Document mBBqM4691rqLXEGmwNLK72jJk
SUBJECT:
ASBESTOS
PAGE: 3 OF 3 LAST REVISED: 11/09/87
UNION CARBIDE CORPORATION TEXAS CITY PLANT
Plant Procedure SH-5.6 Attachment #1
NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR FACILITY CONTAINING ASBESTOS MATERIAL
Description of the facility: k.1 4ar5 QolQma/
'PttoP Mil' t>DC>&7
AS-.So
Estimate of approximate amount of friable asbestos materials present:
(Area in sq. ft. or linear ft.) Mi
tf
Estimation technique used: MfAWfcMkUr sr
Fff t>F P/ftT
Estimated age of asbestos material:
________ -
_________
Location of faci1ity:
&LD6-
Scheduled starting day:
4-- ZM
Scheduled completion day:
- ~2- *7
Nature of planned demolition or renovation:
P-THiftVAz. 4 a)7>
Method to be used (negative pressure enclosure, glove bag, etc.):
yeQfifnoe yffeSSorzX, 'ErfiXtLbSUee .
Name of person that prepared the form: JX,
Q)<L)A-^X^> __________
Location and telephone number:
EXT, S11.Z. $A(l 1^763
Date:
_______________________________________________________________
NOTE:
This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation-operation.
April 1985/Revised November 1987 #0184s
UCTC 18641