Document kRqON15dbpj417w4v300Lez0
940
CHAPTER 65
A high-pressure cutout is normally required to shut off the com pressor if the head pressure should rise above normal working limits. A rupture disk or pressure relief valve may *1* be re-
quired. Protection from excessive pressure due to fire is required in the form of a fusible plug, soft solder joint in the refrigerant piping, or similar temperature-sensitive safety device.
2. Protective Control*. The control system normally nnntnin* at
least some of the following protective devices to prevent damage,
to system components due to abnormal operation:
:
(a) Compressor Motor: Amperage overload protection, locked-rotor protection, and motor winding protection.
(b) Low-Pressure Cutout: Prevent freeze-up, operation on
low charge, and excessive oil foaming. ' (c) Fan Motor Overload: Electrical overload protection.
* (d) Wiring: Short circuit protection.
3. Capacity Control. On larger units capacity control is pro vided to match fluctuating load conditions. This is accomplished
by one of several means, including multiple circuit systemacom* pressor unloadera, and suction-pressure regulators. Head-
pressure control is also used in this sense, particularly with air cooled equipment where internal loads vary independently of extremely low outdoor ambient temperatures.
Compressor unloaders are discussed in Chapters 13 and 38, suction pressure regulators in Chapter 45. Multiple circuit sys tems are units designed with two or more independent refrigera tion cycles, each powered by its own oompressor, and operated
in steps in accordance with load requirements.
Heating System
Integral heating components of unitary air conditioning equipment include:
(a) Steam or hot water coils using an auxiliary boiler. (b) Electric resistance beaters. (c) Direct-fired heating elements using either ofl or gas.
Steam and hot water coils must be of the non-freeze type where outside air for ventilation will be handled. See Chapter 33 for hating coil design. Direct-fired heating components (oil or gas) resemble duct heaters in basic design. See Chapter 51 for design details.
The use of the refrigeration system as a heat pump, thus eliminating the need for a separate heating component, is also common practice. Heat pumps as such, are not included within the scope of unitary air conditioner equipment, .but, rather fall in the category of unitary heat pump equipment.' See Chapter 66 for further information on heat pumps.-', *,
Mechanical Design
,
Since the design objectives of unitary air. conditioners differ widely, depending upon size and intended application of the, unit, the following check list for design and specification work obviously refers to some special problems only:
1. Cabinet Design. Consider appearance as suitable to location
of unit either in the air-conditioned 6pace or hidden from yiewii
1 of TMt will affect cabinet design with respect, to.
shape, sue, weatherproofing, sound-proofing, and finish,.,
i
Adequate ventilation of compressor and control compartments must be provided. For outdoor matAlbtiWi, ventilation must-,be
accomplished without rain or dust getting at control wiring; or,
contacts.
2. Crating and Skipping. The packaged unit must. be^.designed, to withstand the ambient temperatures and handling it'willtre-f
ceive when shipped by; rail or truck. Maximum ambient tem perature for shipping and warehousing is generally accepted'as 150 F. Where additional strength or'rigidity, is required'for-
shipping purposes only, it is- sometimes leas expensive to strengthen the unit itaeff-than to build the added protection into
thecrate.../
- . ...... ' ;v ,i /
-. Shipping requirements for unitary air conditioners .have not
been established. However, a general set of shake and impact
test' qualifications have been set up by the National Safe.Transit
fkimmitt** and puMished in the National Safe Transit. Program.
The applicable sections of this program can serve as a-.guide for.
1965 Guide And Data-Boole
unit design, unit packaging and shake and impact, testing. Other
considerations include, suitability of the peAegw for, handling,
and stacking during both shipment and- warehousing. - During,
shipment, the unit package may have to support, other, products,,
as well as multiple stacking of the same product. Column huntingi
and maximum permissible stacking heights for warehousing
purposes must also be considered.
Stacking heights of corrugated carton design will be affected*
by loss of carton strength due to high humidity conditions; or wet
floors.
3. Cabinet Insulation Requirement. Insulation is required to
minimize conduction*of beat, both into and out of the'unit
cabinet Insulation-is also required to prevent sweating on the;
outside surfaces of the unit
ARI Standard 210-64, Sub-Section 5.40, lists insulation' effi
ciency requirements at specified test conditions. Condensation-is
not perentted to drip, run or blow off unit
This design-
detail is of particular importance in units destined for attic or
furred ceding locations.
