American Society of Heating and Ventilating Engineers Guide, 1930
Examination of Premises and Buildings That all contractors must visit and examine or otherwise be responsible for existing
conditions.
Approval of Sub-Contracts Names to be submitted and approved before sub-contracts are let.
Time of Completion
1. Dates and methods of procedure for any special parts to be completed ahead of general completion.
2. Dates of final completion.
"
3. Liquidated damages.
Extension of Time
Conditions under which additional time will be allowed for completion; to compensate for time unavoidably lost; changes in contract requirements; delays by others, etc.
Extension of Time not a Waiver Extension of time or occupancy of the premises in whole or in part not to constitute
a waiver of the owner's rights.
Unit Schedule
To be furnished for each branch of the work, covering all items of material and labor and footing up to the contract price. For use in checking payments, costs of additional work or credits for work omitted.
Definition of Terms Such as Board, Committee, Owner, Architect, Engineer, etc.
Cooperation 1. Between contractors and with owner as to changes, etc. 2. Rules governing relations between contractors as to water, gas, light, telephone, etc.
Supervision and Foreman Provide for continuous supervision by parties satisfactory to Engineer and subject
to removal if unsatisfactory.
Permits, Department Rules and Regulations
X
1. Compliance with Building, Plumbing, Health and Fire Departments having jurisdiction and with State Codes and rules and with the rules and regulations of the... National Board of Fire Underwriters.
2. Any additional material or labor required to conform to any of these rules and regulations to be furnished under the contract without additional cost.
3. Contractor to secure all necessary permits and pay all fees incident thereto.
Extra Work
To be done upon written orders only, stating cost where possible, otherwise cost to be upon basis of schedule or prevailing market values.
Strikes
To be avoided if possible and settled with dispatch. Patents
Contractor to assume responsibility and pay any royalties for use of patented articles. Payments
When and how made. Final payment not binding as to defective work.
506 .
Chapter 32--Summary of Important Specification Items
Guarantee 1. Regular guarantee. 2. Special maintenance or operation guarantees. 3.. Defects other than normal wear and tear to be made good during the life of the
guarantee.
Material and Workmanship Quality of material and workmanship regardless of manufacturers' trade designations.
Materials to be delivered in sufficient quantities; labor to be competent and both under control of the Engineer.
Samples As required; to be submitted for approval.
Protection 1. Of materials delivered and work in place. 2. Of life and property, including warning signs, guards, watchman's service, etc. 3. Indemnify and save harmless the owner from any suits or claims arising out of
alleged damages.
Insurance Fire and tornado, liability on account of injury to persons or property.
Drawings and Specifications 1. To be used jointly and not separately. 2. Discrepancies to be called to the attention of the engineer before the work is
installed.. 3. Detail drawings. 4. Shop drawings; how submitted for approval.
Engineer's Supervision and Authority 1. All work under Engineer's supervision. 2. Interpretation of plans and specifications to be solely by engineers. 3. Power to manage work if contractor fails to do so satisfactorily. 4. Power to recommend the termination of the contract and employment of others
to complete, if the contractor fails or neglects to properly progress work or abandon the work for three or more days.
5. Disposition of moneys in cases (3) and (4).
Tools and Appliances All derricks, machinery, shoring, scaffolding and tools to be furnished and main
tained by the contractor and removed by him at completion.
Cutting and Patching 1. By whom done. 2. This contractor to give to all other contractors dimensions, location and other
data for chases, sleeves, boxes, etc., to be built in, and in time to prevent delays, other wise to bear expense and responsibility for installing such items later.
3. Repairing and refinishing, as to whom done by and in what manner.
Rubbish and Cleaning 1. Removed by contractors depositing same. 2. Cleaning up building. 3. Cleaning ducts-and flues. 4. Cleaning boilers and pipes.
507