Document kRRx2Ngok51O3ZagnYmDNBKD

Dames &. Moore a FRorssuoMAt UMiTsn A*rv6.*mr 8J3S SUMMA AVENUE, SUITE 100, BATON ROUGE, LA 70809 (50*) 767.8399 FAX NO, (30*) 76*-0*5* --------------------- January 8, 1991 Vista Chemical Company Lake Charles Chemical Plant RO. Box 727 Westlake, LA 70669 ATTN: Diane Johnson Re: Proposal Indoor Air Quality Evaluation Lake Charles Chemical Plant DAM Proposal Mo. eniM-im Dear Ms. Johnson: Thank you for the time you devoted to me during my visit to your facility in December 1990. Dames & Moore appreciates the opportunity to present this proposal for evaluating indoor air quality of the Laboratory Building at Vista's Lake Charles Chemical Plant We believe that indoor air quality problems such as those currently being experienced in tbe Laboratory are best solved by an Integrated approach that combines evaluation of the ventilation system, measurement of air concentrations of selected contaminants, and review and evaluation of employees' concerns and complaints. Failure to consider all of these factors could result in misleading conclusions concerning the need for corrective action. SCOPE OF WORK Dames A Moore proposes to evaluate the Laboratory's internal environment by completing the following tasks: TASK 1> EVALUATION OF EMPLOYEE QUESTIONNAIRES The purpose of this portion of the investigation will be to evaluate worker responses to a questionnaire designed to detect patterns which might tend to implicate or rule out potential environmental problems. Questionnaires will be provided to each laboratory occupant and results tabulated without attribution. Results of this questionnaire will be utilized to more accurately focus the follow-up efforts, thereby potentially minimizing costs associated with evaluation of atmospheric contaminants. 0O0O06318 vvv dames &. Moore . .ROPtUtONAl. UMITtD PARTNtRSMIP Ms* Diane Johnson Vista Chemical Company Page 2 ham Proposal No. oi-na-ioas TASK 21 EVALUATION OF HEATING. 1 SYSTEM IAHQN, and AIR CONDITIONING fHYAQ Work to be completed under this task includes a detailed evaluation of the engineering drawings of the ventilation system to determine design configuration. This task assumes that Vista Humect* can provide the required engineering drawings of the ventilation system. Following review of the engineering plans, an on-site evaluation will be made. This evaluation will include verification of the current status of the ventilation system to include ventilation system flow measurements, an evaluation of the location of makeup air Intakes and the amount of outside makeup air entering the ventilation system, evaluation of the proper functioning of filters, drip pans, mid fans, and an evaluation of the cleanliness of the ventilation system. TASK 3t EVALUATION OF LABORATORY AIR QUALITY Under this task, air samples will be collected from selected rooms within the Laboratory and evaluated for chemicals with high utilization and/or high irritant or toxic properties. Additionally, samples will be analyzed for routine indicators of indoor air quality (carbon dioxide, carbon monoxide, particulates). This task will be accomplished on two separate days and sample collection will occur during-perioda^l^axinxum potential for elevated concentrations. We estimate that approximately 20 to 30 samplcjyof chemicals utilized within the Laboratory will be required and Ifae analyticalcbltt are estimated based on this number. . TASK 4s PREPARATION OF REPORT This task will result in a final report that details the findings of Tasks 1-3. The report will present results of samples collected, a summary of the HVAC system evaluation, and a compilation of the results of employee questionnaires. Based on the findings of the study, conclusions will be formulated and recommendations provided to ameliorate problems identified by the survey data. STAFFING AND SCHEDULE Dames & Moore proposes to conduct this evaluation with a mix of protect