ASBESTOS SPU LRP GUIDELINES
1977 - 81
1. Assume no increase in plant capacity.
2. Assume RG-600 production capability can be brought on stream as required based upon engineering studies already published.
3. RG-244/SX-24 circuit brought to capacity as soon as required by market demand (Capacity 2100 TPY).
4. Phase out of TJC business?
.
5. Base case - Assume 1976 prices.
6. Take most careful look at 1977.
7. Get 5 year up-dates from:
Montello W. R. Grace Tomoe - ASAP
8. Carefully analyze RG-600 assumptions.
WCThurber:j1 May 20, 1976
UCC 025282
INTERNAL CORRESPONDENCE
M E T A L S DIV 1 $ 10 N
To (Name)
Division Location
Floor Number
Mr. J. D. Thacker
Metals 38th Floor
Copy to
/
270 park avenue, new york, new york 10017
Dote May 19, 1976
Originating Dipt.
Floor Nvmber
Answering fetter date Subject
What has been the average sales price per ton for the Asbestos SPU?
1971 1972 1973 1974 1975 1976 Forecast II
Thanks.
W. G. Thurber
UCC 025.283
CRITICAL ASSUMPTIONS ASBESTOS - LRP 1976 - 1980
I. SALES A. RG-600 sales of 3000 Tons/Year will be achieved by 1980. B. RG-244 sales will grow from 750 tons in 1975 to 2000 tons in 1980. C. Sales prices can be escalated to maintain current margins.
II. PRODUCTION A. Production costs will grow at no greater rate than provided
by the inflation factors used. III. OTHER
A. We and our customers will be able to cope with regulatory problems related to asbestos toxicity.
B. Upgrading the business can be accomplished with limited annual expenditures for technology (i.e. on the order of $100 M/Yr.).
UCC 025285
NY TLX 4 15
5-21-76
CAIELL1/SOARES/PELLEORINO UC BRAZIL SAO PAULO
FLS PROVIDE BY MAY 27 YOlR BEST ESTIMATE OF RG-244 REQUIRE
MENTS FOR EACH YEAR, 1977 TO 1981*
MATERIAL FOR RESANA AND CIBA/GEIGY SHOULD BE READY BY MAY 23
AND WE WILL BOOK ON FIRST AVAILABLE SHIP*
THANKS AND REGARDS
JOHN L MYERS CALIDRIA ASBESTOS
RECEIVED MAY 2 8 1976
MS
ASBESTOS SPU LRP GUIDELINES
1977 - 81
1. Assume no Increase in plant capacity. 2. Assume RG-600 production capability can be brought
on stream as required based upon engineering studies already published. 3. RG-244/SX-24 circuit brought to capacity as soon as required by market demand (Capacity 2100 TPY). 4. Phase out of TJC business? 5. Base case - Assume 1976 prices. 6. Take most careful look at' 1977. 7. Get 5 year up-dates from:
Montello W. R. Grace Tomoe - ASAP 8. Carefully analyze RG-600 assumptions.
WCThurber:j1 May 20, 1976
UCC 025288
GRADE
1977 NQNTY.MLBSN
SG-100 AS-200 HPP-EX HP0-EX
T- 13SNPN RG-- 1 44 RG-244 SUPER VISBEST0S
TOTAL
3NOOO 2,000 3,900 8 00 770
240 180
220 11,110
19 78
1979
1980
1981
\ Q, TY.MLBSN NGiTY.MLBSWG, TYMLBSWG, TY.MLBSN
3, 500 2, 100 4, 400
900
830 260
200
4, 000 2, 200 4,8 00 1, 000
890
230 220
260 12, 450
300 13, 690
4, 500 2, 300 5,200 1, 100
950 300
240
340
14,930
5, 000 2, 400 5, 600 1, 010
320 320
260
,38 0
1 6 1 70
IF DA I KEN G0GY0 SWITCHES OVER FROM AS-200 TO SG-100, AS-200 QUANTITY WILL BE CONVERTED T0 SG-100. RG-600 TS NOT INCLUDED IN THIS FORECAST AS TECHNICAL PROBLEM IS NOT YET SOLVED. FUKUMA TOMOE AE