ENGINEERING BULLE#N
PITTSBURGH PLATE GLASS COMPANY CHEMICAL DIVISION
LAKE CHARLES, LOUISIANA
JOE
BULLETIN NO_____ . Mercury Cell Caustic .Piping!DATE February .22., _196_8
CHARGE P-UoU-1784 _ _
This bulletin is issued to release for CONSTRUCTION four (4) prints each of the below listed drawings.
9E-709.1 9E-710.1 9E-713-1
FULLER-AUSTIN to insulate 2' and 1' steam lines and 2' and 1' condensate lines as shown on PPG drawings listed above.
Piping to be installed by Industrial Construction Co.
Contact Tom Nixon for schedule of work.
Reference: P.0. 106-M
DISTRIBUTION
BULLETIN PRINTS
WORKS MGR,
ENG, SUPT*
CHI E 1' CON. ENG. puhchas'g.
DRAF I"'g. RM.
FIELD ENGR,
ussasocTom Nixc n
SERV CE DEPT*
CM. 1 LEG* ENGR.
Cham >asne
4 1
1
4
1
Hervy
1
P-4oV Stick Pile
P.CL -File__________ 2________ ___________
1
. 1_ _
BM
i,sJ}o77a79 7
XX " X .V ,
ENGINEERING DEPARTMENT