Document kmxdj1MmQn1bDbBQnZpXK29VJ

Monsanto TO j ii E. Blavlock - ST T fr~ifT 7* t'&w-V--lVie>x c^ev^ DEC 3 1 SEkeral OFFirES nun R. Allen T. L. Gadwe 11 R. z/Cummings D./M. Gabrls y. T. Matteucci <s(A. M. McGrath... V. V. Varnado fR. E.' Witter - CS7W D. A. Bell L. J. Boesch H. J. Corbett G. M. Ellsworth D. M. Gabrls T. H. Lafferre D. D. Mlckelson J. P. Robb J. E. Rodgers y(J,; -E3NA -M3A -CS7S -F2WC -CS7H pYf 1. Asbestos Direction -- Jim Rodgers, CED, distributed the Piping Standard which identifies non-asbestos gaskets alternatives for Standard Component Groups A-D which is attached. This has been incorporated into the CHS Piping System Users and via General Bulletin in September 1964. All Piping Manuals will have update of Non-Asbestos Standards by 1Q85. The substitutes listed on the attachment do not take into account that special service problems may exist - in product color contamination - and such instances will continue to require Plant/CED efforts to solve. The CED resource person for thi6 area i6 Don Frikken (4-6744) and he is available for assistance. Update by Ron Allen, regarding Fisher status on non-asbestos gaskets for valves indicated that Fisher will be able to meet Monsanto's 12/31/85 target date for alternate materials. The Fisher Lab results otf'fc Garlock 3000 material are positive but will need field testing. R. Allen will keep J. Rodgers current on Fisher progress to allow incorporation into CED Standards. Monsanto currently has 80+ valve vendors which will be required to find asbestos substitutes. Discussions related to a method to monitor the Gasket Replacement Program centered around color coding_nf [|mi J non-asbestos gasketSj^-ReeogglZing that our locationsprBbably pave"a variety of ways to manage this program we would like to\ share these by requesting the plant locations to forward a copy ) of their individual approach to Don Frikken (CS7H) and the .appropriate MMC-SC representative^Thir'ated Should Ee ' considerea~T a topic fe-r-Xhe^pf^posed May 1985 Mechanical Equipment Conference. (ACTION: MMC-SC to notify OpCo locations regarding replacement/monitoring approaches for forwarding.) c 000408 LAM022317 I J J 12/20/84 MEETING MINUTES Other Items related to non-asbestos gasketing included: a Rodgers to summarize a typical gasket suppliers testing procedures and forward to MMC-SC members. The "Stop Purchase" language in the CED Bulletin was to alert CED Purchasing to double check request for non-asbestos gaskets; Rodgers will modify. 2. HAZMAT - Update was presented by D. Gabris indicating that all 4Q84 modules are in production and on schedule at an expected 1984 expenditure of $90K vs $112K Budget. Detail update is attached. Gabris presented Module 4 -- Tank Truck Loading -- to the MMC-SC. The module was well presented in content and visual format reflecting a professional effort that will aid our locations in training plant personnel. This module included a method/time to Incorporate plant specific procedures into the module demonstrating the flexibility built into the overall training program. The only request for assistance was to encourage the OpCo/Div. Distribution Representatives to review the module text quickly. Gabris reports continued excellent plant assistance in module preparation. 3. Safety Audit Task Force - Discussion by Witter indicated that the Task Force Meeting on 12/21 would be the first full meeting of the group. The hazardous materials have been prioritized as have the key locations that handle these materials and audits will be scheduled -- locations are already reviewing their status locally and will follow-up with a full detailed audit in accordance with the overall task force recommendation. /Jf Att. M. E. Blaylock c 000409 LAM022318