GIST meeting notes May 15,2002
Minutes {mm the C-8 DuPont meeting May 15,2002
The meeting began at approximately 10:20 am. Attending were Dave Watkins, George Dasher, and Don Cdss of the Division of Water Resources (DWR), Chris Negley and
Yvonne Anderson, representatives of the WV DEP's Legal Sea-vices, Bill Toomey for the Bureau for Public Health, Roger Reinhart and Karen Johnson of the US EPA Region III,
Steve Williams and Sara Wallace of the Ohio EPA, Aim Bradley (he law finn of Spillman, Thomas, & Battle, and Andrew Hartten representing DuPont.
The meeting began with a discussion of water sampling. Andrew Hartten stated that nearly all survey work was now complete, including return visits to certain residences where sampling was to be done. All sampling work is expected to be completed by the end of the month. May 2002. Sampling has been completed for all targeted wells except those wells that would require extraordinary measures to gain access. Dave Watkins said that those wells would not be sampled unless data from those wells is critical for plume identification- Andrew Hartten went on to briefly discuss the concentration data from the sampling events. Based on the 2-mfle data results, the GIST agreed to cease
survey/sampling efforts at the current radius extent.
Andrew Hartten then discussed sampling efforts in Ohio within the one mile radius of the
Washington Works facility. The hydrogeology of the Ohio well fields and concentration data from the sampling events were discussed. It was mentioned that some of the highest concentrations of C-8 were found in wells screened in bedrock at elevations of 150 feet above the Ohio River- Bill Toomey asked if the age of the water had been determined. Steve Williams replied that some of the wells in the Little Hocking well field had been chronologically studied, and possibly other sites. The final report regarding public water
supplies is expected to be completed by said end of June 2002.
Andrew Hartten then briefly discussed the wells sampled on Blennerhasset Island. It was
noted that only one of the four wells tested on Blennerhasset Island had been installed to
provide drinking water - the other wells were drilled primarily to provide hydrologic
data. Andrew Hartten stated that only one well on the GE facility used for drinking water
(GE well 30) was sampled, as GE gave permission to access that well only
^^WfSfWSSSS'iWtS
""" " ~"
Preliminary groundwater modeling results were then discussed. Andrew Hartten said that
Mark Kozar of the USGS was also in the process of building a groundwater model of the
Lubeck area and that model domain had closely resembled the domain model DuPont's modeler had put together, giving high confidence in key assumptions these models were
built on. Preliminary groundwater modeling results indicate that hydrologic communication under the Ohio River is very unlikely. This assumption was confirmed by
data taken from boring logs across the Ohio River in the vicinity of Blennerhasset Island. Well draw down data from DuPont, GE, and the Little Hocking PSD also strongly
suggest that no hydrologic communication exists under the Ohio River. Andrew Hartten
said that a groundwater divide under the Ohio River would exist even if DuPont ceased
ASH027898 EID781178
EID781178
\
)
GIST meeting note May 15,2002
all pumping from &eir production wells. Models were shown to support that conclusion.
The modeling report is expected to be completed in mid
* July 2002.
See Comment ft 2
A hinch break was taken at that point. The meeting resumed at 2:25 pro-
Andrew Hartten then briefly discussed the final plans for contaminant plume identification. Andrew Hartten stated that DuPont will add three more monitoring wells at the main plant as per George Dasher's request, and that four new wells were to be installed at the local landfill site. These additional wells should close any existing data gaps. George Dasher asked for five additional monitoring wells to be installed at the Letart landfill site; two of these wells have been installed to date, with the installation of the other three wells to come in the near future. See Comment # 1
|Ohio Rfver surface water sampling
was men discussed. Dave
Watldns stated that sampling of me Ohio River would begin as soon as river conditions
made it safe to do so.
The discussion then turned to air monitoring efforts. Andrew Hartten then briefly discussed air monitoring methodology-
Split sampling issues were then discussed. It was asked if the two labs handling me
samples were "on the same page". It was noted that although there may be some difference in equipment, the procedures used by both labs was essentially the same.
Roger Reinhart said that he wiH farther explore this. Dave Watfdns asked ifthere was a
need for State certification of labs. The general consensus was probably not
Other sampling concerns were then discussed. Dave Watldns stated that some citizens
called inquiring about the possibility of sampling their milk, eggs, soil, or having a blood test done. At present mere is no mechanism to do this as the C-8 sampling protocol is for
a water matrix only. Andrew Hartten said he will get back to me GIST regarding the protocol for detecting C-8 in soil at a later time. Some citizens outside the sampling
perimeter have requested their water to be sampled for C-8. Andrew Hartten said that Exygen has declined to accept water samples from the public due to concerns for sample
chain of custody.
It was determined that no further
expansion ofthe established PSD sampling
g&a^j^S locations was warranted in West Virginia, unless some new data comes in
from the field to support the need for additional sampling. It was decided not to sample
farther oouth downriver ofthe sampling area is warranted. The GIST agreed to
initiatequarterly sampling of the Lubek, Little Hocking WA., and Tuppers Plains PSD's in order to continue C-8 concentration monitoring near the DuPont facility.
* in a note in the margin of this paragraph, Andrew Hartten asks "Is this PSD's?" My recollection of this discussion is that it pertains to sampling in general. D. Criss
ASH027899 EID781179
EID781179
GIST meeting notes May 15,2002 It was noted that some PSD 's farther south may wish to have their water tested- Andrew Hartten said after looking at surface water sampling results and the data from the April sampling events, a decision could then be made as to whether or not DuPont may consider providing training to samplers if the PSD's would cover the cost of sampling and could satisfy chain of custody requirements for Exygen.
Bill Toomey asked if the reverse osmosis at me Lakm, Mason Co. PSD bad good effect at
removing C-8. Pre and post treatment data will be looked at to determine this. The Meeting adjourned at approximately 3:30pnL-Thejiext meeting wiD be held at the
Division of water Resources in Charleston oQJiJy31,20g^t*o discuss contaminant
plume identification. Comment #3 Comment #1 George Dasher pointed out that he had asked for additional monitoring weDs at the
landfiDs, and no additional monitoring wells at the main plant, and that none of the wells
had been installed to date.
Comment #2
This note was attached to the June 3,2002 fax from Andrew Hartten: " Note: Ran into software problem on base map. Final calibration being slightly delayed." Comment #3 Andrew Hartten: "new date yet?" Comments/changes noted in the Andrew Hartten June 3, 2002 fax are in blue
ASH027900 EID781180