.. 'TecH- Crt-. #1 31-JAN-1991 12:29:02.92 9. WILL EVALUATE NEED FOR N2 PURGES ON LUBE OIL RESERVOIRS. NEWMAIL 18. WILL CHECK ON ANALYZER LAG TIME AS OPPOSED TO SAMPLE LAG. 19. HAVE REDUNDANT OXYGEN ANALYZERS; CONTROL LOGIC MUST BE ARRANGED SUCH THAT HIGH OXYGEN TRIP CANNOT BE BYPASSED. 21. NOTE ON PROBLEM WITH 8" PRD SUPPORT. 22. QUESTION ON CONTAINMENT CAPACITY FOR HOLDING POND. 23. INVESTIGATING EFFECT OF PRD BURST ON C2. B. OXIDE STRIPPING AND COMPRESSION 6. INCLUDE LOSS OF SUB 9 8. LOOKING AT INCLUDING SEAL PURGE GAS DELTA P IN TRIP SYSTEM. Press RETURN for more... MAIL> #1 31-JAN-1991 12:29:02.92 NEWMAIL 9. EVALUATING N2 PURGE ON LUBE OIL RESERVOIR. 14. EVALUATING CLOSED LOOP SAMPLING. 18. NOTE THAT FIRE WATER WILL NOT REACH T-8-1 TOP MANWAY. 19. SNUFFING STEAM IS NOT USED. QUESTION ON THIS. SOME SNUFFING MEDIUM SHOULD BE USED. SOME PLANTS USE NITROGEN. 37. SCREWED PIPING IS NOT ALLOWED. C. OXIDE PURIFICATION AND STORAGE 8. PLAN IS TO STRIP INSULATION FROM BOTH PURIFICATION TOWERS, CONDUCT THOROUGH INSPECTION, AND REINSULATE WITH FOAMGLASS. 1992 SCHEDULE. 29. A LIST HAS BEEN MADE AND AFFECTED PIPING IN THE FIELD Press RETURN for more... MAIL> #1 31-JAN-1991 12:29:02.92 HAS BEEN SPRAY PAINTED. CORRECTIONS PLANNED FOR 1992 SHUTDOWN. NEWMAIL 37. EVALUATING GRAPHOIL GHE TYPE GASKETS. D. OXIDE LOADING AND SHIPPING 3. LIQUID AND VAPOR SAMPLES ARE ANALYZED. 6. LIQUID AND VAPOR EBV'S TRIP. LOADING PUMP TRIPS DO A 135806 CONFIDENTIAL 7. MONOGGLES ALSO. 9. HAD TYPE DETECTORS ALSO. 15. VAPOR NOW GOES TO SCRUBBER. 29. MAXIMUM TIME ON-TRACK 1 WEEK. NO RECHECKS. Press RETURN for more... MAIL> #1 31-JAN-1991 12:29:02.92 30. NEED TO RE-EVALUATE PROCEDURES TO MINIMIZE RISK OF EXCEEDING VACUUM RATING OF CARS. E. LABORATORY 3. EVALUATING CLOSED LOOP SAMPLING. 5. CAUTION ON PROBLEM WITH INADEQUATE FLOW TO SEWER AND POTENTIAL FOR BACKING UP. 14. NEED TO ELIMINATE STORAGE OF SAMPLES AT TEMPERATURES ABOVE FLASH POINT. F. UTILITIES 6. POWER ALSO. 9. NOTE THAT USE OF BACK ENTRANCE PROBABLY COULD BE DISCONTINUED. IF NOT IT SHOULD BE MARKED PROPERLY. Press RETURN for more... MAIL> #1 31-JAN-1991 12:29:02.92 23. RECOMMEND THOROUGH CHECK FOR VESSELS THAT HAVE POTENTIAL FOR FLAMMABLE HEAD SPACE AND TAKE APPROPRIATE PRECAUTIONS. 36. DOUBLE CHECK ROAD CROSSING BOP ELEVATION. NEWMAIL NEWMAIL GLYCOL PLANT B. OXIDE PROCESSING 1. CHECK ON BACK-FLOW PROTECTION FOR EO TO MIX TUBE. WE DON'T WANT TO DEPEND ON CHECK VALVES ONLY. MAIL> 00 A 1.35807 CONFTOFNTTAl