Document kmqo1Nvn15va6nrz9yRp7q0JE

t : Mv-2 > INTERNAL CORRESPONDENCE ETALS DIVISION 3 (Name) {vision oca tion /oor Number Mr. R. L. Folkman Building 38th Floor opy Or * F. J. Shortsleeve 270 PARK AVENUE, NEW YORK, NEW YORK 10017 Date October 27, 1980 Originating Dept. Floor Number Answer/'ng letter dote Subject 1981 Asbestos Budget The objective set for the Asbestos Business during the St. Louis Budget Meeting is to increase sales income so that rising plant costs are offset, and to project a 1981 percent gross margin equivalent to that now estimated for 1980 (about 30%). The attached revised sales budget will provide the income necessary to meet this objective. The revisions include the addition of new sales; increasing the volume of some existing accounts and increasing prices by an average of 17, 9 percent. John Myers is preparing the necessary requests for authoriza tion to increase prices. The magnitude of the increase in income required to offset the rapidly escalating costs is a graphic illustration of what is happening to energy costs in California. The actual increases in the cost of energy in California are comparable to what is being experienced everywhere in the Western World, but in California a disproportionate part is passed on to industry and the individual consumer is purchasing energy at less than cost* This has happened quickly and its full impact is not yet clear, but California energy intensive industries may already be non-competitive. Increasing prices as required in the 1981 Budget will be a test of King City asbestos products in this respect. A significant part of the increased volume in the revised budget is floor tile filler for GAF. We have supplied some product to two GAF locations since Atlas ceased operation. One location is in the east and it is not possible for UCC to compete with Canadian short fiber at this location. Atlas did compete and perhaps this added to their eventual demise. GAF has always been a price buyer and it is likely that GAF will continue to buy from UCC only until they can work out the technical aspects of switching from Coalinga fiber to Canadian short fiber. UCC 025375 Mr. R. L. Folkman -2- October 27, 1980 All things considered, the risk associated with the budget attached is high. In an attempt to quantify the risk, the price and volume changes bave been rated roughly as to the probability of attainment and the rating are summarized as follows: Sales, M$ Cumulative, M$ Probability of Attainment 1980 Fcst IV 7,317 1,447 80 512 7, 317 8, 764 8, 844 9, 356 1. 00 .85 . 50 .25 This is probably an optimistic assessment. RWR:ac Att. UCC 025376 Calidria Asbestos 1981 Sales Budget (JLM Revised Oct. 27, 1980) Product Budget Tons $M CL Prices, FOB Plant, S/T Current Planned % Increase SG-103-5 (1) -7 (2) -9 SG-104 -130 (3) -200 -210 HPP HPQ (3) RG- 100 -no -144 -244 CSV SHUR <4) UNIVIS Dom. Total 1500 3600 1800 10400 200 360 300 20 740 570 220 400 440 3300 1140 500 2 5490 198 487 238 1206 39 63 75 4 185 399 59 280 1408 594 205 90 5530 122 122 122 106 170 160 220 204 220 560 240 560 2500 160 160 160 132 132 132 116 194 176 250 224 250 700 270 700 3200 180 180 180 8.2 8. 2 -- 9. 1 14. 1 10.0 13. 6 9.8 13. 6 25.0 12. 5 25. 0 28. 0 12. 5 12. 5 -- SG-100-EX -130-EX -210-EX AS-200 HPP-EX HPQ-EX T-135-P-EX RG-144-EX SX-14 (5) RG-244-EX (6) SX-24 Exp. Total 3100 180 0 1100 2640 480 100 250 90 400 570 409 34 0 174 533 120 71 175 44 1212 1054 8910 3826 125 164 144 184 220 648 560 390 2300 1500 132 188 158 202 250 710 700 488 3030 1849 5. 6 14. 6 9.7 9.8 13. 6 9.6 25. 0 25. 