Liar.^H-rfa^
PLAINTIFF'S EXHIBIT
DUP-1447
J. F. Kane
J. E. Romano J. E. Sylvanus
p. C. Santos
R. L. Ferris -'N. Li_berman__
J. M'.' Tracy (Del
Edge Moor, Delaware October 11, 1978
TO:
J. D. HALBERSTADT
G. W. TAYLOR J. T. CAVANAUGH J. B. TAYLOR, JR. R. WALDIN T. A. JENKINS A. R. PALLADINETTI
C. S. STINSON, III R. L. COPPOLA E. S. CRAWLEY J. F. LANE J. J. SHEA T. W. CLEGG, JR. K. R. FARRARE W. J. BULLEN, SR. J. REGAN, JR. J. A. TOPEKA W. E. JOHNSON J. M. SCHULER W. D. WHITESELL
T. R. BARTNETT W. A. CHADWICK H. G. SELHEIMER J. SWIEDER J. E. ANGULO R. N. HITCH, JR. R. D. GILLESPIE
R. 0. JONES C. T. MELVIN E. T. O'NEILL W. G. KIRK J. L. WILLIAMS F. W. SKINNER, JR. G. F. SCHMIDT J. P. HOLBACK P. C. SMITH T. F. DAVID R. W. HUEBNER, JR.
N. F. THOMURE J. R. RAUM,"JR.
D. G. WINNINGTON R. L. MC CATHERN
H. RUDINOFF R. B. GLEASON L. W. MOYLE J. A. DEGE, JR. F. F. WHAM, JR. S. W. WITKOWSKI
G. E. BINDER, JR. M. J. DUNBAR H. B. COULTER, JR M. J. KELLY, JR. R. C. BURGE K. A. BERKLEY
A. W. ROESKE E. F. LILLY J. D. SHUKITT, JR A. J. FLEISCHUT H. E. BORECKI, JR
FROM: W. J. ZERBE
ASBESTOS REMOVAL
^
The attached procedure for asbestos removal must be followed. This procedure supersedes the one dated 9/5/73.
Questions should be directed to line organization.
Reference - Engineering Standard S4T.
WJZ:mew Attach.
DUp I 120179
DU 055205
1
Edge Moor, Delaware October 11, H78
ASBESTOS REMOVAL PROCEDURE Rope off the area and install the special signs warning all personnel of the asbestos dust hazard.
2. Whenever possible, completely wet down the material to be removed. Best results are achieved by removing outer cover ing after initial wet down and rewetting area to be worked on.
3. If the area is wetted down, a Welsh *7170 respirator (stores stock) must be worn. Xn areas where a complete wet down is impossible, an air line mask or a self-contained airpak'mask is required.
4. Disposable paper overalls and plastic gloves are to be worn.
5. No smoking, eating, chewing or drinking is allowed in the area and none of these items are to be carried in the area
or on their persons during asbestos removal. 6. All scrap is to be placed in plastic bags, sealed and a .
v
special warning label installed on each bag. The cover
alls and gloves are to be disposed of at the end of each
job or tha end of each day in the same manner as scrap.
After all bags are sealed and labeled, place in the nearest
Dumpster box.
7. All the above special equipment may be withdrawn from the Tool Room.
8. Clean-up should be accomplished by minimizing dusting.
Never use air to blow off equipment, etc.
DUP 1120180
DU 055206
-2A vacuum cleaner will minimize dusting, however, it must be cleaned out after every job and disposed of as outlined in item 6 above. 9. Personal hygiene is important to limit exposure to asbestos dust. A thorough washing of exposed skin and hands should be done at the completion of the job and before any smoking, eating, drinking, or chewing. SAMPLING AND RECORDING 1. Personal dust sampling must be conducted on all asbestos removal jobs. 2. Samples are to be the duration of the job, including breaks and trips outside work area. 3. All monitoring will be handled by the Safety, Health, fi Environmental Department (phone 118 or 182).
s
DUP I 120181
DU 055207
lasaMSM
CC: ?-. K. / M. Kafka
" Q. V/. Taylor N. R. Eley
Edge Moor, Delaware September 20, 1973
TO: "
s J. A. DEGE W. S. WILSON J. P. AZATO J. SWIEDER S. W. NITKOWSKI R. O. JONES' C. L. HARRINGTON J.' L. WILLIAMS ' R. W. STOWE W. A. CHADWICK A. J. FLEISCHUT.
