Document mB3pzVOke0xza026gEnKavGn4

M NTRAL.... Engineering MENTvv-. ^ PROGRESS REPORT CEA NO. 1800 AR NO. (DATE | November 16, 1? PRODUCT TITLE Aroclors Increase Liquid Aroclor Capacity DISTRIBUTION CED SECTION MANAGER CED PROJECT MANAGER R. P. Stevens R- S. YateS DIVISION Organic PLANT Krummrich . DIVISION REPRESENTATIVE H . R. Ray O. R. Bailey J. M. Depp M. Dmytryszyn R. E. Emling F. W. Enoch F. J. Holzapfel R. W. Kaltenrieder F. P- LaBelle R. E- Lenz Russell L. Miller E. Negro C. L. Parish A. B. Terry . (2) ORGANIC DIVISION H. C. Carder iJSSL;. Cresce R. J. Stratmeyer W. J. Burkett R. R- Cook/J. R. Fullgraf R. E. Howard SCOPE The addition of 40 M lbs./year of Aroclor 1242 capacity in new, con tinuous facilities is planned. This will permit increased production of other Aroclors in the existing batch system. Additional storage tanks for raw materials and finished goods and an extension of an existing track to supply new tank car loading capability are included. DSW 200675 - C O N F IDE N T 1 A L ' INF O R M A T I Q N THIS DOCUMENT IS THE PROPERTY OF MONSANTO COMPANY AND THE RECIPIENT IS RESPONSIBLE FOR ITS SAFEKEEPING AND'DIS- POSITION IT CONTAINS CONFIDENTIAL INFORMATION WHICH MUST NOT BE REPRODUCED, REVEALED TO UNAUTHORIZED PERSONS OR SENT OUTSIDE THE COMPANY WITHOUT PROPER AUTHORIZATION. . CE- 14 STLCOPCB4058739 Product. Aroclors. Title Data Tabulated As "Of October 31. 1967' Appropriation Current Estimate Date of Estimate Expended & Committed Spent This Month Scheduled Completion On Schedule? MS None MS 1.500 September 18. 1967 MS 48.] MS 12.6 December 1 . 1968 Yes Location . W. G. Krummri rh CFA Nn. 1800 Process Design, % Complete Mechanical Design, % Complete Construction, % Complete % Expended & Committed Design Manpower Construction Manpower AR No. ------ Last Month 15 8 -- 0.3 2 0 This Mo. 25 15 _____ 3.0 6-. 5 0 Instrumentation has been added to the flow diagrams and prelimin ary review is complete on the tank farm and manufacturing area. Definitive piping drawings have been started on the tank farm area and tie-ins to existing equipment have been defined. A preliminary model of the manufacturing area has been made and equipment locations are being finalized. Specifications are complete on tank farm pumps and the tank farm filters are on order. Process design sheets are being developed for the distillation area. Motor control center building drawings are complete and ready for checking and drawing of the rail extension is undearway. R.<S./ Yates vo DSW 200676 STLCOPCB4058740