Document kKMw3qOaOK1G31XOJ6rrwOoE

PiL* Copy AMERICAN' 0-2. GAS SIANOARD BOILER INSTRUCTION MANUAL ; NON-PACKAGED BOILERS FLUSH OR DELUXE JACKETS > ' . BP-32942-02 OESIGN CERTIFIED BY AMERICAN GAS ASSOCIATION NOTICE TO INSTALLER AND OF ERATOR THIS BOOK1ET MUST IE AFFIXED ON OR ADJACENT lO THE HEATING EQUIPMENT. 02181 TO THE OWNER: The American-Standard Boiler which has bcci installed for you is the heart of your hydronlc heating system. Its design represents advanced engineering and manufacturing techniques to produce a product which will provide you with heating comfort at the lowest operating Aiiij maintenance cost. The sections arc made of cast iron which is well kaevva for its long life and corrosion resistant properties. When hot water is used as a heating medium, the entire system is filled with water and an expansion tank provides space for the increased volume as the water in the system expands when it is heated. Under no conditions should any boiler be fired unless it is properly filled with water. If a boiler is not in use during the winter season it must be drained or otherwise protected against freezing temperatures. A gas fired boiler uses gas as a fuel. The chemical composition of natural gas is similar to gasoline which is used as the fuel in an automobile engine. The toxic nature of auto mobile exhaust fumes is well known. These fumes are toxic because the hydrocarbon fuel is not completely burned. In u properly adjusted and normally operating gas fired appliance such as a kitchen range, boiler, water heater, etc., the hydrocarbon fuel is burned com pletely, producing harmless combustion by-products, and these products are normally vented to the outside atmosphere. Normal prudence will dictate that the venting system and combustion process of any gas fired appliance be checked periodically to assure that normal operation is taking place. Any abnormalities in combustion or venting of flue products to the outside atmosphere should be promptly corrected. By following the suggestions contained in this manual, you can assume your boiler will function properly for many years. Should any problem arise, contact your nearest AmericanStandard contractor, whose name can be found in the "yellow pages" of your telephone direc tory. AMERICAN STANDARD, INC. Information relative to the rating and fuel requirements is .ocated on the rating plate mounted on the front of the boiler. Please refer to this information and include model number and series number when ordering replacement parts. NOTE: All parts of this boiler have been carefully inspected and packed. See packing and parts list sheet for details. In case of shortage, make sure that all parts have been removed from shipping container and examine packing material thoroughly. If parts cannot be found, report shortage to your dealer, giving boiler size, series number, date, inspector's number and packer's number (See PARTS LIST and packer's check ticket). 02182 NON-PACKAGED G-2 GAS BOILERS INDEX PAGES views and uunensions_________ ______________________________________________ Tappings: location and use 3 Installation Requirements 4 Locating Boiler_________ _______________________________________________' 4 Clearances______________ 4,5 Caution: Piping Heating and Cooling Units 5A Testing Boiler Sections ______ 6 1,2 Boiler Assembly Floor pa-, radiation shield 6 Platework. main burners, manifold 6 Car.o_v___________ 7 Pilot location; location of other burner equipment 8 Jacket9-11 Gas Piping 11,12 Pilot, gas valve, manifold 13 Lighting instructions 13 Piping water boilers 14,15 Piping steam boilers 16 Installing draft diverter 17 Controls_____ _ 17,18 Wiring 18-21 Air For Combustion and Ventilation 22 Filling System With Water 23 Checks Before Starting 2 3 Gas Pressure Adjustment, pilot and main burners 24 Main Burner Air Adjustment 25 Care ar.d Maintenance, Annual 25 Maintenance During Operation 26 Miscellaneous--Important 26 Inspecting and Cleaning Boiler 26 Cleaning Main Burners 27 Cleaning Boiler Sections 27 Cleaning Steam Systems 27 Low water Cutoff Check (steam systems)______________ _________________ 28 Caution to Installer and Owner Inside Back Cover 02183 G-2 GAS BOILERS deluxe jacket model with circulator and combn.ation control for forced circulation with tankless heater 1 de luxe jacket model less controls flush jacket mo.'. .-1 less controls NOTE: These views show typical water and steam boilers with and without controls. Many combinations of controls and control systems to meet special requirements are possible $I0 v<e deluxe jacket model with controls for steam G-:2 ratings (natural & propane gas) boiler number far installations from sea taval to 2000 ft * A.GJL ratines net -- 8 = R ratings * input eutput (Btu/hr) (BtWhr) water staam staan (Btu/hr) (aq. ft) (Btu/hr* chimney height diameter (inches) above draftheed (leet) G-2a G-24 G-25 G-26 G-27 G-28 G-29 G-210 G-211 60,000 90.000 120.000 150,000 180.000 210.000 240.000 270.000 300,000 48,000 72.000 96.000 120.000 144.000 168.000 192.000 216.000 240,000 41.700 62.600 83.500 104.300 125.200 146.100 167.000 187800 208,700 ISO 225 300 375 450 525 600 675 750 36,00' 54.000 72.000 90.000 108.000 126.000 144,000 162,000 18C.OOO 4 5 5 6 6 7 7 7 7 10 10 10 10 10 10 10 10 10 setter content (fallens) enter heller 7.6 9.6 11.7 13.7 15.7 17.7 19.7 21.7 23.7 steam boiltr 4.9 6.2 7.6 8.9 10.2 11.5 12.9 14.2 15.5 optional tankless heaters (forced hot water only) 1 = w = H ratings--(gpm) a heater 219* _ 2Vi ___ _ ___ ___ ___ -- heater 222* _ ___ 3 3i/. 3Yj 3V 3V5 3Va 3Vi heater 226* _ _ _ __ 4 4>/ 4 i/b 4Vo 4vj heater 232* __ _ _ ___ __ _ 41/2 4 V4 S For altitudes stove 2000 ft., ratines should be reduced at the rate of 4% tor 1000 ft abov* sea level. Net I = B = R ratings shown are based on a piping a*al ptek uo al- lowance of 1J33 'ex steam and 1.15 for water American Standard should be consulted before se.ectmj a boiler tor installations having unusual piping and pica up n quirements. a Gallons arater oar minute heated Iran 0*F to 140-F with 200'F boiler water temperature. Last two digits designate lineal feet of Tr Fin tubing in heater cc-i Domestic hot water connection size is >?" tor ail healers 02184 I G-2 GAS BOILERS 2 DIMENSIONS WATER HEATER OR TAPPED COVER PLATE OR SECTION. (SEE PAGE 3) EXTERNAL T------------T-T-% . DDHRAAIFTTHMOOOODU | i I r G'230 0NLY ii rW I 5 I i I h*c*-j 3h- A Y "q 3 'a i C) T4i i i 77 TOP VIEW DELUXE JACKE' OLE* n or n or NUM|C sections U"NlS A G-23D 3 \2 13 8 6% C i 4 4 "H G-24D | G-250 G-260 4 5 6 3 16 8 ^6 5 , '9'1 4 19 \3 7>6 5 19 ; \5 22 1 1 ^6 6 19 i G-270 7 6 26!f *3 ''Is 6 19 G-28D G-290 G-2100 G-211D 8 9 10 11 7 29 H H'>,6 7 . 