Document mBdGwyXQre5y08ZEgkmDaOxQ4
SINTERING FURNACE GREAT LAKES STEEL COR? Drawing Series 21296-A
Dec. 9, 1958
. t
Mr. Irv. Holubovaky Chicago
Dear Irr.s
Confirming our telephone conversation and suppleaenting our letter
to Harold Rowley dated Dec. 2, 1958, we enclose herewith a sketch
showing
` applying a carborundum veneer to 10" Detrick
tile.
As explained in our telephone conversation, although v/e can find no record of it locally, we remember htving seen this method applied to our tile in conjunction with boiler walls it the irate line.
There has been no further information received from Great Lakes in regard to further change in design since our telephone conversation.
At present, we anticipate receipt of an order for the roof described in our letter of quotation of Dec. 2. Please proceed on this basis to complete our present drawing 21296-A including a bill of material utilising the flat roof and 12" radial nosea at the bottom of all four walls.
We will uae this installation until such time as we develop a Carborundum Veneer. These oompleted drawings along with a bill of material will enable ua to place an order for tile and castings of sufficient size to keep this unit in operation until we can sell them on our design of the veneer.
I cannot over-emphasize the fact that this engineering is urgently needed on the jobsite.
Tours very truly,
JXZ/bmf Snc. ccs; Messrs. K. T
Harold Rowley 'Walter
J. M. Edgar