1 31.74 23.27 Total 34400 9356 Average Price Increase (1) Assumes 300 Tpm to GAF-lb. and/or Flintkote (2) Assumes 150 Tpm to GAF-VG (3) Assumes no commission to Harwick (4) Assumes Montello finds packager and promotes UNIVIS (5) Assumes $2800/T for TEC and $3000/T for others (6) Assumes price of $1700/T on 10/1/80 and $1900/T on 7/1/81 17.9 UCC 025377 / frajaet 5S-133-5 -7 -f S-!Q4 4 -aw -m * -'~ v -370 -144 _ . -2J CSV . SW, T0HC CAusau asbestos i95i mss worn i&M, Heiftsed WS/OOf ~~ . - - A ., . : - . : '-kSeEg Cl Prices, KB Plant. SJT Current ,W Planned -*** llntrgastt 1500 35 1800 10400 00 360 300 * 26 740 570 m 400 440 3308 1140 586 198 V 238 1206 39 63 75 3, 4 185 399 59 280 .3&&r/"4e% ; 594 205 90 25430 f-X s.2 6.2 9A UA 16.0 ttJi m mm , 9.8 m 250 73.6 560 3,;? v TOO- ' 25 U> . 240 278- 12.5 560 186 25.8 2500 rtjfjiaim-3 3**- \*AT Af,o 160 Jk.< 180 72.5 160 4 180 : 12-5 160 180 ; ' *** : , [ 'f $6480-EX -m** -213-EX *5-206 T-135-P-EX 6^744-0 SM4 Ifi-JO-EX $&-n t. TOTAL m A\jGpa&`s itt / <v fr* * f ^^ Assists 386-7FS to 6W-15 and/dr flfaikote/ Assays 150 TfW tsSftf-6. . '7%.;: -. 77 Assists o coswtlssion to Ksmrfck ;: ; ....... fests&es ftwitella finds packager and preeiotes U819JS Assm I28GG/T for TO and 53000/T for others fesiaaea price of $17SXS/T a 10/1/80 and $1S00/T oa 7/1/81 / 7. 2 "UCC '025378" METALS DIVISION To [Name) F. J. Shorts!eeve/R. W. Rebholz Division UCC-Metals Division Location 38th Floor 270 Park Avenue New York, NY 10017 Copy to G. R. Adams R. E. Byrne, Jr. W. B. DeAtley File P. D. 30X 579 *4625 ROYAL AVE., NIAGARA FALLS. NEW YORK 14302 rOctober 23, 1980 Originating Dept. Calidria" Asbestos 1981 Sales Budget Attached is a copy of our 1981 Sales Budget, which has been increased considerably over the one submitted on 9/9/80. The increases are a direct result of the recent financial performance review meeting in St. Louis. Attached to the budget is a sheet on which I have rated the potential success of certain items, which must be considered when judging the credibility of our performance in 1981. ^pnn L. Myers JLM:dal Attachments UCC 025379 CALIDRIA ASBESTOS 1981 SALES BUDGET-FINAL (J LM, R ev i s ed""Tb7~23/80) Product SG-103-5 O) -7 (2) -9 SG-104 -130 (3) -200 -210 HPP HPO (3)RG-100 -no -144 -244 CSV SHUR (4)UNI VIS DOM. TOTAL Budget Tons 1500 3600 1800 10400 200 360 300 20 740 570 220 400 440 3300 1140 500 198 487 238 1206 39 63 75 4 185 399 59 280 1311 594 205 90 25490 5433 SG-100-EX -130-EX -210-EX AS-200 HPP-EX HPO-EX T-l35-P-EX RG-144-EX SX-14 (5)RG-244-EX (6 > S X-24 EXP. TOTAL TOTAL 3100 180 0 1100 2640 480 100 250 90 400 570 8910 409 34 0 174 533 120 71 175 44 1144 1026 3730 34400 9163 (See attached comments) (1) Assumes 300 TPM to GAF-LB and/or Flintkote. (2) Assumes 150 TPM to GAF-VG. (3) Assumes no commission to Harwick (4) Assumes Montello finds packager and promotes UNIVIS (5) Assumes S2800/T for TEC and $3000/T for others (6) Assumes price of $1700/T on 10/1/80 and $1900/T on 7/1/81 UCC 025380 COMMENTS ON 1981 CALIDRIA ASBESTOS SALES BUDGET Following are my "ratings" on certain products on the attached 1981 Sales Budget dated 10/23/80, which has been increased by 2000 tons and $703,000 over that submitted on 9/9/80: Product SG-103-7 SG-103-9 SG-104 SG-130 SG-200 S G-- 210 HPO RG-100 It RG-144 RG-244 UNI VIS SG-100-EX SG-130-EX HPP-EX HPO-EX RG-144-EX SX-14 RG-244-EX SX-24 Remarks If Flintkote shuts down, GAF will pickup tonnage To GAF Vails Gate Increased price II II Drop Distributor Commission Increased Price II 11 Increased Volume Increased Price II II M II New Volume 10/9/80 letter from Tomoe Increased Price Increased tonnage Increased Price II 11 II ll M II Increased Volume & Price Ratinq A N-C R-S R-S R-B R-S R-S R-B R-B. R-B R-S N-C B R-B R-S R-B R-B R-B R-S R-B Possible NIFS Loss, $M 0 238 0 0 3 0 0 32 8 10 0 90 79 1 0 2 6 2 0 15 TOTAL $486H Rating Codes: N = New, R - Revision, S = Sure Thing, A = 50/50 +, B = 50/50, C = 50/50 (Please remember that nothing is a "sure thing") JLM: 10/23/80 UCC 025381