4. Condensate Disposal. On larger units, the evaporator coil
condensate is generally piped to a waste drain. Condensate,
fittings and piping should be generously sized to prevent plugging'
due to the introduction of lint and dirt in the incoming air stream.
For smaller, self-contained air-oooled equipment, condensate
is sometimes disposed of by distributing it over the hot condenser
surface for re-evaporation to the outside air. Performance re-,
quirementa for this type of condensate disposal are. listed in ART
Standard 210-64, Sub-Section 5.50.
'.
5. Service Access. This is of primary design importance, par
ticularly for equipment to be installed in'cramped equipment
rooms, attics or crawl spaces.
6. Field Assembly and Installation Considerations. Problems to
be considered include (a) limitations of material handling equip
ment at the job site, (5) maximum size of doors, elevators, and
stairways, and (c) weight limitations due to maximum floor and
ceiling loadings. Other installation considerations affecting design
are minimum sealing heights,- normal equipment room- size,,
clearance from combustible materials {heating equipment), and
accessibility for field installation of condensate drain. piping,
interconnecting refrigerant piping, leak testing, and electrical
wiring.
,>
7. 'Weatherproofing. For outdoor. units, protection must -be
included against water and snow as well as wind-blown sand and
dust in and sections. Outdoor equipment also is subject to the
problems of safety hazards due to inquisitive children and un
authorized tampering.
.. ; ,
PERFORMANCE TESTING. .
Minimum standards for the performance of unitary air con ditioners have been agreed upon by the industry and are pub lished in ARI Standard 210-64. The approved test procedure for the determination of compliance with these standards.has also been summarized in ASHRAE Standard 37-60. Certified capacity ratings for unitary air conditionere up -to-, 135,000 Btuh are supervised by the Air Conditioning-and Refrigera tion Institute. Details of this program and the method of certification are outlined in the bulletin. Unitary Air'Con ditioner Certification Program Operational Manual, dated December 1962.
Shipping and rough handling tests in accordance with the National . Safe Transit Program are* the generally accepted method of qualifying unite and parkaging for safe shipment.
REFERENCES
* Air Conditioning and Refrigeration Institute, Standard, 210-
64 Unitary Air-Conditioning Equipment...
1 Air Conditioning and Refrigeration * Institute Directory
Certified Unitary Air.Conditioners, current issue.
* ARI Unitary Air-Conditioner Certification Program Opera
tional Manual, December 1962. ....*
4 Unitary Air Conditioner Specifications Issue--Air Condi
tioning, Healing. and Refrigeration Nous (Published Annually,
March Issue)..
* The unitary approach to air conditioning (prepared* by a
Committee of ARI) (Air Conditioning, Healing and Ventilating,
October 1962, p. 57).
................. .... ,
. * R. F. Crossmaa and I.- B. Faigen: Predieting operating costa
for residential air conditioning (American Artisan, March 1955).
CHAPTER 66
HEAT PUMPS
Basic Circuits; Fundamentals; Types; Heat Sources and Sinks; Performance Characteristics; Temperature levels;1. . , System Balance;.Components; Heat Storage
HE term heatpump, as .applied to a year-round Air- charged with refrigerant and sealed at the factory, .or indi
Tconditioning system, commonly denotes a'system`in vidual factory-sealed subassemblies may be connected in the which refrigeration equipment is used in* such a maimer thatfield. Some models are arranged for remote location of the
heat is. taken from a heat source'and given up to the con outdoor-air heat exchanger that serves alternately as evapora
ditioned' space when heating service is* wanted,, and is re tor and as condenser. In appearance and dimensions, casings
moved .from the''space:and discharged to'a hdoi sink wteii of unitary heat pumps closely resemble those of conventional
cooling and dehumidification are desired. Tire thermal .cycle air-conditioning units having equal capacity.
is identical with that of ordinary refrigeration,' but tire'ap
Minimum industry performance standards of unitary heat
plication is equally concerned with`the cooling'effect produced pumps are covered by ARI Standard' 240-64, Unitary Heat
at the* evaporator and*the heating* effect1produced at tire con Pump Equipment, revised in 1964 by the Air-Conditioning and
denser. In some applications, both the heating and the cooing Refrigeration Institute. It applies to factory-made heat pumps
effects "obtained*in the' cycle are*utilized.1 " ........ , * -..
