Document keydzGkkE07b7Xyx6qDmv8RO
InUr Office
Personnel and Organization Staff April 6, 1981
W. G. Atkins Safety Engineer Sheldon Road Plant
Subject: Asbestoe Screening Test of Settled Dust
The settled dust sample collected from a truss of the second .floor of the former mix room at the Sheldon Road Plant by the plant UAV Health and Safety Representative was analyzed using the National Institute for Occupational Safety and Health asbestos screening test. The result of the test was negative for aBbe6tos.
For future reference the Data Retrieval Number of the sample iB HBL-1217 and the Industrial Hygiene Laboratory Number is 81-0529.
H. B. Lick Senior Industrial Hygienist Industrial Hygiene and Toxicology Dept. Employe Health Services
dt
SCF-FORD-3084
8005 0637
'*
PPOnt iron dv r?nt>r>