and senior level personnel The industrial hygiene sampling and evaluation of questionnaires will be performed by a project level industrial hygienist. The evaluation of the ventilation system will be conducted by a senior level mechanical engineer. Overall project supervision will be under the direction of a senior level Certified Industrial Hygienist Dames A Moore is prepared to begin-work within two weeks of authorization to proceed. Return of the signed proposal is sufficient for authorization vvv 000006319 afifc D &. Mames oore A fHOrtiWIOMAt UMlTtD FA*TN*AM, Ms. Diane Johnson Vista Chemical Company Pago 3 DAM Proposal No. 91-154-102B to proceed. The field work is expected to take one week to complete, with sample analysis taking approximately 21 days from sample receipt. The final report can be delivered within two weeks of receipt of sample results. We estimate the final report would be complete and delivered within eight weeks of receipt of the authorization to proceed. FEES Dames A Moore proposes to perform the above scope ofwork on a time and materials basis in accordance with the attached General Conditions and standard Schedule of Charges* We estimate that the above scope of work can be accomplished at a fee of $10,750, inclusive of analytical costs. An analysis of this estimate is attached. Dames A Moore is pleased to have the opportunity to provide this proposal for this interesting and important project. Ifyou concur with this proposal, please sign and return one copy of your authorization to proceed. If you have questions, please do not hesitate to contact me. Very Truly Yours, DAMES A MOORE A Professional Limited Partnership SRB:ces Manager, Industrial Hygiene Health Services Group VVV 000006320 dames &. Moore A mOFWIOS'At UMITTP PARTKEfcSI H.' Ms. Diane Johnson Vista Chemical Company Page 4 DAM Proposal No. 91-1S4-1Q2B X hereby authorize Dames A Moore to begin work on the above described scope of work under the stated terms and conditions and prices. for Vista Chemical Company Title Date VVV 000006321 DAMES &. MOORE A PROnSMONAb LIMITED PARTNERSHIP ESTIMATE OF CHARGES VISTA CHEMICAL COMPANY LAKE CHARLES CHEMICAL PLANT LABORATORY BUILDING SERVICE Site Work (review plana, evaluate ventilation system, conduct sampling, prepare questionnaire) Office (data analysis, repon preparation, typing, etc.) Equipment, supplies, travel, etc. Analytical costs ESTIMATED CHARGES $ 4,000 S3,500 Total $1,250 &2.000 $10,750 VVV 000006322 ^ Dames gl Moore * PROFESSIONAL UWITIO PAJITNIUWf SCHEDULE OF CHARGES UNITED STATES The compeflaapon to Dames A Moore for. our profcagoaai services is Meed upon end measured by the foUowinf eicmenu, which ere computed m hs forth Mow. 1.0 PERSONNEL CHARGES 1.1 Cfciries for employees sre computed by muluplyini the total direa salary cost ofour penoeoet (expremed as an hourly rate) by a tutoro/2.3. The total directsalaryoorshall be* sumequal to (hedirect ptyreU eon(computed bydsv(dia|themhimI payrollcost by 1,940 houra) plus40 peieemofraaraiocovR payrodiiMatnsurancaincidem to emptoymem.sidtleave and otheremployee beacftq. The time oft partner or retread oonsuUaat devoted to Use proper o charted et to tsatfned bold* rate. 14 Tbe 40 percent employee benefit lector a used far work performed by personae! eoigned to oflkm in the United States. For work performed by personnel ia our offices to other oounmaa. it will very Orpsnriiae ott the employee benefits paid la the particular location. 14 When outridethe United States, empioyve^andpangers1 total direct salary ooRwtil be irtnunsri bythe premiumcustomarily paid by other ottwdeoocs Cor work at thattoeattoa. 1.4 Time speat ia either tool or inter-city travel, when travel is ie the imerea ofthe work. will be chaffed fbr la accordance with the forcfoiaf sebadula; whea travetfai by public canter, a maaimua chirp of rifR hours per day will be wank. 24 EQUIPMENT CHARGES 2.1 Computer comm of project eexa will t* billed at a rata of 5143 per each 530 of job charts* fraction thereof. 