Document kay1EKedQggMV3M23M24zG91J

Material very dust/ * Three bags vere removed froa the trailer that returned the material and evaluated* (Bag H6a. 72597 manufactured Saturday, Sept, 16, 1967 and 72617 manufactured Monday Sept, 18, 1967). Complaint material vas sprayed through a pole gun using field procedures niques. tech The material vas found to be no dustier than the everyday production run. Out of three bags that were checked, no clouds of excessive dust vas observed, SBS/ec ycc: J, P,' Verhalen B 2. Schleczer J, P, 0*Rourke H, S Gropp I, 1, Bessemer srs