19 H %8 32 16 V, 1 7 j19 H; 9 35 71 '7% 1 8 \10 39 '9 *i* 8 un i NOTE- EXTERNAL ORAFTHOOO IS PROVIDED FOR G-23-0 BOILER SIDE VIEW WATER HEATER OR TAPPED COVER PLATE OR SECTION. i'SEE PAGE 3) FRONT VIEW FLUSH JACKET SIDE VIEW 0>lC* n or n* or NUM0CN SECTIONS UNNCftS A B c 0E G-23F 3 2 1 1 5 % 4 11 5 G-24F 4 3 14 V4 7 V, 5 14 7 G-25F 5 4 17 '/* eV4 5 14 7 G-2SF G-27F G-28F 6 7 8 5 20 V 10V, 6 16 9 6 24 12 6 16 L, 9 7 271* 13V, 7 20'/4 12 G-29F G-2I0F 9 10 8 30Vj IS Li 7 20 \ 12 9 33% 16% 6 25% 16 G-211 F 11 10 37 is'/j 8 25% 16 FRONT VIEW 02185 G-2 GAS BOILERS TAPPING LOCATIONS AND USE TYPES OF LEFT END SECTIONS G0 i poi *1 0 i OI RIGHT END SECTION 'K, -II 1 LESS HEATER (NO 'OVER PLATE) WITH 3" TAPPEO COVER PLATE WITH 0/4" TAPPEO COVER PLATE c 1 c RIGHT SIDE VIEW *Not tapped, forced hot water boilers NOTE: NO TAPPINGS, BACK OF SECTIONS G- Q SSii r12r L_ s/16-18 TAPS TOR FASTENING CANOPY NOTE: All Boilers (except G-23) with Cover Plates on left end section will accept tankless heater. See Table, Page 1. Heaters are for use with forced hot water, only. Steam or gravity water boilers may be converted to forced hot water by changing controls and converting piping system. USE OF TAPPINGS SHOWN TAPPING LOCATION SIZE A 1' A 2 3/4" RECOMMENDED USE Water: High Limit or Combination Control Steam: Optional steam pressure control B 1/2" Water: Temp. Altitude Gauge Steam: Pressure Gauge Tapped on All-Purpose Boilers C 3/4" Only* Optional Use. for circulator (reverse acting) control, standby low limit, etc. Water: Air vent and relief D 3/4" valve. Steam: Pop safety valve* Combination Control or Low E 3/4" Limit, in Heater. Steam: Supply and Blowoff F 3" Water: Gravity Supply: Optional Forced Supply. G 2" Water: Forced Supply Optional Gravity Supply J Drain Cock (left end section 3/4" only) K| 1 1/2" Forced hot water return K2 2" Steam or water return L ^S 1 1/2" Section Drain Plug (Right End Section Only! J 1/2" For steam gauge glass | with low water cutoff 02186 INSTALLATION REQUIREMENTS The complete installation should be made per the latest edition of American National Standard Z21. 30, Installation of Gas Appliances and Gas Piping. obtainable from the American Gas Association. 8501 East Pleasant ValleyRoad, Cleveland, Ohio 44131. LOCATING BOILER For basement locations, when floor is not level, or water may stand, build a level concrete base, at least 3" high. Locate boiler near the chimney used. Locate front, back and sides of boiler for clearance and convenience. CLEARANCES FOR SERVICING AND SAFETY Ml G-2 Boilers are design certified for closet installation with cleara ices shown on the boiler jacket and in the table and sketches below. G-2 Boilers, natural gas or propane, are design certified for use on combustible floors when the Floor'Pan and Radiation Shield are used (See Page 8). G-2 boilers approved installation in utility rooms, alcoves closets . . . anywhere deluxe jacket tap me All G-2 boilers, are A.G.A. de sign certified for closet in* staiietion. Tests show that temperatures of edlacent combustible surfaces will not be excessive when boiler ia installed in a closet type enclosure with the specified minimum clearances. These clearances (see table, below) apply after considering the ready accessibility to the unit for adjustment, repair and replacement of pertt. with the closet door open, there must be e minimum front clearance of It inches. deaifnatisn minimum clearance--(inches) flush jacket and daluaa Jackat, symbol 6-23 daluaa jackat 6-24 thru 6-211 Note: Area of each inlet end ventilating air opening -- l sq. In. for each 1,000 Stub input with a minimum of 100 aq. inches. from top of boiler from front of boiler from flue from beck of boiler from left side from right fide A 8 C D EL ER 56 9 6 3 6 5 24 9 6 2 6 0 For installation on non<ombustlbia floors; for combustibit floors only when equipped with floor pan and radiation shield. 02187 G-2 GAS BOILERS 5 C LjlAkANo.S (continued) A MINIMUM of 6" from external drafthood (if used) and all smokepipe (breeching) to any combustible material must be maintained. Clearances for service access must also be maintained, as listed below. MAINTAIN THE LARGER CLEARANCE (safety or service) when two different clearances are listed. Service Clearances: 1. When a circulator is mounted on the boiler return, allow the necessary access and clearance of wrenches, etc. to service or remove the circulator. 2. Allow AT LEAST -18" between any fixed obstruction and the boiler front, to allow installation and service of burners and pilots. 3. DOORWAYS must be wide enough to allow boiler entrance. 4. SMALL ROOMS OR CLOSETS: Boiler and other appliances (gas water heater, etc.) should be so arranged that one appliance can be removed or serviced without disconnecting or moving the other appliances in the room. 5. TANKLESS WATER HEATER clearance, boiler left side to a wall or other obstruction, must be as follows (minimum): #218 Heater = 15" #222 Heater = 18" #226 Heater = 24" #232 Heater = 31" 5 02188 G-2 G-V BOILER? CAUTION If and when this boiler is used in connection with refrigeration systems, boiler should be 60 installed that chilled medium iS pipcu parallel with wsC hCutlUg bvllCT US;sg appropriate valves to prevent the chilled medium from entering the heating boiler. When hot water heating boilers are connected to heating coils located in air handling units, where they may be exposed to refrigerated air circulation, 6uch boiler piping system shall be equipped with flow control valves or other automatic means to prevent gravity circulation of the boiler water during the cooling cycle. The expansion tank should not be set in a cold or an exposed