Document mBrQvQ7JJ7VnwDRqp2dE9L7VB

, 1 Hfl NTER-OFFICE'MEMO TENNEOO OIL P&M To D. M. Hersh At Flemington From y. r. Smickle At Flemington Sjejlct Safety Department - Activity Report February, 1984 da-e March 2, 1984 C0= * TO Safety Statistics Month First Aid Minor Restricted Duty Lost Time Total Recordable 0 0 0 0 0 y-t-d 2 0 0 0 0 Goal Total Year 6 1 1 0 2 Y-T-D Incidence Rate 16.7 0 0 0 0 Incidence Rate Goal Total Year 8.0 1.3 1.3 0.0 2.6 Incidence goals are based upon 150,000 exposure hours. Total exposure hours for February is 12,247. Total exposure hours year-to-date is 23,966. Last lost time injury occurred on October 2, 1982. Total exposure hours since last lost time injury is 213,005. II. Inj ury None III. Training A. The subject of employee training for February was Noise Exposure and Hearing Conservation. The complete program included background and introduction, effects of noise upon hearing, anatomy and function of human ear, effects of disease and drugs upon hearing, type, use and care hearing protection devices (including proper selection and limitations), audiometric testing, monitoring and record keeping. B. The sequential topic for the month is Safety Lock-out Procedure. Training will emphasize importance and neces sity of following all lock-out procedures ranging from vessel entry to small electrical devices whether for cleaning or maintenance. TEN 4347 Safety February, 1984 Page 2 IV. ' Safety Items A. In an effort to reduce muscular strain injuries from tightening reactor J-bolts, we will have a one week trial period of a pneumatic impact wrench. The wrench will be supplied by IngersollRand on a trial basis. If successful, the pneumatic wrench will replace the manual thirty (30") inch socket wrench. B. The two (2) Emergency Operating Procedures for the February review and revision are E.O.P. #2, Response to VCM Area Monitoring System Alarms and EOP #12, Use of Self-Contained Breathing Appara tus (Scott Air Pak). WRS:ms TEN 4348