' A. A. DE JONG H. P. ALFRED R. P. ARMSTRONG
T. W. CLEGG i J.`D, ' SEUKITT
.
FROM: W- G. KIRK
R- N- HITCH P.. C. BURGE J. C. CROWLEY . H. R. EVELAND J. H. MUNDEN ' J. WILLIAMS F. W. SKINNIER J. F. RIDDLE N. F. TH0MURE ' R. B. DAVIDSON J. F. LANS W. H.. MATTHEWS. G. R. DENNEY . A. J. CAMPBELL
. **
r/
SUBJECT: ASBESTOS REMOVAL
Attached is the new procedure which must be . fallowed to comply with 0SHA and Engineering Standard . S4T.
WGKsmew
DUP 1120182
DU 055208
Edge Moor, September 5, 13 73
ASBESTOS REMOVAL
In order to conform to the new Engineering Standard S4T and
OSHA regulations, the following procedure must be followed.
1. Hope off the area and install the special signs warning all.
personnel of the asbestos dust hazard.
2. Whenever possible, completely wet down the material to be removed*
3. xf the area is wetted down, a MSA Dustfoe 77 respirator must
be worn. Xn areas where a complete wet-down is impossible, an air line or a self-contained mask is required.
4. ' Disposable paper coveralls and plastic gloves are to be . worn.-
5. . Wo smoking, eating, chewing or drinking is allowed in the area and none of these items axe to be carried in the area
or.on their persons during asbestos removal.
*
. *
,,
6. All scrap is to be placed in plastic bags, sealed and a.' >. .
_ .special warning label installed oh each bag. ' The coveralls
and gloves are to be disposed of at the end of each gob or
the end of each day in the same manner as scrap.- After all
%
hags are sealed and labeled,' place in the nearest Dempster
box.,
,
7. All the above special equipment may be withdrawn from the Tool Hooni. DUP '120.83
DU 055209
Asbestos Hemoval ____9/5/73
S. Clean-up should be accomplished by minimizing dusting. Never use air to blow off equipment, etc-
A vacuum cleaner will minimize dusting, however, it'mustbe cleaned out after every job and disposed of as outlined . . in item 6 above.
.9. Personal hygiene is important to limit exposure to asbestos dost. ' A thorough washing of exposed skin andlhands' should, be done at the completion, of the job and before any smoking, eating-, drinking or chewing..
SAMPLING AND RECORDING 1. All asbestos removal jobs must be sampled. '
2. Samples' are to be the duration of the job,, including breaks'
and trips outside work area..
.
3. . SaninlwS are to. be taken with. ..the.. MSA .galvimstrie vacuum
r"
pump with, a MSA filter #459734, available in the Tool Eoon.
.4. Vacuum punps are pre-set for 2 liters per minute and no adjustment is required. The pump should be clipped to the ' Mechanic's belt with the filter clipped to his shirt collar or pocket.
DUP 1120184
DU 055210
-- ----- '"irniii
-ial
'=:iiir ... litiiB. iiliiilil III rail lii II ill
iiMiililiii--MBMiUMt
- 3-
Asbestos Removal 9/5/73
SAILING AND RECORDING (CONT'D)
5. Sampling record sheets -are also available in the. Tool Room and must' be made out for each job and each man (P&S Fora $57).
6. Temperature and humidity must be recorded on the record sheet. Ciese instruments are also available in the Tool Room. :
7. The Supervisor should periodically check the job site to , '' monitor the sampling procedure.
.8. Completed sample record sheet and other equipment must be
returned to the Tool Room.
,
9. The Tool Room Attendant will mark and seal the .samples and '
make two copies of the record sheet, which, will be mailed
to the Labi.`The third copy will be filed by the Mechanical;
Department Stenographer.
.*
WGK:mev
UP H20I8S
DU 055211
isaai
jjygllj
DU 055212