place. If the pipe leading to or from the tank freezes, serious damage may result. If valve of any description is installed In the piping leading to or from the expansion tank BE SURE THAT IT IS OPEN WHILE THE BOILER IS IN OPERATION. RECOMMENDED BOILER PIPING FOR COMBINATION HEATING & COOLING UNITS 02189 G-2 GAS BOILERS BOILER INSTALLATION Non-packaged boilers are shipped with the boiler sections factory assembled; the rerr.air.inq boiler parts are assembled on the job sice. Installation s.iould be accomplished as follows: Remove packaged boiler or section assembly from shipping skid and place in approximate final location (refer to Page 4, Locating Boiler). TESTING Before piping boiler, plug openings, fill boiler with water, and subject to not less than 10 lbs. nor more than 30 lbs. pressure. Inspect boiler inside and outside for leakage as a result or reakage from handling and shipping. To safeguard accuracy of co.'.-ro1' s'mplied ti boiler, do not install until after test of boiler. This pre caution of testing the joiler will simplify handling of any necessary replacements or adjustments and assist in treating with claims against transportation companies. After test, drain and remove plugs where required, and continue. INSTALL FLOOR ' .N AND RADIATION SHIELD (when used); When the G-2 Boiler is installed on a combustible floor, the floor pan and rad.?*-io . '.ueld (ihown on Page 8) must be installed. T ie :lcor pan is inserted, insulation side up, from below the manifold; it rests on lugs on the end sections, in the position illustrated. The rad -r.tion shield, vlth flanges down , is inserted below the burner access door, to rest on lugs on the end sections, as illustrated. ASSEMBLE PLATEWORK, MAIN BURNERS, MANIFOLD AND CONTROL PIPING (See Pages 1, (. and 8) !. Attach combustion chamber rear plate using two 5/16" x 1" Hex. Head Machine screws and 5/ 16" uat washers provided. Putty between top of plate and sections and at each end of plate to form gas seal. Mount canopy on boiler sections and seal all around canopy with asbestos packing. (Be careful not to push packing under the canopy into the flueway). See Page 7. 3. Attach manifold piping and control assembly to front of boiler with four 5/16" x 1/2" Hex. Head cap screws and 5/16" flat washers provided. NOTICE, Deluxe Boilers - Install Jacket Reinforcement Bracket (Packed in Trim Container) under each manifold bracket when attaching manifold piping. See Figure 1, Page 19. 4. Attach pilot burner bracket and tubing assembly to the main burner marked PILOT with #10-24 x 5/16" round head machine screws. When ribbon type burners are supplied, the pilot burner bracket should be assembled over the end ribbon clamp. See Page 8. 5. Install main burners (with air shutters). Slide each burner UNDER manifold and into boiler. Slide rear (inlet) of burner over orifice spud on manifold, and lift and drop rear of burner into position on combustion chamber rear plate. NOTE: Locate burner with pilot as shown on Page 8. Install radiaLion shield and floor plate when required. See Page 9. 6. Install bur ier access door. (Back retaining clips engage cast lugs on right and left end sections). 02190 G-2 GAS BOILEP.S ATTACHING CANOPY TO BOILER FLUSH CANOPY (for flush jacket) has round vertical outlet shown. DELUXE CANOPY (for DeLuxe Jacket) has rectangular back outlet shown. Place asbestos wicking on outer edge of boiler flue opening and place canopy on wicking as shown above. Insert 5/16" bolts through holes in canopy angle strap, and screw into tapped holes in section, as illustrated. Tighten until canopy compresses asbestos wick and is held securely against boiler top. Make final seal around canopy with boiler putty or cement. 02191 G-2 GAS BOILERS I ct>Om 0".c* 4 UC<*> MUI ct* wui mi r4lMQcA4 * UCTtM M4(l *Om.C* MCT< M*f* *Ow**PM-1 wifap^Of.T**M**O*C**MU K0* Ml** WCTIOM *ou* QQQMQQ ' KCf** *0*lC* QQQQSSQQQQ nTc*JN*THMmqJcKo^* i PILOT IUKNC* LOCATION G TIE ROD ASBESTOS STRIP BURNER ACCESS DOOR RADIATION1 SHIELD. MANIFOLD AIR SHUTTER MANIFOLD BRACKET FLOOR LINE^\ FLOOR PAN* __________________^ * NOTE: RADIATION SMIELO ANO fUOOR PAN FURNISHED (SP1 CIAL ORDER) FOR COMBUSTIBLE FLOOR INSTALLATION 02192 G-2 GAS BOILERS 9 INSTALLATION OF JACKET (Refer to Pages 1 and 2 for views): IMPORTANT: Before installing lacket, plug all unused tappings and install bushings in tappings to be reduced. Remove jacket knockouts over tappings to be used. Jacket must be in place before controls and piping are installed. _FLUSH TYPE JACKET Select L. H. Side Panel (panel with 7-5/8" diameter double knockout) Assemble the Bat Panel to the L. H. Side Panel with #10 x 1/2" sheet metal screws and place the assembled panels in approximate final position, against the boiler. LEAVE ALL JACKET SCREWS SLIGHTLY LOOSE. Assemble the R. H. Side Panel to the Back Panel with #10 x 1/2" sheet metal screws. The design of th. jacket provides for 1" clearance above the floor: place 1" supports under the panels until the jacket assemblv is complete. Assemble the Front Panel to the Side Panels with #10 x 1/2" sheet metal screws. Attach spacer angle (when provided, see Page 10) to underside of Top Panel with two #10 x 1/2" sheet metal screws, then assemble Top Panel with flanges overlapping the front, back and side panels. Insert #10 x 1/2" sheet metal screws for holding top panel, then draw all jacket screws up uniformly tight. Remove jacket supports. Attach lighting instructions, rating and series plates to front panel, over locations shown cn panel, using screws provided. DE LUXE TYPE JACKET Install HORIZONTAL DIVERTER (see Page 17). Install temperature-altitude gauge with 5 3/8" x 1/2" nipple and coupling in Tapping B (see Page 3). Assemble left, right and back panels as for flush jacket (above). Attach drafthood baffle (below draft diverter) to side panels. Assemble upper front panel to right and left panels. Install top panel with flanges overlapping front, side and rear panels. Attach lighting instructions, rating and series plates to front pane!, over locations shown on panel, jsing screws provided. Install removable front panel by hooKing rear side clips over matching clips on side panels, and top rear Tange over drafthood baffle flange. 