Attached is a copy of Engineering Specification, ,
c-. .>'
Spec .
fS
, Dated __'Page(s) _____________ ___________
which is in final fora for issuing.
If this specification meets your approval, please sign "below and return.
Issuing date has been set for ____(' ~ / C> S [. To meet this deadline this copy must be returned promptly as it cannot "bo issued until we receive your signature as approved.
Note: (PJ on the specification indicates revision.
ST040326 I
APPROVED: NOT APPROVED AS MARKED:
RETURN TO:
Angie H. Barnes Building A-1201
ahb
l/ SC - J O M
_S( _ Soo SC - S7 I SC - S'ZSC-.y
SC - J)Yr 5
SC '> (' '-6/ ^ S 6 - SiC fj C -(5?- S
5 C d'd 4
S'C - a '/>
Sc- - SS1 >
SC. \
7
0 C.
/ /
ST0403261
CLASS
c i v s e e o to is
ENGINEERING SPECIFICATION Texas Division
56-557 6-15-68 Page 1 of 2
SPRAYED HOT INSULATION - INCLUDING FINISH TANKS, VESSELS, AND EQUIPMENT
1. INSULATION MATERIAL AND THICKNESS 1.1 The insulation material for sprayed hot insulation shall be Armstrong's Limpet (asbestos and cement) or owner-approved equal.
1.1.1 Grade LW.25 Limpet shall be used for Classes E, F, and G insulation, and Grade LB.8 Limpet for Classes B, C, and D.
1.2 The finished thickness shall be as shown in the table below.
Tamperoture
of Pipf or
Equipment 1" and Under
1U Hi
2
NOMINAL INSULATION THICKNESS NOMINAL PIPE SIZE
3 4 5 6 8 10 12 14 16 IB
20 24
Over 24" & Flat Sort.
1500F to A 1201 F
See J >b s >ecif catii ns
B
1200F to 1001 F
------ 2 It
2V v
100CPF to C 801 F
JT*
-n \*
000 F to D 701 F
70CP F to E 601 F -- 1"
600 F to F 401 F
400 F to G UQ= F
IV
iV
ji
j1 11 1
r
I IL
t" L_
___
i
L_ ^ L -
*?" IV
_\ i1
3V 3" 2" 2" IV 1"
2. ANCHORING DEVICES
2.1 Insulation shall be secured to circular equipment over 3' in outside diameter and all flat surfaces with 10 gauge steel Nelson weld studs, or secured by other owner-approved method. The Nelson studs shall be placed in rows with the following minimum spacing.
ST0403262
ENGINEERING SPECIFICATION Texas Division
56-557 6-15-68 Page 2 of 2
ST0W 3263
2.1 (Continued)
Top side of surfaces, including top of vessels, whether flat, conical, or dished......................................................................
24" centers
Bottom side of surfaces, including bottom of vessels, whether flat, conical, or dished................................................
12" centers
Vertical surfaces, including heads of horizontal vessels.....................................................................................................................................
18" centers
2.2 The studs shall be the same length as the insulation thickness so that when Nelson speed clips are applied, the insulation will be compressed approximately 1/4".
3. APPLICATION
3.1 After the studs, straps, or other anchoring devices have been attached, the insulation shall be spray applied in accordance with the manufacturer's application specifications. The maximum thickness that may be sprayed in one course is 4". Immediately after application, the material shall be tamped with a steel trowel or board to flatten and smooth the surface and to obtain the desired density of 12 pounds per cubic foot. After the required thick ness is obtained, the insulation shall be allowed to dry before the finish is applied.
3.2 While the insulation is dry, a coat of Benjamin Foster's Insulation
Primer, Black 51-03, or owner-approved equal, shall be applied to the insula tion.
3.3 One inch hexagonal Honel wire mesh shall be applied over the insulation and secured to the studs with stainless steel Nelson speed clips. All seams of wire mesh shall be tied, leaving a neat appearance.
3.4 Where insulation is to be over 1-1/2" thick, a layer of 1" hexagonal galvanized wire mesh shall be applied when half of the thickness of insulation has been applied. After the balance of the insulation has been applied, the Monel mesh shall be attached as specified in Paragraph 3.2.
4. FINISH
4.1 A breathing type asphalt emulsion mastic having a dry flame spread of less than 56 on asbestos cement board, in accordance with ASTM E84 test, such as Benjamin Foster's 60-80 Safetee Mastic, or owner-approved equal, shall be troweled into the wire mesh The insulation finish shall be smooth, neat, pinhole free, and shall have a uniform thickness of at least 1/8" after a minimum drying time of 24 hours.