUDGET AID FOREC ($000J
REPORTING UNIT: CONSTRUCTION PRO
TITLE OF PROJECT
Total Reqd for Project
Working Capital Required
Authorization A Total Per Uhex
RCA Am
NEW PVC EXTRUDER - CHICAGO HEA2/DDA-7 EQUIPMENT - NEWARK
$ 90 80
COST REDUCTION
'6k
BITUTHENE PILOT LINE - CHICAGO COMMERCIALIZATION OP HEW RPC PROD.
60 100
CAPACITY EXPANSION OF EXISTING BUSINESS
2k
EXPANDING PLANTS
COMBINE JACKSONVILLE, BOCA RATON, TAMPA, AND HIALEAH FACILITIES
500
MFG. FACILITY EXPANSION - KEARNEY FRENCH BOARD FACILITY RELOCATE DEARBORN, MICH., PLANT D-l8, ORE HANDLING AND STORAGE ST. LOUIS NEW DISTRIBUTION/WAREHOUSE FACILITIES - ATLANTA NEW SHOP EQUIPMENT - T.R.
POLLUTION CONTROL
REPLACEMENT AND MAINTENANCE POLYSTYRENE PLANTS
ItitO
275
H05
95
75 61
50
36
EXPAND POLYSTYRENE FACILITIES - NEW CASTLE
159
INSTALL POLYSTYRENE MFG. FACILITY - ATLANTA
CUSTOM MOLDING FACILITIES
INSTALL POLYSTYRENE MFG. FACILITY - NEW ENGLAND
aA > ^ ^ ^
210 150
120
HD FORECAST
IOH i-rtODUCTS' DIVISION
setloo Amount
er UnexpendedSchedule of Expenditures
__ Amount
1970 1971 1972 197S""'TW
0 $ 90
0 80
6k
l 60
o 50 $50
4 2k
Pac* 3 of 5
% Return Pagr* On Out QCE Time
/ 500 / ) U1*0 275
150 255
95
75 \ 1
6l
210 150
120 094004
CAPITAL BUDGET AND FOREC
~~ Uoooj
REPORTING UNIT: CONSTRUCTION PRO!
TITLE OF PROJECT
Total Reqd for Project
Working Capital Required
Authorization A Total Per Unex
RCA As
FLOTATION MOLDS - SOUTHGATE
$ 51*
REPLACEMENT AND MAINTENANCE CAPACITY EXPANSION OF EXISTING BUSINESS
27 20
LOCAL RCA*S - PROJECTS UNDER $10.000
LIBBY ENORu.
51 57
CONCRETE PRODUCTS DAREX/HOHN/SERVICISED/RPC
133
162
EXPANDING PLANTS POLYSTYRENE PLANTS
335 ____50
TOTAL CAPITAL BUDGET
8.301
CAPITAL FORECAST NEW WET MILL - LIBBY
1,000
COMBINE CHICAGO/MILWAUKEE
1*50
COMBINE PORTLAND/SPOKANE
1*25
PROJECTS - $300,000 OR LESS
LIBBY
3,500
ENORIE CONCRETE PRODUCTS
875 1*00
DAREX/HORN/SERVICISED/RPC
1,250
09*005
- ARP FORECAST ->0
Ji+l 2R0DUCTS DIVISlOB
sriaation Amount . Per Unexpended :A Aaeuct
5U
27
20
Schedule of Expenditure!
1970
1971
1972
19T3
197^
$ 5
27 20
Page It of 5
% Return On GCZ
PayOut Tine
51 57 133 162 335
301
000 1*50 U25
500 275
400
250
51 57 133
162
335 50
7.571 $ 730
1,000 % 1*50
1*25
1,300 275 100 350
1,200 $ 600 $ 1*00 200 200 200 100 100 100 300 300 300
094006
TITLE OF PROJECT EXPANDING PLANTS POLYSTYRENE PLANTS TOTAL CAPITAL FORECAST TOTAL CAPITAL EXPENDITURES BEFORE PROBABILITY REDUCTION PROBABILITY REDUCTION TOTAL CAPITAL EXPENDITURES
CAPITAL BUDGET AND FORE CA.
lioooj
REPORTING UNIT: CONSTRUCTION PRODU:
Total Reqd for Project
Working Capital Required
Authorization As: Total Per Unexp*
RCA Asa.
$ 2,070 2.1<00
12.370
$20,9 (1.^
$19.5
094007
r
AW BUDGET AND FORECAST 15000J
* V JTRUCTION PRODUCTS DIVISION
Page 5 of 5
s Author!zat1.on Amount
Total Per Unexpended
ad RCA
Amount
$ 2,070
2.U00
12.370
Schedule of Exoendltures
1970
1971
1972
1973
197**
$ 620 $ 1*50 $ 500 $ 500
900 700 1*00 1*00
1*.970 3.1*00 2.100 1.900
% Return On GCE
PayOut Time
$20,953 (1.1*53)
$19,500
$7,853 (1.1*53) $6.1*00 $5,700 $3.U00 $2.100 $1,900
r
094008
31
CONFIDEN T I A L
CONSTRUCTION PRODUCTS DIVISION V. R. Grace 6 Co.
1970 LONG RANGE PLAN VOLUME II
opy No.: /?
Cambridge, Mass. October, 1969
093QS7
COMT'CTTARY ON 1969 CURRENT ESTIMATE. 1970 BUDGET AND FORECAST CONSTRUCT!ON PRODUCTS DIVISION
a. background
As part of our 1970 Budget analysis, a considerable amount of effort
vas spent reviewing l) tbe various allocations to each of our major profit
centers, and 2) the classification of elements of expense within the F&L's.
This review resulted in several changes in the classification of expenses
end the methods of allocating overheads.
In order to make the 1968 actual results and the 1969 Budget and
Current Estimate comparable with the 1970 Budget and Forecast, the changes in expense classification and allocations were applied to these earlier
f
'
periods. As a result, there are changes in operating profit by profit center
from the 1968 Actual and 1969 Budget reported to New York a year ago. How
ever, the total Construction Products Division remains the same. We believe
these changes result in a more accurate financial picture of each individual
business.
Also, the 1970 Budget and Forecast assumes the continuation of the Darex/
Horn/Servicised business along the same lines as 1969. Our plans for solving
this problem are not yet complete, and ve decided not to reflect any changes
in the Budget and Forecast at this time.
B. 1969 ESTIMATED RESULTS
` 1969 Currest Estimate of Grace share in after-tax profit is $2,029,000, /
which : , $205,000 (9.25) below the 1969 Budget and $166,000 (8.95) ahead of 1968.
n<noss