02193 G-2 GAS BOILERS 1 top pa,;el 2o 02194 G-2 Gy S BOILERS 11 Select L. H. Side Panel (panel with 7-5/8" diameter double knockout). Assemble the Back Panel to the L. H. Side Panel with #10 x 1/2" sheet metal screws and place the assembled panels in approximate final position against the boiler. LEAVE ALL JACKET SCREWS SLIGHTLY LOOSE. Assemble the R. H. Side Panel to the Back Panel with #10 x 1/2" sheet metal screws. The design of the jacket provides for 1" clearance above the floor: place 1" supports under the panels until the jacket assembly is complete. Assemble the drafthood baffle to the side panels with #10 x 1/2" sheet metal screws. Assemble the Upper Front Panel to the right and left side panels with #10 x 1" sheet metal screws. Insert two sheet metal screws through each side panel into jacket reinforcement angles. Place Top Panel with flanges overlapping the front, and assemble to side and rear panels, using #10 x 1/2" sheet metal screws. Attach the lighting instructions and rating plate on the inside of the lower removable Front Panel. Install the lower removable Front Panel (with the angle clips on the rear side near the bottom), engaging the lock clips on the right and left side panels. The turned-down edge on the top of the rear side of the panel locks with the turnedup edge of the drafthood baffle. Remove jacket supports. AFTER JACKET IS INSTALLED, COMPLETE THE BOILER INSTALLATION AS FOLLOWS: GAS PIPING: Install piping from meter per schedule and drawing, Page 12. Piping from main to gas valve runs through hole in left side panel of deluxe jacket. Pipe size from main to gas valve is per SIZE, TEE TO VALVE table. Page 12. All pipe joints must be made using joint compound resistant to L. P. Gases. 02195 G-2 GAS BOILERS 12 GAS PIPE DELIVERY SCHEDULE: Maximum Capacity of Pipe in Cubic Feet of Gas per Hour for Gas Pressure of 0. 5 Psig or less and a Pressure Drop of 0. 3 Inch Water Column Based on a 0.60 Specific Gravity Gas. Nominal Iron Pipe Size. Inches 10 Length of Pipe, Feet 20 30 40 50 60 70 80 90 100 .500 . 750 L.000 L 250 L 500 2.000 132 92 73 63 56 50 46 43 40 38 278 190 152 130 115 105 96 90 84 79 520 350 285 245 215 195 180 170 160 150 1, 050 730 590 500 440 400 370 350 320 305 1, 600 1,100 890 760 670 610 560 530 490 460 3, 050 2,100 1, 650 1, 450 1, 270 1,150 1, 050 990 930 870 PIPE SIZE, MAIN TEE TO GAS VALVE (Size of gas valve inlet) Boiler Number Natural Gas Propane T" G-23 G-24 G-25 G-26 G-27 G-28 G-29 G-210 G-211 1/2 1/2 1/2 1/2 1/2 3/4 3/4 3/4 3/4 1/2 1/2 1/2 1/2 40*TO 60* 1/2 1/2 1/2 1/2 1/2 NOTE: PIPE AND FITTINGS SHOWN ABOVE NOT SUPPLIED WITH BOILER GAS MAIN PIPE (SEE SCHEDULE ABOVE) MANUAL SHUTOFF VALVE (OPTIONAL): COMBINATION GAS VALVE KNOB IS A MANUAL SHUTOFF VALVE (TURN TO OFF) GROUND JOINT UNION DRIP LEG PIPE CAP PIPE TO COMBINATION GAS -* VALVE INLET (SEE TABLE AT LEFT FOR SIZE) ^BLOCK AT LEAST I" THICK TO -"ALLOW FOR 0R1P REMOVAL TFLOOR LINE 1o _ 02196 G-2 GAS BOILERS 13 CONNECT PILOTS: 24 Volt Systems: Connect pilot tubing and thermocouple to combination gas valve. Self Energizing (S. E. ) Systems: Connect pilot tubing and pilot generator wires to combination gas valve. Combination gas valves are internally vented: A pilot vent tube is not used. ASSEMBLY OF COMBINATION GAS VALVE* AND MANIFOLD 24 VOLT SYSTEM 24 volt power for valve operation is supplied by power line through a 24 volt transformer. ASSEMBLY OF COMBINATION GAS VALVE* AND MANIFOLD - SELF ENERGIZING (S. E.) SYSTEM Millivolt power for valve operation is supplied by the pilot generator. ^COMBINATION GAS VALVE (FIVE-FUNCTION VALVE): A pilot safety valve, pressure regulator, ** main manual and pilot shutoff valve and automatic gas valve, combined in one. **The pressure regulator is not used for PROPANE gas (the regulator is installed outside the Boiler) PIPE STEAM OR WATER SYSTEM TO BOILER. See following pages. NOTE: Draft diverter and vent to chimney (See Page 17), and steam or water pipe must be so arranged that there is no interference between vent3 and piping. 02197 G-2 GAS BOILERS 14 PIPING WATER BOILERS (See drawings and fahle = . ?agc I5 ^;0vk) Gravity Circulation Systems A new boiler is usually installed as a replacement in aji existing gravity piping system: connect supply and return mains to boiler as for boiler being replaced. See table below for pipe sizing connections. Use TWO returns, as suggested in table, for G-208 and larger. If existing expansion tank is not serviceable, install compression tank (diaphragm or non-diaphragm) per drawings, Page 15. Forced Circulation Systems - sidential boilers often have the circulator (pump) on the boiler return (see P-ge 1) or the pump may be on the supply (pumping away from the boiler). Lit.icr position is satisfactory for normal residential use. WHEN HIGH HEAD F LvlPS are used, or when RADIATORS SEVERAL STORIES ABOVE THE BOILER are served, the pump(s) should be installed on the supply: this will Keep piping presized and will prevent excessive pressure change in the boiler itself. See Page 15 for pump and compression tank locations and suggestions. Pipe sizes for normal design conditions are shown below. Boiler Size G-2 3 G-24 G-2 5 G-26 G-2 7 G-28 G-29 G-2 10 G-2 11 Gravity Circulation Pipe Size - Inches FORCED HOT WATER FLOW RATES AND PIPE SIZES FOR STANDARD CONDITIONS Supply Main Return Main Approximate Flow Supply & Return Pipe Rate @ 20 F. drop, to Diameter to obtain flow deliver boiler heat rate shown, at normal output water velocity U'> 2 22 22 22 22 3 *(2)-2 3 *(2)-2 3 *(2)-2 3 *(2)-2 5 GPM 7 GPM 10 GPM 12 GPM 15 GPM 17 GPM 19 GPM 22 GPM 24 GPM 3/4" 1" 1" 1 1/4" 1 1/4" 1 1/2" 1 1/2" 1 1/2" 2" *one return on left end, one on right end of boiler 14 02198 G-2 GAS BOILERS 15 PIPING WATER BOILERS PUMP AUTOMATIC AIR VENT l---------------------------------------------------------------------------------------------------------------------------------- ---- Systems using diaphragm compression tank Locate tank near boiler as illustrated (locate on suction side of pump, if pump is mounted on supply main). Use second or larger diaphragm tank to control expansion of water in large piping system. DO NOT ADD A NON DIAPHRAGM TANK. A functioning automatic air vent is re quired. Install as shown, to vent air off top of boiler at Eliminaire. External air control devices are not needed. If bypass piping is used, add automatic air vents in piping system as needed; pump should be mounted in supply main. MON-DIAPHRAM COMPRESSION TANK Systems using non-diaphragm tank 1. Locate tank above boiler as shown. A second tank at the same level, connected to the SINGLE pipe to the boiler, may be added (if needed) to control expansion of water in a large piping system.