and to matched assemblies, as defined in the Standard,' for
. The heat-piimp principle is'also applied for'purposes other residential, .commercial, and industrial service, butdtisnot
than air'cdHditibning, `such"as:*`riipply of domestic hot water applicable to field-modified cooling units converted to-heat-
in residences and, commercial buildings, recovery, of low- pump operation, or to room air conditioners. The Stand
teniperature heat as.a useful'byproduct* in' mdustrialopera^ ard requires that both heating and cooling capacity, be:ex
tions, and disposal of heat from processes involving* evapo pressed in Btu per hour under.specific conditions,- andi in
ration of 'water or other fluids'at depressed temperature cludes minimum performance standards such as the ability
and pressure. Defrosting of evaporator coils in refrigerating to operate under maximum load conditions or adverse power
systems by intermittently admitting hot gas. directly from and temperature conditions. It also describes-safety codes to
tire cohipressor is"another* application of the heatipump which such equipment should be designed and outlines several
method.* DescriptiOns and 'diagrams* of various'! heat-pump performance requirements that are considered good-practice
systems and criteria'for feasibility are given in this chapter. in the design of either unitary heat pumps or built-up systems.
This standard includes methods of testing as established1 by
Present.Status .
...
.........
;* Even though1the hehfc-pump principle is hot new; extensive*
use of this principle in practical devices has been accomplished
only*since about 1947." *
'*'*
*'". y1
The activities of several industry^ committees has led to the*
publication of information on tire technology of heat^umps^1;1
bibliographic,Mand installation statistics.1--1
1 Large central heat-pumps of modem* design;'within, tire
capacity range* of about' 100. to approximately 1000 `bore1'
power* of compressor-motor'rating; are-now operating in a
substantial number of 'buildings."-Detailed'- information on
tireir design and performance, has been presented in ASHRAE
papere*~*rand in technical thagazines. "'*'
:* 1 '
' Compressor'types employed in-lar^ central'systems vary
ASHRAE Standard. 39-61, Methods of- Testing-far Rating
Unitary Heat Pump Equipment.
'- 'yl
. Window-type, or in-the-wall type heat pumps^* now in fac
tory production in $ to 2 hp size range/'resemble conven
tional units for summer air conditioning, similarly -installed:
Heretofore, the capacity of these units on heating service has
generally been less than that required., in- 'extremely toold
weather to maintain the required temperature within,the
space served adequately by the same unit in summer. Except
in regions having a mild climate, they were useful principally
for interinediate-eeason operation or-' to. supplement .the*
main haating system of the building. Some recently intro-;
duced models, however, have characteristics more suited* to
complete year-round operation.
from one large centrifugal unit `to as many as eight 'multi-
BASIC CIRCUITS
cylinder reciprocating units. `A' single-or central system is generally used throughout tire building, but iri some instances
Fundamentals
the'total' capacity is divided among several separate'heat-*
Since, from the refrigeration standpoint, a heat pump is
pump systems to-'facilitate 'zoning: Both well water and.'air gimilftr to a conventional refrigeration system, its baric cir
are: used- as heat-sources; Compression' i accomplished in' cuit may be represented by Fig. 1. Changeover between heat
two stages for a few recent projects. Frequently, provision' ing and cooling services may be accomplished by, (a) actuating
is made for heating and cooling service to be supplied.
valves in the refrigerant lines, so as to interchange the.posi
multaoeously to separate zones'of tire building?5 " v*`
tions of heat exchangers constituting the evaporator, and .the
.. Unitary-,heat pumps, available. from,or under. develop- condenser, respectively,* in the refrigerant flow circuit; or;.(6)
ment by.many manufacturers, account,for the large majority) by switching the paths of air, water, or other fluid that conVey
of residential and) small, commercial; ipfetallatrona.. Outdoor, heat from source to-evaporator and from condenser to rink,
air,is the.heat source in the:majority:of installations, but, respectively. The interchange function inherent in beat-pump
models are: also.built for well water, .Capacities range.ifrom control led to use of the term reoened-cyde refrigeration during
2 to about 25 horsepower. Both hermeticand open-type eom-. the early development perioduof the heat pump, but this in
presets are.used. 'The .entire:heat-pump.circuit*,may , be accurate name is now obsolete.
Tbs cwserki
laTP Z.4, He*tPnn9&1
The operating* principle'of the heatpump & identical with