Document kaygGvgM1Yd49OD8qGgda9JwB
REPORT OF THE PHILADELPHIA DEPARTMENT OF PUBLIC HEALTH
AD HOC COMMITTEE ON ENVIRONMENTAL AND OCCUPATIONAL HAZARDS OF SPRAY ASBESTOS FIBERS
August 31. 1970
,
INTRODUCTION:
In the Fall of 1969 Air Management Services (AMS) learned that
extensive pollution of the environment with spray asbestos fibers was occurring
at a building under construction at 5 Penn Center, as a result of structural
steel fireproofing operations involving the use of spray asbestos material.
Efforts by AMS to persuade the contractors to institute effective measures to
prevent further pollution of the environment met with little success. Subsequently,
with the support of its consultants,-AMS instituted a permit requirement for
the use of spray asbestos materials in future construction and adopted a "total
containment" policy, i.e., that spraying operations must be conducted under
conditions that prevent the escape of any visible amounts of asbestos into the envlronment.
By the Spring 1970, construction work had begun on three other steel structures In the city wherein spray asbestos material was used. Although the
release from those sites of spray asbestos material was, In general, less
serious than that experienced at 5 Penn Center, there were numerous violations
of the "total containment" policy and the result was far from satisfactory.
Meanwhile, the Section of Occupational and Radiological Health of
the Environmental Health Services (EHS) was alerted to the potentially heavy
exposure of construction workers to asbestos fibers. Accordingly, Section,
personnel carried out numerous inspections of the building sites and eventually
concluded that voluntary efforts to control the exposure of workers
E0
asbestos fibers would not succeed without adoption of specific regulations by
SEP 8 1970
HASKELL LABORATOt
DUP 0901497
SC-DP-03060