* 2. USE NO AUTOMATIC AIR VENTS with non-diaphragm tank system. All air in the system after initial venting collects in the tank, to control expansion of water. 3. Avoid piping systems which bypass water around the boiler, when non diaphragm tanks are used: for reliable operation, air must return to the tank and must not be lost through valve packings, etc. *If more tank capacity is needed, a DIAPHRAGM tank can be added, preferably at pump inlet (suction). TANK STEM MUST BE UP, as illustrated, top left. Air must collect in the non-diaphragm tank, only. The system remains NON-DIAPHRAGM: use no automatic air vents. 02199 Q-i. GAS BOIIRS 16 MINIMUM RECOMMENDED STEAM PIPING SIZES BOILER PIPE DIAMETER-INCHES HORIZONTAL RETURN EQUAL OUTLET AND IZING RISER LOOP G-23 G-24 G-25 G-26 G-27 G-28 G-29 G-210 G-211 1 1/2 2 2 1/2 3 1 1 1/2 1 1 1/2 1 1 1/2 1 1/4 1 1/2 RISER SHOULD RISE AT LEAST 13" FROM HORIZONTAL BOILER OUTLET PIPE TO HORIZONTAL OVER HEAD PIPE. BLOWOFF VALVE \ HORIZONTAL OUTLET PIPING --RISER A) The center of the Hartford looop tee should be 2" below the normal water line of the boiler, or 21" above a level floor under the boiler. B) The pipe connecting the orizontal steam outlet to the boiler return tapping is usually called the equalizing loop. The portion of the RECOMMENDED PIPING FOR G-23 or G-24 ILLUSTRATED. NOTE: Larger pipe sizes may be used, if desired. Also see Nat* , below. loop under the Hartford tee A is full of water and is sometimes considered part of the wet return; boiler performance will not be affected if this piping (below A) is the same size as the wet return. However, small diameter pipe will more quickly fill with sediment than larger pipe -- see C below. (c) Tees with nipples and caps (rather than elbows) are illustrated and recommended to allow easy cleaning of the wet return and boiler return horizontal pipes. Tv-se pipes (and the bottom of the boiler) collect all scale and sediment from the system. Capped nipples are easier to remove than plugs. Refer to CLEANING STEAM BOILERS in this boiler manual, for rec ommendations, blowoff, flushing, etc. Blowoff valve and piping should be a minimum of 1 1/4" diameter. Once the system has been thoroughly cleaned, the blowoff valve may be left in place; or it may be removed and the outlet pipe capped or plugged. 02200 G-2 GAS BOILERS D'lSTALL DRAFT DIVERTER HORIZONTAL DIVERTER 17 EXTERNAL (VERTICAL) DIVERTER Slide diverter over collar above jacket, and secure with screws VENT DIVERTER TO CHIMNEY, using vent pipe the full diameter of diverter outlet. Follow recommendations of American Nation Standard Z21. 30. Refer to Z21. 30 if other appliances are vented to the same chimney. NOTE: 1. Vent pipe must not project past inside diameter of chimney. 2. Horizontal pipe should be short (boiler near chimney) and should pitch up toward chimney at least 1/4" per foot. INSTALL CONTROLS Boilers may be ordered for .se with r any different control types and control sys: ms. Oiuv t'-e most frequently used controls and control systems can .e desc ibed in this manual. See following pages. 02201 G-2 GAS BOILERS 18 Wiring diagrams, basic, steam and water, are shown on pages 19, 20 and 21. It is suggested that the installer MARK THE DIAGRAM USED, at the time of installation. If the system design requires a special wiring diagram, a copy of the diagram used should be attached to this manual for later reference. ----------- ------GENERAL RECOMMENDATIONS - CONTROLS STEAM BOILERS (See Paees 1, 3, 16, and below): Install gauge glass and low water cutoff with high limit (pressure) control, pressure gauge and pop safety valve, on tappings and in positions shown. Pop safety valve may also be installed on highest point on steam header, at boiler. 21 1. 24 volt transformer and junction box 2. Pop safety valve 3. Pressure high limit control 4. Syphon connection 5. Low water cutoff 6. Gauge glass assembly WATER BOILERS (See Pages 1, 3. and 19): Install High Limit or Combination Control, other limit controls (if used), temperature-altitude gauge and relief valve in positions shown or suggested. WATER OR STEAM BOILERS: If a pressure limit control is specified IN ADDITION TO the basic controls, that control should be installed on or near the top of the boiler. A syphon connection should be used. See Tappings A (Page 3) FIELD WIRING: A length of listed low voltage cable is supplied for wiring AT THE BOILER of 24 volt or self-energising circuits. Low voltage wiring from boiler to remote thermostat, zone valves, etc., and all line voltage wiring should follow the National Electric Code and local codes or special codes that may apply, using specified wire types (not supplied). 02202 G-2 GAG I 'JILIIRS 19 G-2 GAS BOILERS :1 *2-!1| m iT ; 0@ If1--1 0 20 !i \A ii !'! 0 0 00 ( 0 02204 c-2 ( a: 'ILER5 r! --c 'i- -- J -c V 01 SjGO xl J 7 ti CJI * -I o u. cr! r.1 4 -"L Iji - w 2 c (4 21> -- M- -- --. -r .X -- .T *; . "5 "* <u tr f n, i c Q| J d o 5err- -s :> - 3 u 03 D 44 3S "3 -1 -- ii 0 r C o ^2 i~5 --33a !' - *. *V>i o r. 2o -c* *--C y : - u - 25 w r3 VX (j CL *X 0 X 0) 44 44) 0) 7 ^1 -1 0 *4 > 5^ S* i jj 0) .0 3 U 3 40 iy -- 3.2 U oc 03 z c 4* jr CO H V 41 La 3 O rt d 5 o Jg'rslGS |. 1C S'gS Q U Z S S,-3 2 i |Sa 2Lh z 3 g I ?O C| H d- . * If c. 7> ** y c C M) O c a. Z c xx cc 2 = O o w <d 5 o Q" B gs c ^ O t cC^m.:*> 2 J 4 > <rt 3 V rtl .2 V. -2 w 03 30 It. ?C J c a > 5 bo -U ^ 4-> ** ti 03 -- -- <>f t"- CL 5o >1 u o = Cv * "* c o f'J fr. -! (J 3 In V I1 -- 00 _03 ^** -- n^ c S3*: 0 O 3 C fi J 'j o -n 21 oM *. 