Document mBg9vqZJqQMLeObykBMOXMa14
PLAINTIFF'S EXHIBIT
Bird
Incorporated
bcc: Mr Hardy Mr Maloof
January 15, 1986
Captain B L Runberg Resident Officer in Charge Building 12 Naval Base Charleston SC 29408
RE:
CONTRACT -N 62467-82-C-0496 BUILT-UP ROOF COMPLAINT - BUILDING M766 NAVAL BASE CHARLESTON SC
ROOFER:
HART'S ROOFING COMPANY 1761 SOUTHWICK DRIVE JOHN'S ISLAND SC 29455
Dear Captain Runberg:
This is to acknowledge the receipt of your letter dated November 26, 1985 and Mr. Hart's letter dated December 6, 19 85 pertaining to the roof on building M766.
We regret the delays and inconveniences caused in not responding to your letter sooner.
f
A review of the file on the built-up roof on building M766 shows the four ply roofing assembly was of good quality being applied to a concrete deck with a slope of o" to 1-1/2" per foot. .Mr. Hart's letter of December 6, 1985 quoted the facts to be as follows:
1 - "The materials came directly from the warehouse."
2 - "They were stored in a dry building - 3 stories off the ground."
3 - "The roof was inspected from the start to the finish by the Navy inspectors, Mr. Buddy Haseldon and hi's assistant."
Mr. Marsh, our professional roofing consultant, inspected the roof with Mr. Hart on August 19, 1985. He reports "a few air pockets have shown up since the completion of the roof. The pockets are not large and seem to be between the deck and the base sheet. No leaks from the roof are evident nor have any been reported."
Bird lncorpor.*lc<l/As( Walpole. MAiiAchujetts 02032/?C7i3S6CMHIX
BIRD 011393
Captain B L Runberg January 15, 1986 Page 2
Bird does not have any document that verifies the concrete deck was dry and ready for reroofing with our materials. The following questions are raised:
1 - What was the condition of the concrete deck prior to reroofing?
2 - What precautions were taken to ensure that the concrete did not contain any entrapped moisture?
Bird does not believe it is responsible for the occurrence of the air pockets on the built-up roof in question. Even so. Bird offers to resolve this claim, amicably. We would be willing to contribute towards the roofing materials used to fix the subject roof by splitting the blisters and' repairing them and installing gravity vents, not to exceed $650 ($10 times 65 squares).
Upon the receipt of a signed release. Bird will issue you a check in the amount of $650. Enclosed is a standard release form.
Clifford J Patenaude Division Chemist
CJP/bd
cc:
Mr. Robert Hart Hart's Roofing Co Inc 1761 Southwick Drive John's Island SC 29455
General Contracting Company Inc P O Box 128 Charleston SC 29402
Mr Gib Marsh 457 Vetch Court John's Island SC 29455
Mr G L Haselden Building 12 Code 440.112 Naval Base Charleston SC 29415
BIRD 011394