24 Other Dimes A Moore equipment, if used, will he billed st the rates noted in the Appendix. 3.0 OTHER SERVICES AND SUPPLIES 3.1 Charm for services, equipment and faeflitiee not furnished directly by Dames A Moors, aod any unusual items of expense not customarily incurred ia our normal upereiiocu, era computed as follow* 3.1.1 Cent plus 10 percent includes tiuppin* chariot, subsistence, transportation, printiof and reproduction. Ion* distance eotmnuaieanoft. miscellaneous supplies end rental*. 3.14 Cor plus 15 percent includes turveyiftf sendee*. land dnlfcnt equipment, construction equipment, testin* laboratories, contract labor. 3.14 Cor plus 25 pereem includes aircraft, watercraft, helicopter and marine driliini equipment and operation. 1154 (Utl VVV 000006323 GENERAL CONDITIONS--'FORM D 1.0 S1UZNC 11 Invoice will tmtied every hue week*, pays** upon receipt. unlew otherwise agreed- 5.2 Interest of l Wt per mtmto Ami wt rateallowable bylaw) will be payable os tay amount* not paid wttbin 30 days, payment tfteretfcr co be applied flm to accrued interest and ihen to the principal uapam amount- Any attorney'* fees or other costs incurred in collecting any defendant amount shall be paid by the CUem. 1.3 In the event that die Client requests termination of die work prior to completion of a report. Dames A Moore reserves the right to complete web analyses end records aserenecessary to pise*is filesin ordersod. where considered by it neceovy toprotect its professional reputation co oaoplama report oa the worit performed to data. A termination charge to cow the cost thereof in an amount not to exceed 30* at aU charges incurred up to the date of the stoppage of the work may. st the discretion of Oases A Moots, be nude. 24 WARRANTY AND LIABILITY 2-i Dames A Moorewarrantsthat itsservices sre performed, wiUtm the HmittprrecribedbyiciCJicaa, with the usual thorougfaMreand wmpetetwoftbecoosoltiogprofeesioe, ia accordance with thejteadardforprofemioMl servicessiihetimethoseservtct*are rendered. No other warranty Of wpwwtitrion. dur expressed or implied, d included or intended in its proposals, contra, or reports. 22 Dames A Moore's liability null be limited to injury or to* caused by dm eegltgeace ofDames A Moors, ia jubccturectofl, and/or agents hereunder. Dames A Moore has oclcber created nor contributed to the creation or existence of any hstardoee, radloecuve. toxic, irrttint.potiutagcorotherwisedenjcrorewihsisnns orcondition at thesits,anditscompensatioo hereunder am ao way commensurate with the potential nsk of tit)toy or toss that may be caused by exposures to such rebalances or conditions. 13 Dames A Moore'sfeabiftty forinjuryor loa anting from 0>P4essKal error*or omioiomand/or (2) rsdiarioa nuclear reaction, or radioactive substances orconditions; and/or (3) anyothertoxic. Irritant, pollutant, or waste gases, liquids,or solidmaterialsshall not cetd 13.000 nr cur fee, whichever la frcatcr. 14 DamesA Moore's liabilityforinjuryorlowanting (torn comprehensivefsneraland automobile exposuresshall not exceed S100.000. 15 increased tiabdity limits may be negotiated upon chant's written request, prior ta commencement of services, and agreement to pay an additional fee. 16 The diem agrees to defend, indemnify, and hold Damn A Mooreharmless from any claim, liability, ordefense cost in txcm of the limits determined above for injury or ion sustained by any party from exposures aliefediy caused by Dames A Moore's performance of services hereunder. 17 In theeventthe Client makes a claim against Damn A Moore, at law orotherwise, for any stleged error, omistionorocher act truing out ofthe performance of ia professional services, and to the extern the dear (tilt to prove taeh claim, then the Client shall pay ail emtv including attorney's fees, incurred by Dames A Moore m defending itself against the claim. VVV 000006324