2 s{> V u ^!i - -4 --" *C*O -i i 3; 3 * 5 (a 3 -- 9 E "2 S U rj V 0 c."1> .e 0V X r* f < 5,. JI ox ^g E3 3 ^ c e y 4a4 d 44 03 d Ut S or &4 O c o 03 Vi 0 u > > 0) rt co S8 a. n 3 E : b2 u r , a 33 n3 4 03 oU o 03 J! 00 c- fc t ' < I! T. f* * 3i - *: t --k , ,, * W ON* : Vsl| SS i:> iV j*?** * 1 ii< S ! Hif r 4 [[.j;4n*-oOU*n.-l4*!4c. is*'* oS ` 0 c c* \ ;l 8SS?S iS.` 2 -*5 J "a 25.!" iSJsS "y*4 0cW"0lawcufcozoc^u >5s s;*5 lit Hi X 4T ^ 4 ** lifs OnnJ "j2r;*S 2*' 6's5 %** uC f? ri :5^i 0W^0k0l ' 3 C* d ,*5? 1M In 0) .*4g4 T3 U ^d 0 0) CD n m ^ > > > |2 <a t. 0 "ST > cd > 01 d 2*8 2d "5 .ti cri J > !M & I <3 V. M n( 2ao 2 .a g ao o gO \ *+ ^c ^o -u p .0 e -C . . t 5 C O O > rsj * u > U 0J *0 Vi 4) 00 * (4 O xQ cco H 2 a5 o _ 2h nS >3 2S 2-o 2m ^ V ^-, 0 J3 *44>* 3 E <t U uN* *u-t a r. i" * -- *!L o > TT fsj E aU CO .--2 Q *O40N4 t. 3 go a 5 a) <d 3^ s. -O > 1 It V_ 43 >y O *3 %0 .a 4a ^St oS b .0 3_ n |1 *n ; (e 0 c in ts j= ?r Is 3u 3" JC 03 ~ ,s 4*M b3 25 n) " ^g J20 ^VM c 9 u Vi 4> 44 d o* 44 VS3 ^o* gcto 0u) o r. 4 o- c *5 y U < s*) U ,h o *t . . a .t e r c .t r n i Vc iVrI cR JuNi tGs Dn IoArGmRa lAlyM uVs Le '.dN U FA oL r a fvuariltahl.e- lre BI rt ^o rens UA omn ear.ic Iannc luS tdainn gd a rado .n i Inngc .v /ir< le. p*roe ,,see nvtaaltvive es aa. n dTwh iet h c irc u la to rs . c ? ^d p . m c r ^ c a n S ta n d a r d . I n c . ) a n d th e c o n t r o l s y s te m a s f i e l d w ir e d , a r e th e y w ith . c o d e s . M A R K T H P A C T U A L W IR IN G D IA G R A M USED. A N D M A K E 21 02205 I G-2 GAS BOILERS 22 AIR FOR COMBUSTION AND VENTILATION Air must be supplied to the boiler area at a rate to give satisfactory combustion and venting, and enough ventilation to keep surrounding air temperature within safe limits. The following MINIMUM recommendations to meet AVERAGE conditions are based upon American National Standards Z21. 30, Installation of Gas Appliances and Gas Piping. The boiler (and other appliances, such as a gas fired water heater) will probably be installed in one of the three general locations described below. It must be understood that the total amount of air required by appliances, for combustion and ventilation, is THE SAME for all three locations. The differences shown in the minimum size of air openings in the boiler room walls is due to the effect of air infiltration into LARGE rooms, through cracks around doors and windows, etc. ALL AIR FOR COMBUSTION MUST COME FROM OUTSIDE. Buildings tightly sealed and weather stripped allow least infiltration. In such buildings, positive openings from the boiler room direct to the outside are recommended. 1. BOILER IN LARGE OPEN ROOM (basement without partitions, etc.): Normal air infiltration MAY provide enough air for combustion and ventilation. If the large open room is weather stripped and sealed from other large rooms by tight doors and windows, a permanent opening or openings direct to outside must be provided. Opening(s) must have a minimum of one square inch free area* per 5000 Btuh input to ALL appliances in the large room. 2. BOILER IN CONFINED SPACE WITHIN A LARGER ROOM (utility room, closet, etc.) See Page 4 - UTILITY ROOM; Two openings to the larger room are required, each opening of one square inch (minimum) net free area* per 1000 Btuh input to all appliances in the confined space, with 100 square inches per opening a minimum. 3. BOILER IN CONFINED SPACE. NOT OPEN TO LARGER ROOM (closed small boiler room in a basement or laundry room, etc.): Provide two openings direct to outside, one within 12" of the ceiling, and one within 12" of the floor, EACH opening with minimum net free area* of one square inch per 4000 Btuh input to all appliances in the room._____________________________________________ If the room is not on an outside wall, ducts must be run to outside wall openings: OUTSIDE OPENINGS MUST BE DOUBLED to one square inch per 2000 Btuh to all appliances in the room. Ducts must be full sise of openings.__________________________ _ In a basement below grade, the opening for air supply should be ducted to within 12" of the floor. The second opening provides ventilation at the ceiling. * Net free area is always less than total area, if grilles or screens are used (DO NOT USE fine mesh screen). When metal grilles or large mesh screen is used, add 507a to the net free area calculated. If wooden grilles are used, add 150% to net free area calculated. EXAMPLES; Boiler and other gas appliance in confined space, not open to larger room. Total input to both appliances is 175, 000 Btuh. Metal grilles over openings will be used. (1) Net free area, EACH opening - 175, 000/4, 000 = 44 sq. in. Actual grilled opening should be 44 x 150% = 66 sq. in. Two 8" x 10" openings direct through an outside wall will meet minimum requirements. (2) IF ROOM IS INTERIOR, DUCTS MUST BE RUN TO OUTSIDE WALL. Net free area and actual area of each opening must be doubled: 132 sq, in, actual area of each duct and outside opening with metal grille must be provided. Ducts and openings 12" x 12" or 8" x 18" would provide this area. TAKE PRECAUTIONS AGAINST BLOCKING AIR OPENINGS with snow, d ' 02206 G-2 gas boiusrs 23 FILLING SYSTEM (do not fire boiler until filled) STEAM SYSTEMS: Fill to approximately half way up the gauge glass. During normal operation, SLOWLY add any necessary makeup water. Cleaning is recommended after first filling: see CLEANING STEAM SYSTEMS, Page 27. WATER SYSTEMS: (a) Existing open-expansion-tank (tank at high elevation) systems Fill system, to fill expansion tank 1/3 full, set Boiler pressure gauge stationary indicator under movable indicator at this indi cated pressure. (b) standard closed hot water systems - Fill entire system with water; vent or purge air according to the air control system in stalled. Add water to obtain desired gauge pressure for the system design. Set boiler pressure gauge stationary indicator to that design pressure. CAUTION: After steam or water system is filled, the boiler should be fired and the system vented to remove oxygen from the fresh water. CHECK BEFORE STARTING (Gas valve knob in OFF position): Do not turn main gas valve knob to (MI or place system in auto matic operation until these items are checked: 1. Is boiler or system filled with water? 