Document kmXXyJ3Z7xqEnbbwrYnoGLkRq

MEMORANDUM TO Mr. H. P. Leyendecker FROM SLJBJECT EXXON GETTYSBURG lP ROUGH BILLING - 1978 S/Y PERIOD NEWPORT NEWS SHIPBUILDING DATE FILE NO. T (6 mc.i W. A. Ingham, Jr. January 23, 1979 1. Rough Billing was finally mailed from Newport News on November 30, 1978. 2. Many of the items are unreadable (faulty - xeroxing)._________________________ 3. Although I complained to Lloyd Ware on many occasions in person and via phone on the individual prices, and the disposition of the total cost. He instructed Jerry Allen, a new estimator, to"mail it out as is'.' "They can negotiate it later." Ti The betterment items and tank blasting and coating work interrupted and interfered with general repair items, many of which then had to be worked on overtime, to catch back up. The pricing should, I feel, reflect this. It doesn't. 5. The cost put against many individual items are much higher, in some cases, double the cost of identical items done in 1976, same class vessel. I can appreciate an increase in material and labor, but "double the cost of 1976?" 6. The estimating work on the GETTYSBURG and LEXINGTON was extremely poor, most unprofessional, indifferent. The assigned estimators were brand new young men who were given Tittle to no guidance or superv 7. Some typical comparison figures , 1976 versus 1978. Exxon Gettysburg 1 76 #20 - Main & Emg. Switchboards #21 - Heat Lamps #17 - Rudder Stock Packing #22 - Megger Test Readings #18 - Anchor Chains #40 - Clapper Valves #41 - Sea Valves #47 - Boiler Internal Cleaning #48 - Boiler External Cleaning #52 - Boiler Refractory #26 - Deaereating tank #34 - PVC Valves #32 - Flame Arrestors #33 - Spill Valves #39 - Cathodic Protection #191- Hull Painting '78 $ 2600 - #21 -$3500 1100 - #22 - 1525 920 - #33 - 3565 1240 - #23 - 1925 4320 - #39 -10230 . 1625 - #38 - 4800 13860 - #64 -24300 4890 - #78 - 9500 6550 - #79 -11500' 18720 - #80 -28296 2430 - #48 - 4615 2550 - #72 - 5250 1125 - #73 - 4200 930 - #74 - 1575 4010 - #20 - 6675 46300 #83 -51418 Exxon Lexington #18 - Megger Test Readings #23 - Sea Valves #25 - Clapper Valves #28 - Anchor Chains #36 - Spill Valves 1500 14240 1850 6475 900 BE A WINNER EVERYDAY FOR SAFETY I-M WAI/HPL Page Two January 23, 1979 EXXON GETTYSBURG 8. Meetings with Mr. Guy Via re. above and blasting and coating representatives were held. Promises were made to "get it all together". Lloyd Ware was told to "get with it". Result, none of this was done. Mr. Ware was "out of town" "otherwise busy", etc. The young estimators were for the most part on their own. Note: This problem did not exist when I had estimators like Mel Scruggs, Tim Malloy, C. Reynolds. 9. I am of course aware of the "bottom line - time and material". The reason for this memo is the unprofessional careless distribution of that figure against individual items. I also feel that the built in "fat" of time and material is excessive. I don't like their method of time and material cost control for example. The ship was out of the yard more than three months before I could get prices against additional items which were issued to the assigned estimator early on in the yard period. 10. I would exclude Messrs. Daniels, Shultz, Branch, Braswell, Worthington, Hancock, and Satchel 1, etc. from the above critique. WAI: bt EXX-MOR-002541