Document mB9dMJOxRKo1nNJNKn3jxMNQ0
GRADUATE SCHOOL OF PUBLIC HEALTH
UNIVERSITY OF PITTSBURGH PITTSBURGH, PENNSYLVANIA 15213
BARBER v. PITTSBURGH CORNING COR? ASBESTOS LITIGATION
DEPARTMENT Of OCCUPATIONAL HEALTH
July 29, 1968
Lee B. Grant, M.D. Medical Director Pittsburgh Plate Glass Company One Gateway Center Pittsburgh, Pennsylvania 15222
r7
Dear Lee:
Subject: Port Allegheny Plant, Pittaburgh^Corning Corporation
After our meeting of July 3 I met, a\^he earliest opportunity, with Dr. Belding and relayed the materials relative to the potential h at
stress situation at this plant. The comments by Dr. Belding are en closed and are self-explanatory. \/
With regard to asbestos exposuresVt this plant, it seems to me that the first step should be the^essesjsment of the facility at this point
in time. The U.S.P.H.S. surve^sgc April, 1967 and results from earlier Foundation surveys, Including my own (April, 1966), should not be the basis for current recommendations for alteration of facili
ties. Earlier findings dyf suggest the areas to be looked at closely
and ar_ valuable from thiissN\s^tandpoint.
Therefore, if acceptabJliet! "CUb you. Dr. Belding and I propose that we
spend August 27 at tlje plant. He will drive up on the evening of the 26th, and can;sifnecessary, remain over for the 28th. During this period I would\ia,ce measurements of asbestos dust concentrations
and also check the present ventilation system. Dr. Belding would also make preliminary measurements. The purpose of this trip would be to obtain a cWSr enough view of the situation to propose future detailed studies or design.
The consultation fee during this visit would be $200 per day each plus expenses.^**WmIings would be summarized in a report.
As soon as we receive authorization from you, we will proceed with planning for the visit.
Sincerely, yours.
MC:ng
Enclosure
Ph.c.
IIS DOCUMENT WAS NOT A RECORD Or - -tm iCARIES, INC. DID NOT COME FROM
- -- *>itupntiCATED
aau*' ' "r ' `
""*
' i> .
*v^ *' -
" '
.1
*. UM
\5
'Ml
BARBER v. PITTSBURGH BURNING CuflA ASBESTOS LITIGATION
V. Mortal Ohm frofOMOT if MwtrUI Hyfloao Enclaoorliif Oraduat* Ssbsel of Public Health
thiawlty of Pittsburgh Pittsburgh, Poansylronl* llttl?
Itifcjxti Fart tiltany Pl*at
l-Jorring Corporation
Z her* dlscussad both your Uti^nvtnd $Jr. Holding's latter of *uly 2V ^ith
Hr. ljrrl stoat regarding to* engineering ctlen for asbestos dust control and the ervelnatioo and oootrol if .Mvlroamntal boat otroao. He is delimited that you and Kr. Belding>111 bo able to visit tho Port Allegany Plant on August 86-26, sad >o Will advise thos of your visit.
Z wuald roounaood that j^'oMl^Lorry Griffith only if you have any asocial
royilrswoiits. Otheru^er by-A> copy oi this lettersod your lottur to as ot Jaiy 29 Larry will be,inforaad and sake necessary hotel riservetie:*, %tc. for you and Ur. Balding?"
dinoarsly.
it . B. Stout nr. L. r. uriffith
Dr. H. s. Holding
THIS DOCUMENT WAS NOT A RECORD OF PPG INDUSTRIES, INC. DID NOT COME FROM IT'S FILES AND CANNOT BE AUTHENTICATED
BY PPG INDUSTRIES, INC.
AA 062
J BB 0008727 J