2. Is all wiring completed, per the wiring diagram that applies? 3. Is the draft diverter piped to the chimney? Is the chimney unobstructed? 4. Is air for combustion and ventilation provided for? 5. Has all combustible material been removed from the area? 6. If boiler is on a wooden floor, has floor shield been installed? SHUTOFF AND LIGHTING INSTRUCTIONS: See printed lighting in structions plate on noiier ana on Page 13. 02207 G-2 GAS BOILERS 24 MAIN MANIFOLD, PILOT PRESSURE, AND PTT.rrr FLAME ADJUSTMENT MAIN MANIFOLD - PRESSURE AND INPUT ADJUSTMENT 1. Fire boiler for approximately 15 min. or until at operating temperature or pressure. 2. Shut off gas to all other appliances from the gas meter serving the boiler. 3. R-iad the ratea input in Btuh on the boiler rating plate. Adjust gas pressure regulator to obtain that input, as follows. Ra-ed input is normally obtained at a pressure of 3-1/2 inches of water (natural gas) or 11 inches (Propane) measured at the 1/8 ' tapo;ng on the manifold. * INPUT, BTUH = CU. FT. IN 3 MIN. (on gas meter) .< 20 BTU/CU. FT. OF GAS USED FOR NATURAL GAS OF 1000 BTU/CU. FT.: INPUT, BTUH = CU. FT. (Meter) in 3 MIN X 20, 000 FOR PROPANE OF 2500 BTU/CU. FT. : INPUT, BTUH =CU. FT. (Meter) in 3 MIN X 5 0, 000 TO ADJUST PRESSURE: NATURAL GAS - Adjust regulator in combination gas valve. See instructions furnished with valve. PROPANE GAS - Adjust regulator on gas line external to boiler room. *NOTE: If pressure considerably different from normal is required, larger or smaller burner orifices should be used. PILOT FLAME ADJUSTMENT Normally, no pilot gas pressure adjustment is required to obtain proper pilot flame. Pilot gas pressure can be adjusted at the combination gas valve. Normal input to each pilot is approximate!* 1000 to 1500 Btuh. 24 02208 G-2 GAS BOILERS 23 MAIN BURNER AIR ADJUSTMENT DRILLED PORT burners are normally used with natural gas. To adjust the air setting, allow 5 minutes for the burners to heat up; open the air shutter until the flame lifts off the burner (too much air), then close until the flame returns to the burner. There should be no yellow in the flame. (Orange appearance is caused by lint and dust particles in air and does not affect normal performance). RIBBON BURNERS TZLLOf TIPS (caosxs ciucar FORJUTIORS II BOILER FLOES) LAZT, OXER USER FL4KE ____ EOT EXOUCZ I I 1 I PRDURT AH RLOX-CRXXX FLAMS WRQIO RIBBON BURNERS - NATURAL GAS Adjust air shutter to give sharp blue flame with no yellow. For natural gas, good performance is usually obtained with air shutter set to maximum open position. RIBBON BURNERS - PROPANE GAS Burner flames must be adjusted properly to prevent excessive burner temperatures. Adjust the air shutter to a blue-green inner flame without yellow in flame. (See illustrations). CARE AND MAINTENANCE - ANNUAL THE BOILER AND SYSTEM SHOULD BE INSPECTED AT LEAST ONCE EACH YEAR BY A COMPETENT SERVICEMAN TO INSURE CONTINUED RELIABLE, SAFE OPERATION. 1. CHECK FLUEWAYS, BURNERS AND PILOT for normal combustion and proper alignment. Clean heating surfaces, ports and orifices, if coated or plugged. See following PROCEDURE-INSPECTION b CLEANING section. 2. CHECK CONTROLS AND CONTROL SYSTEMS for proper settings, operation of safety controls, and operation of die complete automatic control system. 3. AIR SUPPLY AND VENTING OF FLUE GAS: Make sure of ample supply of air for combustion and ventilation and complete venting of flue gas. Visually inspect air supply openings and chimney for obstructions. 4. PIPING SYSTEM: Check water or steam piping and gas piping for leaks. Check and service such auxiliary equipment as circulating pumps, control valves, etc. 5. HOT WATER SYSTEM: Check for proper system pressure and control of air. 6. STEAM SYSTEM: Blow down and check low water cutoff; check pop safety valve. Drain off any accumulated sludge, and refill to proper level. Do not drain more water than necessary. Fire boiler to remove oxygen, if fresh water is added. 7. RECHECK GAS INPUT AND BURNER AND PILOT ADJUSTMENT. (See Page 24) 02209 G-2 GAS BOILERS 26 MAINTENANCE DURING OPERATION 1. Check water level or pressure regularly. Add water (slowly) as needed. If water must be added frequently, call a competent serviceman for advice and service. 2. STEAM BOILERS: At least once a month, check the Pop safety valve and low water cutoff. With steam pressure on the boiler POP SAFETY VALVE: Fasten long wire or cord to handle, and (from a safe distance) pull the handle to release steam. If valve does not release steam, shut off all gas and call for ser vict. LOW kATER CVTOFF: Blow sludge from body of cutoff, as covered in instructi-ips furnished wit', cutoff used. S<- Page 28 for checking operation of cutoff. y ISC ELLANEOU.:-IivlPORTANT 1. Do not drain water from either steam or water systems except to remove' sludge, or if there is danger of freezing (long unfired periods during winter), or to perform service. See caution, inside back cover. 2. If fresh water is added, especially complete filling of an empty system, the boiler should be fired immediately to heat the water and drive corrosive oxygen and other gases from the fresh water. Vent and add water as needed. 3. Save all instruction sheets furnished with controls and accessories. Follow these instructions. Keep copies of any special wiring or piping diagrams for the installed heating system, for ready reference. PROCEDURE FOR INSPECTING AND CLEANING BOILER For maximum efficiency and safe operation, burners and boiler flue passages should be inspected at least once a year, and cleaned if necessary. Inspection Procedure: 1. Turn knob on combination gas valve to OFF. 2. Remove lower front jacket panel (deluxe jacket) from boiler. 3. Remove burner access door. 4. Remove burners, lift at the rear, rotate and drop rear between supports, slide toward the back of the boiler u ii.il free of the spuds, and remove from beneath the manifold (disconnect pilot gas tubing as necessary). 5. Check burner gas ports or .-ibbons for '!.it and dirt. 6. Section cleanliness c.