Document knj474nykKbx3G6O00VaKrGJ
FILE NAME Manville JMA
DATE 1972 Oct 20 DOC JMA344
DOCUMENT DESCRIPTION Minutes - Shell Meeting with NICA
Task Force on OSHA
OOT 26 26 1972
28
NICA TASK FORCE ON OSHA Denver Colorado
Manville Corp. October 20 1972
4
-
fileSh= ell
Source JMA JMA
TheThe NICA Committee on OSHA
ppersonnelersonnel of the Shell
ThTe he following attended
Oil the
met in Denver on October
Company headquartered in
meeting
20 1972 Houston
with key
Texas
Committee Members
R. A. Stapleton - Manville Don Bradshaw - Corning
J. S. Royer - Young Sales Corp.
Manville
C. W. Wattson Contract Manager
W. B. Reitze Manager Accident Prevention & Industrial
F. J. Solon Vice President Corporate Relations
Edmund
Edmund Edmund
M.
Fenner
Director Environmental Control.
Health
Shell Oil Co.
W. C. Bluhm Hdq Eng - Refineries R. B. Howard Hdq Eng - Chemical Plants Gayden Derickson Mgr Contractor Relations
D. P. Atwood Regional Industrial Hygienist
Tabershaw Asso Dr. J. R. Tabershaw
Through the graciousness of Manville
the meeting was held in
lunch was served
the Corporate Board Room A beautiful and enjoyable
by the staff which administers to the needs and requirements of the
top executives of Manville We all appreciated Dick Stapleton
making this possible
discussion of the problems which will be encountered
After a general
asbestos the Chairman
in complying with the new OSHA regulation on
asked Shell if they would give the others present the benefit of their
studies to date
Bluhm acted as spokesman and using the data they had obtained from
Mr.
at their refineries in Wood River and at their
monitoring processes
Norco Refinery he outlined their results They included installa-
tion removal clean up and fabrication
He asked that these not
additional tests in
be published since they still intend to perform
their refineries as well as in their chemical plants
a
amazing thing about the report was that in monitoring all the
different operations necessary to fabricate
containing pipe covering and blocks the
and install asbestos
highest fiber count
which they accomplished was 4.53 fibers per milliliter
Readings were taken upwind and downwind from the operations as well as on the person of the applicators The readings in the shop were taken with proper dust removal equipment on the saws
In some cases
and in others difference
they they
tried wetting down
did not This did
;
old materials before removal not seem to make a material
\
Bill Reitze who spent 18 months with who made most of the monitoring tests readings concurred with those that he instances he agreed
Dr. for
was
Selicoff him was familiar
at Mt. Sinai and asked if these with and in most
Ed Fenner who is in charge of Environmental Control for Manville and who supervises the taking of fiber readings in the plants as well as as on jobs also concurred in most instances
All parties who are expert in this field then began discussing the
credibility finally was
of the filter list as it is made that it can be as much
now made
The statement
as 300 inaccurate This
certainly shook the members of the Committee
A discussion was then had of when asbestos free materials will be
available
It was the concensus of the manufacturers present that
they would be in full supply by the end of 1973
Mr. Derickson of Shell asked for a few minutes to review Shell's out-
look as far as OSHA is concerned and what they are doing to comply
They are
to their
very much concerned that contractors that will be
NICA will put out recommendations at variance with their instructions
and detrimental to the relations between Shell and their plant em-
ployees They emphasized that they have insulators in their plants
on their payroll at all times and that they hoped we would agree on
people the same recommendations to our
as they give to their
ployees because they also hire independent contractors
em-
The thrust of the whole meeting was that Shell believed that they
the
the
can keep the fiber
law to say that it
lockers clothing
count under will not be
powered air
five 5 and
for
necessary
respirators
therefore interpret the thethe
them provide special to
special special special
doa
The meeting with Shell adjourned at 2:15 p.m. and
with Dr. Tabershaw and Bill Reitze and Ed Fenner
the Committee met This discussion
was to summarize what we had gotten from Shell and to see if we could
agree to relate it to NICA No final conclusion was reached
The Committee then met with Dr. Tabershaw alone to see what could be
done to get our health program started in time to comply with the OSHA regulations
Dr. Tabershaw recommended that we ask for a variance to delay the en-
forcement It is his
of the belief
law as far as that the cost
the monitoring process is
to individual contractors
concerned will be pro-
hibitive and that the present methods of arriving at the fiber count
are inadequate and inaccurate
He believes that we must institute job practices that will effect a lowering of the fiber concentration to a level acceptable to OSHA In other words he recommends getting at the source of the problem rather than trying to prove a negative count of fibers
The meeting adjourned at 4:30 p.m.
Respectfully Respectfully Respectfully submitted
. J. S. Royer
JSR
cc Stapleton
Bradhsaw
Brown
Bayer
Yount
Munsey Munsey Murfin
Pfister
Dr. Tabershaw
Pollock
--
Sartori