-..i V. checked wi- mirror and light inserted in the opening where the burners have teen r : oved. 02210 BURNER CLEANING If burner inspection reveals rust, scale or lint is present, clean as follows: t1. ] Drilled Port Burner Pass a drill of same size as port diamster through the ports, and shake any dislodged material out through the mixing tube. .2 Ribbon Burner Remove ribbon hold down clamps and then remove ribbons Separate ribbons by fanning out, and clean with wire brush. Reassemble to burner. SECTION CLEANING If section inspection reveals soot or scale, clean as follows: 1. IMPORTANT - BE SURE BURNERS ARE OUT OF BOILER BEFORE PROCEEDING. 2. Remove jacket top and canopy. 3. Clean sections with a wire flue brush. 4. Reassemble, carefully locating all parts. 5. Install burners and connect pilot. 6. Follow startup and adjustment procedures given in this manual. CLEANING STEAM SYSTEMS (Refer to pictures, Pages 16 and 18). The grease used to lubricate the cutting tools during erection of a new piping system (or a new boiler on an existing piping system) serves as a carrier for dirt, with the result that a scum of fine particles and grease accumulates on the surface of the water in all new boilers, while heavier dislodged particles settle to the bottom of the boiler.* These impurities tend to cause foaming, prevent the generation of steam, and cause an unsteady water line. This unavoid able accumulation of oil, grease and sediment should be removed by blowing off and cleaning the boiler as follows: install blowoff pipe with valve of at least 1-1/4 inch nominal pipe size, with outlet extended to within 18 inches of the floor, or to drain (see Page 16). , Bring boiler water line to center of horizontal outlet pipe, raise steam pressure and, while burners are operating, open blowoff valve. When pressure drops, close valve and repeat process, adding water at intervals, to maintain proper level. As a final operation, close blowoff valve, bring the pressure in the boiler to about 10 lbs., close main gas valve, and open boiler drain valve to flush out sediment. After boiler has cooled, fill and flush out boiler several times, before filling to proper water level for normal service. Fire boiler with final fill of water, to drive out oxygen. See CAUTION, inside back cover. 02211 G-2 GAS BOILERS 28 LOW WATER CUTOFF-SERVICEABILITY CHECK CAUTION: An operating Low Water Cutoff is vital to protect the boiler against being fired dry. After boiler has been cleaned, a check should be made of the Low Water Cutoff as follows. NOTE: Combination gas valve has built-in delay in opening and closing. 1. Lijjht pilot as indicated in Lighting Instructions. Turn thermostat or operating control to highest temperature. Automatic gas valve should open and main burners light. 2. Open boiler drain cock, and drain water until water level is below center line of Low Water Cutoff. Automatic gas valve should close, as Cutoff switch opens, 3. Refill until water level is above centerline of Low Water Cutoff. Automatic gas valve should open, as cutoff switch closes. 4. See MAINTENANCE DURING OPERATION section. Page 26, for cleaning and maintenance of cutoff. 28 02212 CAUTION tc INSTALLERS and owners 1 The heat transfer surface of this boiler has been carefully designed to give I optimum performance and reliability. However, the presence of contaminants i such as scale or lime, sediment and boiler seallog compound* in the section | waterways may 'Cause premature failure of the sections. | if leaKx occur in the system and are undetected or neglected, fresh water i .replaces the water lost through the leaks. Nearly all water contains ^ dissolved minerals ("lime"). As water is heated in the boiler, the minerals are deposited, mostly at the bottom of the sections directly above the fire. No appreciable amount of lime is deposited in a system with no leaks; but ..when water is hard and makeup water must be added frequently end in large amounts, boiler waterways may be coated with a thick layer of lime within . days ora few wenks of operation. Lime is an insulator, which causes over* beating of boiler /hetal if deposition of lime is not halted, the boiler will fail. To stop lime deposition, stop system leaks. ' Leaks may occur occasionally in any system. These leeks are usually of such . a nature that they can be prevented or corrected by good workmanship. Every 1 effort should be made to correct them without the use of boiler sealing compounds. . If compounds are used, they should be used as sparingly as possible, and never in cxcaae of manufacturers recommendations. Following use, the boiler must be flushed out thoroughly, or serious damage is likely to result. Sediment which may accumulate in the boiler should be flushed out in accordance ` with recommended maintenance practices. Excessive use of water should be avoided because of the danger of lime and corrosion buildup. Glycol anti-freeze is sometimes added to system wasex to protect against freezup. Although American Standard can not recommend this practice, we realize that glycol anti-freeze will occasionally be used. Heat transfer through glycol is . poorer than through water: use no more then 50 percent glycol in the system. With any proportion of glycol, radiator output wUl be lower thon with pure water v at the same temperature. 2t.it always better, when possible, to drain the system rather than add anti-freeze , neither th^ heating systemplumbing system water will freeze so long as the jheAting system continues to operate; and the plumbing system is not protected ^ against freezeup when the heating system is off, whether or sot the heating system r f contains anti-freeze. t. ` ' i K(^ast iron is highly resistant to corrosion. However, some propellants used in * Kaerosol cans break down into poison gas and corrosive gas, at high temperatures. | If aerosol mixtures are used near boilers, the aerosol will enter the boiler flame !. and will be heated. Continued use of aerosol cans near heating system boilers 1 -can result in severe boiler beating surface corrosion end possible danger to | -health. 6 i' The installer of this boiler Is responsible for shoving to Che owner operator the location of all eaergency shutoff devices, and Instructing hln is the use of aaeh. 02213